Top Banner
S.E.P – TRAINING CENTRE PROCEDURE FOR TESTING P122 THREE PHASE OVERCURRENT & EARTH FAULT PROTECTION RELAY
22

PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

Jun 09, 2018

Download

Documents

phamxuyen
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

PROCEDURE FOR TESTING

P122 THREE PHASE OVERCURRENT &

EARTH FAULT PROTECTION

RELAY

Page 2: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

INDEX

CHAPTER 1:

1. INTERFACING PC WITH RELAY

2. EXTRACTING SETTINGS FROM THE RELAY

CHAPTER 2:

1. SETTING VALUES AS PER OUR REQUIREMENT IN

THE RELAY.

2. UPLOADING THE SETTING VALUES TO THE RELAY.

3. MEASUREMENT TEST

CHAPTER 3:

1. BREAKER FAILURE PROTECTION

2. ENABLING THE FUNCTION

3. UPLOADING THE SETTING VALUES IN TO THE

RELAY

4. PICK UP AND DROP OUT TEST.

5. TIMING TEST.

Page 3: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

CHAPTER 1

INTERFACING PC WITH RELAY

Page 4: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

A. COMMUNICATION WITH RELAY.

CLICK MICOM S1 AS MENTIONED IN BELOW

PICTURE.

Page 5: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

1.NOW WE HAVE TO CREATE NEW SYSTEM HENCE

CLICK NEW SYSTEM AS MENTIONED IN BELOW

PICTURE.

2. ASSIGN NAME FOR NEW SYSTEM AND CLICK OK

Page 6: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

3.NOW SYSTEM IS CREATED AND THEN CLICK QUICK

CONNECT AS SHOWN IN BELOW PICTURE

Page 7: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

4. ENTERING QUICK CONNECT THE PAGE WILL

OPENED AS SHOWN IN BELOW PICTURE.

5. NOW WE NEED TO ENTER THE DEVICE TYPE, AS

PER OUR CONCERN OUR RELAY IS P122 HENCE IT

FALLS IN PX20 SERIES. CLICK PX20 AND THEN OK

Page 8: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

6. NOW WE NEED TO ASSIGN OUR COMMUNICATION

TYPE, HENCE CLICK BELOW OPTION AS PER OUR

REQUIREMENT.

Page 9: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

7. WE NEED TO ENTER THE COMMUNICATION

ADDRESS WHAT WE USED IN OUR PC, THERFORE

ASSIGN AS PER OUR REQUIREMENT AND CLICK

FINISH.

Page 10: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

8.NOW THE COMMUNICATION PROCESS IS

STARTED WHICH IS MENTIONED IN BELOW

PICTURE.

Page 11: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

9.NOW WE NEED TO ENTER THE NAME AND THEN

CLICK FINISH

Page 12: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

10.AFTER THIS NOW WE SUCCESSFULLY COMPLETED

OUR COMMUNICATION AND NOW WE NEED TO

EXTRACT THE SETTINGS FROM RELAY.

11.GO TO EXTRACT AND CLICK EXTRACT SETTINGS.

Page 13: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

12.AFTER EXTRACTING SETTINGS IT WILL SHOW WITH

NAME AS 000 AND HENCE WE NEED TO RENAME AS

DEFAULT.

13.FOR OUR TESTING PURPOSE WE SHOULD NOT

DISTURB THE DEFAULT VALUES AND HENCE DO THIS

PROCESS ONCE MORE AND NAME IT AS TEST.

Page 14: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

14. NOW CLICK TEST AND NEW WINDOW WILL BE

OPENED WITH ALL THE DEFAULT CONFIGURATION

AND SETTING VALUES.

THIS CHAPTER DEALS WITH HOW TO COMMUNICATE

WITH RELAY AND HOW TO EXTRACT THE DEFAULT

VALUES.

Page 15: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

CHAPTER 2

Page 16: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

1.WE NEED TO CHANGE THE SYSTEM VALUES AS PER

OUR REQUIREMENT AND OUR SCHEMES

2.ACCORDING TO OUR SCHEMES WE NEED TO CHANGE

THE SYSTEM DATA AND CT RATIO AS MENTIONED IN

ABOVE PICTURE.

Page 17: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

3.AFTER SENDING SAVED VALUES TO THE RELAY, IT

STARTS LOADING PROCESS THEN AT LAST IT WILL

SHOW AS MENTIONED IN BELOW PICTURE.

4.NOW WITH FREJA 300 EQUIPMENT INJECT THE

SECONDARY CURRENT AND MEASURE THE PRIMARY

CURRENT TO PERFORM THE METERING TEST.

Page 18: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

CHAPTER 3

THREE PHASE OVERCURRENT

& EARTH FAULT PROTECTION

Page 19: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

1.GO TO PROTECTION G1 AND MAKE PHASE

OVERCURRENT ENABLE.

2.NOW SET THE VALUE 0.5 A AS THE SETTING VALUE

THEN SAVE AND SEND TO THE RELAY.

3.AFTER THIS GO TO FREJA PAGE AND CLICK CURRENT

OPTION FOR PERFORMING PICK UP AND DROP OUT

TEST.

Page 20: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

4.PERFORM PICK UP AND DROP OUT TEST AS SHOWN IN

BELOW PICTURE.

5.HENCE FROM ABOVE PICTURE AS PER OUR SETTINGS

PICK UP VALUE IS 0.501A AND DROP OUT VALUE IS

0.447A.

Page 21: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

6.TO PERFORM TIMING TEST WE NEED TO DO FOR

BOTH STAGE 1 AND STAGE 2.

7.FIRST SET TIMING FOR STAGE 1 AND GO TO

AUTOMAT.CONTROL AND ASSIGN TRIP COMMAND AS

(tstage1) AS SHOWN IN BELOW PICTURE.

NOTE: WHEN EVER THE VALUES HAS BEEN CHANGED

WE SHOULD SAVE AND SEND TO THE RELAY.

8.NOW GO TO FREJA PAGE AND PERFORM THE TIMING

TEST FOR STAGE 1.

Page 22: PROCEDURE FOR TESTING P122 - My Protection Guide · 2016-03-06 · procedure for testing p122 three phase overcurrent & earth fault protection relay . s.e.p ... a. communication with

S.E.P – TRAINING CENTRE

9.NOW PERFORM THE TIMING TEST AS SHOWN IN

BELOW PICTURE.

10.TIMING TEST FOR STAGE 1 IS COMPLETED AND SAME

FOR STAGE 2 , WE NEED TO CHANGE THE SETTING

VALUES AND ASSIGN TRIP COMMAND AS (tstage2).

CONCLUSION:

THIS PROCEDURE CONTAINS HOW TO

COMMUNICATE RELAY WITH PC AND HOW TO

PERFORM PICK UP, DROP OUT AND TIMING TEST.