LampiranKontrak : Pembangunan IPLT Kabupaten Bangka BaratNomor :Tanggal :
DAFTAR KUNTITAS DAN HARGA
PEKERJAAN : PEMBANGUNAN IPLT KABUPATEN BANGKA BARATLOKASI : KABUPATEN BANGKA BARATSUMBER DANA : APBN 2015
PT. MANDALA BAKTI UTAMA
No. Uraian Pekerjaan Sat. Volume Harga Satuan Jumlah Harga
1 2 3 4 5 6I. PEKERJAAN PERSIAPAN 42,019,204.25
1. 1. Pek. Mobilisasi dan Demobilisasi Ls 1.00 33,027,469.25 33,027,469.25 1. 2. Pek. Pengukuran Pemasangan Bowplank M1 134.00 67,102.50 8,991,735.00
II. PEKERJAAN BANGUNAN IPLT 2,303,000,430.12 2. 1. Land Clearing/Grading m2 5,000.00 7,016.74 35,083,700.00 2. 2. Galian Tanah (Manual) m3 16.04 39,560.00 634,423.72 2. 3. Galian Tanah Dengan Alat m3 1,709.33 64,544.89 110,328,745.96 2. 4. Buangan Tanah Sisa Galian Sekitar Lokasi m3 1,230.96 29,727.50 36,593,421.37 2. 5. Urugan Tanah Kembali m3 537.19 18,963.50 10,187,015.84 2. 6. Urugan Pasir m3 69.06 96,140.00 6,639,679.81 2. 7. Urugan Gravel 5-7 cm m2 2.25 703,340.00 1,582,515.00 2. 8. Pek. Pas. Cerucuk Btg 120.00 30,967.86 3,716,143.20 2. 9. Pas. Batu Belah ad. 1:4 m3 33.75 852,230.50 28,762,779.38 2. 10. Lantai kerja beton ad. 1 pc : 2 ps : 3 kr m3 44.29 1,399,078.50 61,965,088.83 2. 11. Pek. Beton k-275 Bertulang utk. Balok Atas m3 3.89 9,203,419.03 35,782,893.19 2. 12. Pek. Beton k-275 Bertulang utk. Kolom 20/20 m3 0.77 12,553,070.26 9,640,757.96 2. 13. Pek. Beton k-275 Bertulang utk. Plat Deucker t=10 cmm3 1.20 8,106,343.17 9,727,611.80 2. 14. Pek. Beton k-275 Bertulang utk. Lantai Atas t=20 cm m3 2.91 6,123,202.86 17,830,766.73 2. 15. Pek. Beton k-275 Bertulang utk. Lantai Dasar t=20 cmm3 5.16 5,822,719.36 30,033,586.46 2. 16. Pek. Beton k-275 Bertulang utk. Lantai Dasar t=25 cmm3 102.94 6,209,685.98 639,243,393.35 2. 17. Pek. Beton k-275 Bertulang utk. dinding t=20 cm m3 119.67 8,809,412.48 1,054,248,819.72 2. 18. Pek. Pas. Dinding 1/2 bata m2 509.20 154,140.25 78,488,215.30 2. 19. Pek. Plesteran ad. 1:2 m2 534.66 72,835.25 38,942,094.77 2. 20. Pleteran Siaran m2 65.00 62,407.63 4,056,495.95 2. 21. Pek. Acian m2 534.66 35,512.00 18,986,845.92 2. 22. Konblock m2 85.50 120,347.50 10,289,711.25 2. 23. Pipa HDPE ø 150 cm m 4.90 350,492.40 1,717,412.76 2. 24. Bend Ø 150 x 90ᵒ bh 4.00 200,000.00 800,000.00 2. 25. Tee Ø 150 bh 2.00 225,000.00 450,000.00 2. 26. Pek. Pas. Pintu Air Type 1 bh 2.00 3,500,000.00 7,000,000.00 2. 27. Pek. Pas. Pintu Air Type 2 bh 12.00 3,650,000.00 43,800,000.00 2. 28. Bar Screen m2 5.00 1,250,000.00 6,250,000.00 2. 29. Lapisan Ijuk t=10 cm m2 2.24 97,635.00 218,311.86
III. PEKERJAAN JALAN OPERASIONAL 415,115,776.10 3. 1. Land Clearing/Grading m2 600.00 7,016.74 4,210,044.00 3. 2. Striping 30 cm m3 180.00 22,827.50 4,108,950.00 3. 3. Urugan Tanah Pilihan + Pemadatan m3 180.00 59,809.45 10,765,701.00 3. 4. Base course Aggr Klas A-CBR 90% (t=15 cm) m3 90.00 571,420.76 51,427,868.40 3. 5. Lantai kerja beton ad. 1 pc : 2 ps : 3 kr m3 30.00 1,399,078.50 41,972,355.00 3. 6. Rigid pavement, K-275 m3 120.00 1,830,570.00 219,668,400.00 3. 7. Wiremesh M6 (GGPS & GGUS) + pasang m2 600.00 80,000.00 48,000,000.00 3. 8. Pembesian rigid (Dowel bar Dia.33 mm) + pasang kg 2,133.33 16,388.65 34,962,457.70
PT. MANDALA BAKTI UTAMA
No. Uraian Pekerjaan Sat. Volume Harga Satuan Jumlah Harga
1 2 3 4 5 6
IV. PEKERJAAN PAGAR KELILING 182,311,583.55 4. 1. Galian Tanah Biasa m3 36.33 39,560.00 1,437,214.80 4. 2. Pondasi Pagar Pas 1pc : 3ps : 5kr m3 5.20 1,399,078.50 7,274,368.75 4. 3. Pagar Plat + kolom Beton Precast t :2 m bh 185.00 320,000.00 59,200,000.00 4. 4. Pagar BRC t : 190 cm, dia. Jari : 7 mm, Tiang pipa GIP m2 143.00 800,000.00 114,400,000.00
V. PEKERJAAN LAIN-LAIN 16,100,000.00 5. 1. Pekerjaan Pengeringan/dewatering Ls 1.00 13,600,000.00 13,600,000.00 5. 2. Perapian Selesai Pekerjaan Ls 1.00 2,500,000.00 2,500,000.00
JUMLAH 2,958,546,994.02 PPN 295,854,699.40 JUMLAH (a + b) 3,254,401,693.42 DIBULATKAN 3,254,401,000.00
LAPORAN KEMAJUAN FISIK PEKERJAANMINGGUAN
MINGGU KE : 1 (SATU) TANGGAL : 18 MEI 2015 S/D 24 MEI 2015 Pekerjaan : PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT Lokasi : KABUPATEN BANGKA BARAT Tahun Anggaran : 2015
NO URAIAN PEKERJAAN
PERKEMBANGAN KUANTITAS VOLUME
SAT. BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI BOBOT
Disetujui/Diketahui : Diperiksa oleh : Dibuat Oleh :PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT CV. ARY CON'S PT. MANDALA BAKTI UTAMA
AHMAD SUFYAN, ST KEVIN RAJ CHANDRA ERDIANSYAH, STNIP. 19800802 201410 1 001 Pengawas 2 Inspector Pelaksana Lapangan
LAPORAN KEMAJUAN FISIK PEKERJAANMINGGUAN
MINGGU KE : 2 (DUA) TANGGAL : 25 MEI 2015 S/D 31 MEI 2015 Pekerjaan : PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT Lokasi : KABUPATEN BANGKA BARAT Tahun Anggaran : 2015
NO URAIAN PEKERJAAN
PERKEMBANGAN KUANTITAS VOLUME
SAT. BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI BOBOT
Disetujui/Diketahui : Diperiksa oleh : Dibuat Oleh :PENGAWAS LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT CV. ARY CON'S PT. MANDALA BAKTI UTAMA
AHMAD SUFYAN, ST KEVIN RAJ CHANDRA ERDIANSYAH, STNIP. 19800802 201410 1 001 Pengawas 2 Inspector Pelaksana Lapangan
LAPORAN KEMAJUAN FISIK PEKERJAANBULANAN
BULAN KE : 1 (SATU) TANGGAL : 18 MEI 2015 S/D 31 MEI 2015 Pekerjaan : PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT Lokasi : KABUPATEN BANGKA BARAT Tahun Anggaran : 2015
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN 1.1 Pek. Mobilisasi dan Demobilisasi 1.2 Pek. Pengukuran Pemasangan Bowplank
II PEKERJAAN BANGUNAN IPLT 2.1 Land Clearing/Grading 2.2 Galian Tanah (Manual) 2.3 Galian Tanah Dengan Alat 2.4 Buangan Tanah Sisa Galian Sekitar Lokasi 2.5 Urugan Tanah Kembali 2.6 Urugan Pasir 2.7 Urugan Gravel 5-7 cm 2.8 Pek. Pas. Cerucuk 2.9 Pas. Batu Belah ad. 1:4 2.10 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 2.11 Pek. Beton k-275 Bertulang utk. Balok Atas 2.12 Pek. Beton k-275 Bertulang utk. Kolom 20/20 2.13 Pek. Beton k-275 Bertulang utk. Plat Deucker t=10 cm 2.14 Pek. Beton k-275 Bertulang utk. Lantai Atas t=20 cm 2.15 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=20 cm 2.16 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=25 cm 2.17 Pek. Beton k-275 Bertulang utk. dinding t=20 cm 2.18 Pek. Pas. Dinding 1/2 bata 2.19 Pek. Plesteran ad. 1:2 2.20 Pleteran Siaran 2.21 Pek. Acian 2.22 Konblock 2.23 Pipa HDPE ø 150 cm 2.24 Bend Ø 150 x 90ᵒ 2.25 Tee Ø 150 2.26 Pek. Pas. Pintu Air Type 1
2.27 Pek. Pas. Pintu Air Type 2 2.28 Bar Screen 2.29 Lapisan Ijuk t=10 cm
III PEKERJAAN JALAN OPERASIONAL 3.1 Land Clearing/Grading 3.2 Striping 30 cm 3.3 Urugan Tanah Pilihan + Pemadatan 3.4 Base course Aggr Klas A-CBR 90% (t=15 cm) 3.5 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 3.6 Rigid pavement, K-275 3.7 Wiremesh M6 (GGPS & GGUS) + pasang 3.8 Pembesian rigid (Dowel bar Dia.33 mm) + pasang
IV PEKERJAAN PAGAR KELILING 4.1 Galian Tanah Biasa 4.2 Pondasi Pagar Pas 1pc : 3ps : 5kr 4.3 Pagar Plat + kolom Beton Precast t :2 m 4.4 Pagar BRC t : 190 cm, dia. Jari : 7 mm, Tiang pipa GIP Ø 1,5"
V PEKERJAAN LAIN-LAIN 5.1 Pekerjaan Pengeringan/dewatering 5.2 Perapian Selesai Pekerjaan
TOTAL JUMLAH
Mengetahui : Disetujui Oleh :PEJABAT PEMBUAT KOMITMEN DIREKSI LAPANGAN
PEMBANGUNAN IPLT PEMBANGUNAN IPLTKABUPATEN BANGKA BARAT KABUPATEN BANGKA BARAT
Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :DIREKSI LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA PEMBANGUNAN IPLT CV. ARY CON'S PT. MANDALA BAKTI UTAMA
KABUPATEN BANGKA BARAT
INDRA JAYA , ST, MT HERIADY, STNIP. 19721202 200701 1 005 Team Leader General Superintenden
MINGGU KE : 3 (TIGA) TANGGAL : 1 JUNI 2015 S/D 7 JUNI 2015 Pekerjaan : PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT Lokasi : KABUPATEN BANGKA BARAT Tahun Anggaran : 2015
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN 1.1 Pek. Mobilisasi dan Demobilisasi 1.2 Pek. Pengukuran Pemasangan Bowplank
II PEKERJAAN BANGUNAN IPLT 2.1 Land Clearing/Grading 2.2 Galian Tanah (Manual) 2.3 Galian Tanah Dengan Alat 2.4 Buangan Tanah Sisa Galian Sekitar Lokasi 2.5 Urugan Tanah Kembali 2.6 Urugan Pasir 2.7 Urugan Gravel 5-7 cm 2.8 Pek. Pas. Cerucuk 2.9 Pas. Batu Belah ad. 1:4 2.10 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 2.11 Pek. Beton k-275 Bertulang utk. Balok Atas 2.12 Pek. Beton k-275 Bertulang utk. Kolom 20/20 2.13 Pek. Beton k-275 Bertulang utk. Plat Deucker t=10 cm 2.14 Pek. Beton k-275 Bertulang utk. Lantai Atas t=20 cm 2.15 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=20 cm 2.16 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=25 cm 2.17 Pek. Beton k-275 Bertulang utk. dinding t=20 cm 2.18 Pek. Pas. Dinding 1/2 bata 2.19 Pek. Plesteran ad. 1:2 2.20 Pleteran Siaran 2.21 Pek. Acian 2.22 Konblock 2.23 Pipa HDPE ø 150 cm 2.24 Bend Ø 150 x 90ᵒ 2.25 Tee Ø 150 2.26 Pek. Pas. Pintu Air Type 1
2.27 Pek. Pas. Pintu Air Type 2 2.28 Bar Screen 2.29 Lapisan Ijuk t=10 cm
III PEKERJAAN JALAN OPERASIONAL 3.1 Land Clearing/Grading 3.2 Striping 30 cm 3.3 Urugan Tanah Pilihan + Pemadatan 3.4 Base course Aggr Klas A-CBR 90% (t=15 cm) 3.5 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 3.6 Rigid pavement, K-275 3.7 Wiremesh M6 (GGPS & GGUS) + pasang 3.8 Pembesian rigid (Dowel bar Dia.33 mm) + pasang
IV PEKERJAAN PAGAR KELILING 4.1 Galian Tanah Biasa 4.2 Pondasi Pagar Pas 1pc : 3ps : 5kr 4.3 Pagar Plat + kolom Beton Precast t :2 m 4.4 Pagar BRC t : 190 cm, dia. Jari : 7 mm, Tiang pipa GIP Ø 1,5"
V PEKERJAAN LAIN-LAIN 5.1 Pekerjaan Pengeringan/dewatering 5.2 Perapian Selesai Pekerjaan
TOTAL JUMLAH
Disetujui/Diketahui :PENGAWAS LAPANGAN
PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT
AHMAD SUFYAN, ST KEVIN RAJ CHANDRANIP. 19800802 201410 1 001 Pengawas 2
MINGGU KE : 4 (EMPAT) TANGGAL : 8 JUNI 2015 S/D 14 JUNI 2015 Pekerjaan : PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT Lokasi : KABUPATEN BANGKA BARAT Tahun Anggaran : 2015
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN 1.1 Pek. Mobilisasi dan Demobilisasi 1.2 Pek. Pengukuran Pemasangan Bowplank
II PEKERJAAN BANGUNAN IPLT 2.1 Land Clearing/Grading 2.2 Galian Tanah (Manual) 2.3 Galian Tanah Dengan Alat 2.4 Buangan Tanah Sisa Galian Sekitar Lokasi 2.5 Urugan Tanah Kembali 2.6 Urugan Pasir 2.7 Urugan Gravel 5-7 cm 2.8 Pek. Pas. Cerucuk 2.9 Pas. Batu Belah ad. 1:4 2.10 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 2.11 Pek. Beton k-275 Bertulang utk. Balok Atas 2.12 Pek. Beton k-275 Bertulang utk. Kolom 20/20 2.13 Pek. Beton k-275 Bertulang utk. Plat Deucker t=10 cm 2.14 Pek. Beton k-275 Bertulang utk. Lantai Atas t=20 cm 2.15 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=20 cm 2.16 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=25 cm 2.17 Pek. Beton k-275 Bertulang utk. dinding t=20 cm 2.18 Pek. Pas. Dinding 1/2 bata 2.19 Pek. Plesteran ad. 1:2 2.20 Pleteran Siaran 2.21 Pek. Acian 2.22 Konblock 2.23 Pipa HDPE ø 150 cm 2.24 Bend Ø 150 x 90ᵒ 2.25 Tee Ø 150 2.26 Pek. Pas. Pintu Air Type 1
2.27 Pek. Pas. Pintu Air Type 2 2.28 Bar Screen 2.29 Lapisan Ijuk t=10 cm
III PEKERJAAN JALAN OPERASIONAL 3.1 Land Clearing/Grading 3.2 Striping 30 cm 3.3 Urugan Tanah Pilihan + Pemadatan 3.4 Base course Aggr Klas A-CBR 90% (t=15 cm) 3.5 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 3.6 Rigid pavement, K-275 3.7 Wiremesh M6 (GGPS & GGUS) + pasang 3.8 Pembesian rigid (Dowel bar Dia.33 mm) + pasang
IV PEKERJAAN PAGAR KELILING 4.1 Galian Tanah Biasa 4.2 Pondasi Pagar Pas 1pc : 3ps : 5kr 4.3 Pagar Plat + kolom Beton Precast t :2 m 4.4 Pagar BRC t : 190 cm, dia. Jari : 7 mm, Tiang pipa GIP Ø 1,5"
V PEKERJAAN LAIN-LAIN 5.1 Pekerjaan Pengeringan/dewatering 5.2 Perapian Selesai Pekerjaan
TOTAL JUMLAH
Disetujui/Diketahui :PENGAWAS LAPANGAN
PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT
AHMAD SUFYAN, ST KEVIN RAJ CHANDRANIP. 19800802 201410 1 001 Pengawas 2
MINGGU KE : 5 (LIMA) TANGGAL : 15 JUNI 2015 S/D 21 JUNI 2015 Pekerjaan : PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT Lokasi : KABUPATEN BANGKA BARAT Tahun Anggaran : 2015
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN 1.1 Pek. Mobilisasi dan Demobilisasi 1.2 Pek. Pengukuran Pemasangan Bowplank
II PEKERJAAN BANGUNAN IPLT 2.1 Land Clearing/Grading 2.2 Galian Tanah (Manual) 2.3 Galian Tanah Dengan Alat 2.4 Buangan Tanah Sisa Galian Sekitar Lokasi 2.5 Urugan Tanah Kembali 2.6 Urugan Pasir 2.7 Urugan Gravel 5-7 cm 2.8 Pek. Pas. Cerucuk 2.9 Pas. Batu Belah ad. 1:4 2.10 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 2.11 Pek. Beton k-275 Bertulang utk. Balok Atas 2.12 Pek. Beton k-275 Bertulang utk. Kolom 20/20 2.13 Pek. Beton k-275 Bertulang utk. Plat Deucker t=10 cm 2.14 Pek. Beton k-275 Bertulang utk. Lantai Atas t=20 cm 2.15 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=20 cm 2.16 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=25 cm 2.17 Pek. Beton k-275 Bertulang utk. dinding t=20 cm 2.18 Pek. Pas. Dinding 1/2 bata 2.19 Pek. Plesteran ad. 1:2 2.20 Pleteran Siaran 2.21 Pek. Acian 2.22 Konblock 2.23 Pipa HDPE ø 150 cm 2.24 Bend Ø 150 x 90ᵒ 2.25 Tee Ø 150 2.26 Pek. Pas. Pintu Air Type 1
2.27 Pek. Pas. Pintu Air Type 2 2.28 Bar Screen 2.29 Lapisan Ijuk t=10 cm
III PEKERJAAN JALAN OPERASIONAL 3.1 Land Clearing/Grading 3.2 Striping 30 cm 3.3 Urugan Tanah Pilihan + Pemadatan 3.4 Base course Aggr Klas A-CBR 90% (t=15 cm) 3.5 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 3.6 Rigid pavement, K-275 3.7 Wiremesh M6 (GGPS & GGUS) + pasang 3.8 Pembesian rigid (Dowel bar Dia.33 mm) + pasang
IV PEKERJAAN PAGAR KELILING 4.1 Galian Tanah Biasa 4.2 Pondasi Pagar Pas 1pc : 3ps : 5kr 4.3 Pagar Plat + kolom Beton Precast t :2 m 4.4 Pagar BRC t : 190 cm, dia. Jari : 7 mm, Tiang pipa GIP Ø 1,5"
V PEKERJAAN LAIN-LAIN 5.1 Pekerjaan Pengeringan/dewatering 5.2 Perapian Selesai Pekerjaan
TOTAL JUMLAH
Disetujui/Diketahui :PENGAWAS LAPANGAN
PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT
AHMAD SUFYAN, ST KEVIN RAJ CHANDRANIP. 19800802 201410 1 001 Pengawas 2
MINGGU KE : 6 (ENAM) TANGGAL : 22 JUNI 2015 S/D 28 JUNI 2015 Pekerjaan : PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT Lokasi : KABUPATEN BANGKA BARAT Tahun Anggaran : 2015
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN 1.1 Pek. Mobilisasi dan Demobilisasi 1.2 Pek. Pengukuran Pemasangan Bowplank
II PEKERJAAN BANGUNAN IPLT 2.1 Land Clearing/Grading 2.2 Galian Tanah (Manual) 2.3 Galian Tanah Dengan Alat 2.4 Buangan Tanah Sisa Galian Sekitar Lokasi 2.5 Urugan Tanah Kembali 2.6 Urugan Pasir 2.7 Urugan Gravel 5-7 cm 2.8 Pek. Pas. Cerucuk 2.9 Pas. Batu Belah ad. 1:4 2.10 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 2.11 Pek. Beton k-275 Bertulang utk. Balok Atas 2.12 Pek. Beton k-275 Bertulang utk. Kolom 20/20 2.13 Pek. Beton k-275 Bertulang utk. Plat Deucker t=10 cm 2.14 Pek. Beton k-275 Bertulang utk. Lantai Atas t=20 cm 2.15 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=20 cm 2.16 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=25 cm 2.17 Pek. Beton k-275 Bertulang utk. dinding t=20 cm 2.18 Pek. Pas. Dinding 1/2 bata 2.19 Pek. Plesteran ad. 1:2 2.20 Pleteran Siaran 2.21 Pek. Acian 2.22 Konblock 2.23 Pipa HDPE ø 150 cm 2.24 Bend Ø 150 x 90ᵒ 2.25 Tee Ø 150 2.26 Pek. Pas. Pintu Air Type 1
2.27 Pek. Pas. Pintu Air Type 2 2.28 Bar Screen 2.29 Lapisan Ijuk t=10 cm
III PEKERJAAN JALAN OPERASIONAL 3.1 Land Clearing/Grading 3.2 Striping 30 cm 3.3 Urugan Tanah Pilihan + Pemadatan 3.4 Base course Aggr Klas A-CBR 90% (t=15 cm) 3.5 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 3.6 Rigid pavement, K-275 3.7 Wiremesh M6 (GGPS & GGUS) + pasang 3.8 Pembesian rigid (Dowel bar Dia.33 mm) + pasang
IV PEKERJAAN PAGAR KELILING 4.1 Galian Tanah Biasa 4.2 Pondasi Pagar Pas 1pc : 3ps : 5kr 4.3 Pagar Plat + kolom Beton Precast t :2 m 4.4 Pagar BRC t : 190 cm, dia. Jari : 7 mm, Tiang pipa GIP Ø 1,5"
V PEKERJAAN LAIN-LAIN 5.1 Pekerjaan Pengeringan/dewatering 5.2 Perapian Selesai Pekerjaan
TOTAL JUMLAH
Disetujui/Diketahui :PENGAWAS LAPANGAN
PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT
AHMAD SUFYAN, ST KEVIN RAJ CHANDRANIP. 19800802 201410 1 001 Pengawas 2
BULAN KE : 2 DUA) TANGGAL : 1 JUNI 2015 S/D 28 JUNI 2015 Pekerjaan : PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT Lokasi : KABUPATEN BANGKA BARAT Tahun Anggaran : 2015
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN 1.1 Pek. Mobilisasi dan Demobilisasi 1.2 Pek. Pengukuran Pemasangan Bowplank
II PEKERJAAN BANGUNAN IPLT 2.1 Land Clearing/Grading 2.2 Galian Tanah (Manual) 2.3 Galian Tanah Dengan Alat 2.4 Buangan Tanah Sisa Galian Sekitar Lokasi 2.5 Urugan Tanah Kembali 2.6 Urugan Pasir 2.7 Urugan Gravel 5-7 cm 2.8 Pek. Pas. Cerucuk 2.9 Pas. Batu Belah ad. 1:4 2.10 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 2.11 Pek. Beton k-275 Bertulang utk. Balok Atas 2.12 Pek. Beton k-275 Bertulang utk. Kolom 20/20 2.13 Pek. Beton k-275 Bertulang utk. Plat Deucker t=10 cm 2.14 Pek. Beton k-275 Bertulang utk. Lantai Atas t=20 cm 2.15 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=20 cm 2.16 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=25 cm 2.17 Pek. Beton k-275 Bertulang utk. dinding t=20 cm 2.18 Pek. Pas. Dinding 1/2 bata 2.19 Pek. Plesteran ad. 1:2 2.20 Pleteran Siaran 2.21 Pek. Acian 2.22 Konblock 2.23 Pipa HDPE ø 150 cm 2.24 Bend Ø 150 x 90ᵒ 2.25 Tee Ø 150 2.26 Pek. Pas. Pintu Air Type 1
2.27 Pek. Pas. Pintu Air Type 2 2.28 Bar Screen 2.29 Lapisan Ijuk t=10 cm
III PEKERJAAN JALAN OPERASIONAL 3.1 Land Clearing/Grading 3.2 Striping 30 cm 3.3 Urugan Tanah Pilihan + Pemadatan 3.4 Base course Aggr Klas A-CBR 90% (t=15 cm) 3.5 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 3.6 Rigid pavement, K-275 3.7 Wiremesh M6 (GGPS & GGUS) + pasang 3.8 Pembesian rigid (Dowel bar Dia.33 mm) + pasang
IV PEKERJAAN PAGAR KELILING 4.1 Galian Tanah Biasa 4.2 Pondasi Pagar Pas 1pc : 3ps : 5kr 4.3 Pagar Plat + kolom Beton Precast t :2 m 4.4 Pagar BRC t : 190 cm, dia. Jari : 7 mm, Tiang pipa GIP Ø 1,5"
V PEKERJAAN LAIN-LAIN 5.1 Pekerjaan Pengeringan/dewatering 5.2 Perapian Selesai Pekerjaan
TOTAL JUMLAH
Mengetahui : Disetujui Oleh :PEJABAT PEMBUAT KOMITMEN DIREKSI LAPANGAN
PEMBANGUNAN IPLT PEMBANGUNAN IPLTKABUPATEN BANGKA BARAT KABUPATEN BANGKA BARAT
Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :DIREKSI LAPANGAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA PEMBANGUNAN IPLT CV. ARY CON'S PT. MANDALA BAKTI UTAMA
KABUPATEN BANGKA BARAT
INDRA JAYA , ST, MT HERIADY, STNIP. 19721202 200701 1 005 Team Leader General Superintenden
MINGGU KE : 7 (TUJUH) TANGGAL : 29 JUNI 2015 S/D 5 JULI 2015 Pekerjaan : PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT Lokasi : KABUPATEN BANGKA BARAT Tahun Anggaran : 2015
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN 1.1 Pek. Mobilisasi dan Demobilisasi 1.2 Pek. Pengukuran Pemasangan Bowplank
II PEKERJAAN BANGUNAN IPLT 2.1 Land Clearing/Grading 2.2 Galian Tanah (Manual) 2.3 Galian Tanah Dengan Alat 2.4 Buangan Tanah Sisa Galian Sekitar Lokasi 2.5 Urugan Tanah Kembali 2.6 Urugan Pasir 2.7 Urugan Gravel 5-7 cm 2.8 Pek. Pas. Cerucuk 2.9 Pas. Batu Belah ad. 1:4 2.10 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 2.11 Pek. Beton k-275 Bertulang utk. Balok Atas 2.12 Pek. Beton k-275 Bertulang utk. Kolom 20/20 2.13 Pek. Beton k-275 Bertulang utk. Plat Deucker t=10 cm 2.14 Pek. Beton k-275 Bertulang utk. Lantai Atas t=20 cm 2.15 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=20 cm 2.16 Pek. Beton k-275 Bertulang utk. Lantai Dasar t=25 cm 2.17 Pek. Beton k-275 Bertulang utk. dinding t=20 cm 2.18 Pek. Pas. Dinding 1/2 bata 2.19 Pek. Plesteran ad. 1:2 2.20 Pleteran Siaran 2.21 Pek. Acian 2.22 Konblock 2.23 Pipa HDPE ø 150 cm 2.24 Bend Ø 150 x 90ᵒ 2.25 Tee Ø 150 2.26 Pek. Pas. Pintu Air Type 1
2.27 Pek. Pas. Pintu Air Type 2 2.28 Bar Screen 2.29 Lapisan Ijuk t=10 cm
III PEKERJAAN JALAN OPERASIONAL 3.1 Land Clearing/Grading 3.2 Striping 30 cm 3.3 Urugan Tanah Pilihan + Pemadatan 3.4 Base course Aggr Klas A-CBR 90% (t=15 cm) 3.5 Lantai kerja beton ad. 1 pc : 2 ps : 3 kr 3.6 Rigid pavement, K-275 3.7 Wiremesh M6 (GGPS & GGUS) + pasang 3.8 Pembesian rigid (Dowel bar Dia.33 mm) + pasang
IV PEKERJAAN PAGAR KELILING 4.1 Galian Tanah Biasa 4.2 Pondasi Pagar Pas 1pc : 3ps : 5kr 4.3 Pagar Plat + kolom Beton Precast t :2 m 4.4 Pagar BRC t : 190 cm, dia. Jari : 7 mm, Tiang pipa GIP Ø 1,5"
V PEKERJAAN LAIN-LAIN 5.1 Pekerjaan Pengeringan/dewatering 5.2 Perapian Selesai Pekerjaan
TOTAL JUMLAH
Disetujui/Diketahui :PENGAWAS LAPANGAN
PEMBANGUNAN IPLT KABUPATEN BANGKA BARAT
AHMAD SUFYAN, ST KEVIN RAJ CHANDRANIP. 19800802 201410 1 001 Pengawas 2