Progress of NVDAL BSL-3 Construction

Feb 08, 2016

Download

Documents

qabil

Progress of NVDAL BSL-3 Construction. Enuh R.Djusa DVM,Ph.D. Jl.Raya Pembangunan, Gn. Sindur Bogor 16340. BACKGROUND. HPAI is still problem in southeast Asia countries including Indonesia Vaccination is one of the strategy implemented beside Other strategies - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Progress of NVDAL BSL-3 Construction

Enuh R.Djusa DVM,Ph.D.Jl.Raya Pembangunan, Gn. Sindur Bogor 16340

Page 2: Progress of NVDAL BSL-3 Construction

• HPAI is still problem in southeast Asia countries including Indonesia

• Vaccination is one of the strategy implemented beside Other strategies

• NVDAL ensures the quality of the vaccines distributed in Indonesia.

• BSL-3 is urgently needed to test zoonotic diseases vaccines such as AI,Rabies,Brucella, Anthrax, and others.

Page 3: Progress of NVDAL BSL-3 Construction

Internasional Standard: WHO Laboratory Biosafety Manual, 3rd

edition 2004 (accessed online 2010)3 OIE Manual of Diagnostic Tests and

Vaccines for Terrestrial Animals (2008): Chapter 1.1.2: Biosafety and Biosecurity in the Veterinary Microbiological Laboratory and Animal Facilities (accessed online 2010)

Page 4: Progress of NVDAL BSL-3 Construction

Conceptual design Review process Detailed design Review process Tender preparation Approval Call for tender Tender evaluation and award Construction and supervision (site inspections and meetings) Contractual and payment support Commissioning and testing Selection and appointment of certifier Certification Hand-over Cold and training operation Hot operation Post-commissioning observation (warranty issues)

Page 5: Progress of NVDAL BSL-3 Construction

BSL-3 size : 15 x 24 sq.m.

Page 6: Progress of NVDAL BSL-3 Construction

BSL-3 lay outBSL 3 Lay out

Page 7: Progress of NVDAL BSL-3 Construction

• BSL-3 laboratory equipped by BSC class IIA2, refrigerator, freezer, CO2 incubator, centrifuges etc.

• Cabinet Laboratory-style ABSL-4: isolators (animal isolators and surgical isolator).

Page 8: Progress of NVDAL BSL-3 Construction

• Corridor: connected all laboratories, changing room for male/female, Equipment maintenance (autoclave, dunk-tank, pass-box, Storage room.

• Decontamination airlock for heavy equipment transfer.

• Administration room

Page 9: Progress of NVDAL BSL-3 Construction

TERIMA KASIH