Project Details Construction of Six Lane Bridge across Ulhas Creek, on Proposed Mankoli Motagaon Road District Thane.
49

Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Mar 26, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Project Details

Construction of Six Lane Bridge across Ulhas Creek,on Proposed Mankoli – Motagaon Road District Thane.

Page 2: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Information in From-APart- II

Filled up byThe Project Authority

The Executive Engineer,Engineering Division,

Mumbai Metropolitan RegionDevelopment Authority,Bandra – Kurla Complex,

Bandra (E), Mumbai.

Page 3: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

APPENDIX(Sec Rule 6)

FORM – ‘A’

Form for seeking prior approval under section 2 of the proposals by the State Governmentsand other Authorities.

PART – 1(to the filled up by user agency)

1. Project Details1.0 Short narrative of the proposal

and project /scheme for whichforest land is acquired.

Proposal:Construction of six lame bridge across Ulhas creekhaving length 980 meter on proposed Mankoli Motagaonroad connecting kdmc municipal limit at Dombivali (w)to Surai village This missing link will connect KDMCmunicipal limit to Thane & Bhivandi municipal limit withshortest distance. constructing this bridge on Ulhas creekriver(east west) at motagaon (Dombivali) and mankoli(Bhivandi Taluka) will form connectivity to population ofthree municipal limits benefiting to about 60 lacs. People.Maharashtra Coastal Zone Management Authority(MCZMA) in 84th meeting of the Coastal ZoneManagement Authority held on 30th & 31stAugust2013.The Authority has recommended the proposal fromCRZ point of view to MOEF subjected to conditions of10 times replantation of mangroves falling in survey no 62in surai village which is shown as tickle land in 7/12extract.As Mangroves are seen on Govt. Land necessarypermission from forest deptt is being taken. Hence toidentify the exact number of mangroves affecting &transfer the above land through the forest departmentadmeasuring about Total Area: 0.58 Ha Of Tal.Bhivandi, Village- Surai: S.No. 62 Pt. 0.58 Ha.(less than 1Ha) is submitted .MMRDA has also applied for permission to carry outconstruction activity in Mangroves or its buffer Zone areaif any.

1.1 Map showing the requiredforest area, boundary ofadjoining forest area & itemwise breakup of forest arearequired for different purposes.

1) Index Map in 1:5000 scale is enclosed on Page No.2) Mangroves in alignment & bridge structure shown inVillage Map surai on mankoli side (Taluka Bhivandi) in1:5000 scale is enclosed on Page No.3) Geo-Digital Map in 1:5000 scale is enclosed on PageNo.4) Topo Sheet in 1:5000 scale is enclosed on Page No.5) KMZ File is enclosed

1.2 Cost of the project Total Cost of the bridge Project Rs. 190.00 Crores1.3 Justification for locating the

project in forest area.1. Approved D.P. Road in MMRDA area2. This is shortest link connecting Thane & Bhivandi

Page 4: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Municipal Limit to Thane by constructing bridge980m. length on Ulhas Creek connecting Surai &Motagaon Village & very few or smallest patchMangroves land on Surai side at present mankolivillage on thane & Bhivandi Bypass in 22 KMfrom Dombivali – Thane 18KM form Dombivali-Kalyan, Kalyan Bhivandi NH3 Mankoli Village.

1.4 Cost-benefit analysis (to beenclosed)

Not Applicable

1.5 Employment likely to begenerated

About 200 Man Per days for two years.

2.0 Purpose-wise break-up of thetotal land required

Total forest (Khanjan) land required = 0.58 Ha

Break up of forest land required1. Along existing road

Bhivandi : 0.58 HaTotal : 0.58 Ha

2. Refer Annex 3 for details on Page no.3.0 Details of displacement of

people due to the projectNil

3.1 Total Number of Families Nil3.2 Number of Scheduled Tribe

familiesNot Applicable

3.3 Rehabilitation Plan Not Applicable4.0 Whether clearance under

Environment (Protection) Act,1986 required.

Not Applicable

5.0 Undertaking to bear the cost ofraising and maintenance ofcompensatory Afforestation

Replantation Mangroves affected to project underguidance forest deptt. Will be done by MMRDACertificated.

6.0 Details of Certificates /documents enclosed asrequired under the instructions.

Required certificates and documents are providedseparately in respective section.Encolsed in proposal as per Index.

Date :- / /2014Place :-

(J.S. Chivhane)Executive Engineer

M.M.R.D.A.

Page 5: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

State Serial No. of proposal ______________(To be filled up by the Nodal Officer with date of receipt)

PART-II

(To be filled by the concerned Deputy Conservator of Forests)State serial No. of proposal________________

Location of the project/Scheme:

i State/Union Territory MAHARASHTRA STATE

ii Forest Division Thane Forest Division, Thane

iii District Thane

iv Area of forest land proposed fordiversion (in ha.)

0.58 Ha of forest area at Surai Village, Bhivandi

v Legal status of forest The legal status of the land on which mangroveson said area and very fev Mangaon are disturbedis tickle land as per 7/12 extract having surveyno 62. As Mangroves are seen on Govt. Landnecessary permission from forest deptt is beingtaken.

vi Density of Vegetation Sparingly are seen.

vii Species-wise (scientific names) anddiameter class-wise enumeration oftrees (to be enclosed. In case ofirrigation / hydel projectsenumeration at FRL, FRL-2 meter &FRL-4 meter also to be enclosed.)

1. Mangroves along creek shore.10 time mangroves to be planted as perMaharashtra Coastal Zone ManagementAuthority (MCZMA) .

viii Brief note on vulnerability of theforest area to erosion

vulnerability of the forest area to erosion notseen

ix Approx. distance of proposed site fordiversion from boundary of forest

No Forest boundary is adjacent to the ProposedBridge site

X Whether forms part of National Park,wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, etc.(If so, the details of the area andcomments of the Chief WildlifeWarden to be annexed).

No

xi Whether any rare/endangered/ uniquespecies of flora and fauna found inthe area if so detail thereof.

No

xii Whether any protected No necessary Certificate Attached by project

Page 6: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

archaeological/heritage site/ defenseestablishment or any other importantmonument is located in the area. Ifso, the details thereof with NOC fromcompetent authority, if required

authority.

8 Whether the requirement of forestland as proposed by the user agencyin col. 2 of Part-I is unavoidable andbarest minimum for the project. If no,recommended area item-wise withdetails of alternatives examined

The legal status of the land on which mangroveson said area and very fev Mangaon are disturbedis tickle land as per 7/12 extract having surveyno 62. As Mangroves are seen on Govt. Landnecessary permission from forest deptt is beingtaken. The required area demanded for thepurpose of the project is the barest minimumrequirement & unavoidable.

9 Whether any work in violation of theAct has been carried out (Yes/No). Ifyes, details of the same includingperiod of work done, action taken onerring officials. Whether work inviolation is still in progress.

No

10 Details of compensatory afforestationscheme

A compensatory afforestation scheme isenclosed on Page No.

i Details of non forest area/degradedforest area identified forcompensatory afforestation, itsdistance from adjoining forest,number of patches, size of each patch

--

ii Map showing non-forest/degradedforest area identified forcompensatory afforestation andadjoining forest boundaries

Enclosed at page No.----

iii Details Compensatory afforestationscheme including species to beplanted, implementing agency, timeschedule, cost structure,etc.

Enclosed at page No.----

iv Total financial outlay for comp-ensatory afforestation scheme

Enclosed at page No.----

v Certificates from competent authorityregarding suitability of areaidentified for compensatoryafforestation and from managementpoint of view. (To be signed by theconcerned Deputy Conservator ofForests).

Not Applicable.

Page 7: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

11 Site inspection report of the DCF (tobe enclosed) especially highlightingfacts asked in col. 7 (xi, xii), 8 and 9above.

Site Inspection format attached on pageNo. site inspection is to be done

12 Division/District profile: District – ThaneDivision – Thane Forest Division

i Geographical area of the district

ii Forest area of the district.

iii Total forest area diverted since 1980with number of cases in the Division

-

iv Total compensatory afforestationstipulated in the district/divisionsince 1980 on

a) forest land including penalcompensatory afforestation,

b) non-forest land

Refer Annex III for details on Page no.

v Progress of compensatoryafforestation as on 31/03/2013(a) forest land

(b) non-forest land.

Refer Annex III for details on Page no.

13 Specific recommendations of theDeputy Conservator of Forest foracceptance or otherwise of theproposal with reasons

Attached separately

Place :ThaneDate: / /2014

Deputy Conservator of Forest,Thane

Page 8: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

PART – III

(To be filled up by the concerned Chief Conservator of Forests)

1. Whether site, where the forestlandinvolved is located has beeninspected by concerned ChiefConservator of Forests (Yes / No).If yes, the date of inspection andobservations made in form ofinspection note to be enclosed.

2. Whether the Chief Conservator ofForests agree with the informationgiven in Part-II and therecommendations of the DeputyConservator of Forests.

3. Specific recommendations of theconcerned Chief Conservator ofForests for acceptance orotherwise of the proposal withdetailed reasons.

Date :Place :

Chief Conservator of ForestsThane,

MAHARASHTRA

Page 9: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

PART – IV

(To be filled up by the Nodal Officer or Principal Chief Conservator of Forests

or Head of Forest Departments)

Detailed opinion and specific recommendations

of the State Forest Department for acceptance or

otherwise of the proposal with detailed reasons.

( While giving opinion, the adverse comments made by concerned

Conservator of Forests or Deputy Conservator of Forests should be

categorically reviewed and critically commented upon)

Date :

Place :

Nmae & Designation

(Official Seal)

Page 10: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

PART – V

(To be filled in by the Secretary in charge of the Forest Department or any

other authorized officer of the State Government not below the rank of Under

Secretary)

Recommendations of the State Government.

( Adverse comments made by any officer or authority in part-B or Part – C or

Part –D) above should be specifically communicated upon)

Date :Place :

Name & Designation

(Official Seal)

Page 11: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Project Note

1.0 GENERAL

1.1 With the growth of urban centre and the economic activities around

the focal points, the demand for inter-urban transportation has been

increasing steadily in India. To cope with this ever increasing demand

Mumbai Metropolitan Region have undertaken 6 lanning bridge

project in various phases for safe, economic and fast travel. Proposed

6 lanning Bridge is part of stages as explained above .

1.2 Six lane bridge across Ulhas creek having length 980 meter on

proposed Mankoli – Motagaon Road which forms existing Kalyan

Dombivali city.In short this will form acceses to south west side of

thane district Kalyan city.

The bridge proposal is cleared in the 134th Authority meeting of

MMRDA held on 27th June 2014 headed by Hon’ble Chief Minister

Maharashtra.

Maharashtra Coastal Zone Management Authority (MCZMA) in 84th

meeting of the Coastal Zone Management Authority held on 30th &

31stAugust 2013.The Authority has recommended the proposal from

CRZ point of view to MOEF subjected to conditions of 10 times

replantation of mangroves falling in survey no 62 in surai village

which is shown as tickle land in 7/12 extract. The legal status of the

land on which mangroves on said area and very few Mangroves are

disturbed is tickle land as per 7/12 extract having survey no 62. As

Mangroves are seen on Govt. Land necessary permission from forest

deptt is being taken.

Page 12: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

2.0 DESIGN STANDARDS

2.1 The IRC standards for major design elements of the proposed road,

generally are being adopted as recommended by Consultants and

were accepted by the Mumbai Metropolitan Region Development

Authority

Bridge Alignment

The bridge alignment having length 980 meter is on approved DP is under

consideration under this proposal.

2.3 ROW/Land width

The proposed ROW/land width required is of 45 mtr.width and bridge

width is 28 mtr.

2.5 4 Lane Configuration

Based on the traffic survey, analysis consultant has recommened 6 lane

bridge.

2.6 Financial Details

The capital cost of the project 190.00Crores

Construction period 24 Months

Date :

Place :

(J.S. Chivhane)Executive Engineer

M.M.R.D.A.-

Page 13: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

AREA STATEMENT

Page 14: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

(J.S. Chivhane)Executive Engineer

M.M.R.D.A.Address (of user agency:)

Mumbai Metropolitan Region Development AuthorityBandra – Kurla Complex, Bandra (E), Mumbai

Construction of Six lane bridge across ulhas creek having length 980 meter on proposed Mankoli Motagaon road .Survey Number wise Four side Boundary Area Statement

Thane Forest Division

Sr.No.

Nmae ofVillage

Nameof

Division

Lagel Status Boundaries of Four StateSurvey/ GatNo.

Area inHa.

East West South North Remark

1 2 3 4 5 6 7 8 9 10

1.Surai Thane

62 Pt. 0.58Remaining Part ofSurvey No. 62 Pt.

Remaining Part ofSurvey No. 62 Pt.

Survey No. 59 Pt. Survey No. 56 Pt.

Total Forest Area (in Ha.) 0.58

Page 15: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Item-wise Breakup of the Land 1/2THANE FOREST DIVISION

(Under Forest Conservation Act, 1980)

Abstract of Item-wise Breakup of the LandAnnexure – III

( Details of area statement of Forest Land & Non-Forest Land Required)

Item of the workpurpose

Nameof

Village

Forest Land to be AcquiredLegal Statue

of Land

Details of Non Forest LandTotal Area

Ha.

Survey /Gat

ConpttNo.

Av Length xwidth

Area Survey /Gat

Length x widthArea inSq.Mtr.Sq.Mtr. Ha.

Construction ofSix lane bridgeacross ulhascreek havinglength 980 meteron proposedMankoliMotagaon road .

Surai 62 Pt. 129.45 x 45 5835.43 0.58 TickleLand 40 Pt. As shape of area

affected surveynos is norrectangle Exactarea of affectedsurvey nos inforest & nonforest land areworked fromvillage map byauto cad fromauto caddrawing.

2219.80 4.40

Total 0.58 38 Pt. 195.3344 Pt. 1263.7245 Pt. 5107.0046 Pt. 2352.7351 Pt. 1364.4052 Pt. 2232.8753 Pt. 1118.1154 Pt. 2010.1255 Pt. 227.2756 Pt. 2506.9258 Pt. 1880.3659 Pt. 635.00Creek 15150.00

Total 38263.63

As shape of area affected survey nos is nor rectangle Exact area of affected survey nos in forest & non forest land are worked from village map byauto cad from auto cad drawing.

(J.S. Chivhane)Executive Engineer

M.M.R.D.A.

Page 16: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Construction of Six lane bridge across ulhas creek having length 980 meter on proposed MankoliMotagaon road

Village wise Area

Thane Forest Division, Thane

Sr.No.

Name ofvillage

Taluka

FOREST AREA UNDER HA.TotalForestAreaHA.

NonForestAreaHA.

TotalAreaHA.

R.F.I.F.

Under Section 35(3)

RestoredUnder

Required

Areafinally

acquired1. Surai Bhivandi 0.58 0.58 3.82 4.40

(J.S. Chivhane)Deputy Conservator of Forest Executive Engineer

Thane Forest Division M.M.R.D.A.Thane

Page 17: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Necessary

documents

as per the Index

Page 18: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

SiteInspection

Report

Page 19: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

SITE INSPECTION REPORT

THANE FOREST DIVISION

(Under Forest Conservation Act,1980)

1. Name of the Proposal : Construction of Six lane bridge

across ulhas creek having length

980 meter on proposed Mankoli

Motagaon road.

2. Forest Area involved : 0.58 Ha.

3. Location

a. Division : Thane

b. Range : As Per List

c. Round : As Per List

d. Survey No./ Compt No. : As Per List

4. Date of Site Inspection : ……………………

5. Details of forest type and area

of existing crop with

botanical Name of specie

: ……………………

6. Details of fauna including

their population and

distribution in Game

sanctuary, National Park or

Reserve Forest.

: ……………………

7. Other aspects of importance

a. Historical/ Archaeological : ……………………

b. Geographical : ……………………

c. Religious : ……………………

d. Geological : ……………………

8. Remarks regarding sensitivity : ……………………

Page 20: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

of the Area is affected due to

the project

9. Number of Photographs if

enclosed

:……………………

10. Whether any work in

violation of the Act has been

carried out

a. On non – forest land : ……………………

b. On forest land ……………………

((J.S. Chivhane)Executive Engineer Deputy Conservator of Forest

M.M.R.D.A. Thane Forest DivisionThane

Page 21: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

NecessaryCertificates.Asperthe guideline issued bytlieChief Conservator

of Forests :Noda[Officer,:M.S.,:Nagpur's fetter:No.Desk..;17/:NC/CRJ/571,dated2ndJuly,2005

Required Certificates for the proposal, as per theguidelineissuedbytheChiefConservatorofForests&NodalOffic

er,M.S.,Nagpur'sletterNo.Desk-17/NC/RS/571,dated 2nd July, 2005.

Page 22: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

REQUIRED CERTIFICATE FOR THE PROPOSAL

Documents verification certificate

Certified that all the documents enclosed here with the proposal have

been scrutinized as per the revised check list and found to be correct.

Deputy Conservator of ForestThane Forest Division

Thane

Page 23: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Chronology of Events.

Date From To No. & date.

Deputy Conservator of ForestThane Forest Division

Thane

Page 24: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Minimum Demand of Forest Area- Certificate ofProject Authority.

This is to certify that no suitable alternative Non-Forest Land is

available for the purpose for use of Forest Land to non-forest purpose i.e. for

construction of Roads required forest land is lowest minimum & unavoidable.

(J.S. Chivhane)Executive Engineer

M.M.R.D.A.

Page 25: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Certificate of about absences of alternative about the project.

This is to certify that no suitable alternative non-forest land is

available other than forest Gut No. Village- Surai : 62 Pt Tal. Bhivandi, Dist.

Thane and demand for the forest land is minimum & unavoidable.

Deputy Conservator of ForestThane Forest Division

Thane

Page 26: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Compensatory Afforestation Cost- Certificate of Project Authority.

This is to certify that the Project Authority is agreed to defray the cost

of compensatory afforestation as determined by the Forest Department.

(J.S. Chivhane)Executive Engineer

M.M.R.D.A.

Page 27: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

No violation of forest (Conservation) Act, 1980 / Guide lines under it - Certificateof Project Authority.

It is state that the proposed work is not started yet. It will be started

only after the Government of India gives permission. However, no violation is

done of the Forest (Conservation) Act, 1980 or its guidelines.

(J.S. Chivhane)Executive Engineer

M.M.R.D.A.

Page 28: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Certificate of Forest Department violation / No violation of Forest (Conservation)

Act, 1980 - Certificate of Deputy Conservator of Forest Officer, Thane

It is state that the proposed work is not started yet. It will be started

only after the Government of India gives permission. However, no violation is

done of the Forest (Conservation) Act, 1980 or its guidelines

Deputy Conservator of ForestThane Forest Division

Thane

Page 29: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Compensatory Afforestation area suitability Certificate – By Deputy Conservatorof Forest Officer, Thane

proposed area is 0.58 ha.

AND

Certificate of identified Forest and Acquired Forest for compensatory afforestationarea - Deputy Conservator of Forest Officer, Thane certificate.

proposed area is 0.58 ha.

Deputy Conservator of ForestThane Forest Division

Thane

Page 30: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Identified Forest and Acquired forest certificate for Non-Forest area under theproject - Deputy Conservator of Forest Officer, Thane

Not applicable as the project includes only the reserved forest area of

forest Village- Surai : 62 Pt Tal. Bhivandi, dist. Thane not any privet land.

Deputy Conservator of ForestThane Forest Division

Thane

Page 31: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Archeological importance - Certificate by the Deputy Conservator of ForestOfficer, Thane

This is to certify that, Construction of Six lane bridge across ulhas

creek having length 980 meter on proposed Mankoli Motagaon road is not likely to

affect any monument site of cultural, historical, religious, archeological or

recreational importance.

Deputy Conservator of ForestThane Forest Division

Thane

Page 32: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

WILD LIFE CERTIFICATE

(Certificate of Deputy Conservator of Forest)

This is certify that area Construction of Major Bridge on D.P Road (at

present missing link) Mankoli to motgaon road lies on Ulhas Creek river Village-

Surai Tal. Bhivandi, District Thane does not included in the area of any National

Park / Wild life Sanctuary or Nature Reserve.

Deputy Conservator of ForestThane Forest Division

Thane

Page 33: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Wildlife certificate if proposed area is within 10 km from National Park /Sanctuary – By the Deputy Conservator of Forests Wildlife

Not applicable as the required & proposed forest area is not within 10

km from National Park / Sanctuary.

Deputy Conservator of ForestThane Forest Division

Thane

Page 34: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Net Present Value – Project Authority.

Under taking

Project Authority hereby gives an undertaking to defray the Net

Present Value of area 0.58 ha. proposed for Non-Forest use for the project of Road

Construction in forest Village- Surai : 62 Pt Tal. Bhivandi, District Thane as fixed

by the Forest Department.

(J.S. Chivhane)Executive Engineer

M.M.R.D.A.

Page 35: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Net Present Value – Deputy Conservator of Forest Officer,Thane

Certify that 0.58 ha. of forest land to be used in this proposed project,

construction of Roads on the forest Gut No. Village- Surai : 62 Pt Tal. Bhivandi

Dist- Thane of Thane Range falls in Soil and Moisture Conservation cum

afforestion working Circle and has the density of 0.01.

It is also certify that the amount of Net Present Value of forest

land calculated and to be collected for Rs. ( /-) One lakh sixty

one thousand six hundred seventy seven only for value Class IV of open forest is

exactly as per the rates and calculation provided in the letter No. 1-19/ CEC/ SCI

2006-Pt., dated 5th June, 2008 of Central Empowered Committee.

Deputy Conservator of ForestThane Forest Division

Thane

Page 36: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Certificate for area under enquiry under Private Forest(Acquisition) Act, 1975 – By Villagers

Not applicable

Deputy Conservator of ForestThane Forest Division

Thane

Page 37: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Certificate of the project authority to take up attachmentarea treatment plan as per the guidelines of

Government of India.

Not applicable

Deputy Conservator of ForestThane Forest Division

Thane

Page 38: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Certificate of the Deputy Conservator of Forests

regarding alternative examined

Certified that following alternatives:

I have been examined the alignment connecting KDMC and Bhivandi talukaaffecting mangroves very less though it crosses creek and land in vicinity ofmarshi and creek portion in between Mumbra and Dombivali .

Deputy Conservator of ForestThane Forest Division

Thane

Alignment GutNo./Comptt.No.

Length &Width in

Sq.m.

Areain ha

Reason for site selection orrejection.

AlignmentNo. 1D.P. RoadConstructionof MajorBridge on D.PRoad(atpresentmissing link)Mankoli tomotgaon roadlies on UlhasCreek river

Village-Surai : 62 Pt

129 x 45 0.58 This alignment is recoomendedbecause1. alignment is on approvedD.P.Road in MMR area .2. This is shortest route

connecting KDMC area atDombivali and NH-3 (Mankoli)crossing Ulhas Creek river bybridge and very megremangroves come acrossalignment

Page 39: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

No objection certificate of Gram Sabha about theproject- English copy.

Copy of the no-objection certificate from the Grampanchayat of Surai,

Tal. Bhivandi is attached here with.

Deputy Conservator of ForestThane Forest Division

Thane

Page 40: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Certificate of Zudpi Jungle compensatory afforestationland- Deputy Conservator of Forests.

Not applicable

Deputy Conservator of ForestThane Forest Division

Thane

Page 41: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Non availability of non-forest area for compensatoryafforestation- Collector / commissioner.

Not applicable

Deputy Conservator of ForestThane Forest Division

Thane

Page 42: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

When any protected / archeological / heritage site andother important monument is located in the area-

Certificate by Archeological Department

Not applicable

Deputy Conservator of ForestThane Forest Division

Thane

Page 43: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Complete list of Identified Forest of the District Thane.

Complete list of Identified Forest of Thane District is attached here

with.

Deputy Conservator of ForestThane Forest Division

Thane

Page 44: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

No objection Certificate of M. D., F.D.C.M. forInvolvement of their area.

Not applicable

Deputy Conservator of ForestThane Forest Division

Thane

Page 45: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

COST BENEFIT ANALYSISTHANE FOREST DIVISION

(Under Forest Conservation Act, 1980)

COST BENEFIT ANALYSIS

Not applicable, due to the proposed &

required area is less than 1.00 ha.

Deputy Conservator of ForestThane Forest Division

Thane

(J.S. Chivhane)Executive Engineer

M.M.R.D.A.

Page 46: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Construction of six lame bridge across Ulhas creek having length 980 meter on proposed Mankoli Motagaon roadTHANE FOREST DIVISION = GIRTH WISE TREE TO BE FEILED ALONG THE EXISTING ROAD

LocalName

Scientific Name < =30

> 30 to<

=45

> 45 to<=60

> 60to<=75

> 75 to<=90

> 90 to<=105

> 105to<

=120

> 120to< =135

>135 to<=135

> 180 TOTAL

1 2 3 4 5 6 7 8 9 10 11 12 13Sag Techona grandisAir TerminaliyaKhair Acasia catechuSaver Bombax malaborikPalas Butea prondisaShemal Odina wadirAssana Bridelia retuseVehal Texminalia betoriaDhawala Anogeissus latifoliaAthroon Flacurtin ramontochiBhisala Plerocarpas marsupiumKuda Holarrena antiolysentericaMoha Sam madhuka parrifolaUmbar Ficus glornerataDhaman Grewia filaHedu Adina cordidiaBonda Lagerstroemia parvifolaHakad Garuga pinnataGhol Perena orintailsPelar Prewia nudifloraDhandosi Dalberia inceclariaKharsing Stereospermumxy locarpumAiv Phyilanyus emblicaChera Erimacarpus nimmoamesMot Bassia latidiaArshi Morinda tintoriaBholi Semecarpus anacardimuSambhai Albizia procersBehada Terminillia belericaHumb Saccopetalum tomentosum

(J.S. Chivhane)Deputy Conservator of Forest Executive Engineer

Thane Forest Division M.M.R.D.A.Thane

Page 47: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Gram Panchayat’sN.O.C.

And7/12 Extract

Page 48: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

To

EXECUTIVE ENGINEEREngineering Division,Mumbai Metropolitan Region Development Authority,Bandra – Kurla Complex, Bandra (E), Mumbai.

Sub: NOC for Acquisition of Land to Forest Department

Construction of six lame bridge across Ulhas creek on proposed Mankoli

Motagaon road .

Ref: Engineering Division MMRDA Letter No. 284/2014 Dated 17/10/2014.

With reference to above subject, we hereby inform you that Surai – Sarang Grampanchayat

has no objection For Acquisition of land throughforest department for Construction of six lane

bridge across Ulhas Creeck.

Sd/-Sarpunch

Group Grampanchyet Surai Sarang,Taluka Bhivandi, Dist Thane.

Page 49: Project Details Construction of Six Lane Bridge …forestsclearance.nic.in/writereaddata/FormA/UserAgency...0.58 Ha of forest area at Surai Village, Bhivandi v Legal status of forest

Village Extract Number 7, 7-A & 12.Village:Surai Taluka:Bhiwandi District: Thane

Survey No./GutNo.

Hissa No. Holding No. Village form No. 7 Khate No.

62Cultivable Area Hactor R.

Tickle LandNon Irrigated -- --IrrigatedPady land

Total 14 51 Name ofTenantsOther rights

Fall OutClass (a)Class (b)

Total 14 51Aneswari Rs.

Coss orSpecial CossAbout water

Total -- --

Village Extract No. 7-4 Village Extract No. 12Year Na

meofCultivator

Type

season

Area under Mixcrop

Name of cropunder mixcrop

Area n underNon- Mix crop

Particular of &Nonunableland

Irrigationsystem

Remarks

Num

eric

alM

ix c

rop

Iriga

ted

Non

-irr

igat

edC

rop

Nam

eIrr

igat

ed

Non

Irrig

ayte

d

Cro

pN

ame

Irrig

ated

non

Irrig

ated

Type

Area

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 172011-2012

Grazing waste

True Extract Given Date:- 30/03/2012 Sd/-TalathiSurai

TalukaBhiwandi, District Thane.