  • 8/3/2019 Priyansh__seminar Ppt - Copy

    1/27

    PRACTICAL TRAININGSEMINAR

    ONKota Super Thermal Power Plant

    Presented byPriyansh goyal

    7th Sem , EE

    08EE038

    Presented ToMr. K.G SHARMA

    Seminar Coordinator

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    2/27

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    3/27

    INTRODUCTION

    It was establish in 1973.It is located at the left bank of the CHAMBLE River at the

    upstream of KOTA BAIRAJ

    1st & 2nd units are of 110 MW each

    3rd ,4th &5th units are of 210 MW

    6th & 7 unit of 195 MW

    Total generation capacity(110+110+210+210+210+195+195) =1240 MW

    Favorable condition

    Abundant quantity of clean cooling water.Good transport facility

    Concentration of load in Kota region due to large number of

    industries.

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    4/27

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    5/27

    Operation of thermal power plant.

    Layout

    Coal handling plant

    Ash handling plant Boiler

    Steam Turbine

    Generator

    Cooling system Transformer

    Water pump

    Protection

    Main parts of Kota Super ThermalPower Plant

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    6/27

    Operation of thermal power plant.

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    7/27

    COALHAND

    ASH

    STOR

    COALSTOR

    ASH

    HAND

    BOILER SUPHEATER

    ECO

    AIR,PREHEATER

    TURB

    CONDENSER

    TRANALT

    CHI

    LAYOUT

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    8/27

    Layout of thermal power plant

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    9/27

    1). The thermal power station burns the fuel and use the heat

    to raise the steam.2). Heat from the coal is absorbed by kilometers long tubes in

    boiler walls by Boiler Feed Water and transferred to theturbine blades rotating them.

    3). When turbine rotates, the rotor housed inside the statorturns with it.

    4). Electricity is produced by the movement of magnetic fieldcreated by rotor.

    5). This electricity passes to the transformer which steps up

    the voltage for effective transmission.6). The used steam is changed back into water in the

    condenser for reuse.

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    10/27

    Coal handling plant

    Wagon unloading system

    Crushing system

    Conveying system

    Coal handling plant section

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    11/27

    Wagon unloading system

    Unload the coal fromwagon to hopper.

    Hopper allows to passcoal pieces 200mm

    From hopper coal fall onvibrator which issupported by roller.

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    12/27

    Crushing system

    CRUSHER HOUSE:- Its mainfunction to crush the coalto 20mm

    Two types

    Primary crusher

    oRail crusher

    oRotary breaker

    Secondary crusher

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    13/27

    Conveying system

    Stacker reclaimer:- This unitcan stack the material on tothe pipe and feed on to themain line conveyor.

    Specification:-

    Belt width : 1400mm

    Speed : 2.2m/sec

    Total install power : 360kw

    Capacity : 1350/750 ton/hr

    No. of conveyor: 38

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    14/27

    It can be divided into 4 sub plants :

    Fuel and Ash plant

    Air and Gas plant

    Feed water and steam circuit.

    Cooling water circuit.

    Coal fired steam power plant

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    15/27

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    16/27

    It is a closed vessel in which water under pressure is convertinto steam.

    Hot water or steam used to transfer heat to a process.

    A boiler is always designed to absorb max amount of heatreleased in process of combustion.

    Furnace:- It is primary part of boiler where the

    Boiler

    ChemicalEnergy of

    fuel

    ThermalEnergy by

    combustion

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    17/27

    FIRING ACTION IN BOILER

    Boilers are tangentially fired

    Fuel

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    18/27

    Steam Turbine

    It is a machine in which a

    shaft is rotated steadilyby reaction of steam, air,water, gases etc. uponblades of a wheel.

    When Steam is used thencalled steam turbine.

    KineticEnergy

    Mechanicalpower

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    19/27

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    20/27

    Generator

    An electrical generator is a

    machine which convertsmechanical energy into electricalenergy through electromechanical energy conversion .

    The generator is driven by

    directly coupled steam turbine ata speed of 3000 r.p.m

    ElectricalEnergy

    Mechanicalpower

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    21/27

    Cooling System

    In KSTPS hydrogen

    cooling system is

    employed for generatorcooling.

    Hydrogen is used

    because of its superior

    cooling properties &low density.

    Thermal conductivity

    of H2 7.3 times of air.

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    22/27

    Circulating water pump:- It is arequirement of the condenser tocondensate the steam by coolingwater. Five pump are used forcondensing.

    Each pump has capacity of 8275m3/hr and develop pressure about1.94kg/cm2

    Firstly water is purified and filtered

    and pumped to elevation of 42 mtrwhere it is stored and used forcooling the oil cooler.

    Water pump

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    23/27

    TRANSFORMER

    Transformer:- It is a static

    device used to changevoltage level keeping thepower and frequency same.

    There are nearly 83transformer through out theplant. Transformer arelocated b/w main plant &switchyard.

    Types of transformer

    a) Generator Transformer-Ab) Generator Transformer-B

    c) Station transformer

    d) Unit auxiliary transformer

    e) Station servicetransformer

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    24/27

    Protection

    Protection of stator

    Faults:- Phase to phase fault. Phase to phase earth. Short circuit b/w lines. Overheating

    Various device are used todetect faults which can givealarm to operator.

    It is required to have minimumtripping time.

    Protection of winding

    Faults

    First rotor fault

    Second rotor fault.

    Interterm fault.

    Magnetic unbalance canproduce can produce seriousvibration and distortion of therotor shaft.

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    25/27

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    26/27

  • 8/3/2019 Priyansh__seminar Ppt - Copy

    27/27

    Any Queries ? ? ?