Top Banner
CCHBC Poland Demand Side Response
33

PRODUCTION DEMAND Mature blocks closeout, up to 4,4 GW power DEMAND PRODUCTION.

Apr 01, 2015

Download

Documents

Lance Gudgeon
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Slide 1

Slide 2 Slide 3 Slide 4 Slide 5 Slide 6 Slide 7 Slide 8 PRODUCTION DEMAND Slide 9 Mature blocks closeout, up to 4,4 GW power DEMAND PRODUCTION Slide 10 Demand Side Response (DSR): temporary reduction of energy consumption, implemented on demand, realized according to schedule agreed by Energy Consumer and Supplier Technology Supplier / VEMS Operator = VemsEcoFound DSR Integrator = WSEInfoEngine / Sparkhouse Slide 11 NotifyRespondRestore Slide 12 Slide 13 INDUSTRY BUSINESS PUBLIC INSTITUTIONS HOSPITALS SHOPPING MALLS AGGREGATOR: SPARKHOUSE/ INFOENGINE VEMS SYSTEM / DSR ENABLER PSE / OSD ENERGY WHOLESALE MARKET MW / STAND BY / MWh Slide 14 AUTOMATICMANUAL OR Slide 15 Automated power reduction aggregation in all managed entities through VEMS A GGREGATOR OPERATING ENERGY MANAGEMENT SYSTEM Slide 16 Operational platform for power reduction management in distributed entities = VEMS Enabler DSR Slide 17 Slide 18 Power demand in peak times relates to approx. 1% of the whole year period (50-70 hours) Need for DSR may reach from 500 MW to 4000 MW Current costs of extraordinary power supply for peaks reach 600- 800 mln PLN Slide 19 MarketDR Capacity% of Capacity PJM14,118 MWs8.6% NYISO2,248 MWs6.7% ISO-NE2,164 MWs7.4% UK3,621 MWs4.5%4.5% PL ?? Slide 20 MarketDR Capacity% of Capacity PJM14,118 MWs8.6% NYISO2,248 MWs6.7% ISO-NE2,164 MWs7.4% UK3,621 MWs4.5%4.5% PL 1,380 MWs (estimated) 5.0% (estimated) Slide 21 Slide 22 Slide 23 Slide 24 Virtual Energy Management System (VEMS) VEMS allows power use reduction during peak energy demand periods. Slide 25 Reduction up to 30% Rationalization of ventilation, heat and cooling management Slide 26 Daily profile changes technical handling Roster unit profile optimization for dealing unit Profiting from daily profile changes (price x quantity) Energy measurement management Slide 27 DSR deals Profiting from: DSR and daily profile changes Power reduction technical handling Slide 28 income costs Slide 29 1.New income source 2.Media costs reduction 3.No investment costs for Partner (*) (*) Possible exception in case of necessary measurement infrastructure adjustement or repair Slide 30 Slide 31 Slide 32 VEMS ON Slide 33 https://www.facebook.com/Virtual2Power