Project 5145-00-01/71 WIS 78 TO US 12 WIS 19 Dane County Public Involvement Meeting July 19, 2018 1 Preliminary Plans
Project 5145-00-01/71WIS 78 TO US 12
WIS 19Dane County
Public Involvement Meeting
July 19, 2018
1
Preliminary Plans
Welcome and Opening Remarks
Lalitha Balachandran, PEWisDOT Project Manager
Greg Payne, PEWisDOT Project Leader
William Strobel, PEWisDOT Project Development Supervisor
Jeremy RachWisDOT Design Engineer
2 2
Preliminary Plans
Agenda
Project Location
Recent Activities
Project Purpose/Need
Design Overview
Upcoming Schedule
Other Discussion – Questions?
3
Preliminary Plans
Project Location
4
Preliminary Plans
5
Anticipated Construction 2022
WIS 19 will be closed to thru traffic
Open for local, business and park access
Preliminary Plans
Recent Activity
6
2013 – Archaeology investigation began
2015 – WisDOT maintenance requested an emergency lane edge improvement
2017 – Lane edge improvement project was constructed
Preliminary Plans
Recent Activity
7
2017 continued
• Design for the current project began
• Project flown for surface survey data
• Archaeology investigation continued
• Existing drainage investigation
• Traffic forecast completed
2018
• Archaeology investigation completed
• Preliminary impacts completed
• Began drafting environmental report
Preliminary Plans
Project Purpose and Need
8
Safety Concerns
• Blind vertical and horizontal curves leading to crash concerns
• Narrow shoulder width
• Ditches are not traversable
Drainage Concerns
Deteriorating Surface
Bridges in Need of Replacement
Preliminary Plans
Design Overview
Project Overview
9
Resurface
CTH
F
Reconstruct Resurface ReconstructResurface
CTH
K
Reconstruct Resurface
Preliminary Plans
Design Overview
Rehabilitation Project
• 35% Reconstruct / 65% Resurface
• Geometric adjustments to improve safety
• Widening of shoulders for length of the project
• Improve drainage capability with new ditching
• Cost vs. Benefit consideration
10
Preliminary Plans
Design Overview
Existing Typical Section
11
Preliminary Plans
Design Overview
Proposed Typical Section
12
Preliminary Plans
Design Overview
Benefits of Wider Shoulders
• Provides more space for farm equipment and other oversized loads
o Increased safety for those deciding to pass these vehicles
• Increased safety for cars turning left or right
• Increased safety for bicyclists, pedestrians and motorists.
• Provides a safe area for broken down cars to pull over
• Provides a safe area for police to pull over speeding motorists
13
Preliminary Plans
Design Overview
WIS 78/WIS 19 Intersection
14
Resurface
ReconstructPreliminary Plans
15
Preliminary Plans
Design Overview
Vertical and Horizontal Improvements Near CTH F
CTH
F
16
Reconstruct
Resurface
Preliminary Plans
Design Overview
Marxville Reconstruct
CTH
KP
17
Resurface
ReconstructPreliminary Plans
Design Overview
Horizontal Improvements Near Indian Lake Park
18Lila
c La
ne
Indian Lake Park
Resurface
ReconstructPreliminary Plans
Design Overview
Horizontal Improvements Near Indian Lake Park
19
BEFORE AFTERPreliminary Plans
Design Overview
Horizontal Curve Improvement and Pedestrian Underpass
20
Mat
z R
dResurface
Reconstruct
Preliminary Plans
Design Overview
Horizontal Curve Improvement and Pedestrian Underpass
21
BEFOREPreliminary Plans
Design Overview
Horizontal Curve Improvement and Pedestrian Underpass
22
AFTERPreliminary Plans
Design Overview
Horizontal Curve Improvement and Pedestrian Underpass
23
Mat
z R
dResurface
Reconstruct
Preliminary Plans
Design Overview
Horizontal Curve Improvement and Pedestrian Underpass
24
BEFOREPreliminary Plans
Design Overview
Horizontal Curve Improvement and Pedestrian Underpass
25
AFTER
7-FEET
Preliminary Plans
Design Overview
Vertical, Horizontal, and Drainage Improvements
26
Mat
z R
d
Resurface
Reconstruct
Preliminary Plans
27
Preliminary Plans
Design Overview
Horizontal Curve Improvement and Pedestrian Underpass
28
Resurface
Reconstruct
Preliminary Plans
Design Overview
WIS 19/US 12 Intersection
29
Resurface
ReconstructPreliminary Plans
Upcoming Schedule
Soil Testing
Environmental Report Submittal
Survey, Plat
Public Involvement Meeting #2
Real Estate Acquisition
Final Plans
Construction
30
Fall 2018
February 2019
May 2019
Tentatively May 2019
Fall 2019
May 2021
Spring 2022
Preliminary Plans
Drain Tile Locations
Septic Tank Locations
Drainage Issues
Sensitive Installations, Trees, or Heirlooms
31
Preliminary Plans
32
STEP 1 – Place number on the map.
STEP 2 – Write number and comment on form.
12
Preliminary Plans
33
Preliminary Plans