Subsea Ver. Status Issue date Made by Checked by Approved by 00 IFC 2013.04.23 KNUDTZEN, FRITHJOF THOMSON, BARRIE INNES, ANDREW Originator: KNUDTZEN, FRITHJOF This document contains Aker Subsea legal entity proprietary and confidential information that is legally privileged and is intended only for the person or entity to which it is addressed and any unauthorised use is strictly prohibited. It is provided for limited purpose and shall not be reproduced, stored electronically, transferred to other documents, disseminated or disclosed to any third parties without the prior written consent of the relevant Aker Subsea legal entity. Any attachments are subject to the specific restrictions and confidentiality regulations stated therein and shall be treated accordingly. The document is to be returned upon request and in all events upon completion of use for which it was provided. Product Data Sheet, Production XMT Brynhild SPS 10001727951-PDC-000 Client Document Number Client Document Version Project code Originator Discipline Doc.Type Sequential number 01 21480-AKSSU-R-DS-0019 Reason for Issue Revision Rev. Date Prep. By Checked Approved IFC 01 23.04.2013 Knudtzen, Frithjof Thomson, Barrie Innes, Andrew
3
Embed
Product Data Sheet, Production XMT · 2020-05-13 · Product Data Sheet, Production XMT . Brynhild SPS . 10001727951-PDC-000 . Client Document Number Client Document Version Project
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Subsea
Ver. Status Issue date Made by Checked by Approved by
00 IFC 2013.04.23 KNUDTZEN, FRITHJOF
THOMSON, BARRIE INNES, ANDREW
Originator: KNUDTZEN, FRITHJOF
This document contains Aker Subsea legal entity proprietary and confidential information that is legally privileged and is intended only for the person or entity to which it is addressed and any unauthorised use is strictly prohibited. It is provided for limited purpose and shall not be reproduced, stored electronically, transferred to other documents, disseminated or disclosed to any third parties without the prior written consent of the relevant Aker Subsea legal entity. Any attachments are subject to the specific restrictions and confidentiality regulations stated therein and shall be treated accordingly. The document is to be returned upon request and in all events upon completion of use for which it was provided.
Product Data Sheet, Production XMT
Brynhild SPS
10001727951-PDC-000
Client Document Number Client Document Version
Project code
Originator Discipline Doc.Type Sequential
number 01
21480-AKSSU-R-DS-0019
Reason for Issue Revision Rev. Date Prep. By Checked Approved
IFC 01 23.04.2013 Knudtzen, Frithjof Thomson, Barrie Innes, Andrew
www.akersolutions.com/subsea
Production XMT
The Production XMT lands out in the wellbay on the 4slot manifold template. Here it connects onto the18-3/4" wellhead and to the manifold using a 12"Horizontal Connection Module (HCM). The hydrauliccontrol pressure is supplied through the 12" HCM andthe electrical supply through 2 off electrical flying leadswhich connects on to the Subsea Control Module (SCM)directly.
The Production XMT provides the required means of controlon the well. The Production Master Valve (PMV) andProduction Wing Valve (PWV) provide barriers for theproduction fluid. The Production Choke Valve (PCV) providesthe means for adjusting flow from the well. The SCMprovides hydraulic control and monitoring abilities forpressure and temperature in the XMT and the well. The mainbore of the XMT allows for the landing of a Tubing Hanger(TH) which can provide hydraulic and electric communicationdown hole as well as chemical injection.
This Production XMT has been based on the originalHigh-Pressure/High-Temperature (HPHT) XMT whichwas first designed for use on the Statoil Kristin field.This has later been used on the Statoil Morvin andTotal Hild fields.
This XMT will be installed on the Lundin Brynhild field.