PROCESSO DE VENDA DE PROJETO DE REMEDIAÇÃO OBRIGAÇÕES/LIMITAÇÕES Ana Paula Queiroz Waterloo Brasil Ltda. [email protected]
Nov 10, 2018
PROCESSO DE VENDA DE PROJETO DE REMEDIAÇÃO OBRIGAÇÕES/LIMITAÇÕES
Ana Paula QueirozWaterloo Brasil Ltda.
•• ConsultoriaConsultoria??
•• EngenhariaEngenharia??
•• Obra Obra Civil?Civil?
•• Montagem elMontagem eléétricatrica? ? MecânicaMecânica??
•• Venda Venda de de EquipamentoEquipamento??
•• TercerizaTercerizaçção ão de de Mão Mão de de ObraObra??
•• Pesquisa CientPesquisa Cientííficafica??
•• Ciência ExataCiência Exata? ? BiolBiolóógicagica? Humana?? Humana?
O QUE O QUE ÉÉ UM PROJETO DE REMEDIAUM PROJETO DE REMEDIAÇÇÃOÃO
•• Metas Metas de de RemediaRemediaççãoão
•• Estudo Estudo de de Alternativas Alternativas de de RemediaRemediaççãoão
•• Projeto ConceitualProjeto Conceitual
•• Projeto ExecutivoProjeto Executivo
•• ImplantaImplantaççãoão
•• OperaOperaççãoão
•• MonitoramentoMonitoramento
COMPONENTES DE UM PROJETO DE COMPONENTES DE UM PROJETO DE REMEDIAREMEDIAÇÇÃOÃO
•• Definida Definida a a partir da Avaliapartir da Avaliaçção ão de de Risco Risco àà SaSaúúde de Humana.Humana.
•• Depende Depende do do uso pretendido da uso pretendido da áárearea..
•• SerSeráá decisiva na tdecisiva na téécnica cnica de de remediaremediaçção ão a ser a ser utilizadautilizada..
META DE REMEDIAMETA DE REMEDIAÇÇÃOÃO
VINYL CHLORIDE 100 YEARSCONTOUR INTERVAL= 0.002
GOLF COURSEFORMER
COC0.0133
TARGET LEVELSVC
BOUNDARY CONDITIONS)
RT3D RESULTS 100 YEARRUN (WITH BIO-FUTURE
NORTHEAST OHIO
FORMER GOLF COURSE
= TARGET LEVEL (SEE TABLE)
= POTABLE WELL
= STREAM SAMPLE
= GEOPROBE BORING
= MONITORING WELL= BUILDING
LEGEND
= BOREHOLE
100'0 200'
BAR SCALE IN FEET
AVENUE
ROAD
DRIVE
0.0360.0560.076
0.002
0.0060.010.0140.02
0.0280.04
Future Boundaries w/Decay
•• Tem o Tem o objetivo objetivo de de selecionar selecionar a a melhor tmelhor téécnica cnica de de remediaremediaçção ão com base com base nos elementosnos elementos::
•• EfetividadeEfetividade
•• ImplementabilidadeImplementabilidade
•• CustoCusto
•• PrazoPrazo
ESTUDO DE ALTERNATIVA DE ESTUDO DE ALTERNATIVA DE REMEDIAREMEDIAÇÇÃOÃO
Expected to receive regulatory approvalEstimated to be acceptable to general public since it
eliminates risks to river and receptors
Expected to receive regulatory approvalEstimated to be acceptable to general public since
it eliminates risks to river and receptorsRegulatory and
Community Acceptance
Estimated capital cost is $274,000, and present worth of 20 years O&M (10 years active sparging, 10 years monitoring only) is $842,100
Total implementation cost estimate is $1,116,100
Estimated capital cost is $282,4000, and present worth of 30 years O&M (20 years active pumping, 10 years monitoring only) is $2,054,800
Total implementation cost estimate is $2,337,200Cost
Readily implementedMinimal O&M
Readily implementedO&M intensiveImplementability
Eliminates pathway and, therefore, risk to the river and potential receptors (environmental and human)
Proven technology capable of 100% benzene removal insitu
Provides for treatment and removal of dissolved benzene through insitu volatilization
Continuous or cyclic operation possibleSystem easily expandableLikely to achieve applicable drinking water standards within
10 yearsContinued use of free phase benzene recovery system is
necessary for source control
Eliminates pathway and, therefore, risk to the river and potential receptors (environmental and human)
Proven technology capable of 100% benzene removal from recovered groundwater, but reduction of benzene in aquifer to applicable drinking water standard may be difficult
Likely to approach, but may not achieve applicable drinking water standards even after operation for 20 years
Continued use of free phase benzene recovery system is necessary for source control
Protection of Human Health and the Environment,
Effectiveness, and Reduction of
Contamination
Alternative 2Air/Biosparging
Alternative 1Groundwater Pump and Treat
Screening Criteria
PROJETO PILOTOPROJETO PILOTO
•• AvaliarAvaliar::
•• Geologia Geologia locallocal
•• Comportamento Comportamento dos dos contaminantescontaminantes
•• Emissões atmosfEmissões atmosfééricas geradasricas geradas
•• ResResííduos sduos sóólidos lidos e e llííquidosquidos
•• Compostos secundCompostos secundááriosrios
•• HidroquHidroquíímicamica
PROJETO CONCEITUAL E EXECUTIVOPROJETO CONCEITUAL E EXECUTIVO
•• Desenhos conforme normasDesenhos conforme normas
•• ARTART
•• Lista Lista de de MateriaisMateriais
•• ““Bid PackageBid Package””
•• HAZOPHAZOP
Preparation of executive design: Air/Preparation of executive design: Air/BiospargingBiospargingAlternative Alternative –– typical Air/typical Air/BiospargingBiosparging well and wellheadwell and wellhead
IMPLANTAIMPLANTAÇÇÃOÃO
•• EquipeEquipe
•• MateriaisMateriais
•• Procedimentos Procedimentos de de SeguranSeguranççaa
•• EPIsEPIs
•• CronogramaCronograma
•• Seguro Seguro de de ResponsabilidadeResponsabilidade
OPERAOPERAÇÇÃOÃO
•• Pelo EmpreendedorPelo Empreendedor
•• Pelo ConsultorPelo Consultor
•• RemotaRemota
MONITORAMENTOMONITORAMENTO
•• PeriodicidadePeriodicidade
•• No de No de pontospontos
•• MetodologiaMetodologia
•• RelatRelatóóriorio
Não se deve pular etapas na contrataNão se deve pular etapas na contrataçção, cada ão, cada etapa tem sua importância.etapa tem sua importância.