Why is Commissioning Why is Commissioning Required?Required?

Buildings and systemshave become much more complexComputer controlsTele/data and audio/visual systems Indoor air quality concernsEnergy efficiency requirements

Page 3: Proceso Comisionamiemto

3

What Is TheWhat Is TheCommissioning Commissioning

ProcessProcess??

Page 4: Proceso Comisionamiemto

Just Like a Project isJust Like a Project isPerformed by a Team...Performed by a Team...

PROJECTTEAM

USERGROUPS

DESIGNMANAGER

CONSTRUCTIONMANAGER

ARCHITECT/ENGINEER

SPECIALCONSULTANTS

CONTRACTORS

PLANTOPERATIONS

COMMISSIONINGTEAM

Page 5: Proceso Comisionamiemto

Commissioning is Performed by a Team Commissioning is Performed by a Team (with members from the Project Team)(with members from the Project Team)

COMMISSIONINGTEAM

USERREPS

ARCHITECT/ENGINEER

REP

CONSTRUCTIONMANAGER

PLANTOPERATIONS

REPSCONTRACTOR

REPS

COMMISSIONINGAGENT

Page 6: Proceso Comisionamiemto

6

Commissioning BeginsCommissioning Beginsat the Beginningat the Beginning

The need for commissioning is determined when a project is opened

Projects we commission include: New buildings and building additions Complex mechanical/electrical renovations Elevator and fire alarm system

replacements

Page 7: Proceso Comisionamiemto

7

Commissioning Occurs inCommissioning Occurs inTwo PhasesTwo Phases

Design-Phase CommissioningUsually only on large projectsOccurs from Programming to Bidding

Construction-Phase CommissioningOn all commissioned projectsOccurs through User Move-In

Page 8: Proceso Comisionamiemto

8

During Design-Phase During Design-Phase Commissioning:Commissioning:

Commissioning promotes development of a DESIGN INTENT DOCUMENT Written narrative of project requirements Documents User and Maintenance

expectations

Page 9: Proceso Comisionamiemto

9

During Design-Phase During Design-Phase Commissioning:Commissioning:

Commissioning promotes conformance to the University’s Design Guidelines and Preferred Manufacturers List (except when deviations are justified)

Page 10: Proceso Comisionamiemto

10

During Design-Phase During Design-Phase Commissioning:Commissioning:

Commissioning spot-checks A/E design calculations

Commissioning spot-checks A/E design drawings and specifications

Page 11: Proceso Comisionamiemto

11

Page 12: Proceso Comisionamiemto

12

During Design-Phase During Design-Phase Commissioning:Commissioning:

Commissioning helps Value Engineer projects by deleting unnecessaryM & E systems and equipment

On LSI, Commissioning had 14 VE recommendations accepted for a savings of over $700,000

Page 13: Proceso Comisionamiemto

13

During Design-Phase and During Design-Phase and Construction-Phase Construction-Phase

Commissioning:Commissioning:

Commissioning helps with Vendor and Contractor negotiations

F&O Administration, Purchasing, Plant Ops, and Commissioning worked with LSI and the Med School to negotiate over $5,000,000 in savings this year on construction components costs

Page 14: Proceso Comisionamiemto

14

During Construction-Phase During Construction-Phase Commissioning:Commissioning:

Commissioning promotes planning ahead Develop a project-specific Commissioning

Manual Give Contractors written check-lists so

work isn’t forgotten Give Contractors written test procedures

identifying our expectations

Page 15: Proceso Comisionamiemto

15

During Construction-Phase During Construction-Phase Commissioning:Commissioning:

Commissioning promotes conformance to the Project Contract Documents

Commissioning promotes the use of construction mock-ups