1 1 1 eresource nfra ERP Estimation Module
9

Project Estimation ERP Software - eresource nfra ERP

Aug 04, 2015

Download

nfra erp
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Estimation ERP Software - eresource nfra ERP

1 1

1

eresource nfra ERP

Estimation Module

Page 2: Project Estimation ERP Software - eresource nfra ERP

2 2

2

Estimation of a project cost begins with this page. This is where material items that are required for a project has been entered. While entering the material item, the estimated price of the item will be reflected in the column alongside as per the last purchased rate, which will be fetched from the item master page. Item-line wise cost of each materials will be displayed that can be added up to get the total cost of material required for the project.

Page 3: Project Estimation ERP Software - eresource nfra ERP

3 3

3

BOQ In the quotation provision to add new BOQ is available.

Show list of item and its details which you enter

Save your details

Page 4: Project Estimation ERP Software - eresource nfra ERP

4 4

4

BOQ Services

Add new services

Any additional BoQ Services can be captured from here

Page 5: Project Estimation ERP Software - eresource nfra ERP

5 5

5

Add Material(Tools Rate)

Inventory Category

Default Rate

System generated amount as per default rate set

List of your entered items

Page 6: Project Estimation ERP Software - eresource nfra ERP

6 6

6

Installation (Tools Rate)

System generated amount as per default rate set

List of added items Resource involved in project with their wages

Assign Resources for project

Resources for estimation like wise materials, services, tools, Hiring Rates, Equipment,Subcontractor, items for a BoQ item or all BoQ items can be added from this section.

Page 7: Project Estimation ERP Software - eresource nfra ERP

7 7

7

Subcontract(Hiring)

Select your resource type Unit of Measurement Auto generated amount

It is a common practice for project-based companies go for hiring services as all the services may not be functioning under their wing. Or sometime they are forced to hire equipments that are also considered services. Any hiring services that are hired by the company can be estimated and managed through this page, which will be ultimately reflected in the final estimate.

Page 8: Project Estimation ERP Software - eresource nfra ERP

8 8

8

Add on MasterIncurring additional expense is a common scenario as far as a project-industry work is concerned. Additional cost like freight, loading, unloading, commissions cannot be avoided and these expenses, which falls under the additional expenses or Add on charges can be included in the final estimation using this module.

Select add on type Select profit type

Select the category on which you want to rate your user

Page 9: Project Estimation ERP Software - eresource nfra ERP

9 9

9