Top Banner
problems in Maintenance of Railway tracks in deserts And Possible solutions By Anurag sharma Former chief engineer Indian Railway
64

problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Aug 30, 2018

Download

Documents

hanguyet
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

problems in Maintenance of

Railway tracks in deserts

AndPossible solutions

ByAnurag sharma

Former chief engineer Indian Railway

Page 2: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Tracks on Indian Railway North western Railways in India has large

stretches of track in the Thar desert on its two divisions

54737 Sq km

81142 sq km

Area of sandy soil

38%479 km2241kmBikaner division

40%770 km1805 kmJodhpur division

% of total trackTrack in desertTotal track kmDivision

Page 3: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Desert in India

Page 4: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast
Page 5: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

BME

JSM

LOCATION SHOWING SANDY TERRAIN

Page 6: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

TYPES OF SAND DUNES ON THAR DESERTTYPES OF SAND DUNES ON THAR DESERTTYPES OF SAND DUNES ON THAR DESERTTYPES OF SAND DUNES ON THAR DESERT

Page 7: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

CLIMATIC CONDITIONS OF DESERT REGION

Max. Wind velocity in Summer – 70 to 80 kmph

Average Mean Wind velocity – 30 to 40 kmphDirection of Flow – from south-west to north-east

Annual Rainfall – 100 to 300 mmBut in particular area less than 100 mm or even no drop of rain in particular year.

Temperature

Min. up to 00Winter

350C550 to 600CMax. up to 500CSummer

Sandy Soil at 50 cm below

Sandy Soil at SurfaceAmbientSeason

Page 8: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

PROPERTY OF SAND (General)

The properties of the Dunes Sand are as followsNon Cohesive.Sand Dunes without any type of vegetation.Highly errodable due to wind.(Even sand dunes of about 10 mtr. Height can shift their position in one Year)Very difficult to ply any vehicle except tractors and dozers.Get very hot during day and cold in night.

Page 9: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

INDIA RAILWAYS SERVICES IN DESERT In India tracks of North western Railway zone tracks are located in the desert.These tracks were laid as per meter gauge standards to serve the local population but in the last 15 Years most of the lines have been converted into Broad gauge on which long distance trains and heavy good traffic also run. This has increased the importance of this network.In Bikaner division there are problems of sand drift while on Jodhpur division there is problem of cyclonic rains.

Page 10: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Track structure in desert region

Conventional fittings

200 mm ballast cushion in most of the cases but sand cushion at some

places

CST-9 and ST sleepers with wooden sleepers on the joints

Mostly 90R or 75R and 60R in

some case. It is mostly SWP

MG

Elastic fastenings

250 to 300 mm stone ballast cushion

Concrete sleepers in M=7 density

52 kg /m LWRBG

FittingsBallast cushion

SleepersRailsGauge

Page 11: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

TRACK MAINTENANCE IN DESERT REGION

On Indian Railways regular maintenance is now being done with the help of track machines like tie tampers and ballast cleaning machines, etc. Due to mechanization hardships faced by Railway men in old days have minimized. But some of the problems persist.

Indian Railways are making continuous efforts to improve the reliability and safety of services.

Page 12: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Special maintenance Problems in desert areas a). Extreme Temperature variations.b). Lack of Vegetation or poor vegetation.c). Scanty rainfall, active shortage of the water for

the gang men and other staff in field.d). Corrosion due to salinity in the soil and water.e). Insufficient water-ways.f). Disruption due to sand storms.g). Water breaches due to obstructions in water

ways.h) Disturbance of longitudinal levels due bulking of

sandi) Deep screening and overhauling of the track is not

effective.

Page 13: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast
Page 14: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Chemical composition of the sand in Rajasthan desert area

Page 15: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Engineering properties of the sand in the Thardesert.

Page 16: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Types of Sand dunes

•Old system type Average height of 20m to 40m – They are stable •New system type up to a height of 2m to 8m –they are unstable and they move.

Page 17: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Types of dunes on the basis of shapes

Barchans dunes: The barchans are formed from a relatively small sand supply under the influence of moderate wind of constant direction, thus stand apart from each other – their convex side heading into the wind and the tips of their crescents tapering off to leeward.

Page 18: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Star dunes: A cluster of Barchans forms star dunes. These dunes are formed when wind blows from all directions. Unlike other types of dunes, which move in the direction of prevailing wind, star dunes remain stationary.

Page 19: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Transverse dunes: these are product of moderate, one way winds which move light sand, tumbling air eddies swirl heavier grains to the side which make ridges.

Page 20: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

•Longitudinal dunes: these dunes are formed when stronger one way wind moves, both fine and coarse, sand particles cutting the long troughs parallel with the path of the wind.

Page 21: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

TYPES OF SAND DUNES

Page 22: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

HALF MOON TYPE DUNE

Page 23: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

HALF MOON TYPE DUNES

Page 24: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Compound Parabolic Dunes

Page 25: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

TRANSVERSE DUNES LINEAR DUNES

Page 26: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Mechanism of sand stormAs soon as the wind velocity is more than 16Kmph at one meter above ground sand starts lifting off the ground.Sand transportation is directly proportionate to cube of the velocity of the wind.During storms transportation of sand particle takes place as under:Rolling or surface creep- bigger sand particle(>0.25mm) move along the surface.Saltation- Medium size particles(0.15 to 0.25 mm) move constantly rise and fall and move by leaping. Suspension –Fine sand Particles(< 0.15mm) are carried away to large distances.

Page 27: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

DEPOSITION OF DRIFT SAND AROUND OBSTACLES

Pattern deposition of drift sand varies depending upon the flexibility, permeability and location of the obstruction. Study of these patterns of deposition help in deciding the plantation strategy.

Page 28: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Behavior of Sandy Soil/Sand Dunes during Sand Streams. (Contd.)

• During sandy storm – sand flows with wind in three layers.

– First layer of heavy particle at lower height.– Second layer of particle with dancing (sine wave). Movement up to 2

mtr. Ht . Which is main cause of deposition of sand.– Third layer of suspended particle above 2 – 4 mtr. Ht.

Page 29: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Aerodynamic Characteristics of Sand Blowing

Through porous obstruction Velocity of wind gets reduced due to porous barrier and upto 20 H line of length the effect of sand blowing is less.

Through impervious obstructionsIf velocity of wind is restricted by dense barriers the wind flows in turbulent pattern and eddy currents forms which results in deposition of sand near barriers.

Page 30: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast
Page 31: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast
Page 32: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast
Page 33: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast
Page 34: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast
Page 35: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast
Page 36: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast
Page 37: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Problems due to sandy storms and cyclonic rains

Blockade of railway track due to sand depositsLoss of elasticity of track due to chocking of ballast bed Drainage problemCorrosion of rails and fittingsLoss of visibility due to new sand dunesExcessive wear of rails Breaches even in scanty rain fallSignal failures

Page 38: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Problems faced during sand storms and cyclonic rains

Please look at some panoramic views of track after sand storms and breaches

Page 39: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

•WATER BREACHES IN RKB-JSM SECTION ON 20/8/2006

Page 40: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

OTHER PROBLEMS FACED (Contd.)

•Effects on Yard Drainage etc.

Page 41: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

OTHER PROBLEMS FACED (Contd.)

•Effect on Visibility

Page 42: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

OTHER PROBLEMS FACED (Contd.)

•Effect on Visibility

Page 43: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Day to day remedial actions

Some of the photographs showing common remedial measures in the desert region are shown in coming slides

Page 44: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

•Deputation of patrolman

ROUTINE MAINTENANCE WORKING(During Sand Storms) (Contd.)

Page 45: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

ROUTINE MAINTENANCE WORKING(During Sand Storms) (Contd.)

•Removal of sand by Tractors

Page 46: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

ROUTINE MAINTENANCE WORKING(During Sand Storms) (Contd.)

•Flange way clearing by manual labour

Page 47: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

ROUTINE MAINTENANCE WORKING(During Sand Storms) (Contd.)

•Removal of Sand by manual labour

Page 48: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Precautions to be taken in case of a new line

Route the railway line around the high dunesSelect the formation on embankment if the prevailing wind blows along the line and in the cutting if the wind blows across the lineIn high velocity wind and sandy region select the height of the bank equal to the average height of the dunes

Page 49: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Precautions to be taken in case of a new line contd.

Increase the width of right of way for protective measures. At least 100 m land width on either side of the track should be available.Carry out erection of shields protecting the vegetation on the strip adjacent to formation.Adopt mild slopes not steeper than 1 in 200 .Make effective catch water drains to minimize the damage during the cyclonic rains.

Page 50: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Problems in the existing lines and possible solutions

Erosion of the bank during summer months

Where railway alignment is across the direction of wind this damage is more. Provide shield of local bushes in slopes and edge of embankmentErosion of the bank during monsoon

Make cross drains one per rail length as a pre-monsoon work . Dress up slopes away from the centre of track.. At the moth of the drain provide dry bushes and do paving of the drain.

Page 51: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Problems and possible solutions contd.

Loose sand from the top of the bankroll down to the formation due to strong wind or due to vibration

Widen the cuttings. If possible ease out the slopes and turf the slopes with the arid bushes.

Page 52: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

During monsoon sandy cuttings or soft moorum move along with waterWiden the cutting ease out the slopesPave the side drains with stones.In such areas patrolling is necessary

Problems and possible solutions contd.

Page 53: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Problems and possible solutions contd.

Huge sand deposits take place on the embankment and in the cuttingsleveling of adjoining sand dunesSpraying of oil on the sand dunes to

stabilize themDress up ridges by the side of trackProvide air passage between the sleepers and the railsCut sand channels in the direction of wind on both side of track. Trapezoidal channels with wooden sleepers on the mouth of the channel increase their effectiveness.

Page 54: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast
Page 55: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Solutions to drift sand contd.Provide impervious wall 6” above and 18” below ground on the dune on the wind ward side

Page 56: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Solutions to drift sand contd.

Remove obstacles from the leeward side. There should be no obstacles higher than the formation level.Plantation/ protection of small plants in railway landDig trenches parallel to railway line on the boundary on wind ward side

Page 57: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Solutions to drift sand contd.

Stabilize the sand dunes by plantation with the help of a special bricks which retain moisture even up to one year.

Page 58: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Solutions to drift sand contd.Protect the sand surface with a cover spray with emulsion of petroleum resins.Roughening of the surface for slowing down the wind velocity. For this barriers are placed 10m from the track. Also trenches are dug on the leeward side to collect the sand. Av series of banks and trenches helps in controlling the problem for the longer duration.

Page 59: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Solutions to drift sand contd.

Provide shelter belt of trees shrubs and grass in rows . Tallest tree should be in the centre

Page 60: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Local Shrub of 1 ft. height

Local Shrub of 1 ft. height

15 M 10 M

Local green plant of 2 ft. height

Track

Plantation in pyramid shape

REMEDIAL MEASURES (Contd.)

Page 61: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Changes during the gauge conversion

After the gauge conversion of the sections in the desert area, problems have come down due to following improvements done during gauge conversion project:

1. Use of stone ballast in place of sand and kankar ballast.

2. Easing out of the slopes.

3. Heavier track structure i.e. rail and sleepers.

Page 62: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Other Happenings in the Area

After the commissioning of Rajasthan canal problem sand blowing have come down substantially in its command areaPlantation in the area in general has reduced the problem.

Page 63: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Magnitude of the Problem at present

Due to the above reasons and other measures taken by the Indian railways, no of accidents and blockades to the traffic have been reduced to 1 or two in year and the blockade of traffic on an average of 7 days in a year.

Due to vigilant management most of the accident causing occasions get converted into cancellation of trains or loss of punctuality cases.

Page 64: problems in Maintenance of Railway tracks in … · problems in Maintenance of Railway tracks in deserts And ... Former chief engineer Indian Railway. ... BG 52 kg /m LWR Ballast

Conclusions

After the strengthening of the track structure during gauge conversion problems have been reducedEasing out of grades has also helpedUse of stone ballast in place of sand ballast track levels are better maintainedPlantation has helped in sand dune stabilization