Top Banner
Location Data Country City Indonesia Solo : : Kitchenette Basic Parameters Car Parking Type of Retail Site Area Light Industry 6,678 m² Outdoor Car Parking Yes Yes Landscaped Area : : : Use 3 Shift (24hrs, 6d/wk) : Project Details Project Name Number of Distinct Buildings Number of EDGE Subproject(s) associated GALERI KERAJINAN TANGAN KHAS JAWA TENGAH DI SEMARANG 2 1 : : : Total Project Floor Area 3,245 m² : Project Owner Name Project Owner Email BEKRAF [email protected] : : Project Owner Phone Mobile 62-85742227828 : Address Line1 Address Line2 City State/ Province Postal Code Country Jl. Madukoro Raya no. 3 Semarang Jawa Tengah 50141 Indonesia : : : : : : Project Number 1000449746 : Associated Subproject(s): galeri kerajinan tangan Share with investor(s) or bank(s)? No : Subproject Name Retail Store Name Subproject Multiplier for the Project Address Line1 Address Line2 City State/ Province Postal Code Country Subproject Details galeri kerajinan tangan handcrafts gallery 1 Jl. Madukoro Raya no. 3 semarang jawa tengah 50141 indonesia : : : : : : : : : Subproject Type New Building : Certification Stage Preliminary : Status Auditor Self-Review : : Certifier : 1 EDGE Version : File Number: Created By: Date Time: 2.1.5 19032010063022 Ane Yoshinta Angestie 15-Apr-2019 22:59:18 Modified By: Project No.: 1000449746 Ane Yoshinta Angestie
16

Project Details - Unika Repository

May 09, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Details - Unika Repository

Location Data

Country

City

Indonesia

Solo

:

:

Kitchenette

Basic Parameters

Car Parking

Type of Retail

Site Area

Light Industry

6,678 m²

Outdoor Car Parking

Yes m²

Yes

Landscaped Area:

:

:

Use 3 Shift (24hrs, 6d/wk):

Project DetailsProject Name

Number of Distinct Buildings

Number of EDGE Subproject(s) associated

GALERI KERAJINAN TANGAN KHAS JAWA TENGAH DI SEMARANG

2

1

:

:

:

Total Project Floor Area 3,245 m²:

Project Owner Name

Project Owner Email

BEKRAF

[email protected]

:

:

Project Owner Phone Mobile 62-85742227828:

Address Line1

Address Line2

City

State/ Province

Postal Code

Country

Jl. Madukoro Raya no. 3

Semarang

Jawa Tengah

50141

Indonesia

:

:

:

:

:

:

Project Number 1000449746:

Associated Subproject(s):galeri kerajinan tangan

Share with investor(s) or bank(s)? No:

Subproject Name

Retail Store Name

Subproject Multiplier for the Project

Address Line1

Address Line2

City

State/ Province

Postal Code

Country

Subproject Details

galeri kerajinan tangan

handcrafts gallery

1

Jl. Madukoro Raya no. 3

semarang

jawa tengah

50141

indonesia

:

:

:

:

:

:

:

:

:

Subproject Type New Building:

Certification Stage Preliminary:

Status

Auditor

Self-Review:

:

Certifier :

1

EDGE Version :File Number:Created By:

Date Time:

2.1.519032010063022Ane Yoshinta Angestie

15-Apr-2019 22:59:18Modified By: Project No.: 1000449746Ane Yoshinta Angestie

Page 2: Project Details - Unika Repository

Building Data

Office Space

Gross Internal Area

Floors Above Ground

Default User Entry

2 no.

171 191

3,245

Floors Below Ground 0 no.

Floor to Floor Height 5 m

Gross Internal Area 3,245 m²

Receiving Area m²225

Shipping Area m²216

Production Area m²1,190

Inventory Area m²541 566

Mechanical & Electrical Room m²100 317

Kitchenette m²361 576

Cold Storage Area m²180

W/m²5

W/m²5

W/m²5

W/m²5

W/m²8

Default User Entry

Heat Addition by Process/Miscellaneous Equipment

Building Systems Does the building design include an AC system?

Does the building design include a space heating system?

: Yes

: No

Building Orientation

Floor Plan Depth*** :

Main Orientation*** : North

m

Default User Entry

25.48 North

Default User Entry

63.7

South 63.7

East 25.5

West 25.5

Northeast -

Northwest -

Southeast -

Southwest -

*** These parameters will be used to estimate building dimensions. If the exact details of the dimensions and orientation are available, then complete the User Entry fields in the Building Lengths section. The orientation of the building will have a direct effect on energy consumption.

Building Lengths

2

EDGE Version :File Number:Created By:

Date Time:

2.1.519032010063022Ane Yoshinta Angestie

15-Apr-2019 22:59:18Modified By: Project No.: 1000449746Ane Yoshinta Angestie

Page 3: Project Details - Unika Repository

Key Assumptions for the Base Case

Fuel Used for Electric Generator

Fuel Used for Hot Water Generation

Fuel Used for Cooking

Fuel Used for Space Heating

% of Electricity Generation Using Diesel % Ave. Yrly

Default User Entry

Diesel

Electricity

Electricity

Electricity

5.00%

Diesel

Electricity

Electricity

Electricity

Cost of Electricity

Cost of Diesel Fuel

Cost of Natural Gas

Cost of Water

Latitude Deg

1.441

6.42

3.80

7.86

7.56

CO₂ Emissions from Electricity Generation

Window to Wall Ratio

Roof U-value

Wall U-value

Glass U-value

g/kWh

%

W/m².K

W/m².K

W/m².K

635.40

10.00%

1.99

1.86

5.75

Glass SHGC

Average Annual Rainfall

Cooling System

AC System Efficiency

Heating System

Factor

mm

COP

0.50

1,736.00

PSZ-PTHP

2.66

Electric Heat Pump

ASHRAE 90.1.2007

ASHRAE 90.1.2007

Heating System Efficiency Eff.2.66

Dec

Nov

Oct

Sep

Aug

Jul

Apr

May

Default

Mar

Feb

Jan

Monthly Average Outdoor Temperature (deg.C)

Jun

User Entry

26.2

26.2

26.2

26.6

26.7

26.3

25.7

25.8

26.6

27.3

27.0

26.5

Solar Reflectivity for Paint - Wall

Solar Reflectivity for Paint - Roof

%

%

30.00%

30.00%

Thousand Rp/kWh

Thousand Rp/L

Thousand Rp/L

Thousand Rp/kL

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

:

3

EDGE Version :File Number:Created By:

Date Time:

2.1.519032010063022Ane Yoshinta Angestie

15-Apr-2019 22:59:18Modified By: Project No.: 1000449746Ane Yoshinta Angestie

Page 4: Project Details - Unika Repository

RESULTSFinal Energy Use

Final Water Use

Base Case Utility Cost

Utility Cost Reduction

Operational CO₂ Savings

Embodied Energy Savings

Incremental Cost

Payback in Years

18,382.66 kWh/Month

697.49 m3/Month

103.90 tCO₂/Year

1,878.50 MJ/m²

56,330.13 Thousand Rp/Month

24,270.00 Thousand Rp/Month

2,416,297.05 Thousand Rp

8.30 Yrs.

:

:

:

:

:

:

:

:

Energy Savings

Embodied Energy in Materials Savings

Water Savings

Aggregate Floor Space Including Multiplier

170.86 MWh/Year

6502.98 GJ

5701.74 m³/Year

3245.00 m²

:

:

:

:

Energy Efficiency Measures 43.65% Meets EDGE energy standard

* Virtual energy is the amount of energy that will be required based on the assumption that the retail will eventually install air conditioning or heating.

CARBON EMISSIONS: 0.00 tCO₂/Year Meets Zero Net Carbon Standard

4

EDGE Version :File Number:Created By:

Date Time:

2.1.519032010063022Ane Yoshinta Angestie

15-Apr-2019 22:59:18Modified By: Project No.: 1000449746Ane Yoshinta Angestie

Page 5: Project Details - Unika Repository

RTE02 Reflective Paint/Tiles for Roof - Solar Reflectivity (albedo) of 0.7Yes SR

RTE03 Reflective Paint for External Walls - Solar Reflectivity (albedo) of 0.7Yes SR

RTE05 Insulation of Roof : U-value of 0.442Yes W/m².K

RTE06 Insulation of External Walls : U-value of 0.435Yes

RTE07 Low-E Coated Glass : U-value of 3 W/m².K and SHGC of 0.45Yes

RTE08 Natural Ventilation with Operable Windows for Corridors, Atrium, and Common AreasYes

RTE10 Variable Refrigerant Flow (VRF) Cooling System - COP of 3.5Yes

COP

RTE11 Air Conditioning with Air Cooled Screw Chiller - COP of 3.63Yes

COP

RTE12 Air Conditioning with Water Cooled Chiller - COP of 4.95Yes

COP

RTE13 Ground Source Heat Pump - COP of 4.65Yes

RTE14 Absorption Chiller Powered by Waste Heat - COP of 0.7No

RTE15 Recovery of Waste Heat from the Generator for Space HeatingNo

RTE16 Variable Speed Drives on the Fans of Cooling TowersYes

RTE17 Variable Frequency Drives in AHUsYes

RTE18 Variable Speed Drives PumpsYes

RTE19 Sensible Heat Recovery from Exhaust Air - Efficiency of 60%No Efficiency

RTE01 Reduced Window to Wall Ratio - WWR of 5%Yes North 5

South 5

East 5

West 5

Northeast

Northwest

Southeast

Southwest

RTE09 Air Economizers During Favorable Outdoor ConditionsYes

RTE04 External Shading Devices - Annual Average Shading Factor (AASF) of 1Yes AASF

COP

COP

W/m².K

W/m².K

SHGC

5

EDGE Version :File Number:Created By:

Date Time:

2.1.519032010063022Ane Yoshinta Angestie

15-Apr-2019 22:59:18Modified By: Project No.: 1000449746Ane Yoshinta Angestie

Page 6: Project Details - Unika Repository

RTE20 CO2 Sensor/Demand-Controlled Ventilation for Fresh Air IntakeYes

RTE21 High-Efficiency Condensing Boiler for Space Heating - Efficiency of 90%Yes Efficiency

RTE22 High-Efficiency Boiler for Water Heating - Efficiency of 90%No Efficiency

RTE23 Energy-Saving Light Bulbs - Sales AreaYes

RTE24 Energy-Saving Light Bulbs - Corridors and Common AreasYes

RTE25 Energy-Saving Light Bulbs - External SpacesYes

RTE26 Occupancy Sensors in BathroomsYes

RTE27 Higher Efficiency Refrigerated CasesYes

RTE28 Solar Hot Water Collectors - 50% of Hot Water DemandNo % Hot Water

RTE29 Solar Photovoltaics - 25% of Total Energy DemandYes

Collector Area (m²) 0.0

% of Annual Electricity Use

Capacity (kWp) 42.4

RTE30 Skylight(s) to Provide Daylight to 50% of Top Floor AreaYes % Daylit Area

SHGC

U-value [K·m²/W]

Yes RTE31 Other Renewable Energy for Electricity Generation Source Type Biomass

% of Annual Electricity Use

RTE32 Offsite Renewable Energy Procurement - Equal to 100% of total Operational CO2Yes % Annual Operational CO2

kWh/Year 220,592

No RTE33 Carbon Offset - 100% of Total CO2 % Annual Operational CO2

-tCO2/Year

6

EDGE Version :File Number:Created By:

Date Time:

2.1.519032010063022Ane Yoshinta Angestie

15-Apr-2019 22:59:18Modified By: Project No.: 1000449746Ane Yoshinta Angestie

Page 7: Project Details - Unika Repository

Water Efficiency Measures 40.20% Meets EDGE Water StandardWATER SAVINGS

RTW01 Dual Flush for Water Closets in All Bathrooms - 6 L/first flush and 3 L/second flushNo 1st - L/flush

2nd - L/flush

RTW02 Water-Efficient Urinals in All Bathrooms - 2 L/flushYes L/flush

RTW03 Aerators & Auto Shut-off Faucets in All Bathrooms - 2 L/minNo L/min

RTW04 Water-Efficient Kitchen Faucets - 4 L/minYes L/min

RTW05 Water-Efficient Dishwashers - 2 L/RackYes

RTW06 Pre-Rinse Valve for Rinsing Operation - 6 L/minYes

RTW07 Water-Efficient Landscaping - 3 L/m²/dayYes

RTW08 Condensate Water RecoveryYes

RTW09 Rainwater Harvesting System - 50% of Roof Area Used for Rainwater CollectionYes

RTW10 Grey Water Treatment and Recycling SystemYes

RTW11 Black Water Treatment and Recycling SystemNo

% of Roof Area Used

No Single Flush/Flush Valve

L/m²/day

7

EDGE Version :File Number:Created By:

Date Time:

2.1.519032010063022Ane Yoshinta Angestie

15-Apr-2019 22:59:18Modified By: Project No.: 1000449746Ane Yoshinta Angestie

Page 8: Project Details - Unika Repository

Materials Efficiency Measures 64.65% Embodied Energy Savings

RTM01 Floor Slabs

mm

RTM02 Roof Construction

mm

RTM03 External Walls

mm

In-Situ Reinforced Concrete Slab

350 mm

Steel : 35 kg/m²

In-Situ Reinforced Concrete Slab

350 mm

Steel : 35 kg/m²

Common Brick Wall with Internal & External Plaster

200 mm

Re-Use of Existing Floorslab

Re-Use of Existing Roof

Common Brick Wall with Internal & External Plaster 100 %

Steel Rebar

Type 1

Meets EDGE Material Standard

Proportion % Thickness

kg/m²

kg/m²Type 1 100 %

8

EDGE Version :File Number:Created By:

Date Time:

2.1.519032010063022Ane Yoshinta Angestie

15-Apr-2019 22:59:18Modified By: Project No.: 1000449746Ane Yoshinta Angestie

Page 9: Project Details - Unika Repository

RTM04 Internal Walls

mm

RTM05 Flooring

RTM06 Window Frames

RTM07 Wall Insulation

RTM08 Roof Insulation

Common Brick Wall with Plaster on Both Sides

100 mm

Ceramic Tile

Aluminium

Single Glazing

No Insulation

U : ~ 1.86 W/m²k

No Insulation

U : ~ 1.99 W/m²k

Common Brick Wall with Plaster on Both Sides

Plant Fibre (Seagrass, Sisal, Coir and Jute) Carpet

Re-Use of Existing Window Frames

Woodwool

Woodwool

100 %

100 %

100 %

mm

mm

Type 1

Type 1

Type 1 Single Glazing

Proportion % Thickness

9

EDGE Version :File Number:Created By:

Date Time:

2.1.519032010063022Ane Yoshinta Angestie

15-Apr-2019 22:59:18Modified By: Project No.: 1000449746Ane Yoshinta Angestie

Page 10: Project Details - Unika Repository

Building Type Certification Stage Subproject NameRetail Preliminary galeri kerajinan tangan

Energy Measures Preliminary Audit RequirementsRTE01 Reduced Window to Wall Ratio > Calculation of “Glazing Area” and “Gross Exterior Wall Area” for each façade of the building and the

average building area weighted WWR using the WWR calculator

> All façade elevation drawings showing glazing dimensions and general building dimensions.

RTE02 Reflective Paint/Tiles for Roof > Building design drawings showing the roof material and roof finish.

> Roof specification with solar reflectivity of the roof surface indicated.

> Bill of quantities with the roof finish clearly marked.

RTE03 Reflective Paint for External Walls > Building design drawings showing the wall finish.

> Wall specification with solar reflectivity of the wall’s surface indicated.

> Bill of quantities with the wall finish clearly marked.

RTE04 External Shading Devices > All façade elevation drawings highlighting the provision of horizontal and vertical shading devices.

> Window details clearly showing the depth of the shading device and the calculation of the proportion.

> If vertical and horizontal shading are not provided on all windows, the design team will need to provide the output from the solar shading design software.

RTE05 Insulation of Roof > A roof construction detail drawing showing the type and thickness of insulation material. Ideally the roof detail drawing should be annotated with the U Value of the roof.

> Calculations of U value either using the formula or U value calculators.

> Manufacturer’s data sheet of specified insulation material for the roof.

RTE06 Insulation of External Walls > External walls construction detail drawing showing the type and thickness of the insulation material. Ideally the external walls detail drawing should be annotated with the U Value of the external walls.

> Calculations of U value either using the formula or U value calculators.

> Manufacturer’s data sheet of specified insulation material for the external walls.

RTE07 Low-E Coated Glass > Manufacturer’s data sheets showing the seasonal average U Value for the glazing (including losses through the glass and frame) and the solar heat gain coefficient (SHGC) of the glass.

> A list of different types of window included in the design (window schedule).

RTE08 Natural Ventilation: Corridors, Atrium and Common Areas

> Typical floor plans for every floor showing corridors’ layouts and the location of openings.

> Typical sections showing the floor to ceiling height for every floor.

> Calculations showing the depth to ceiling height ratio and minimum area of opening for each typical space.

RTE09 Air Economizers During Favorable Outdoor Conditions

> Manufacturer’s data sheet for the air economizer specified.

> System schematics showing the location, brand and model of the air economizer.

RTE10 Variable Refrigerant Volume (VRV) Cooling System

> Manufacturer’s data sheets for the VRV cooling system specifying COP information.

> For systems including more than one chiller unit, the design team must provide the average COP calculation.

> Mechanical drawings showing the location of the external and internal units.

RTE11 Air Conditioning with Air Cooled Screw Chiller

> Manufacturer’s data sheets for the Air cooled screw chiller system specifying COP information.

> For systems including more than one chiller unit, the design team must provide the ton-weighted average COP calculation.

> Mechanical layout drawings showing the location of the external and internal units.

RTE12 Air Conditioning with Water Cooled Chiller

> Mechanical drawings with air conditioning schematics for all floors.

> Manufacturer’s data sheets for the Water cooled chiller system specifying COP information.

> For systems including more than one chiller unit, the design team must provide the ton-weighted average COP calculation.

> Mechanical layout drawings/schematic showing the location of the external and internal units.

RTE13 Ground Source Heat Pump > Manufacturer’s data sheets for the Ground Source Heat Pump system specifying COP information.

EDGE Certification Checklist

10

EDGE Version :File Number:Created By:

Date Time:

2.1.519032010063022Ane Yoshinta Angestie

15-Apr-2019 22:59:18Modified By: Project No.: 1000449746Ane Yoshinta Angestie

Page 11: Project Details - Unika Repository

RTE13 Ground Source Heat Pump > Mechanical and electrical layout drawings showing the location of the external loops and internal equipment and distribution for all floors.

RTE16 Variable Speed Drives on the Fans of Cooling Towers

> Mechanical and electrical layout drawings highlighting the use of VSD in the fans of the cooling towers.

> Manufacturer’s data sheets for the air conditioning with Water cooled chiller and cooling towers, showing the specification of VSDs in the fans of the cooling towers.

> For systems including more than one cooling tower, the design team must ensure that all fans are provided with VSDs.

RTE17 Variable Speed Drives in AHU > Mechanical and electrical layout drawings showing the whole HVAC system and highlighting the use of VSD in AHU fans.

> Manufacturer’s data sheets VSD for fans.

RTE18 Variable Speed Drives Pumps > Mechanical and electrical layout drawings showing the whole HVAC system and highlighting the use of VSD pumps.

> Manufacturer’s data sheets VSD pumps.

RTE20 CO2 Sensor / Demand-Controlled Ventilation for Fresh Air Intake

> HVAC layout drawings showing the location of the CO2 sensors including the mounting height.

> Specification of the sensors from manufacturer.

RTE21 High Efficiency Condensing Boiler for Space Heating

> Manufacturer’s data sheet for the condensing boiler/s specified.

> System schematics showing the brand and model of boiler/s.

> If multiple condensing boilers with different efficiencies are specified, then the calculation of average weighted efficiency must be provided.

RTE23 Energy Saving Light Bulbs- Sales Area > Lighting schedule listing type and number of bulbs specified.

> Electrical layout drawings showing the location and type of all installed bulbs.

RTE24 Energy Saving Light Bulbs- Corridors and Common Areas

> Lighting schedule listing type and number of bulbs specified.

> Electrical layout drawings showing the location and type of all installed bulbs.

RTE25 Energy Saving Light Bulbs- External Areas

> Lighting schedule listing type and number of bulbs specified.

> Electrical layout drawings showing the location and type of all installed bulbs.

RTE26 Occupancy Sensors in Bathrooms > Electrical layout drawings showing the location of the occupancy sensors.

> Specification of the sensors from manufacturer.

RTE27 Higher Efficiency Refrigerated Cases > List of the refrigerated cases, including quantity, energy use, and proof of Certification by Energy Star, EU Energy Efficiency Labelling Scheme, Energy Technology Product List (ETL), or equivalent.

> Specifications from the manufactured detailing energy use.

RTE29 Solar Photovoltaics > Manufacturer’s data sheet for the panels specified with information on Wp per square meter.

> Calculation showing the proposed solar photovoltaics will deliver sufficient electricity to achieve the claimed proportion of total demand, and at least as much as the area estimated by EDGE. If not clear justification should be provided.

> The roof plan and/or other drawings showing the location, orientation, and angle of the panels.

RTE30 Skylight(s) to Provide Daylight to 50% of Top Floor Area

> Buildings plans and sections showing the skylights and obstructions in the daylight zones.

> Lighting plans showing the lighting controls in the Daylight Zones.

RTE31 Other Renewable Energy > Supporting calculation showing the proposed system will deliver sufficient electricity to achieve the claimed proportion of total demand , and

> Manufacturer’s data sheets for the proposed system, or

> Engineering drawings showing the system size and location

Water Measures Preliminary Audit RequirementsRTW02 Water-Efficient Urinals in all

Bathrooms> Plumbing drawings/specifications including make, model, and flush volume of the urinal(s).

> Manufacturer’s data sheet for urinal(s) with information on the flush volume.

RTW04 Water-Efficient Faucets for Kitchen Sinks

> Plumbing drawings/specifications including make, model, and flow rate of kitchen(s) faucet(s) or flow restrictor(s).

> Manufacturer’s data sheet for faucet(s)/flow restrictor(s) confirming the flow rate at 3 bar.

11

EDGE Version :File Number:Created By:

Date Time:

2.1.519032010063022Ane Yoshinta Angestie

15-Apr-2019 22:59:18Modified By: Project No.: 1000449746Ane Yoshinta Angestie

Page 12: Project Details - Unika Repository

RTW05 Water-Efficient Dishwashers > Summary list of the dishwasher(s) to be installed in the building, including quantity and proof of maximum water use.

> Specifications from manufacture detailing water use.

RTW06 Pre-rinse Valve for Rinsing Operation > Plumbing drawings/specifications including make, model, and flow rate of the pre-rinse valve(s).

> Manufacturer’s data sheet for pre-rinse valve(s) confirming the flow rate at 3 bar.

RTW07 Water Efficient Landscaping > A landscape plan showing the zoning for plants and the type of plants use highlighting native species and the irrigation system selected.

> Description of the water requirements use in landscaped areas

> Calculation of the landscape water consumption in litres/m²/day.

RTW08 Condensate Water Recovery > Calculations for condensate water recovery specifying cooling load and water collected in litres per day.

> Hydraulic layout drawings showing the location of the recovery, collection and reuse technology.

RTW09 Rainwater Harvesting System > A system schematic showing the collection area, feed pipes, and storage tank.

> Sizing calculations for the rainwater harvesting system.

RTW10 Grey Water Treatment and Recycling System

> A system schematic showing the plumbing layout including the dual plumbing lines.

> Manufacturer’s data sheet of the specified grey water treatment plant.

> Calculations for: 1.Designed capacity of the grey water treatment system (m3/day) 2.Quantity of grey water available daily to recycle (litres/day) 3.Efficiency of the grey water system to produce treated water (litres/day) 4.Water balance chart.

Material Measures Preliminary Audit RequirementsRTM01 Floor Slabs > Floor sections showing build-up of the floor; or

> Manufacturer’s data sheet for specified building material if applicable; or

> Bill of quantities with the floor slab specification clearly highlighted.

RTM02 Roof Construction > A section drawing of roof showing the materials and thicknesses; or

> Manufacturer’s data sheet for specified building material; or

> Bill of quantities with the materials used for roof construction clearly highlighted.

RTM03 External Walls > Façade drawings clearly marking the external wall specification selected; and

> Drawings of the external wall sections; or

> Manufacturer’s data sheet for specified building material; or

> Bill of quantities with the materials used for the external wall clearly highlighted.

RTM04 Internal Walls > Drawings of the internal wall sections; or

> Manufacturer’s data sheet for building materials used for internal wall specifications if available; or

> Bill of quantities with the materials used for the internal wall clearly highlighted.

RTM05 Flooring > Drawings clearly marking the flooring specification selected; or

> Manufacturer’s data sheet for building materials used for floor specifications; or

> Bill of quantities with the materials used for the flooring clearly highlighted.

RTM06 Window Frames > Façade drawings clearly marking the window frame(s) specification; or

> Manufacturer’s data sheet for glazing specified; or

> Bill of quantities with the windows/window frames clearly highlighted.

RTM07 Wall Insulation > Drawings clearly marking the insulation specification selected; or

> Manufacturer’s data sheet for insulation specified; or

> Bill of quantities with the insulation materials clearly highlighted.

RTM08 Roof Insulation > Drawings clearly marking the insulation specification selected; or

> Manufacturer’s data sheet for insulation specified; or

> Bill of quantities with the insulation materials clearly highlighted.

12

EDGE Version :File Number:Created By:

Date Time:

2.1.519032010063022Ane Yoshinta Angestie

15-Apr-2019 22:59:18Modified By: Project No.: 1000449746Ane Yoshinta Angestie

Page 13: Project Details - Unika Repository

91.28% Originality 8.72% Similarity 143 Sources

Doc vs Internet + Library

Web sources: 27 sources found

1. http://repository.unika.ac.id/15324/4/12.11.0045%20LTP%20Bonaventura%20Anindita%20Rositad… 0.87%2. http://repository.unika.ac.id/16225/4/13.11.0137%20Siti%20Maesaroh.BAB%20III.pdf 0.5%3. http://repository.unika.ac.id/15324/5/12.11.0045%20LTP%20Bonaventura%20Anindita%20Rositad… 0.48%4. http://repository.unika.ac.id/14654/4/11.11.0075%20Stevan%20Arian%20Henas%20BAB%20III.pdf 0.41%5. https://sule-epol.blogspot.com/2017/08/makalah-keterampilan.html 0.41%6. http://library.binus.ac.id/eColls/eThesisdoc/Bab2/2014-2-00398-DI%20Bab2001.pdf 0.39%7. http://repository.unika.ac.id/15415/4/13.11.0055%20LTP%20Mayrosi%20Wahyu%20Aji%20BAB%… 0.25%8. http://library.binus.ac.id/eColls/eThesisdoc/Bab2/2012-2-00012-DI%20Bab2001.pdf 0.24%9. http://repository.unika.ac.id/15414/4/13.11.0053%20LTP%20Andrian%20Wibowo%20BAB%20III.pdf 0.22%10. http://eprints.undip.ac.id/56674/6/Wirda_Nursiamidewi_(21020113120012)_BAB_V.pdf 0.15%11. http://repository.unika.ac.id/15436/4/13.11.0025%20LTP%20Anisa%20Anggraini%20BAB%20III.… 0.14%12. https://komunitas.bukalapak.com/news/104725-pengertian-fungsi-dan-faktor-kerajinan-tangan 0.13%13. https://sinta.unud.ac.id/uploads/wisuda/1104205002-3-BAB%20II.pdf 0.13%14. https://indeksprestasi.blogspot.com/2014/11/penerapan-pendekatan-pembelajaran.html 0.13%15. https://www.slideshare.net/AndayWijaksana/laporan-kerja-praktek-full-kp-pt-kopolco 0.11%16. https://limbarup.wordpress.com/category/infrastruktur/page/8 0.1%17. http://eprints.undip.ac.id/44087/5/5.ENDI_BURHAN_21020112150020_BAB_IV.pdf 0.1%18. https://koriawulandari.blogspot.com/2015/11/kota-yang-gagal-dan-berhasil-dalam.html 0.1%19. https://ikurwan.blogspot.com/2011/05/analisis-faktor-faktor-yang.html 0.1%20. https://trimentarihandayani.blogspot.com/2014/01/contoh-laporan-penyuluhan.html 0.1%21. https://oeebudhi.blogspot.com/2012/01/makalah-hak-asasi-manusia.html 0.1%22. https://rizkifachurohman.blogspot.com/2013/12/arsitektur-dan-lingkungan.html 0.1%23. http://file.upi.edu/Direktori/FPIPS/JUR._PEND._SEJARAH/194403101967101-SAID_HAMID_HAS… 0.1%24. http://eprints.undip.ac.id/20742/1/Cover.pdf 0.1%25. https://hutanadatkubar.blogspot.com/2014/09/perlindungan-hukum-terhadap-kawasan.html 0.1%26. https://dunia-arsitekture.blogspot.com/2012 0.1%27. https://nazarul14.wordpress.com/2015/10/07/bangunan-green-arsitektur 0.1%

Web omitted sources: 2 sources found

1. https://blogarsitek.blogspot.com/2010/04 1.9%2. http://etheses.uin-malang.ac.id/1206/7/07660053_Bab_2.pdf 0.67%

Excluded as citation or reference Web sources: 2 sources found

berkas plagscan LTP AN...

Uploaded: 04/10/2019

Checked: 04/10/2019

Similarity

Similarity from a chosen source

Possible character replacementabc

Citation

References

Page 14: Project Details - Unika Repository

1. http://aspak.yankes.kemkes.go.id/beranda/wp-content/uploads/downloads/2014/01/6.-Pedoman-Ba… 0.29%2. http://ejournal3.undip.ac.id/index.php/geologi/article/download/6759/6493 0.11%

Library sources: 112 sources found

kent nurcahyo D 27 Maret.docx 1.21%Benediktus Arsitektur 27 Maret.docx 1.21%14.A1.0087 Khoe, Devi Irena Santoso.doc 1.12%15.A1.0048 YOVITA AMELIA UTOMO - LTP PAA75 BEACH CLUB PANTAI.docx 0.79%JUAN PATRIK 19 September.docx 0.75%Nur Fauzi 20 September.docx 0.75%JUAN PATRIK Revisi 20 September.docx 0.75%Satria Pamungkas 23 Maret.docx 0.71%Satria P 23 Maret.docx 0.71%Monica 17 September.docx 0.71%Bernadett Revisi 18 September.docx 0.69%SANY HUSNAINY 26 Maret.docx 0.62%Galih 27 Maret.docx 0.61%15.A1.0061_ALBERT DENDY_PLAGSCAN.docx.docx 0.59%15.A1.0051 Albertus Aditya P..docx.docx 0.53%15.A1.0067_Carina Safitri.docx.docx 0.5%Indra Naufal Yuristriza 23 Maret.docx 0.5%scan - 13110122 - Linggar Euodia.docx.docx 0.47%15.A1.0121 ANGGA DIBDA A ( SCAN ).docx.docx 0.47%15.A1.0163 - SONY MUTIARA (SCAN).docx.docx 0.47%plagscan.docx.docx 0.46%13.11.0120-Grahito Pradipta_SCAN.docx.docx 0.43%YosephArdiJatmiko 20 September.docx 0.43%Albert Candra Wijaya 26 Maret.docx 0.41%IVANG CANDRA 26 Maret.docx 0.41%ANDYA BUDI LAKSITARINI 19 September.docx 0.41%15.A1.0030 - Beverlly Angela SCAN.docx.docx 0.41%LTP Plag Scan Revisi.docx.docx 0.41%15.A1.0024 Monica Fransisca Giovanni SCAN.docx.docx 0.41%15A10045_Michelle Dhifa S.N..docx.docx 0.37%Maria Christia 27 Maret.docx 0.37%DUHITA PUSPA 18 September.docx 0.34%DUHITA PUSPA Revisi 19 September.docx 0.34%Kurnia Desy Revisi 19 September.docx 0.34%15A10110_PRIMA_EDHIE_LTP.docx.docx 0.33%TEGAR STARRYSTIA 27 Maret.docx 0.33%Nur Fauzi Revisi 20 September.docx 0.33%YOHANA NADIA Y 24 September.docx 0.33%15.A1.0053-VALLENTINO FANDHI S.docx.docx 0.31%14.A1.0031_imanuella yukano.docx 0.29%14.A1.0144 Ricky Sitorus Scan.docx.docx 0.28%

berkas plagscan LTP AN...

Uploaded: 04/10/2019

Checked: 04/10/2019

Similarity

Similarity from a chosen source

Possible character replacementabc

Citation

References

Page 15: Project Details - Unika Repository

92.69% Originality 7.31% Similarity 136 Sources

Doc vs Internet + Library

Web sources: 26 sources found

1. https://ilmuseni.com/dasar-seni/macam-macam-kerajinan-tangan-dan-asalnya 0.95%2. https://yopaora.blogspot.com/2013/03/jejak-pembangunan-ibc-wiradesa.html 0.45%3. https://pelsekolahkita.blogspot.com/2016/02/rangkuman-materi-prakarya-kelas-9.html 0.42%4. http://library.binus.ac.id/eColls/eThesisdoc/Bab2/2014-2-00398-DI%20Bab2001.pdf 0.41%5. http://repository.unika.ac.id/14658/5/12.11.0023%20Khoe%2C%20Gianina%20Aurellia%20-%20BA… 0.28%6. https://www.slideshare.net/IndahRohmatullah/sejarah-indonesia-buku-guru 0.21%7. https://www.slideshare.net/lathifahhanhan/bab-iii-55464601 0.21%8. https://arccoland.blogspot.com/2012 0.21%9. http://jurnaldikbud.kemdikbud.go.id/index.php/jpnk/article/download/302/204 0.21%10. http://www.powershow.com/view/4077d7-Yjg0Z/Hospitals_push_green_building_standards_power… 0.21%11. https://indeksprestasi.blogspot.com/2014/11/penerapan-pendekatan-pembelajaran.html 0.13%12. https://id.123dok.com/document/y60o8kny-bab-iv-program-arsitektur-galeri-dan-studio-seni-lukis-d… 0.12%13. https://id.123dok.com/document/wyek8l4y-eksperimen-pembuatan-roti-manis-menggunakan-baha… 0.12%14. https://siddiq-4hm4d87.blogspot.com/2010/09/perlindungan-konsumen-akibat-iklan-yang.html 0.11%15. http://digilib.unila.ac.id/24465/3/SKRIPSI%20TANPA%20BAB%20PEMBAHASAN.pdf 0.11%16. https://mafiadoc.com/peningkatan-kemampuan-penalaran-matematis-siswa-_59c0fd891723dde21… 0.11%17. https://docplayer.info/144398667-Pengetahuan-sikap-dan-praktik-phbs-dan-pgs-serta-hubunganny… 0.11%18. https://jodhy21.blogspot.com/2013/10/pengaruh-komunikasi-interpersonal-antar_6.html 0.11%19. https://yogapermanawijaya.files.wordpress.com/2012/05/efektivitas-pembelajaran-multimedia-inte… 0.11%20. http://directory.umm.ac.id/Laporan/Laporan_WS/WORKSHOPKETAHANANPANGAN_Jabal%20T… 0.11%21. https://contoh-contohskripsi.blogspot.com/2010/02/pengaruh-komunikasi-interpersonal-antar.html 0.11%22. https://bpbksmp.blogspot.com/2016/12/bimbingan-konseling.html 0.11%23. https://amadhy.blogspot.com/2012/11/makalah-masalah-pembangunan.html 0.11%24. https://andibayu13.blogspot.com/2011/02/pemanfaatan-media-blog-sebagai-sarana.html 0.11%25. https://core.ac.uk/download/pdf/11060585.pdf 0.11%26. https://alisadikinwear.wordpress.com/2012/07/16/laporan-penelitian-tindakan-kelas-1 0.11%

Excluded as citation or reference Web sources: 1 source found

1. http://eprints.undip.ac.id/59564/6/BAB_V.pdf 0.16%

Library sources: 109 sources found

14.A1.0153 Zulfikar Fahrur HP (scan).docx.docx 0.53%SANY HUSNAINY 26 Maret.docx 0.53%

15.A1.0076 ANEYOSHINT...

Uploaded: 07/29/2019

Checked: 07/29/2019

Similarity

Similarity from a chosen source

Possible character replacementabc

Citation

References

Page 16: Project Details - Unika Repository

JUAN PATRIK 19 September.docx 0.5%JUAN PATRIK Revisi 20 September.docx 0.5%15.A1.0121 ANGGA DIBDA A ( SCAN ).docx.docx 0.49%HASIL PLAGSCAN ARSITEKTUR 230719 ANGGA DIBDA - 15.A1.0121.do.docx 0.49%plagscan.docx.docx 0.46%Benediktus Arsitektur 27 Maret.docx 0.46%15.A1.0051 Albertus Aditya P..docx.docx 0.44%LTP ARSITEKTUR 15.A1.0051 ALBERTUS ADITYA P.docx.docx 0.44%14.A1.0046 - SAMMUEL INDRA KURNIAWAN (Scan).docx.docx 0.42%14.A1.0046 - SAMMUEL INDRA KURNIAWAN.docx.docx 0.42%Galih 27 Maret.docx 0.38%13.11.0120-Grahito Pradipta_SCAN.docx.docx 0.38%15A10177_Ellena Amelia W_scan.docx.docx 0.34%Claudia Yunita Budiana 26 Maret.docx 0.34%15A10124 Michael Dwi Isumareno (Scan).docx.docx 0.33%15A10124 Michael Dwi Isumareno.docx.docx 0.33%Monica 17 September.docx 0.32%14.A1.0144 Ricky Sitorus Scan.docx.docx 0.3%14.A1.0144 Ricky Sitorus Scan.docx.docx 0.3%Fajar 27 Maret.docx 0.29%15A10045_Michelle Dhifa S.N..docx.docx 0.28%cyber Michelle Dhifa S.N 15.A1.0045 - Pengembangan Museum ke.docx 0.28%14.A1.0031_imanuella yukano.docx 0.26%YosephArdiJatmiko 20 September.docx 0.26%15.A1.009 Alexandra Rosario (Scan).docx.docx 0.25%CYBER LTP ARSITEKTUR PAA 75 - ALEXANDRA ROSARIO 15.A1.0099.d.docx 0.25%Silvester Archi Yoga Prabandaru 23 Maret.docx 0.24%Maria Christia 27 Maret.docx 0.24%15.A1.0019 Lisa Novita (scan).docx.docx 0.23%scan - 13110122 - Linggar Euodia.docx.docx 0.23%15A10177_Ellena Amelia W_scan.docx.docx 0.23%Lisa Novita 15.a1.0019 LTP.docx.docx 0.23%14.A1.0080_Raynaldo Handoyo.docx 0.23%DINA PUTRI SANTIKA 20 September.docx 0.23%Gregoria Merici Christ Jayanti Saputri 20 September.docx 0.21%DEVRY NUR MAJID 19 September.docx 0.21%DESAIN KOTA RAMAH LINGKUNGAN FULL.pdf 0.21%Satria P 23 Maret.docx 0.21%15A10048 YOVITAAMELIA LTP PAA75 BEACH CLUB FINAL. Cyberunika.docx 0.21%Satria Pamungkas 23 Maret.docx 0.21%CYBER 15.A1.0024 Monica Fransisca Giovanni.docx.docx 0.21%15.A1.0030 - Beverlly Angela SCAN.docx.docx 0.21%15.A1.0048 YOVITA AMELIA UTOMO - LTP PAA75 BEACH CLUB PANTAI.docx 0.21%15.A1.0024 Monica Fransisca Giovanni SCAN.docx.docx 0.21%15.A1.0053-VALLENTINO FANDHI S.docx.docx 0.17%15.a1.0022 septiartika scan.docx.docx 0.17%

15.A1.0076 ANEYOSHINT...

Uploaded: 07/29/2019

Checked: 07/29/2019

Similarity

Similarity from a chosen source

Possible character replacementabc

Citation

References