Top Banner
INTRODUCTION TO DRAWING INTRODUCTION TO CONSTRUCTION INDUSTRY Project 1: Understanding Different types of Professions and Drawings in the Built Environment LAW ZHI CHANG JOSEPH SOH LEONG LI JING KIMBERLEY FAY HO ZI YAN LEE FEI SYEN
35
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Project 1 - Architect

INTRODUCTION TO DRAWINGINTRODUCTION TO CONSTRUCTION

INDUSTRY

Project 1: Understanding Different types of Professions and Drawings in the Built Environment

LAW ZHI CHANG

JOSEPH SOH

LEONG LI JING

KIMBERLEY FAY

HO ZI YAN

LEE FEI SYEN

Page 2: Project 1 - Architect
Page 3: Project 1 - Architect

ROLES

STARTERCLIENTS

THINKERDESIGN

FINALIZERDOCUMENTATION

DO-ERCONSTRUCTION

Page 4: Project 1 - Architect

RESPONSIBILITIES & TASK

Page 5: Project 1 - Architect

BEFORECONSRTUCTION

•Customer Meeting.

• Identify alternatives.

•Decision Making.

•Discussing the objectives, requirements and budget of a project.

•Building Regulations Approval – permission to build.

Page 6: Project 1 - Architect

DURINGCONSTRUCTION

•Producing detailed workings, drawings and specifications.

•Contractor selecting with clients.

•Project managing.

•Commencing a project from start to finish.

•Regular check on site and process to ensure that the project is running on time and to budget.

•Resolving problems and issues

Page 7: Project 1 - Architect

AFTERCONSTRUCTION

•Testing, adjusting and correcting all components of the building

•Apply for Certificate of Completion and Compliance

•Respond to Feedback either users or clients

Page 8: Project 1 - Architect

DRAWINGS

Page 9: Project 1 - Architect

STAGES OF DRAWING

Before Construction

•Schematic design

•Design development

After construction

•Construction documents

Page 10: Project 1 - Architect

SCHEMATIC DESIGN

• Bubble Diagram

• Preliminary Sketch

Page 11: Project 1 - Architect

BUBBLE DIAGRAM

Page 12: Project 1 - Architect

PRELIMINARY SKETCH

Page 13: Project 1 - Architect

DESIGN DEVELOPMENT

Page 14: Project 1 - Architect

DESIGN DEVELOPMENT

•Site Plan

•Foundation Plan

•Building Section

•Floor Plan

•Roof plan

•Exterior Elevation

Page 15: Project 1 - Architect

SITE PLAN

Page 16: Project 1 - Architect

FOUNDATION PLAN

Page 17: Project 1 - Architect

BUILDING

SECTION

Page 18: Project 1 - Architect

FLOOR PLAN

Page 19: Project 1 - Architect

FLOOR PLAN

Page 20: Project 1 - Architect
Page 21: Project 1 - Architect

ROOF PLAN

Page 22: Project 1 - Architect

ROOF PLAN

Valley line

Hip Line

Ridgeline Ridgelin

e

Rid

gelin

e

Page 23: Project 1 - Architect

EXTERIOR ELEVATION

Page 24: Project 1 - Architect

EXTERIOR ELEVATION

Page 25: Project 1 - Architect

CONSTRUCTION DETAILS

Page 26: Project 1 - Architect
Page 27: Project 1 - Architect

Stairs

Page 28: Project 1 - Architect

Toilets & Kitchen

Toilet

Toilet

Page 29: Project 1 - Architect

Measurements

Page 30: Project 1 - Architect

CONSTRUCTION DOCUMENT

Page 31: Project 1 - Architect
Page 32: Project 1 - Architect

CONCLUSION

•Architect is a very important role in the construction industry.

Page 33: Project 1 - Architect

REFLECTION• MEET NEW FRIENDS

• WORKING AS A TEAM

• HOW TO DIFFERENTIATE THE DRAWINGS

• PROJECT PLANNING

• JOB DISTRIBUTION

• GREAT TIMES ! ! !

Page 34: Project 1 - Architect

THANK YOU