Proiect - Qua rterlv Progress Report Promote/s Name Casa Grande Civil En gineering Private Limited Project Name Casagrand Bellissimo Project Registration No TN/01/Buildin sloo28l2ot7 Quarter Ending September 23,zOLg B. Construction S.No Description Nos. Total Area - (sq.m) Plots/Flats Booked size wise (As given in Carpet Area Statement while registering) 2!9.2493 7 501.311 3952.069 96s 1.802 2 Parking Lots 339 UDS Registered in Sq.m. 35 t89L.17 S.No Description Block/Tower No. Status Door Shutter fixing, Painting & Cp san fixing work is in resS B Door Shutter fixing, Pajnting & Cp san fixing work is in pr ogress ary C Final Coat painting is in progress, Han over is in P rogress tng D False ceiling, Door Shutter fixing, pain CP sanitary fixing & Terrace tile laying is in progress ng, ork E False ceiling, Door Shutter fixing, paint CP sanitary fixing work is in progress ng& L Stage of construcUon of each Block/Tower, Floor wise F Tile laying, Window fixing & painting is in progress rk ./.. / t'i I I I 5 A. Sales 4 2367 6.7 2BHK 64 1) 3BH K 156 4BH K 43 L. 4068 3.
21
Embed
Proiect rterlv Progress - tnrera.intnrera.in/Current_Status_Project/Building/2017/28-2017.pdf · Proiect -Quarterlv Progress Report Promote/s Name Casa Grande Civil Engineering Private
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Proiect - Qua rterlv Progress Report
Promote/s Name Casa Grande Civil Engineering Private LimitedProject Name Casagrand BellissimoProject Registration No TN/01/Buildin sloo28l2ot7Quarter Ending September 23,zOLg
B. Construction
S.No Description Nos. Total Area
- (sq.m)
Plots/Flats Booked size wise(As given in Carpet AreaStatement while registering)
2!9.24937 501.311
3952.069
96s 1.802
2 Parking Lots
339
UDS Registered in Sq.m.
35 t89L.17
S.No Description Block/Tower No. Status
Door Shutter fixing, Painting & Cp sanfixing work is in resS
B Door Shutter fixing, Pajnting & Cp sanfixing work is in progress
ary
C Final Coat painting is in progress, Hanover is in Progress
tng
DFalse ceiling, Door Shutter fixing, pain
CP sanitary fixing & Terrace tile layingis in progress
ng,
ork
EFalse ceiling, Door Shutter fixing, paintCP sanitary fixing work is in progress
ng&
L Stage of construcUon ofeach Block/Tower, Floorwise
FTile laying, Window fixing & paintingis in progress
rk
./../ t'i
II
I5
A. Sales
4
2367 6.7
2BHK 641)
3BH K 156
4BH K 43
L.
40683.
ress
1g isj
Marble & Tile laying, Window fixing &Painting work is in progress
lnternal Plumbing, WaterproofingCompleted & Tile laying work is in p
Block work, lnternal Plastering, plumbiin Progress, Water proofing Complete
2 Status of commonAmenities for eachBlock/Tower, ltem wise Club House Stilt floor roofslab is in
C. Details of Clearances
1-. Completion Certificate No. NA2. Annual Audit Report of Special Account in Form 7 Enclosed
D. Latest Photo with Date (Atleast from 2 angles) - Enclosed in CD
For CASA G CIVIL
U
PVI LTD
d tories
G
J
BLOCK – A PAINTING WORK, FALSE CEILING, SWITCH PLATE, KITCHEN COUNTER, FINISHING WORK IN PROGRESS.
BLOCK – A
BLOCK – B FINISHING WORK IN PROGRESS
BLOCK – B
BLOCK – C FINISHING AND QC SNAG WORK IN PROGRESS
BLOCK – C
BLOCK – D 3RD FLOORPAINTING AND KITCHEN GRANITE LAYING, DOOR SHUTTER, COUNTER TOP WASH BASIN, WIRING, SWITCH PLATE GRANITE WORK
IN PROGRESS
BLOCK – D
BLOCK – E INTERNAL PAINTING,SWITCH PLAT WORK,KITCHEN PLATFORM, IN PROGRESS
BLOCK – E
BLOCK – F 4TH FLOOR TILE, WALL PUTTY, EXTERNAL PAINTING, UPVC WINDOW WORK IN PROGRESS, WATER PROOFING, WINDOW GRILL
BLOCK – F
BLOCK – G PLUMBING WORK , WATER PROOFING, WALL&FLOOR TILES, MARBLE FLOORING, EXTERNAL PAINTING WORK, GRILL FIXING
IN PROGRESS
BLOCK – G
BLOCK – H PLUMBING WORK,WATERPROOFING,WALL PUTTY TILING,EXTERNAL PAINTING IN PROGRESS