PROJECT INFORMATION PROJECT NAME: REDESIGN OF COMMON AREA OF LIBRA COMMUNITY CENTER (DESIGN ONLY) PROJECT NUMBER: 17033001 SQUARE FOOTAGE: 1500 PROJECT IMAGES DESIGN COST PER SQUARE FOOT: $28.01 PROJECT COST DATE COMPLETED: NOVEMBER 3, 2020 PROJECT MANAGER: DAVID EDGAR PROJECT DESCRIPTION: PROVIDE DESIGN SERVICES, INCLUDING SCHEMATIC DESIGN, DESIGN DEVELOPMENT, MEP ENGINEERING SERVICES, PROJECT COST ESTIMATING, CONSTRUCTION DOCUMENTS AND BIDDDING ASSISTANCE, FOR THE DESIGN AND RENOVATION OF THE COMMON AREA AND KITCHEN OF THE LIBRA COMMUNITY CENTER. THE LENGTHY DESIGN PROCESS WAS DUE TO SEVERAL SCOPE INCREASES DRIVEN BY CLIENT NEEDS. EXECUTION OF THIS PROJECT WILL OCCUR UNDER A DIFFERENT PROJECT, ONCE THE CLIENT HAS SUFFICIENT FUNDS.
2
Embed
PROJECT COST PROJECT INFORMATION PROJECT IMAGES · 2020. 11. 9. · project information project name: redesign of common area of libra community center (design only) project number:
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PROJECT INFORMATIONPROJECT NAME: REDESIGN OF COMMON AREA OF LIBRA COMMUNITY
CENTER (DESIGN ONLY)
PROJECT NUMBER: 17033001
SQUARE FOOTAGE: 1500
PROJECT IMAGES
DESIGN COST PER SQUARE FOOT: $28.01
PROJECT COST
DATE COMPLETED: NOVEMBER 3, 2020
PROJECT MANAGER: DAVID EDGAR
PROJECT DESCRIPTION: PROVIDE DESIGN SERVICES, INCLUDING SCHEMATIC DESIGN, DESIGN DEVELOPMENT, MEP ENGINEERING SERVICES, PROJECT COST
ESTIMATING, CONSTRUCTION DOCUMENTS AND BIDDDING ASSISTANCE, FOR THE DESIGN AND RENOVATION OF THE COMMON AREA AND KITCHEN OF THE LIBRA
COMMUNITY CENTER. THE LENGTHY DESIGN PROCESS WAS DUE TO SEVERAL SCOPE INCREASES DRIVEN BY CLIENT NEEDS. EXECUTION OF THIS PROJECT WILL
OCCUR UNDER A DIFFERENT PROJECT, ONCE THE CLIENT HAS SUFFICIENT FUNDS.
PROJECT INFORMATIONPROJECT NAME: REDESIGN OF COMMON AREA OF LIBRA COMMUNITY CENTER (DESIGN
PROJECT NUMBER: 17033001
SQUARE FOOTAGE: 1500
PROJECT COST PROJECT TIME
DESIGN COST 42,028.00$ PROJECT SUBMITTED BY CLIENT
PAYMENT & PERFORMANCE BOND (NOT REQ'D IF UNDER $100K) ‐$ PAYMENT APPLICATIONS, INVOICES
INFORMATION TECHNOLOGIES & RESOURCES COST ‐$ INSPECTIONS
UCF IT ‐$ CERTIFICATE OF COMPLETION
OFFICE OF INSTRUCTIONAL RESOURCES (OIR) ‐$ CERTIFICATE OF OCCUPANCY
FACILITIES & SAFETY COST 4,330.00$ BENEFICIAL OCCUPANCY BY CLIENT
BUILDING CODE OFFICE PUNCH LIST COMPLETION
STATE FIRE MARSHALL ‐$ FINAL INVOICES
FP&C PROFESSIONAL MANAGEMENT SERVICES (3%) 4,330.00$ OWNER'S MANUALS
FACILITIES OPERATIONS ALLOWANCE ‐$ ASSET TURNOVER TO OPERATIONS
CONSTRUCTION CONTINGENCY (10%, REFUNDED IF NOT USED) ‐$ ACCOUNTING CLOSE‐OUT
TOTAL PROJECT COST 46,358.00$ TOTAL PROJECT TIME ‐ 2.5 YEARS
CLO
SE‐OUT
.5 MONTHS
NA
4.5 MONTHS
16 MONTHS
DESIGN
BID/PER
MIT
CONSTRUCTION
PROJECT DESCRIPTION: PROVIDE DESIGN SERVICES, INCLUDING SCHEMATIC DESIGN, DESIGN DEVELOPMENT, MEP ENGINEERING SERVICES, PROJECT COST ESTIMATING, CONSTRUCTION DOCUMENTS
AND BIDDDING ASSISTANCE, FOR THE DESIGN AND RENOVATION OF THE COMMON AREA AND KITCHEN OF THE LIBRA COMMUNITY CENTER. THE LENGTHY DESIGN PROCESS WAS DUE TO SEVERAL
SCOPE INCREASES DRIVEN BY CLIENT NEEDS. EXECUTION OF THIS PROJECT WILL OCCUR UNDER A DIFFERENT PROJECT, ONCE THE CLIENT HAS SUFFICIENT FUNDS.