Top Banner
Production Schedule 12/01/15-16/01/15
16

Production schedule & Editing Log

Aug 10, 2015

Download

Education

afiyae
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Production schedule & Editing Log

Production Schedule

12/01/15-16/01/15

Page 2: Production schedule & Editing Log

Day 1 (12/01/15)

• Today I gather all actors and crew members and discuss their roles and responsibilities throughout the production. This will include allowing time for rehearsal.

Page 3: Production schedule & Editing Log

Day 2 (13/01/15)

• Today I will take the lead female and male and film them together and separately in the Photography studio. Later I will film some extras at a Gym and Train station.

Page 4: Production schedule & Editing Log

Day 3 (14/01/15)

• Today I filmed more of the actors at McDonalds in Calcot.

• We also filmed in Sainsburys.• A lot of the footage I got is not of high quality

as it was very noisy in both areas.

Page 5: Production schedule & Editing Log

Day 4 (15/01/15)

• Today I filmed one of the lead males at the gym. I gathered a lot of decent footage inside and outside the gym.

Page 6: Production schedule & Editing Log

Editing

Page 7: Production schedule & Editing Log

Day 1 (21/01/2015)I decided to make my music video in black in white with a high contrast to give a cartoon/drawing effect. This works well because all of the shots blend together more smoothly. I left some shots just in simple black and white because they did not work well with high contrast.

Page 8: Production schedule & Editing Log

Day 2 (22/01/2015)Today I continued adding shots to the music video. I remained using the black and white effect. I also worked out where certain shots should be as the order did not seem to make sense.Next lesson I plan to continue doing this and also introduce the second character.

Page 9: Production schedule & Editing Log

This is a contact sheet of the footage I got when filming at McDonalds

Page 10: Production schedule & Editing Log

This is a contact sheet of the footage I got from filming in the Drama Studio at Theale Green School.

Page 11: Production schedule & Editing Log

Today I decided that to make my creative style more apparent, I should change all the shots where the actors are not singing to the camera and make them black and white, as opposed to it all being in high contrast.

Page 12: Production schedule & Editing Log

• Today I continued adding in clips to my video. I have decided that I may need to film a few more clips of one of the males as not enough good footage was captured.

Page 13: Production schedule & Editing Log

• Today I filmed the male during lunch time and was able to import the shots straight away. Looking at them they are much better than before. I divided to add some close ups of knives to add t the eeriness of the video. I also added two layers to a shot of the males as in the song you can here the rappers overlapping lyrics.

Page 14: Production schedule & Editing Log

• Today I added more clips. I decided to add a split screen on to shots, one above and one bellow. The shot goes from 1 to 1&2 to 2. it is a useful transition as it sets the scene and is in time wit the beat.

Page 15: Production schedule & Editing Log

• Today I continued editing and have come o the final chorus of the video. I have put the shots into a montage on the very last line which is, ‘she really don't give a..’. A different shot is played on each word. This is effective because it is summing up the video in one and also is in time with the beat.

Page 16: Production schedule & Editing Log

Finished!!

• Today I finished the video. I added the final 2 last clips and exported it. I was not happy about not being able to make it wide screen.