PROFESSIONAL ECO TRENDS FOR BUILDING FINISHES IN 21st CENTURY OUR COMPANY • 47 years old specialized company based at Italy in the heart of ceramic tile industry at Sassuolo. • Manufacturing latest technological products for laying all kinds of tiles & stone finishes. • Total of 11 manufacturing plants worldwide. • 1st plant in Asia, located in Vadodara India. • 15 branches in Europe, USA, Asia and Australia. • Indian H.O at Mumbai with branches spread across India.
21
Embed
PROFESSIONAL ECO TRENDS FOR BUILDING FINISHES … · PROFESSIONAL ECO TRENDS FOR BUILDING FINISHES IN ... TRADITIONAL WORK & LIFE CYCLE ... Life Republic - By Kolte Patil Developers
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PROFESSIONAL ECO TRENDSFOR BUILDING FINISHESIN21st CENTURY
OUR COMPANY
• 47 years old specialized company based at
Italy in the heart of ceramic tile industry
at Sassuolo.
• Manufacturing latest technological products
for laying all kinds of tiles & stone finishes.
• Total of 11 manufacturing plants worldwide.
• 1st plant in Asia, located in Vadodara India.
• 15 branches in Europe, USA, Asia and
Australia.
• Indian H.O at Mumbai with branches
spread across India.
OUR COMPANY
• It is the leading world manufacturer of Green Build ing solution products, boasting a technological supremacy famous around the globe.
• With over 1,700 eco-friendly items and production o f over 950,000 tons/year
• Kerakoll invests 5.4% of its turnover into Green Te chnology
Our Green Building Campus : Training Activity
Highlight: The Kerakoll Study Centre held 4,000 courses from 2009 to 2013, awarding diplomas to more than 240,000 professionals.
• Applicators : 35%
• Builders / Contractor : 23%
• Architects / Consultant : 33%
• Distributors : 6%
• Public Authorities : 3%
GREEN TECHNOLOGY
•7,000 m2 surface area
•15,762 m3 volume
•23.75 m highest point of the building
•87 green building researchers
•9 laboratories
•15,000,000 € investments
: - The Green Lab - A Unique Building
External design: Arch. Genius Loci - Italy
The GreenLab is a unique
building because of:
• External design.
• Internal concept.
• Green Building
• 20 different kind of Kerakoll eco material used.
Our GreenLab is born – Key element
Building solutions: Steel structure
Our GreenLab is born – Key element
Building solutions: Thermal insulated wooden roof
Our GreenLab is born – Key element
Building solutions: Thermal insulated walls
• Thermal blocks
• Kerakoll Biocalce® Termointonaco
• Kerakoll Biocalce® Silicato Puro Pittura
Our GreenLab is born – Key element
Building solutions: Thermal insulated glasses and windows
• High thermal
insulated double
glazing.U = 1,4 W/mq°C
Our GreenLab is born – Key element
Building solutions: Natural lighting from roof
Our GreenLab is born – Key element
Building solutions: Optimization of solar radiations for maximum natural light
Our GreenLab is born – Key element
Savings and energy generation: photovoltaic panels
The photovoltaic
plant composed of
208 panels is able
to generate up to 16
KW.
Our GreenLab is born – Key element
Savings and energy generation: geothermal probes
The geo thermal plant is
capable to cover the
entire demand of
heating and cooling
energy required by the
radiant ceiling panels.
HEAT ENERGY GENERATION:
Geothermal heat pump
Condensing heat generators
COOLING ENERGY GENERATION:
Geothermal heat pump
Air-cooled water chillers
Our GreenLab is born – Key element
Savings and energy generation: radiant ceiling panels
RADIATION SYSTEM - WORKING
TEMPERATURE:
Heating: temp. 30° (70° traditional system)
Cooling: temp. 16°(7° traditional system)
Our GreenLab is born – Key element
Savings and energy generation: Building automation
The Building Automation
system monitors and
manages several elements
of the building, such as:
Climatic chambers, lights,
alarms, access control.
Our GreenLab is born – Key element
Savings and energy generation: suction system hoods
• High efficiency
hoods - 65%
energy
• Exchanger:
energy saving 50%
Our GreenLab is born – Key element
Building solutions: Rainwater harvesting
• Rain water coming from the
roof is harvested with a
natural filtration system.
• The recovered water is used
for irrigation and for
replenishing water in the
pools lost by evaporation.
Our GreenLab is born – Key element
Building solutions: Grey water harvesting
• Recovery of grey water from
toilets and changing rooms.
Purifications. Reintegration into
boxes.
• Estimated saving: 30% of water
used in the toilets.
Our GreenLab is born – Key element
Building solutions: Roof coating
• The roof coating is made entirely
of innovative Kerakoll technologies .
• The wooden board is
waterproofed with specially
designed waterproofing
membrane – Nanogum Eco .
Our GreenLab is born – Key element
Building solutions: Fixing of Trencadis (Glazed Mosaic)
• Trencadis laid with Kerakoll Superflex Eco & grouted with Fugazero Eco .
Kerakoll material selected for installation of Natural stone flooring of 50000 M²
Project Facts :Operator : GVK
Terminal area : 439000 M²Terminal capacity : 40m. per yearBuilding height : 45 meterNo. of stories : 4No of check in counter : 188No of boarding bridges : 52No. of car parking : 5000
New Chhatrapati Shivaji International Terminal 2 at Mumbai commissioned
IGBC LEAD RATING - GOLD
FLAGSHIP PROJECT REFERENCES
New Bangaluru International Terminal T1 Expansion - commissioned
PROJECT FACTS:Total expansion cost : > 1000 cr.Terminal area : 150000 m2Operator : GVKCompletion Year : 2013Terminal capacity : Current 10 m .Future capacity : 17 millionNo. of check in counter : 83No. of boarding gate : 23Single Terminal for domestic and international passenger
Kerakoll material selected for installation of Natural stone flooring of 50000 M²
Architect :HOK UK
IGBC LEED RATING - GOLD
FLAGSHIP PROJECT REFERENCES
Project facts:Total area : 400 acre1st Phase : 1068 acreTotal cost : 5500 cr.Floor Area : 400000 m2Parking Area : 8400Public Amenity : 50000 m2Kerakoll Material : Special, Nanoflex,
Fugalite
Architects : MVRDV Architects - NL
Amnora Park Town – Future tower –Pune – under progress
Material for installation of Tiles flooring& waterproofing system - > 100000 M²
FLAGSHIP PROJECT REFERENCES
FLAGSHIP PROJECT REFERENCES
Project facts:Total area : 1 acreTotal cost : 5 cr. For remakeType : Olympic sizeCompletion Year : 2013 Dec.Kerakoll material : Full systeme.g. P5, Keracem, Quartzo, Nanoflex, H40 Flex, Fugazero, Fugaella Silicon
Material for installation of mortar, waterproofing, Tiles & grouting system -> 3000 M²
10 lane Sports Pool – IIT – ChennaiPlanner : IIT - Chennai
Architect: TEAM ONE - Bangalore
Project fact:State of art commercial Project in heart of Indore at AB Road.Commissioned in 2013.
Business Sky Line: 2nd commercial Project of same promoter at AB toad to be commissioned by 2015.
Mineral for installation of stone& waterproofing System -> 5000 M²