PRACTICAL TRAININGSEMINAR
ONKota Super Thermal Power Plant
Presented byPriyansh goyal
7th Sem , EE
08EE038
Presented ToMr. K.G SHARMA
Seminar Coordinator
8/3/2019 Priyansh__seminar Ppt - Copy
2/27
8/3/2019 Priyansh__seminar Ppt - Copy
3/27
INTRODUCTION
It was establish in 1973.It is located at the left bank of the CHAMBLE River at the
upstream of KOTA BAIRAJ
1st & 2nd units are of 110 MW each
3rd ,4th &5th units are of 210 MW
6th & 7 unit of 195 MW
Total generation capacity(110+110+210+210+210+195+195) =1240 MW
Favorable condition
Abundant quantity of clean cooling water.Good transport facility
Concentration of load in Kota region due to large number of
industries.
8/3/2019 Priyansh__seminar Ppt - Copy
4/27
8/3/2019 Priyansh__seminar Ppt - Copy
5/27
Operation of thermal power plant.
Layout
Coal handling plant
Ash handling plant Boiler
Steam Turbine
Generator
Cooling system Transformer
Water pump
Protection
Main parts of Kota Super ThermalPower Plant
8/3/2019 Priyansh__seminar Ppt - Copy
6/27
Operation of thermal power plant.
8/3/2019 Priyansh__seminar Ppt - Copy
7/27
COALHAND
ASH
STOR
COALSTOR
ASH
HAND
BOILER SUPHEATER
ECO
AIR,PREHEATER
TURB
CONDENSER
TRANALT
CHI
LAYOUT
8/3/2019 Priyansh__seminar Ppt - Copy
8/27
Layout of thermal power plant
8/3/2019 Priyansh__seminar Ppt - Copy
9/27
1). The thermal power station burns the fuel and use the heat
to raise the steam.2). Heat from the coal is absorbed by kilometers long tubes in
boiler walls by Boiler Feed Water and transferred to theturbine blades rotating them.
3). When turbine rotates, the rotor housed inside the statorturns with it.
4). Electricity is produced by the movement of magnetic fieldcreated by rotor.
5). This electricity passes to the transformer which steps up
the voltage for effective transmission.6). The used steam is changed back into water in the
condenser for reuse.
8/3/2019 Priyansh__seminar Ppt - Copy
10/27
Coal handling plant
Wagon unloading system
Crushing system
Conveying system
Coal handling plant section
8/3/2019 Priyansh__seminar Ppt - Copy
11/27
Wagon unloading system
Unload the coal fromwagon to hopper.
Hopper allows to passcoal pieces 200mm
From hopper coal fall onvibrator which issupported by roller.
8/3/2019 Priyansh__seminar Ppt - Copy
12/27
Crushing system
CRUSHER HOUSE:- Its mainfunction to crush the coalto 20mm
Two types
Primary crusher
oRail crusher
oRotary breaker
Secondary crusher
8/3/2019 Priyansh__seminar Ppt - Copy
13/27
Conveying system
Stacker reclaimer:- This unitcan stack the material on tothe pipe and feed on to themain line conveyor.
Specification:-
Belt width : 1400mm
Speed : 2.2m/sec
Total install power : 360kw
Capacity : 1350/750 ton/hr
No. of conveyor: 38
8/3/2019 Priyansh__seminar Ppt - Copy
14/27
It can be divided into 4 sub plants :
Fuel and Ash plant
Air and Gas plant
Feed water and steam circuit.
Cooling water circuit.
Coal fired steam power plant
8/3/2019 Priyansh__seminar Ppt - Copy
15/27
8/3/2019 Priyansh__seminar Ppt - Copy
16/27
It is a closed vessel in which water under pressure is convertinto steam.
Hot water or steam used to transfer heat to a process.
A boiler is always designed to absorb max amount of heatreleased in process of combustion.
Furnace:- It is primary part of boiler where the
Boiler
ChemicalEnergy of
fuel
ThermalEnergy by
combustion
8/3/2019 Priyansh__seminar Ppt - Copy
17/27
FIRING ACTION IN BOILER
Boilers are tangentially fired
Fuel
8/3/2019 Priyansh__seminar Ppt - Copy
18/27
Steam Turbine
It is a machine in which a
shaft is rotated steadilyby reaction of steam, air,water, gases etc. uponblades of a wheel.
When Steam is used thencalled steam turbine.
KineticEnergy
Mechanicalpower
8/3/2019 Priyansh__seminar Ppt - Copy
19/27
8/3/2019 Priyansh__seminar Ppt - Copy
20/27
Generator
An electrical generator is a
machine which convertsmechanical energy into electricalenergy through electromechanical energy conversion .
The generator is driven by
directly coupled steam turbine ata speed of 3000 r.p.m
ElectricalEnergy
Mechanicalpower
8/3/2019 Priyansh__seminar Ppt - Copy
21/27
Cooling System
In KSTPS hydrogen
cooling system is
employed for generatorcooling.
Hydrogen is used
because of its superior
cooling properties &low density.
Thermal conductivity
of H2 7.3 times of air.
8/3/2019 Priyansh__seminar Ppt - Copy
22/27
Circulating water pump:- It is arequirement of the condenser tocondensate the steam by coolingwater. Five pump are used forcondensing.
Each pump has capacity of 8275m3/hr and develop pressure about1.94kg/cm2
Firstly water is purified and filtered
and pumped to elevation of 42 mtrwhere it is stored and used forcooling the oil cooler.
Water pump
8/3/2019 Priyansh__seminar Ppt - Copy
23/27
TRANSFORMER
Transformer:- It is a static
device used to changevoltage level keeping thepower and frequency same.
There are nearly 83transformer through out theplant. Transformer arelocated b/w main plant &switchyard.
Types of transformer
a) Generator Transformer-Ab) Generator Transformer-B
c) Station transformer
d) Unit auxiliary transformer
e) Station servicetransformer
8/3/2019 Priyansh__seminar Ppt - Copy
24/27
Protection
Protection of stator
Faults:- Phase to phase fault. Phase to phase earth. Short circuit b/w lines. Overheating
Various device are used todetect faults which can givealarm to operator.
It is required to have minimumtripping time.
Protection of winding
Faults
First rotor fault
Second rotor fault.
Interterm fault.
Magnetic unbalance canproduce can produce seriousvibration and distortion of therotor shaft.
8/3/2019 Priyansh__seminar Ppt - Copy
25/27
8/3/2019 Priyansh__seminar Ppt - Copy
26/27
8/3/2019 Priyansh__seminar Ppt - Copy
27/27
Any Queries ? ? ?
THANK YOU!!!
&