Top Banner
PRODML Review Energistics Western Europe London, 31 May 2011
19

PRODML Review

Feb 24, 2016

Download

Documents

pekelo

PRODML Review. Energistics Western Europe London, 31 May 2011. Summary - Aims of Presentation. Review background Short term re-energize New Capability: Wireline /Drill Stem Testing Plan: Completions Find compelling business cases Request member involvement. “A Brief History of PRODML”. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PRODML Review

PRODML Review

Energistics Western EuropeLondon, 31 May 2011

Page 2: PRODML Review

Summary - Aims of Presentation

Review background Short term re-energize New Capability: Wireline/Drill Stem Testing Plan: Completions Find compelling business cases Request member involvement

Page 3: PRODML Review

“A Brief History of PRODML”

‘05 – formed by majors, invited service co’s ‘06 – $1.25m, Focus “DOF”, 4 pilots, plug &

play demos, ATCE launch v1.0, SPE paper ‘07 - ~$0.7m, 7 pilots, 2 reporting, 1 DTS, 4

DOF, ATCE roadmap & 2 SPE papers ‘08 – slowing momentum, 1-2 pilots,

SAM/GDA ‘09-’10 – fewer initiatives, incremental

release

Page 4: PRODML Review

Re-energize during 2011

Demonstrate essential commitment by maintaining annual & “responsive” releases

Identify a Compelling Business Case objective, achievable in 1-2 years, with commitment of current SIG membership to contribute

Refine roadmap longer term around industry desires & matching commitments

Page 5: PRODML Review

2011 Development Release 2.1 - pending

adds Formation Tester Saudi Aramco requests - incr. release

Gain Aramco involvement and usage Completion Object – start work

Work with WITSMLEnsure Business Case & use cases

understood & supported Regulatory reporting - prep. for 2012

Interact with NDR SIG to gain requirements

Page 6: PRODML Review

PRODML Data Objects

1. Flow Network2. Product Volume3. Production Operation4. Well Test5. DTS6. Time series7. Fluid Sample and Analysis8. Wireline formation tester (coming in 2.1)

Page 7: PRODML Review

Slide #7

Scope of Formation/Drill Stem Testing

P Gauge

Flow

Sample

PressureTransient

Analysis

ReservoirInflowParameters

PVT LabAnalysis

FluidsProperties

TransientWelltest orWireline FT

Performance& Res Descr.

Time-seriesData

P

Q

Page 8: PRODML Review

WFT Packers

8

Page 9: PRODML Review

Slide #9

WFT Probe Types (examples)

9

Single Probe (Weatherford photo)

See:~http://www.slb.com/content/services/evaluation/reservoir/quicksilver_probe.asp?

Central plus annular Probe

See:~http://www.halliburton.com/public/common/Data_Sheets/H06089.pdf

Oval Pad Probe

Page 10: PRODML Review

Slide #10

WFTs: Multiple Layers Tested

Can test, sample, analyse and report flowing interval by flowing interval.

Each “stop” is referred to as a Station

Page 11: PRODML Review

Slide #11

R1

Results Derived From Results

WFTStation

Sensor 1

Sensor 2

Tests

Samples

Events

Example: property measured in test 2 is used to derive results from test 3

Methods

Results R2

Page 12: PRODML Review

Slide #12

Results across stations upscaling, form eval., res.descr.

Results apply at each station individually, but also across multiple stations.

WFTStations

PropertyProfiles

PropertyGradients

Std. Logs

Page 13: PRODML Review

Slide #13

Completion Data Drilling Production

Perm.Gauge

DTSFlowingIntervals, sensor depths

DrilledWell Completed

Well

Perm.Gauge

DTS

Surveillance/Reporting

E.g. Gas LiftChange

Optimization

Optimization using models

New Completion

Drilling & Completions Domain Production Domain

WorkoverPlanned

Tubing

Perforations

SSSV

Packer

Completion DB

Well

Services

Drilling system

WITSML

Drill

Complete

Page 14: PRODML Review

Compelling Business Cases – e.g.’s Completions (D&C life of well) NDR and/or NOJV reporting Service company data (field office) DOF Formation EvaluationHow? Member commitment to “make it happen” Roadmap Iterative approach to thorny problems

Page 15: PRODML Review

2011 Promoting Awareness

Take story back to key members Promotion/assessment: current capabilities

e.g. survey of well test use (?others, e.g. reporting, DTS, etc.)

Initiatives: compelling but achievable aims Get right expectations and engagement

Page 16: PRODML Review

2011 Processes

Requirements capture - Use Case TeamCompletionsRegulatory reporting

Development - Specification TeamData schemas & services

Support - Deployment Support TeamDocumentation and helpNo team or resources currently in place

Page 17: PRODML Review

2011 Technology Trends

Shared issues across standards Need for cross-standards workgroup to

integrate all this

Page 18: PRODML Review

The Team

Jim Green (CVX) – Board sponsor Bill McKenzie (CVX) & Mike Knewtson

(SLB) – Spec Team co-leads + ~6 regular Dave Shipley (CVX) & TBC (svc co) – Use

Case Team co-leads + ~ 2-3 regular Jerry Hubbard, Jana Schey, Gary Masters

- Energistics Laurence Ormerod – PM (part time role)

Page 19: PRODML Review

Our Need

Please get involved!! Any input welcome, esp:

Use Case Team (details or long term vision)Deployment Support

We want to be led by real world deployments