Location Data Country City Indonesia Solo : : Kitchenette Basic Parameters Car Parking Type of Retail Site Area Light Industry 6,678 m² Outdoor Car Parking Yes m² Yes Landscaped Area : : : Use 3 Shift (24hrs, 6d/wk) : Project Details Project Name Number of Distinct Buildings Number of EDGE Subproject(s) associated GALERI KERAJINAN TANGAN KHAS JAWA TENGAH DI SEMARANG 2 1 : : : Total Project Floor Area 3,245 m² : Project Owner Name Project Owner Email BEKRAF [email protected]: : Project Owner Phone Mobile 62-85742227828 : Address Line1 Address Line2 City State/ Province Postal Code Country Jl. Madukoro Raya no. 3 Semarang Jawa Tengah 50141 Indonesia : : : : : : Project Number 1000449746 : Associated Subproject(s): galeri kerajinan tangan Share with investor(s) or bank(s)? No : Subproject Name Retail Store Name Subproject Multiplier for the Project Address Line1 Address Line2 City State/ Province Postal Code Country Subproject Details galeri kerajinan tangan handcrafts gallery 1 Jl. Madukoro Raya no. 3 semarang jawa tengah 50141 indonesia : : : : : : : : : Subproject Type New Building : Certification Stage Preliminary : Status Auditor Self-Review : : Certifier : 1 EDGE Version : File Number: Created By: Date Time: 2.1.5 19032010063022 Ane Yoshinta Angestie 15-Apr-2019 22:59:18 Modified By: Project No.: 1000449746 Ane Yoshinta Angestie
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Location Data
Country
City
Indonesia
Solo
:
:
Kitchenette
Basic Parameters
Car Parking
Type of Retail
Site Area
Light Industry
6,678 m²
Outdoor Car Parking
Yes m²
Yes
Landscaped Area:
:
:
Use 3 Shift (24hrs, 6d/wk):
Project DetailsProject Name
Number of Distinct Buildings
Number of EDGE Subproject(s) associated
GALERI KERAJINAN TANGAN KHAS JAWA TENGAH DI SEMARANG
Building Systems Does the building design include an AC system?
Does the building design include a space heating system?
: Yes
: No
Building Orientation
Floor Plan Depth*** :
Main Orientation*** : North
m
Default User Entry
25.48 North
Default User Entry
63.7
South 63.7
East 25.5
West 25.5
Northeast -
Northwest -
Southeast -
Southwest -
*** These parameters will be used to estimate building dimensions. If the exact details of the dimensions and orientation are available, then complete the User Entry fields in the Building Lengths section. The orientation of the building will have a direct effect on energy consumption.
Energy Efficiency Measures 43.65% Meets EDGE energy standard
* Virtual energy is the amount of energy that will be required based on the assumption that the retail will eventually install air conditioning or heating.
CARBON EMISSIONS: 0.00 tCO₂/Year Meets Zero Net Carbon Standard
Building Type Certification Stage Subproject NameRetail Preliminary galeri kerajinan tangan
Energy Measures Preliminary Audit RequirementsRTE01 Reduced Window to Wall Ratio > Calculation of “Glazing Area” and “Gross Exterior Wall Area” for each façade of the building and the
average building area weighted WWR using the WWR calculator
> All façade elevation drawings showing glazing dimensions and general building dimensions.
RTE02 Reflective Paint/Tiles for Roof > Building design drawings showing the roof material and roof finish.
> Roof specification with solar reflectivity of the roof surface indicated.
> Bill of quantities with the roof finish clearly marked.
RTE03 Reflective Paint for External Walls > Building design drawings showing the wall finish.
> Wall specification with solar reflectivity of the wall’s surface indicated.
> Bill of quantities with the wall finish clearly marked.
RTE04 External Shading Devices > All façade elevation drawings highlighting the provision of horizontal and vertical shading devices.
> Window details clearly showing the depth of the shading device and the calculation of the proportion.
> If vertical and horizontal shading are not provided on all windows, the design team will need to provide the output from the solar shading design software.
RTE05 Insulation of Roof > A roof construction detail drawing showing the type and thickness of insulation material. Ideally the roof detail drawing should be annotated with the U Value of the roof.
> Calculations of U value either using the formula or U value calculators.
> Manufacturer’s data sheet of specified insulation material for the roof.
RTE06 Insulation of External Walls > External walls construction detail drawing showing the type and thickness of the insulation material. Ideally the external walls detail drawing should be annotated with the U Value of the external walls.
> Calculations of U value either using the formula or U value calculators.
> Manufacturer’s data sheet of specified insulation material for the external walls.
RTE07 Low-E Coated Glass > Manufacturer’s data sheets showing the seasonal average U Value for the glazing (including losses through the glass and frame) and the solar heat gain coefficient (SHGC) of the glass.
> A list of different types of window included in the design (window schedule).
RTE08 Natural Ventilation: Corridors, Atrium and Common Areas
> Typical floor plans for every floor showing corridors’ layouts and the location of openings.
> Typical sections showing the floor to ceiling height for every floor.
> Calculations showing the depth to ceiling height ratio and minimum area of opening for each typical space.
RTE09 Air Economizers During Favorable Outdoor Conditions
> Manufacturer’s data sheet for the air economizer specified.
> System schematics showing the location, brand and model of the air economizer.
RTE10 Variable Refrigerant Volume (VRV) Cooling System
> Manufacturer’s data sheets for the VRV cooling system specifying COP information.
> For systems including more than one chiller unit, the design team must provide the average COP calculation.
> Mechanical drawings showing the location of the external and internal units.
RTE11 Air Conditioning with Air Cooled Screw Chiller
> Manufacturer’s data sheets for the Air cooled screw chiller system specifying COP information.
> For systems including more than one chiller unit, the design team must provide the ton-weighted average COP calculation.
> Mechanical layout drawings showing the location of the external and internal units.
RTE12 Air Conditioning with Water Cooled Chiller
> Mechanical drawings with air conditioning schematics for all floors.
> Manufacturer’s data sheets for the Water cooled chiller system specifying COP information.
> For systems including more than one chiller unit, the design team must provide the ton-weighted average COP calculation.
> Mechanical layout drawings/schematic showing the location of the external and internal units.
RTE13 Ground Source Heat Pump > Manufacturer’s data sheets for the Ground Source Heat Pump system specifying COP information.
RTE13 Ground Source Heat Pump > Mechanical and electrical layout drawings showing the location of the external loops and internal equipment and distribution for all floors.
RTE16 Variable Speed Drives on the Fans of Cooling Towers
> Mechanical and electrical layout drawings highlighting the use of VSD in the fans of the cooling towers.
> Manufacturer’s data sheets for the air conditioning with Water cooled chiller and cooling towers, showing the specification of VSDs in the fans of the cooling towers.
> For systems including more than one cooling tower, the design team must ensure that all fans are provided with VSDs.
RTE17 Variable Speed Drives in AHU > Mechanical and electrical layout drawings showing the whole HVAC system and highlighting the use of VSD in AHU fans.
> Manufacturer’s data sheets VSD for fans.
RTE18 Variable Speed Drives Pumps > Mechanical and electrical layout drawings showing the whole HVAC system and highlighting the use of VSD pumps.
> Manufacturer’s data sheets VSD pumps.
RTE20 CO2 Sensor / Demand-Controlled Ventilation for Fresh Air Intake
> HVAC layout drawings showing the location of the CO2 sensors including the mounting height.
> Specification of the sensors from manufacturer.
RTE21 High Efficiency Condensing Boiler for Space Heating
> Manufacturer’s data sheet for the condensing boiler/s specified.
> System schematics showing the brand and model of boiler/s.
> If multiple condensing boilers with different efficiencies are specified, then the calculation of average weighted efficiency must be provided.
RTE23 Energy Saving Light Bulbs- Sales Area > Lighting schedule listing type and number of bulbs specified.
> Electrical layout drawings showing the location and type of all installed bulbs.
RTE24 Energy Saving Light Bulbs- Corridors and Common Areas
> Lighting schedule listing type and number of bulbs specified.
> Electrical layout drawings showing the location and type of all installed bulbs.
RTE25 Energy Saving Light Bulbs- External Areas
> Lighting schedule listing type and number of bulbs specified.
> Electrical layout drawings showing the location and type of all installed bulbs.
RTE26 Occupancy Sensors in Bathrooms > Electrical layout drawings showing the location of the occupancy sensors.
> Specification of the sensors from manufacturer.
RTE27 Higher Efficiency Refrigerated Cases > List of the refrigerated cases, including quantity, energy use, and proof of Certification by Energy Star, EU Energy Efficiency Labelling Scheme, Energy Technology Product List (ETL), or equivalent.
> Specifications from the manufactured detailing energy use.
RTE29 Solar Photovoltaics > Manufacturer’s data sheet for the panels specified with information on Wp per square meter.
> Calculation showing the proposed solar photovoltaics will deliver sufficient electricity to achieve the claimed proportion of total demand, and at least as much as the area estimated by EDGE. If not clear justification should be provided.
> The roof plan and/or other drawings showing the location, orientation, and angle of the panels.
RTE30 Skylight(s) to Provide Daylight to 50% of Top Floor Area
> Buildings plans and sections showing the skylights and obstructions in the daylight zones.
> Lighting plans showing the lighting controls in the Daylight Zones.
RTE31 Other Renewable Energy > Supporting calculation showing the proposed system will deliver sufficient electricity to achieve the claimed proportion of total demand , and
> Manufacturer’s data sheets for the proposed system, or
> Engineering drawings showing the system size and location
Water Measures Preliminary Audit RequirementsRTW02 Water-Efficient Urinals in all
Bathrooms> Plumbing drawings/specifications including make, model, and flush volume of the urinal(s).
> Manufacturer’s data sheet for urinal(s) with information on the flush volume.
RTW04 Water-Efficient Faucets for Kitchen Sinks
> Plumbing drawings/specifications including make, model, and flow rate of kitchen(s) faucet(s) or flow restrictor(s).
> Manufacturer’s data sheet for faucet(s)/flow restrictor(s) confirming the flow rate at 3 bar.
RTW05 Water-Efficient Dishwashers > Summary list of the dishwasher(s) to be installed in the building, including quantity and proof of maximum water use.
> Specifications from manufacture detailing water use.
RTW06 Pre-rinse Valve for Rinsing Operation > Plumbing drawings/specifications including make, model, and flow rate of the pre-rinse valve(s).
> Manufacturer’s data sheet for pre-rinse valve(s) confirming the flow rate at 3 bar.
RTW07 Water Efficient Landscaping > A landscape plan showing the zoning for plants and the type of plants use highlighting native species and the irrigation system selected.
> Description of the water requirements use in landscaped areas
> Calculation of the landscape water consumption in litres/m²/day.
RTW08 Condensate Water Recovery > Calculations for condensate water recovery specifying cooling load and water collected in litres per day.
> Hydraulic layout drawings showing the location of the recovery, collection and reuse technology.
RTW09 Rainwater Harvesting System > A system schematic showing the collection area, feed pipes, and storage tank.
> Sizing calculations for the rainwater harvesting system.
RTW10 Grey Water Treatment and Recycling System
> A system schematic showing the plumbing layout including the dual plumbing lines.
> Manufacturer’s data sheet of the specified grey water treatment plant.
> Calculations for: 1.Designed capacity of the grey water treatment system (m3/day) 2.Quantity of grey water available daily to recycle (litres/day) 3.Efficiency of the grey water system to produce treated water (litres/day) 4.Water balance chart.
Material Measures Preliminary Audit RequirementsRTM01 Floor Slabs > Floor sections showing build-up of the floor; or
> Manufacturer’s data sheet for specified building material if applicable; or
> Bill of quantities with the floor slab specification clearly highlighted.
RTM02 Roof Construction > A section drawing of roof showing the materials and thicknesses; or
> Manufacturer’s data sheet for specified building material; or
> Bill of quantities with the materials used for roof construction clearly highlighted.
RTM03 External Walls > Façade drawings clearly marking the external wall specification selected; and
> Drawings of the external wall sections; or
> Manufacturer’s data sheet for specified building material; or
> Bill of quantities with the materials used for the external wall clearly highlighted.
RTM04 Internal Walls > Drawings of the internal wall sections; or
> Manufacturer’s data sheet for building materials used for internal wall specifications if available; or
> Bill of quantities with the materials used for the internal wall clearly highlighted.
RTM05 Flooring > Drawings clearly marking the flooring specification selected; or
> Manufacturer’s data sheet for building materials used for floor specifications; or
> Bill of quantities with the materials used for the flooring clearly highlighted.
RTM06 Window Frames > Façade drawings clearly marking the window frame(s) specification; or
> Manufacturer’s data sheet for glazing specified; or
> Bill of quantities with the windows/window frames clearly highlighted.
RTM07 Wall Insulation > Drawings clearly marking the insulation specification selected; or
> Manufacturer’s data sheet for insulation specified; or
> Bill of quantities with the insulation materials clearly highlighted.
RTM08 Roof Insulation > Drawings clearly marking the insulation specification selected; or
> Manufacturer’s data sheet for insulation specified; or
> Bill of quantities with the insulation materials clearly highlighted.