Product Design for Colombia’s Regulated Market Peter Cramton University of Maryland and Market Design Inc. 10 May 2007
44

Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Jun 09, 2018

Download

Documents

vannhan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Product Design forColombia’s Regulated Market

Peter CramtonUniversity of Marylandand Market Design Inc.

10 May 2007

Page 2: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Three steps to market design

• Product design• Auction design• Transition

Today!JuneJuly

Page 3: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Purpose of market

• Efficient price formation• Transparency• Neutrality• Risk management• Liquidity• Simplicity• Consistency

Page 4: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Efficient price formation

• Reliable price signals based on market fundamentals

• Competitive• Mitigate market power

Page 5: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Transparency

• Offers are comparable• Clear why winners won• Prompt regulatory review and approval• Regulatory certainty

Page 6: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Neutrality

• All suppliers treated equally• All demanders treated equally

Page 7: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Risk management

• Reduces risk for both sides of market• Rate stability, yet responsive to long-term

market fundamentals• Shields from transient events• Addresses counterparty risk

Page 8: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Liquidity

• Promotes secondary market• Liquid market for primary product • Liquid market for derivative products

– Long-term strips– Short-term slices

Page 9: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Simplicity

• For participants• For system operator• For regulator

Page 10: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Consistency

• Consistent with other key elements– Spot energy market– Firm energy market

• Consistent with best practice in world

Page 11: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Colombia setting

• Hydro-dominated electricity market– 80% of energy– 67% of capacity– 50% of firm energy (exceptional dry period)

• Hourly bid-based spot energy– Single zone

• Firm energy market– Assures sufficient firm energy– Hedges prices above scarcity price (about $260/kWh)

Page 12: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Market structure of firm energy(moderate concentration)

Hydro Thermal TotalEmgesa 10,419 2,373 12,792 21% 455Epm 8,523 3,295 11,818 20% 388Corelca 9,873 9,873 16% 271Isagen 5,099 2,327 7,426 12% 153Epsa 1,487 1,655 3,142 5% 27AES Chivor 2,925 2,925 5% 24Gensa 57 2,594 2,651 4% 20Termoflores 2,189 2,189 4% 13Termoemcali 1,533 1,533 3% 7Merielectrica 1,404 1,404 2% 5Termotasajero 1,349 1,349 2% 5Termocandelaria 1,062 1,062 2% 3Proelectrica 708 708 1% 1Menores 689 689 1% 1Urra S.A 438 438 1% 1Total 29,637 30,363 60,000 100% 1,374

HHIMarket share

ENFICC Declared (GWh)Company

Page 13: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Product:Energy share of regulated load

• Supplier bids for % of regulated load• Supplier that wins 10% share has an

obligation to serve 10% of regulated load in each hour

• Deviations between hourly obligation and supply settled at the spot energy price (or scarcity price if spot is higher)

• Pay as demand contract

Page 14: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Price coverageof regulated customer

Old market New market

Bilateral energy contracts and spot market

$260

>$500

$0 $0

>$500

Organized Regulated Market (MOR)

Firm energy marketPrice risk

Market power

High transactioncosts

Low transactioncosts

Little market power

Full price hedge

Page 15: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Type of contracts

020406080

100120140160180200

Jan/

02

May

/02

Sep

/02

Jan/

03

May

/03

Sep

/03

Jan/

04

May

/04

Sep

/04

Jan/

05

May

/05

Sep

/05

Jan/

06

May

/06

Sep

/06

Jan/

07

Num

ber o

f act

ive

cont

ract

s

Take or Pay Pay as Demand

Pay-as-demand is common

Page 16: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Type of contracts

0%10%20%30%40%50%60%70%80%90%

100%

Jan/

02

May

/02

Sep

/02

Jan/

03

May

/03

Sep

/03

Jan/

04

May

/04

Sep

/04

Jan/

05

May

/05

Sep

/05

Jan/

06

May

/06

Sep

/06

Jan/

07

Mar

ket s

hare

Take or Pay Pay as Demand

Pay-as-demand in energy terms

Page 17: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Product

• Regulated load is aggregate of all LSEs• 100% of regulated load is purchased in

auctions• Mandatory for LSEs• Voluntary for suppliers• Accommodates multiple customer classes

if required– For example, undesirable load shape of LSE

Page 18: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006

50 100Price

50 100Price

50 100Price

50 100Price

50 100Price

50 100Price

50 100Price

50 100Price

50 100Price

50 100Price

ASCC

CAEC

CAFC

CDIC

CDNC

CDSC

CENC

CETC

CHCC

CMPC

CMRC

CNCC

CNSC

CONC

CQTC

CRLC

CTGC

CTSC

DCLC

EADC

EBPC

EBSC

ECAC

EDCC

EDPC

EDQC

EECC

EEPC

EGTC

EGVC

EMEC

EMGC

EMIC

EMSC

ENCC

ENEC

ENIC

EPMC

EPSC

EPTC

ESCC

ESRC

ESSC

EVSC

GNCC

HIMC

HLAC

ISGC

RTQC

YRMC

Average cost ($/kWh) by LSE and Year

1452 9B

Demand

Price for each LSE broken down by Year. Color shows details about Demand. The data is filtered on Days, which ranges from 350 to 366.

Conclusion:Only one customer class!

Page 19: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Comparison with CREG proposal

• Energy share is huge simplification– Improved liquidity– Enhanced competition– Reduced risk

• Greater frequency of auctions reduces risk• Similar in other respects

– Single centralized market– Standard contract– Bundled product across all LSEs

Page 20: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Further issues

Page 21: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Seasonal factor?

• Costs are about 19% higher in dry season• Wet season .92; dry season 1.11• Conclusion: seasonal factor not needed

Page 22: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Load-following not ideal for all• Different resource types have different ideal

dispatch– Baseload, peaker, limited-water hydro, etc.

• Difference in dispatch and obligation introduces risk and market power issues

• Problem mitigated by– Balanced portfolio of resources– Balanced portfolio of contracts (Reg. and NR)

• Conclusion: benefits of pay-as-demand greatly exceed costs

Page 23: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Regulated demand participation

• Participation by LSE is mandatory• Retail choice has not worked well in US• Boundary between regulated/non-

regulated should be studied• If demand does participate, it should be

directly, not through LSE– Large sophisticated buyers could manage

themselves

Page 24: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Non-regulated demand participation

• Non-regulated demand can participate– As separate customer classes– With separate product

• Product: expected energy, not actual energy– Still hourly, but based on expected energy demand– Hedges expected energy demand, but exposes

customer to spot price on the margin– Requires hourly meter and demand management

• Participation benefits both regulated and non-regulated

Page 25: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Qualification and credit

• Beyond the scope of my task• Guarantees depend on duration• Reduce guarantees by recognizing

physical assets and firm fuel contracts

Page 26: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Number of active contracts by price index

0

20

40

60

80

100120

140

160

180

200

Jan/

02

Apr/0

2

Jul/0

2

Oct

/02

Jan/

03

Apr/0

3

Jul/0

3

Oct

/03

Jan/

04

Apr/0

4

Jul/0

4

Oct

/04

Jan/

05

Apr/0

5

Jul/0

5

Oct

/05

Jan/

06

Apr/0

6

Jul/0

6

Oct

/06

Jan/

07

Num

ber o

f Act

ive

Cont

ract

s

CERE (Capacity Charge) MM (Market Average) CERE and MM IPP (Producer Price index) SP (Spot Price)

Index multi-year contracts with IPP

Page 27: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Market share (energy basis) of active contracts by price index

0%10%20%30%40%50%60%70%80%90%

100%

Jan/

02

Apr

/02

Jul/0

2

Oct

/02

Jan/

03

Apr

/03

Jul/0

3

Oct

/03

Jan/

04

Apr

/04

Jul/0

4

Oct

/04

Jan/

05

Apr

/05

Jul/0

5

Oct

/05

Jan/

06

Apr

/06

Jul/0

6

Oct

/06

Jan/

07

Mar

ket s

hare

CERE (Capacity Charge) MM (Market Average) MM and CEREIPP (Producer Price Index) SP (Spot Price)

Index multi-year contracts with IPP

Page 28: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Small lot size

• 0.1% of regulated load (6 MW)• Great flexibility in expressing quantity• Accommodates small bidders• Improves secondary market

Page 29: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Planning, commitment, and frequency

Page 30: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Planning period

• Time between auction and start of commitment

• Opportunity to make adjustments• Impacts how much uncertainty has been

resolved• Longer implies price stability• Longer implies more costly guarantees

Page 31: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Commitment period

• Time between start and end of commitment; contract duration

• Longer implies price stability• Longer implies better financing• Longer implies greater guarantees

Page 32: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Frequency

• Number of auctions per year

Page 33: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Three instruments yield many options

• Single auction for a single commitment period

• Multiple auctions for a single commitment period (multiple planning lengths)

• Rolling auctions with a single commitment length (single planning length)

• Rolling auctions with multiple commitment lengths

Page 34: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Annual auction for 1-year commitment(6-month planning period)

PlanningYr

Year Qtr 1 2 3 4 1 2 3 4 1 2 3 4123 64123 64123 64

100%

100%

2008

2009

Months ahead

Energy commitment2011

100%

Auction date 2009 2010

2010

One product at any one time.

Page 35: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Quarterly auction for 1-year commitment(variable planning period)

PlanningYr

Year Qtr 1 2 3 4 1 2 3 4 1 2 3 41 122 93 64 31 122 93 64 31 122 93 64 3

2008

2009

2010

Energy commitment

1/41/4

1/4

1/4

1/41/41/4

1/41/41/4

1/4

1/4

Months ahead

Auction date 2009 2010 2011

One product at any one time.

Page 36: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Rolling quarterly auction for 1-year commitment(6-month planning period)

PlanningYr

Year Qtr 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4123 64 61 62 63 64 61 62 63 64 61 62 6

1/4

2011

1/41/4

1/41/4

1/41/4

1/41/4

Energy commitment

2008

2009

2010

1/4

Months ahead

1/4

1/4

2012Auction

date 2009 2010 2011

Four products at any one time.

Page 37: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Rolling quarterly auction for 3-year commitment(6-month planning period)

PlanningYr

Year Qtr 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4123 64 61 62 63 64 61 62 63 64 61 62 6

2008

2009

2010

Months ahead

1/121/12

1/121/12

1/121/12

1/121/12

Energy commitment

2011

1/121/12

1/121/12

2012 2013 2014Auction

date 2009 2010 2011

Twelve products at any one time.

Page 38: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Rolling quarterly auction for 1-year and 3-year commitments (6-month planning period)

PlanningYr

Year Qtr 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

2008

2009

2010

Months ahead

6

6

6

6

1

2

3

4

1

2

3

4

3

4

Energy commitment

1/24

1/24

1/24

1/24

6

6

6

6

1/24

1/24

1/24

1/24

1/8

1/8

1/8

6

6

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/24

1/24

1/24

1/8

6

62011

1

2

2012 2013 2014Auction

date 2009 2010 2011

Sixteen products at any one time.(four 1-year + twelve 3-year)

Page 39: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Quarterly auction for 1-year and rolling 3-year commitments (variable planning period)

PlanningYr

Year Qtr 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

12

9

6

3

12

9

6

31/81/24

1/81/24

1/81/24

1/81/24

Months ahead

1/81/24

1/8

12

9

6

3

4

1/81/24

1/81/24

4

2010

1 1/81/24

2

2009

1 1/81/24

2

3

3

4

1/241/8

1/24

2008

1 1/81/24

2

2012 2013 2014

3

Auction date 2009 2010 2011

Energy commitment

Four products at any one time.(one 1-year + three 3-year)

Page 40: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Recommendation

Page 41: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

1 3 5 7 9 11 13 15 17 19 21 23 25 27 30 32 34 36

Non

-reg

ulat

edRe

gula

ted

0

20

40

60

80

100

Coun

t of

Dur

atio

n

0B

10B

20B

Sum

of En

ergy

0

20

40

60

80

100

Coun

t of

Dur

atio

n

0B

10B

20B

Sum

of En

ergy

Frequency of contract durations by months and market

Start month123456789101112

Count of Duration and sum of Energy for each Duration broken down by Market. Color shows details about Start month. The view is filtered on Duration of 3 years or less.

Conclusion:2-year contracts, starting in January are most common.

Page 42: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Recommendation:Quarterly 2-year contracts, annual rolling

PlanningYr

Year Qtr 1 2 3 4 1 2 3 4 1 2 3 41 142 113 84 51 142 113 84 5

1/81/81/81/8

1/81/81/81/8

2009

Months ahead

2008

Auction date

Energy commitment2009 2010 2011

2 products,8 pricesat any one time.

Page 43: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

International experience

• Maryland• New Jersey• Illinois• France• Spain

Page 44: Product Design for Colombia’s Regulated Market · Product Design for Colombia’s Regulated Market Peter Cramton ... EGVC EMEC EMGC EMIC EMSC ENCC ENEC ENIC EPMC EPSC ... 2012 2013

Conclusion