1 Project 1 I-30/35 Interchange Reconstruction Fort Worth, Texas
10

Project 1 i-30-35 interchange ft worth 092210

Jun 20, 2015

Download

Business

TTI-UTCM

Case Study #1 for UTCM Report #08-14-03 "Making Mobility Improvements a Community Asset: Transportation Improvements Using Context-Sensitive Solutions"
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project 1   i-30-35 interchange ft worth 092210

1

Project 1I-30/35 Interchange Reconstruction

Fort Worth, Texas

Page 2: Project 1   i-30-35 interchange ft worth 092210

2

Project Existing elevated freeway over Lancaster Avenue

Project Reconstruction Capacity and safety improvements

Page 3: Project 1   i-30-35 interchange ft worth 092210

3

Initial Plan Initial plan – west leg (early 1980s)

Widened elevated structure

Community reaction

Opposition

Lawsuit (filed 1983)

Leadership interest to find better solution

Page 4: Project 1   i-30-35 interchange ft worth 092210

Collaborative Approach District Engineer saw advantage to proceed with collaborative

effort Community leaders and stakeholders wanted I-30 improved Problem was “how,” not “if”

DE assembled “I-30 Working Group” 1985 Also wide range of stakeholders

Leaders Residents Businesses Property owners

Numerous workshops Objectives Concepts Options Evaluations

Multi-disciplinary planning team 4

Page 5: Project 1   i-30-35 interchange ft worth 092210

5

CSS Approach – Stakeholder Objectives Objectives/concerns

Replace aging structure

Increase interchange capacity

Increase safety Merges, weaves

Design speed

Sight distances

Improve aesthetics Freeway

Barrier

Historic preservation

Permit T&P building revitalization

Redevelopment

Page 6: Project 1   i-30-35 interchange ft worth 092210

6

Approach

Initial alternatives

Existing alignment Elevated

At-grade

Depressed

New alignments

Preferred alignment

Late 1987 Visualization of preferred alternative (SDH&PT, FHWA, 1991)

Page 7: Project 1   i-30-35 interchange ft worth 092210

7

Relocated I-30 West Leg

Page 8: Project 1   i-30-35 interchange ft worth 092210

Original Interchange

8

I-30/I-35W interchange looking south, 1958. Source: http://www.texasfreeway.com/dallas/historic/photos/images/i35w_i30_fw_looking_s_july-1958.jpg

Page 9: Project 1   i-30-35 interchange ft worth 092210

9

Improved Ramps

Page 10: Project 1   i-30-35 interchange ft worth 092210

Lancaster Avenue

Completion Freeway - 2000 Lancaster - 2008 Redevelopment - 2006+

10