PROJECT 9: INTEGRATED PROJECT Issued by: Sr Dr. Md Azree Othuman Mydin Planning, Designing and Managing PROJECT 9 INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)
34

Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

May 13, 2018

Download

Documents

donhi
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PROJECT 9: INTEGRATED PROJECT

Issued by: Sr Dr. Md Azree Othuman Mydin

Planning, Designing and Managing

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 2: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

Why INTEGRATE?• The bringing of people of different groups into unrestricted and equal association, as in society or an organization.

• 7 disciplines in single project (ARCH, BT, BS, CM, QS, PL and ID

• ‘broad‐based’ education

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 3: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

Recap….. Project 8‐ You have done site analysis holistically

‐ You are aware of community facility 

‐ You are familiar with tourism activities

‐ You have done environmental analysis

‐ You have done spatial analysis

‐ You are aware of tourism‐related economic activities

‐ You have already identified the type of buildings (commercial, residential, institutional, leisure & recreational and reserved area)

‐ AND FINALLY YOU HAVE OPTED ONE MOST SUITABLE SITE TO LOCATE ‘’BATU FERINGGHI INFORMATION CENTRE” BASED ON THE 5 RECCOMENDED SITES

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 4: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

(5 recommended sites)

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 5: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PROJECT 9: PLANNING, MANAGING & DESIGNING

Penang State Tourism Development & Culture has agreed to build a Information Centre at Batu Ferringhi that provides tourist information to the visitors who tour the place or area locally They agreed to appoint your company to come out with Development Proposal of ‘’Batu Ferringhi Information Centre” They necessitate the following outputs from you:1. Detail site analysis presentation drawing.2. Design proposal of ’Batu Ferringhi Information Centre’3. A Report of Development Proposal (Cadangan Pembangunan)4. A conceptual model of the proposed design The construction of the Information Centre building should be completed within 12 calendar months.

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 6: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PROJECT 9a:Design Proposal – Batu Ferringhi Information Centre

Based on the opted site, conduct a site analysis and gather all required information (refer Site Inventory & Analysis) You are required to  propose a design of Batu Ferringhi Information Centre on the selected site Design MUST have a concept Design a single‐storey information centre with a floor area not exceeding 200 square meters (you are free to choose any dimension)

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 7: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PROJECT 9a (cont.):Design Proposal – Batu Ferringhi Information Centre

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

You are required to obtain a ‘plot plan’ of the opted site by buying it (mention the number of the land lot) at the counter of JUPEM (Department of Survey and Mapping Malaysia), Penang):

Jabatan Ukur dan Pemetaan Pulau Pinang,Level 39, KOMTAR, 10000 Pulau Pinang

Tel: +04‐2611762Fax: +04‐2635884

Director: Ahmad Azman bin GhazaliEmail: [email protected]

Opening Hours:Monday‐Thursday : 7.45 am ‐ 12.30 pm; 2.00 pm ‐ 4.45 pm

Friday : 7.45 am ‐ 12.00pm; 2.45 pm ‐ 4.45 pm

You are necessary to provide a schematic design (conceptual sketches and bubble diagram) as a basis for design.

Page 8: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PROJECT 9a (cont.):Design Proposal – Batu Ferringhi Information Centre

You must ensure that the design consists of only 3 basic spaces: lobby (reception, sales area & waiting area), exhibition space and toilet. (But students are ALLOWED to introduce other exterior spaces like patio, verandah, terrace etc. in the design).

The presentation board should consists of :Board 1‐ Key Plan, Location Plan and Analysed Site Plan (existing condition) (Scale 1:250)‐ Site Analysis Information 

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 9: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PROJECT 9a (cont.):Design Proposal – Batu Ferringhi Information Centre

Board 2 & 3i) Schematic Design (Design Concept)‐ Conceptual Sketches & Bubble Diagram

ii) Presentation Drawings‐ Proposed Site Plan (with roof plan and landscape) (Scale1:250)‐ Floor Plan (Scale1:100)‐ Front Elevation, Rear Elevation, Side Elevations (Scale 1:100)‐ Perspective Drawings: 2 Exteriors and 2 Interiors‐ 1 interior section drawing (showing lobby & exhibition space) (Scale 1:100) 

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 10: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PROJECT 9a (cont.):Design Proposal – Batu Ferringhi Information Centre Board 4

i) Material Selection‐ structure, roof, roof structure, wall, ceiling, window, door,  floor, sanitary, fencing etc

ii) Building ServicesOnly focus on these 2 elements:‐ fire prevention and control system (passive and active)‐ building security systems

All of these Project 9a requirements should be composed in 4 nos of A1 size presentation board

DESIGN FOR ALL 4 PRESENTATION BOARDS SHOULD BE HARMONIZED AND COORDINATED

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 11: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

HARMONIZED AND COORDINATED

Page 12: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

HARMONIZED AND COORDINATED

Page 13: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

NOT HARMONIZED AND NOT COORDINATED

Page 14: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

WHAT IS CONCEPTUAL SKETCHES?

Vision in your mind What a project may look and feel like  Translating the vision into a sketch that captures whatever aspects you may wish to highlight

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 15: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

SCHEMATIC DESIGN:Example of Conceptual Sketches 1Example of Conceptual Sketches 1

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 16: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

Example of Conceptual Sketches

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 17: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

Example of Conceptual Sketches

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 18: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

WHAT IS BUBBLE DIAGRAM?

Free flowing concepts to help you start getting ideas for your design  Define spaces within the base plan Later on, these spaces will be further developed to include specific rooms, circulation, and designated spaces

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 19: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

BUBBLE DIAGRAM EXAMPLE 1:

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 20: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

BUBBLE DIAGRAM EXAMPLE 2:

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 21: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

BUBBLE DIAGRAM EXAMPLE 3:

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 22: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

BUBBLE DIAGRAM EXAMPLE 4:

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 23: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PRESENTATION BOARD EXAMPLE 1:

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 24: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PRESENTATION BOARD EXAMPLE 2 : INTERIOR

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 25: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PRESENTATION BOARD EXAMPLE 3:

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 26: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PROJECT 9B:Development Proposal (Cadangan Pembangunan) Students are required to prepare a report of Development 

Proposal (Cadangan Pembangunan) of the Batu Ferringhi Information Centre

The proposal should consist the following elements:1. Purpose, goal and objective (ALL)2. Background study and site analysis (PL)3. Proposed design development (ARCH, ID)4. Construction Method, Material Selection & Building Services 

(BS,BT)5. Elemental cost analysis (QS)6. Project Scheduling (CM)

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 27: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PROJECT 9B:Development Proposal (Cadangan Pembangunan)

1. Purpose, goal and objective (ALL)Purpose Development Proposal of Batu Ferringhi Information Centre at Batu 

Ferringhi Site xx (mention which site you have chosen).Goals and objectives1. To carry out site analysis for Site xx2. To propose a design of single storey information centre with floor 

area not exceeding 200 square metres3. To recommend building specification, material selection and 

construction method for the proposed design4. To provide elemental cost analysis for the proposed design5. To prepare project scheduling of the proposed design

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 28: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

2. Background Study and Site AnalysisYou must provide: Key Plan, Location Plan and Site Plan  Suitability of site / Potential of site Site Inventory and Analysis ‐ Site location, land use and 

context, Topography, Hydrology and Drainage, Soil, Microclimate, Vegetation, Existing Structures, Utilities, Site Functions, Problems on site

PROJECT 9B (cont.):Development Proposal (Cadangan Pembangunan)

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 29: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

3. Proposed Design DevelopmentYou must provide: Schematic Design (Conceptual Sketches and Bubble Diagram) Presentation Drawings (Proposed Site Plan, Floor Plan, Front 

Elevation, Rear Elevation, Side Elevations Perspective drawings & Interior Section Design

* Students are encouraged to just reduce the A1 size presentation drawing board to A3 size presentation drawing paper and attached it as Appendix in the report.

PROJECT 9B (cont.):Development Proposal (Cadangan Pembangunan)

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 30: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

4. Construction Method, Material Selection & Building Services

You must provide: Construction method ‐> Conventional? IBS? Mixed? Propose 

the superstructure and substructure. Material selection for ‐> structure, roof, roof structure, wall, 

ceiling, window, door, floor, sanitary, fencing Building Services ‐> only focus on fire prevention & control 

systems and building security systems

PROJECT 9B (cont.):Development Proposal (Cadangan Pembangunan)

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 31: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

5. Elemental Cost Analysis (ECA) ECA – a systematic breakdown of the cost of building 

according to key elements Key elements – substructure, superstructure, finishes, fittings 

& furniture, services, external work Specification in the ECA describes the type and quality of 

materials to be used in the projects You must provide:‐ An ECA and Specification for your project

PROJECT 9B (cont.):Development Proposal (Cadangan Pembangunan)

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 32: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

6. Project Management & Scheduling Knowing how much time a team has to complete a project makes it 

easier for the project manager to allocate tasks and get things done.  Therefore, many project managers rely on project schedules to set 

timeframe parameters for projects.

You must provide:1. Role of group members2. Organization chart of your group 3. Gantt Chart (reporting on actual project ‐ excel) which is based on ECA.

Submission requirement for Project 9B: One complete typed report (printed in A4 format; font Arial 11; 1.5 spacing) : 25‐35 pages

PROJECT 9B (cont.):Development Proposal (Cadangan Pembangunan)

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 33: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

GANTT CHART EXAMPLE 1:

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)

Page 34: Project 9 - Integrated - Universiti Sains Malaysia · PROJECT 9 ‐INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING) (5 recommended sites) PROJECT 9 ‐INTEGRATED PROJECT (PLANNING

PROJECT 9C: CONCEPTUAL MODEL 

Based on the design and dimensions of your Information Centre (Project 9a), build its CONCEPTUAL MODEL in 1:50 scale.

Submission requirement: MODEL BASE: A1 Size Hardboard or PlywoodMATERIAL: anything suitable COLOUR: monochrome

SUBMISSION ON 7.12.2012

PROJECT 9  ‐ INTEGRATED PROJECT (PLANNING, DESIGNING & MANAGING)