Proactive Proactive Environmental Environmental Management System Management System 1 Illinois Department of Transportation Illinois Department of Transportation (IDOT) EMIS Implementation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. Steve Gobelman, P.E., P.G. S. Babusukumar, P.G. S. Babusukumar, P.G. Michael Yesconis Michael Yesconis ® TRB ADC Conference July 26, 2011
38

Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Mar 27, 2015

Download

Documents

Miguel Byrd
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Proactive EnvironmentalProactive EnvironmentalManagement SystemManagement System

1

Illinois Department of Transportation (IDOT) Illinois Department of Transportation (IDOT) EMIS ImplementationEMIS Implementation

Steve Gobelman, P.E., P.G.Steve Gobelman, P.E., P.G.

S. Babusukumar, P.G.S. Babusukumar, P.G.

Michael YesconisMichael Yesconis

®

TRB ADC Conference

July 26, 2011

Page 2: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Background The Illinois Department of Transportation (IDOT) maintains over 300

facilities statewide to support the state’s highway maintenance activities.- Vehicle Maintenance Activities

- Handling Hazardous Materials

- Underground Storage Tanks

- Aging Facilities

- Decentralized EnvironmentalManagement (facility by facility)

IDOT proactively conducted Environmental Compliance Audits (ECAs) at 150 facilities and identified high priority environmental compliance issues.

The next step was to implement a solution to address the environmental issues found during the ECAs.

2

Page 3: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Implementation Approach Environmental Compliance Audits performed at facilities to

establish high priority issues and a baseline.

Procedures and Technical Guidance documents were developed to manage high priority concerns as a part of an initial Environmental Management System (EMS).

To facilitate the implementation of the EMS a Web-based Environmental Management Information System (EMIS) has been developed to provide a consistent and centralized approach to EMS

Asset Inventories to define inspection targets which are now being conducted during the ECA’s.

.

3

Page 4: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Implementation Approach

4

Engage the End Users of the EMIS through meetings and informational overview documents (FAQs).

Training for each district is conducted on-site at their respective district headquarters. Users are also provided an EMIS Quick Start Guide for reference after training.

This EMIS has been implemented in IDOT’s District 8 which contains 25 maintenance facilities and is currently being expanded to the other IDOT districts (3 districts in 2011 and the final 5 districts in 2012), totaling over 300 facilities.

Page 5: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Examples of EnvironmentalCompliance Issues

Summary of Issues:

Uncovered salt storage resulting in stressed vegetation and impacts to local waterways.

Tanks that were leaky tanks and lacking proper labeling and secondary containment.

Improperly maintained Oil Water Separators and inlet filter units.

Improperly stored waste and hazardous materials.

Resulting EMS Procedures:

Salt Storage

Bulk Oil Products

Solvent-based Parts Washers

Hazardous Waste Streams

Universal Waste

Used Oil

Filters & Fuel Filters

Underground Storage Tanks

Oil/Water Separators / Inlet Filter Units

Stormwater Drainage Pathways5

Page 6: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Examples of EnvironmentalCompliance Issues

Impact to Stormwater(Salt Containing Prussian Blue)

Impact to Storm Water

6

Page 7: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Stressed Vegetation From Salt Runoff

Stressed Vegetation From Salt Runoff

Examples of EnvironmentalCompliance Issues

7

Page 8: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Leaky Tanks Leaky Waste Oil Tank

Examples of EnvironmentalCompliance Issues

8

Page 9: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Sludge in Oil Water Separator Oil Water Separator Requiring Maintenance

Examples of EnvironmentalCompliance Issues

9

Page 10: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Lack of Secondary Containment and Tank Labels

Improper Labeling

Examples of EnvironmentalCompliance Issues

10

Page 11: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Potential Waste Stored in Open Containers

Improperly Discarded Empty Drums

Examples of EnvironmentalCompliance Issues

11

Page 12: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Parts Washer with Solvents Left Open When Not in Use

Unsecured Gas Cylinders

Examples of EnvironmentalCompliance Issues

12

Page 13: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Dilapidated Buildings/Unsafe Conditions

Unsafe Structures

Examples of EnvironmentalCompliance Issues

13

Page 14: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Improperly Stored Used Batteries Improper Storage of Flammable Material

Examples of EnvironmentalCompliance Issues

14

Page 15: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Clogged Drains/Impact toStorm Water

Examples of EnvironmentalCompliance Issues

15

Improper Disposal of Oil Filtersin Trash

Page 16: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

EMS to EMIS

16

Paper-BasedEMS Procedure

Documents

Page 17: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

System Features

17

Main Menu/User Tasks

Inspections

Issue Identification and Resolution

Technical Guidance & Facility Maps

Asset Inventories

Waste and Bulk Product Manager

Reporting & Analysis

Page 18: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

EMIS Workflow

18

Page 19: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

EMIS Workflow

19

Page 20: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

EMIS Main Screen

20

Page 21: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

EMIS Inspection w/ Asset Data Pop-up

21

Page 22: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

EMIS Completed Inspection

22

Page 23: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Issue Resolution

23

Once issues are logged they can be resolved in 3 different ways:

•Field Resolved – The inspection finds an issue that that was resolvable during the inspection (i.e., cover a pile of salt).

•Self-Assigned – The inspection finds an issue that he/she can resolve, but cannot attend to it during the inspection.

•Notify Field Engineer – The inspection finds an issue that needs Field Engineer support or escalation.

Page 24: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Issues Awaiting Assignment

24

Issues in the Issues Task window on the EMIS home page. These are currently unassigned and awaiting assignment from the inspections Field Engineer.

Page 25: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Asset Inventory

25

Page 26: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Asset Inventory

26

Page 27: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Technical Guidance & Facility Maps

27

Page 28: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

EMIS Reporting

28

Report Types:

•Inspections•Issues •Issues Status•Waste Inventory•Waste Shipping•Bulk/Waste Type •Bulk Inventory•SPCC Facility Summary

Page 29: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Waste Management Features

29

•Waste Inspection Checklist - Identify issues in the storage and handling of Waste at each facility” (labeling, storage, secondary containment)

•Waste Inventory Form - Provides inputs to track accumulated Waste stored at each facility

•Waste Shipping Tracking -Tracking of where the waste is being transported to and by whom. The Pickup Date, Transport From, Transport To as well as Transporter can be tracked for any given shipment by facility.

•Request Waste Pickup Notifications – Allows system users to request a waste pickup if capacity to store those waste streams are low. Notification goes to IDOT Waste Specialist. Allows for more efficient pickup/disposal logistics.

Page 30: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

EMIS Waste Inventory

30

Page 31: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

EMIS Waste Shipping

31

The last step in the Waste process is the Waste Shipping feature that allows for the tracking of where the waste is being transported to and by whom. The Pickup Date, Transport From, Transport To as well as Transporter can be tracked for any given shipment by facility.

Page 32: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Bulk Product Tracking/SPCC

32

The EMIS provides a Bulk Product Inventory form with the ability to determine if an SPCC plan is required at a given facility based on the amount of bulk product being stored on-site along with associated reports to assist in the tracking of bulk product at each facilities.

Reports provide several ways to query and report on Bulk product inventories and SPCC status. Examples provided on the following slide.

Page 33: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Bulk Product Tracking/SPCC

33

Page 34: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

EMIS Admin Features/Archives

34

Admin Features:

•Facilities•Users•Inspections•Tasks•User Log•System Valid Values•Inspection Archive•Issues Archive

Page 35: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

EMIS Top Findings Are stormwater inlet protection devices provided when no

secondary containment is provided?

Locate liquid salt storage tanks away from storm drains, trenches or ditches that lead off site. If this is not possible, provide appropriate inlet protection devices such as storm drain covers to be used when transferring liquid salt or in the event of a leak.

Are outdoor stockpiles of potential pollutants (e.g., batteries, oil products, salt, scrap metal, etc) covered?

Is this AST equipped with secondary containment?

Are all hazardous waste containers stored on secondary containment?

35

Page 36: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

EMIS Features Review User-friendly and intuitive interface

Build specifically for IDOT’s workflow requirements

Web-based Portal provides a custom user experience based upon their role in the system

Electronic notification of Task Assignments

Electronic Inspection Checklists for all EMS Procedures

Corrective Action / Issue Resolution and Issue Prioritization features

Asset Management

Robust Reporting and Task Tracking tools

36

Page 37: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Benefits of the EMS & EMIS Protecting public health and environment

Effective compliance with regulatory requirements

Improve IDOT’s public image as a green organization

Facilitate efficient fiscal planning and prioritization of environmental issues

Manage challenging environmental issues with top-to-bottom engagement of all IDOT stakeholders from a central Web-based system

Potential integration of the EMIS into other IDOT systems (Asset / Work Order Management)

37

Page 38: Proactive Environmental Management System 1 Illinois Department of Transportation (IDOT) EMIS Implementation Steve Gobelman, P.E., P.G. S. Babusukumar,

Contact Information

38

Steven Gobelman, P.E., L.P.G. IDOT Bureau of Design & [email protected](217) 785-4246

S. Babusukumar, P.G.Weston Solutions, [email protected](847) 918-4018 Michael YesconisWeston Solutions, [email protected](610) 701-3931