Sika Australia Pty Ltd55 Elizabeth StWetherill Park, NSW 2164Phone +61 2 9575 5670 / Fax +61 2 9756 0502www.sika.com.au

Kempsey Bi-Pass Bridge Bearing Pads

Product Used: SikaDur

Sika

at W

ork

December, 2011

Page 2: Proj ref sml_kbpb

Requirements:

To provide High Strength Epoxy Grouted Bridge Bearing pads for Australia’s Longest Bridge of 3.2klm length with more than 940 Super T Beams, each of 34 metre’s for the Macleay River & Floodplain Bridge for the Pacific Hwy Kempsey Bi-pass.

Solution:

To provide SikaDur 32 Epoxy resin bonding agent to be coated on the galvanized bearing plate to provide a bonding agent for the SikaDur 42 High Strength Pourable Epoxy Grout to be placed in thickness ranging from 17mm to 70mm over the 1882 quantity of Bridge Bearing Pads required.

Products used: SikaDur 32SikaDur 42

Project Details:

Date: 1/12/2011 Location: Macksville , NSWContractor: Australian Precast SolutionsSika Representative: Brett Finucane

Concrete Remedial Repairs