1 Chapter 18 Materials Requirements Planning
28

Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

May 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

1

Chapter 18

Materials Requirements Planning

Page 2: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

2

Material Requirements Planning

Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed to produce a product

MRP provides time scheduling information specifying when each of the materials, parts, and components should be ordered or produced

Dependent demand drives MRP

MRP is a software system

Page 3: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

3 Example of MRP Logic and Product Structure Tree

B(4)

E(1) D(2)

C(2)

F(2) D(3)

A

Product Structure Tree for Assembly A Lead Times

A 1 day

B 2 days

C 1 day

D 3 days

E 4 days

F 1 day

Total Unit Demand

Day 10 50 A

Day 8 20 B (Spares)

Day 6 15 D (Spares)

Given the product structure tree for “A” and the lead time and demand

information below, provide a materials requirements plan that defines the

number of units of each component and when they will be needed

Page 4: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

4

LT = 1 day

Day: 1 2 3 4 5 6 7 8 9 10

A Required 50

Order Placement 50

First, the number of units of “A” are scheduled backwards to

allow for their lead time. So, in the materials requirement

plan below, we have to place an order for 50 units of “A” on

the 9th day to receive them on day 10.

Page 5: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

5 Next, we need to start scheduling the components that make up “A”. In the case of

component “B” we need 4 B’s for each A. Since we need 50 A’s, that means 200 B’s.

And again, we back the schedule up for the necessary 2 days of lead time.

D a y : 1 2 3 4 5 6 7 8 9 1 0

A R e q u ire d 5 0

O rd e r P la c e m e n t 5 0

B R e q u ire d 2 0 2 0 0

O rd e r P la c e m e n t 2 0 2 0 0

B(4)

E(1) D(2)

C(2)

F(2) D(3)

A

Spares LT = 2

4x50=200

Page 6: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

6

Day: 1 2 3 4 5 6 7 8 9 10

A Required 50

LT=1 Order Placement 50

B Required 20 200

LT=2 Order Placement 20 200

C Required 100

LT=1 Order Placement 100

D Required 55 400 300

LT=3 Order Placement 55 400 300

E Required 20 200

LT=4 Order Placement 20 200

F Required 200

LT=1 Order Placement 200

B(4)

E(1) D(2)

C(2)

F(2) D(3)

A

40 + 15 spares

Part D: Day 6

Finally, repeating the process for all components, we have the

final materials requirements plan:

Lead Times

A 1 day

B 2 days

C 1 day

D 3 days

E 4 days

F 1 day

Total Unit Demand

Day 10 50 A

Day 8 20 B (Spares)

Day 6 15 D (Spares)

Page 7: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

7

Master Production Scheduling (MPS)

Time-phased plan specifying how many and

when the firm plans to build each end item

Aggregate Plan

(Product Groups)

MPS

(Specific End Items)

Page 8: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

8

Types of Time Fences

Frozen

No schedule changes allowed within this window

Moderately Firm

Specific changes allowed within product groups as long as parts are available

Flexible

Significant variation allowed as long as overall capacity requirements remain at the same levels

Page 9: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

9

Example of Time Fences

8 15

26

Weeks

Frozen Moderately

Firm Flexible

Firm Customer Orders

Forecast and available

capacity

Capacity

Page 10: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

10

Material Requirements Planning System

Based on a master production schedule, a material requirements planning system:

Creates schedules identifying the specific parts and materials required to produce end items

Determines exact unit numbers needed

Determines the dates when orders for those materials should be released, based on lead times

Page 11: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

11

Firm orders

from known

customers

Forecasts

of demand

from random

customers

Aggregate

product

plan

Bill of

material

file

Engineering

design

changes

Inventory

record file

Inventory

transactions

Master production

Schedule (MPS)

Primary reports Secondary reports

Planned order schedule for

inventory and production control

Exception reports

Planning reports

Reports for performance control

Material

planning

(MRP

computer

program)

Page 12: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

12

Bill of Materials (BOM) File

A Complete Product Description

Materials

Parts

Components

Production sequence

Modular BOM

Subassemblies

Super BOM

Fractional options

Page 13: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

13

Inventory Records File

Each inventory item carried as a separate file

Status according to “time buckets”

Pegging

Identify each parent item that created demand

Page 14: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

14

Primary MRP Reports

Planned orders to be released at a future time Order release notices to execute the planned orders Changes in due dates of open orders due to

rescheduling Cancellations or suspensions of open orders due to

cancellation or suspension of orders on the master production schedule

Inventory status data

Page 15: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

15

Secondary MRP Reports

Planning reports, for example, forecasting inventory requirements over a period of time

Performance reports used to determine agreement between

actual and programmed usage and costs

Exception reports used to point out serious discrepancies,

such as late or overdue orders

Page 16: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

16

Additional MRP Scheduling Terminology

Gross Requirements

Scheduled receipts

Projected available balance

Net requirements

Planned order receipt

Planned order release

Page 17: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

17

MRP Calculations

Projected available balancet

= Projected available balancet-1

- Gross Requirementst

+ Scheduled receiptst

+ Planned order receiptst

- Safety stock

Page 18: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

18

Page 19: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

19

Page 20: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

20

Page 21: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

21

Closed Loop MRP

Production Planning

Master Production Scheduling

Material Requirements Planning

Capacity Requirements Planning

Realistic? No

Feedback

Execute:

Capacity Plans

Material Plans

Yes

Feedback

Page 22: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

22

MRP Example

A(2) B(1)

D(5) C(2)

X

C(3)

Item On-Hand Lead Time (Weeks)

X 50 2

A 75 3

B 25 1

C 10 2

D 20 2

Requirements include 95 units (80 firm orders and 15 forecast) of X

in week 10

Page 23: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

23

Day: 1 2 3 4 5 6 7 8 9 10

X Gross requirements 95

LT=2 Scheduled receipts

Proj. avail. balance 50 50 50 50 50 50 50 50 50 0

On- Net requirements 45

hand Planned order receipt 45

50 Planner order release 45

A Gross requirements 90

LT=3 Scheduled receipts

Proj. avail. balance 75 75 75 75 75 75 75 0

On- Net requirements 15

hand Planned order receipt 15

75 Planner order release 15

B Gross requirements 45

LT=1 Scheduled receipts

Proj. avail. balance 25 25 25 25 25 25 25 0

On- Net requirements 20

hand Planned order receipt 20

25 Planner order release 20

C Gross requirements 45 40

LT=2 Scheduled receipts

Proj. avail. balance 10 10 10 10 0

On- Net requirements 35 40

hand Planned order receipt 35 40

10 Planner order release 35 40

D Gross requirements 100

LT=2 Scheduled receipts

Proj. avail. balance 20 20 20 20 20 20 0

On- Net requirements 80

hand Planned order receipt 80

20 Planner order release 80

It takes 2 A’s for each X

A(2)

X

Page 24: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

24

Day: 1 2 3 4 5 6 7 8 9 10

X Gross requirements 95

LT=2 Scheduled receipts

Proj. avail. balance 50 50 50 50 50 50 50 50 50 0

On- Net requirements 45

hand Planned order receipt 45

50 Planner order release 45

A Gross requirements 90

LT=3 Scheduled receipts

Proj. avail. balance 75 75 75 75 75 75 75 0

On- Net requirements 15

hand Planned order receipt 15

75 Planner order release 15

B Gross requirements 45

LT=1 Scheduled receipts

Proj. avail. balance 25 25 25 25 25 25 25 0

On- Net requirements 20

hand Planned order receipt 20

25 Planner order release 20

C Gross requirements 45 40

LT=2 Scheduled receipts

Proj. avail. balance 10 10 10 10 0

On- Net requirements 35 40

hand Planned order receipt 35 40

10 Planner order release 35 40

D Gross requirements 100

LT=2 Scheduled receipts

Proj. avail. balance 20 20 20 20 20 20 0

On- Net requirements 80

hand Planned order receipt 80

20 Planner order release 80

B(1) A(2)

X

It takes 1 B

for each X

Page 25: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

25

Day: 1 2 3 4 5 6 7 8 9 10

X Gross requirements 95

LT=2 Scheduled receipts

Proj. avail. balance 50 50 50 50 50 50 50 50 50 0

On- Net requirements 45

hand Planned order receipt 45

50 Planner order release 45

A Gross requirements 90

LT=3 Scheduled receipts

Proj. avail. balance 75 75 75 75 75 75 75 0

On- Net requirements 15

hand Planned order receipt 15

75 Planner order release 15

B Gross requirements 45

LT=1 Scheduled receipts

Proj. avail. balance 25 25 25 25 25 25 25 0

On- Net requirements 20

hand Planned order receipt 20

25 Planner order release 20

C Gross requirements 45 40

LT=2 Scheduled receipts

Proj. avail. balance 10 10 10 10 0

On- Net requirements 35 40

hand Planned order receipt 35 40

10 Planner order release 35 40

D Gross requirements 100

LT=2 Scheduled receipts

Proj. avail. balance 20 20 20 20 20 20 0

On- Net requirements 80

hand Planned order receipt 80

20 Planner order release 80

A(2) B(1)

X

C(3)

It takes 3 C’s

for each A

Page 26: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

26

Day: 1 2 3 4 5 6 7 8 9 10

X Gross requirements 95

LT=2 Scheduled receipts

Proj. avail. balance 50 50 50 50 50 50 50 50 50 0

On- Net requirements 45

hand Planned order receipt 45

50 Planner order release 45

A Gross requirements 90

LT=3 Scheduled receipts

Proj. avail. balance 75 75 75 75 75 75 75 0

On- Net requirements 15

hand Planned order receipt 15

75 Planner order release 15

B Gross requirements 45

LT=1 Scheduled receipts

Proj. avail. balance 25 25 25 25 25 25 25 0

On- Net requirements 20

hand Planned order receipt 20

25 Planner order release 20

C Gross requirements 45 40

LT=2 Scheduled receipts

Proj. avail. balance 10 10 10 10 0

On- Net requirements 35 40

hand Planned order receipt 35 40

10 Planner order release 35 40

D Gross requirements 100

LT=2 Scheduled receipts

Proj. avail. balance 20 20 20 20 20 20 0

On- Net requirements 80

hand Planned order receipt 80

20 Planner order release 80

A(2) B(1)

C(2)

X

C(3)

It takes 2 C’s

for each B

Page 27: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

27

Day: 1 2 3 4 5 6 7 8 9 10

X Gross requirements 95

LT=2 Scheduled receipts

Proj. avail. balance 50 50 50 50 50 50 50 50 50 0

On- Net requirements 45

hand Planned order receipt 45

50 Planner order release 45

A Gross requirements 90

LT=3 Scheduled receipts

Proj. avail. balance 75 75 75 75 75 75 75 0

On- Net requirements 15

hand Planned order receipt 15

75 Planner order release 15

B Gross requirements 45

LT=1 Scheduled receipts

Proj. avail. balance 25 25 25 25 25 25 25 0

On- Net requirements 20

hand Planned order receipt 20

25 Planner order release 20

C Gross requirements 45 40

LT=2 Scheduled receipts

Proj. avail. balance 10 10 10 10 0

On- Net requirements 35 40

hand Planned order receipt 35 40

10 Planner order release 35 40

D Gross requirements 100

LT=2 Scheduled receipts

Proj. avail. balance 20 20 20 20 20 20 0

On- Net requirements 80

hand Planned order receipt 80

20 Planner order release 80

A(2) B(1)

D(5) C(2)

X

C(3)

It takes 5 D’s

for each B

Page 28: Production and Operations Management: Manufacturing and ...management.unk.edu/...18_Operations_Management_2012...2 Material Requirements Planning Materials requirements planning (MRP)

28

Lot Sizing in MRP Programs

Lot-for-lot (L4L)

Economic order quantity (EOQ)

Least total cost (LTC)

Least unit cost (LUC)

Which one to use?

The one that is least costly!