Top Banner
1 PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 4 JULY 2013 PACKAGE V4 : SECTION 17 - SEMANTAN
27

PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

Apr 08, 2018

Download

Documents

dokhuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

1

PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1

4 JULY 2013

PACKAGE V4 : SECTION 17 - SEMANTAN

Page 2: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

Topics of Discussion

• Introducing Mass Rapid Transit

• Section 16 MRT Station

• Entrance A

• Typical Cross Section at Section 16 Station

• Construction Activities & Schedule

• Traffic Management Plan

• Working Hours

2

Page 3: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

3

MASS RAPID TRANSIT

Page 4: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

• Location: Section 17 – Semantan Portal

• Length: 6.6km

• No. of Stations: 3 nos

Section 16

Pusat Bandar Damansara (PBD)

Semantan

• No. of piers: 199 nos

4

PROJECT INFORMATION

Page 5: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

PACKAGE V4 – SECTION 17 TO SEMANTAN PORTAL

BANGSAR

SECTION 17

KGPA

BUKIT DAMANSARA V4

V4

V3

VICTORIA

STATION

5

Page 6: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

SECTION 16 MRT STATION

6

Page 7: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

• The station is an island type platform served by 2

entrances, Entrance A on the south and B on the north.

• A multi-storey park and ride shall be constructed as support

facility at north-east of the station.

• Entrance A is located near Phileo Damansara / SIBKL

buildings connected to the station by an overhead

pedestrian link bridge over Sprint Highway

7

SECTION 16 MRT STATION INFORMATION

Page 8: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

8

BHP

SECTION 17

PETRONAS

LINK BRIDGE SPANNING

OVER SPRINT HIGHWAY

ENTRANCE A

ENTRANCE B

PHILEO

DAMANSARA 1

SIBKL MULTISTOREY

PARK & RIDE

SECTION 16 MRT STATION

Page 9: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

- FLOOR PLAN OF STATION

AND RELATED STRUCTURES

9

Page 10: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

10

ARTIST IMPRESSION - DAY VIEW

Page 11: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

11

ARTIST IMPRESSION - NIGHT VIEW

Page 12: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

ENTRANCE A

12

Page 13: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

SITE LOGISTIC PLAN FOR ENTRANCE A

13

SIBKL

PHILEO DAMANSARA 1

LEGEND

EXISTING TRAFFIC

TRAFFIC FLOW

AT SITE

Page 14: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

14

ENTRANCE A – REAR PHOTO

- PHILEO DAMANSARA ENTRANCE

Page 15: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

15

ENTRANCE A – REAR PHOTO

- PHILEO DAMANSARA SIDE LANE DRIVEWAY

- EXIT FORM CAR PARK

±3.050M ENTRANCE A

SETBACKLINE FROM R.O.W

Page 16: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

16

ENTRANCE A – REAR PHOTO

- PHILEO DAMANSARA ENTRANCE

Page 17: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

17

CONSTRUCTION SCHEDULE

Page 18: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

CONSTRUCTION SCHEDULE

SECTION 16 STATION

DESCRIPTION START FINISH

PIERS & VIADUCT JULY 2012 DEC 2016

STATION APRIL 2013 JAN 2016

ENTRANCE A MAY 2013 JUN 2015

ENTRANCE B NOV 2013 JAN 2016

LINK BRIDGE OCT 2013 FEB 2014

Page 19: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

CONSTRUCTION ACTIVITIES

19

Page 20: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

20

• Piling works

• Earthworks / Excavation

• Concreting Activities

• Construction Vehicles

• Construction Equipment

NAIM ENGINEERING SDN BHD WILL BE MONITORING DUST, NOISE AND AIR QUALITY AT ALL TIMES.

GENERAL CONSTRUCTION ACTIVITIES

Page 21: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

TRAFFIC MANAGEMENT PLAN

21

Page 22: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

22

TANDAS

SEPTICTANK

KABINPEJABAT

KONTENASETOR

SETOR BAHAN /TAPAK FABRIKASI

PINTUMASUK

WAS

H TR

OUG

H

PAPAN TANDAPROJEK

working area

Page 23: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

•Reduce existing lanes width upon authorities’ approval.

•Install proper traffic and safety signage’s at visible locations.

•Maintain cleanliness adjacent to construction area.

•Sufficient flagman and signaling during critical activities.

•Approval from authority will be obtained for any night works required.

23

MEASURES WILL BE TAKEN FOR TRAFFIC MANAGEMENT

Page 24: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

WORKING HOURS

24

Page 25: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

25

Normal working hours: 7am – 7pm

Boring & micropile: 8am – 10pm

WORKING HOURS AT SECTION 16 STATION

Page 26: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

For project information, please call : • MRT Hotline at 1800-82-6868

• Sunway Construction Sdn. Bhd. contact person,

Ms. Liyana Yusoff – Executive Communications

012-2955993, [email protected]

En. Wan Mohd Izzuddin – Project Manager (NAIM)

019-3320 315, [email protected]

Mr. Chin Yuen Hin – Manager

019-6641 112, [email protected]

• MMC-Gamuda (PDP) contact person,

Mr. Chandra Kumar – Liaison Manager 019-336 2629 , [email protected]

En. Noor Azlan Salleh – Project Manager

019-233 6090, [email protected]

26

Page 27: PROJECT BRIEFING ON SECTION 16 STATION FOR PHILEO DAMANSARA 1 · project briefing on section 16 station for phileo damansara 1 4 july 2013 package v4 : ... petronas link bridge spanning

27

ALL INFORMATION CONTAIN HEREIN IS SUBJECT TO CHANGES