PROJECT : BBS REF : Description CONCOURSE SLAB BOTTOM Y DIRECTION Date Prepared 30.03.2015 Date Modified Prepared by SR Checked by SA Member A * B * C * D * E/R * Shape Rev mm mm mm mm mm F * G * H * I * J * mm mm mm mm mm BOTTOM Y REINF. 11 Y20 1 124 124 2800 9910 2800 856.25 11.1 Y20 1 108 108 3575 9910 3575 952.19 11.2 Y20 1 6 6 3100 9916 450 2700 45.87 11.3 Y20 1 16 16 3750 9910 3750 147.97 12 Y16 1 24 24 6350 00 6350 240.54 12.1 Y16 1 24 24 8675 00 8675 328.61 12.2 Y16 1 25 25 7100 00 7100 280.15 12.3 Y16 1 23 23 6350 00 6350 230.52 12.4 Y16 1 3 3 10650 00 10650 50.43 12.5 Y16 1 12 12 8325 00 8325 157.68 12.6 Y16 1 12 12 9075 00 9075 171.88 12.7 Y16 1 1 1 7475 11 450 7045 11.80 12.8 Y16 1 2 2 6700 11 450 6285 21.15 12.9 Y16 1 7 7 3175 11 450 2755 35.08 12.10 Y16 1 7 7 3925 11 450 3515 43.36 12.11 Y16 1 18 18 7775 00 7775 220.88 12.12 Y16 1 6 6 7425 11 450 6995 70.31 12.13 Y16 1 6 6 8175 11 450 7755 77.42 12.14 Y16 1 10 10 3100 9912 3100 48.93 12.15 Y16 1 9 9 3850 9912 3850 54.69 Page Total : 4045.71 REINFORCEMENT DETAILS BETWEEN GRID (24 to 26 ) Bar Mark Type & Size No. of mbrs No. of bars in each Total no. Length of each bar (mm)+ Shape code Weight (Kg) A One End Threaded A One End Threaded One End Threaded A B A One End Threaded A A A A A A A B A B A B A B A A B A B A A One End Coupler A One End Coupler
4
Embed
PROJECT BBS REF - Bar bending Schedule | Shop Drawingsgriddesignsolutions.com/wp-content/uploads/2017/02/3.-Bar-bending... · Member A * B * C * D * E/R * Shape Rev mm mm mm mm mm
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PROJECT :
BBS REF :
Description CONCOURSE SLAB BOTTOM Y DIRECTION Date Prepared 30.03.2015 Date Modified