1 Programme 726 Tx / Dx Demarcation Feb 08
1
Programme 726
Tx / Dx Demarcation
Feb 08
2
Programme 726
Topics cover in this presentation
Back Ground
Existing and future MTS substations
Lines connecting generators and other direct connected customers
International inter-connectors
Lines with above 132kV operating voltage currently belonging to Metros
Other issue: Short lines operating at 132kV or below, but directly interconnecting Tx
substations. Certain lines constructed with the capacity to operate at above 132kV, but
integrated initially with Dx networks Emergency supply facilities to nuclear power stations. Traction Lines
3
Programme 726
Transmission Asset Ownership Boundary
Since 2004 and presently, Eskom has formally supported the voltage based boundary principle, preferring a flexible approach with priority on safety, operational efficiency and purpose of use, with any asset issues arising between Transmission and Distribution in terms of the Blueprint definition being dealt with as REDs unfold.
As the establishment of the REDs approached in 2005, Eskom proceeded to ringfence its assets along the 132kV demarcation with the intention of complying with regulatory requirements and aligning asset ownership as far as was practically possible. Significant safety and control risks have been highlighted during the detailed preparations for implementation within Main Transmission Substations (MTS). Consequently, Eskom is reviewing the position for approval by NERSA regarding ownership of assets within MTS substations i.e. they are to remain as is, demarcated in terms of the substation fence.
4
Programme 726
Existing Substations Complex and highly integrated substations
For substations where the controls, protection and access are integrated no demarcation and whole substation must retain with Tx. Advantages:
Safety and OHSACT requirements will not be jeopardize.Access control, operations, and complicated SLA’s, will not be necessary.
Demarcation of assets w.r.t. NER requirements:All equipment equal and smaller than 132kV must be ring fenced in the asset register of Tx.
Demarcation point:All equipment with in the boundaries of the Tx substation will form part of Tx.The fence of the substation will be the demarcation point.
275 or 400 kV
132 kV
TX
66 kV
5
Programme 726
New Future Sub Stations
Transmission to supply only at the requested voltage and no secondary transformation will form part of the Transmission Sub station. Distribution Substation to be totally
independent from the Tx sub.
Advantages:No shared equipment or services between Tx and DxDistribution the owner and totally responsible for the Dx yard.No maintenance or operational SLA required for the Dx yard.Dx responsible for any replacement or refurbishment in the distribution sub. NER can ring-fence according the 132kV Voltage rule.
Disadvantages Compensation equipment will have to be accommodated in the distribution yard
275 or 400 kV
132 / 88 / 66kV
DX
TX
6
Programme 726
Demarcation principles
New Future Sub Stations with short bus bar Transmission may deiced to introduce a short secondary bus bar
before feeding the Dx substation.
Advantages:Configuration and operation of the Transformers independent from the configuration on the Dx bus bars.All compensation and monitoring equipment required to regulate the supply voltage from Tx can be installed on the short bus bar.Supply to other utilities (Metro or other RED’s) can be supplied from the short bus bar.
275 or 400 kV
132 / 88 / 66kV
DX
TX
Supply to other utilities
7
Programme 726
Migration of Existing Substations
Possible migration of equipment from Tx to Dx For substations or portion there off where the layout and integration
of the controls, protection and access are currently separated the 132 kV and smaller equipment must be re-linked to Dx.
Advantages:Safety and OHSACT requirements will not be jeopardize.Distribution to take charge of the distribution voltage equipment sooner
Upgrading and major refurbishment of 132kv and lower voltage equipment.If a substation or portion there of must be refurbish or replaced it must be investigated if part of the project can not also ensure that it will operate independent from TX and then that portion can be transferred.
275 or 400 kV
132 kV
TX
66 kV
8
Programme 726
4. Networks feeding Generating equipment and contestable customers
DxFor existing Tx substations
Gx or IPP
Gx or IPP
Dx line
Tx line
Dx lineDx Substation
Tx line Contestable customer
Short dedicated line (also see section on direct connected customers)
Note:• Lines connecting direct customers: Only the customers noted in Annexure A of the demarcation
document are under discussion. • For future applications for access to 132kV and lower dedicated lines connecting Transmission
substations and direct customers as well as generation equipment. Each application must be investigated individually.
9
Programme 726
International feeders
International Utility
Directly fed end-Customers across SA borders
Parallel CircuitSA Customer
EHV Network (220kV and above)
HV Network (132kV and below)
MV Network (usually 22 & 11 kV)
SA Customer
, Dx ownership
, Tx ownership
Tx ownership without exception
radial networks feeding end-customers across international boundaries
If source substation is Tx station, apply as above. Otherwise, Dx asset
10
Programme 726
275 kV and above lines and s/s equipment currently belonging to Metros
Clearly for operating simplicity, Metro networks above 132kV isolated from the Transmission network by Distribution networks should remain with the Metro or transferred to REDs .
In addition, Metro networks above 132kV adjoining Eskom Transmission networks of above 132kV should also remain with the metro’s or be transferred to REDs, unless a sound business case is provided for the overall benefit to the industry that offsets the abovementioned concerns .
Metro’s/REDs may approach Eskom Transmission regarding the transfer of specific plant, yet these accounts will be negotiated to ensure the protection of each party’s interests. If above 132 kV assets are transferred from the Metro to NTC/Tx, the tariff will have to be restructured
11
Programme 726
Short lines operating at 132 kV or below
Directly interconnecting Tx s/s’s
If any such lines, operating at 132kV or below, are to form part of NTC/Tx, the asset transfer should be negotiated when a customer connection is most viable off the 132kV line
Planned upgrades of such lines are to be taken into account on a case by case basis in determining which of these assets are transferred or remain with NTC/Tx
Planned upgrades of such lines are to be taken into account on a case by case basis in determining which of these assets are transferred or remain with NTC/Tx
12
Programme 726
Tx Tx
DxTx TxorPotential Customer
Actual Customer
275kV and above construction for strength or insulation with the intended use at / upgrade to Tx voltage
or275kV and above construction for strength or insulation with no intended use at / upgrade to Tx voltage
TxTx
Dx
Planned upgrade to 275kV and aboveTx
Certain lines constructed to operate at above 132 kV, but integrated initially with Dx networks
Certain lines constructed with the intention of operating at above 132 kV, but integrated initially with Distribution networks are to remain with or be transferred to NTC/Tx with the use of a regulatory leasing methodology to influence Dx charges rather than Tx charges
A line built to transmission voltage standards (e.g. for additional insulation for pollution strength benefits), should be transferred to or stay with RED/Dx, if there is no intention of upgrading its operating voltage in the future, especially if customers are connected to the line.
13
Programme 726
Emergency supply and Traction lines
Emergency supply facilities to nuclear power stations Applying the exception in the blueprint, emergency supply facilities to
nuclear power stations are to remain with or be transferred to NTC/Tx with the Duynefontein-Vissershoek double circuit 132kV line remaining with RED/Dx.
Traction lines Since the secondary circuit of Traction lines are mainly owned and
serviced by the customer, 220kV and above lines feeding Traction customers are to remain with NTC/Tx. Lines of 132kV and below are to remain or transferred to RED/Dx
14