DIREKTORAT JENDERAL PENGUATAN RISET DAN PENGEMBANGAN KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET KEMARITIMAN
109

PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Oct 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

DIREKTORAT JENDERAL PENGUATAN RISET DAN PENGEMBANGAN KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI

PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET KEMARITIMAN

Page 2: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

DIREKTORAT JENDERAL PENGUATAN RISET DAN PENGEMBANGAN KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI

Page 3: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

DIREKTORAT JENDERAL PENGUATAN RISET DAN PENGEMBANGAN KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI

Page 4: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

DIREKTORAT JENDERAL PENGUATAN RISET DAN PENGEMBANGAN KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI

Page 5: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

DIREKTORAT JENDERAL PENGUATAN RISET DAN PENGEMBANGAN KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI

Page 6: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

DIREKTORAT JENDERAL PENGUATAN RISET DAN PENGEMBANGAN KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI

FOKUS RISET KEMARITIMAN PRODUK: KAPAL HARBOUR TUGBOAT

Page 7: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Key Technology Kapal Harbour Tug Dual Fuel

Pelaksana: BPPT, ITS, Kemenhub, PT.PAL Indonesia, PT. BKI, PT. LEN, PT. INTI, PELINDO 1-4 Target: 2022/2023 Indonesia mampu memproduksi sendiri kapal Tugboat untuk mendukung operasional Pelabuhan di Indonesia

Traction and control system for tugboat

winches BPPT, PINDAD, BKI

Ship design & certification BPPT, ITS, Kemenhub, PAL, BKI

Maneuvering and Stability Analysis

BPPT, BKI

Hydrodynamics Testing and Analysis

BPPT, BKI

Engine and Propulsion System Design BPPT, PAL, BKI

Structure Analysis and Design Construction

BPPT, ITS, BKI

Material (Marine Grade) Structural Testing BPPT, BKI, PT. KS

Electrical System and Automation

BPPT, PAL, BKI, PT. LEN

Piping And General System

BPPT, PAL, BKI

Safety and Fire System

BPPT, Kemenhub, PT. BKI

Production Technology BPPT, PAL

20 21 22 23 24

21 22

21 22

22

21 22

20 21 22 23

20 21 22 23

20 21 22 23

Navigation and Communication System BPPT, PT. LEN, PT. INTI

Sea Trial and Bollard Pull Test BPPT, PT. LEN, PT. INTI

23 24

21 22 23

21 22 23

21 22

20 21 22 23

Target : Prototype Tug Boat Utk Pelayan Pelabuhan Wilayah Pelindo 3

2020 2021 2022 2023 2024

BPPT Desain, uji model 3,30 4,00 4,95 0,95 0,50 13,70

Kemenhub Regulasi 0,45 0,50 0,10 - - 1,05

ITSDesain struktur dan

konstruksi bollard0,10 0,40 0,25 - - 0,75

PT PALProduksi, komponen,

sistem propulsi0,50 0,75 65,00 70,00 2,00 138,25

PT BKI Rule Klas, survey 0,20 0,20 0,50 0,50 0,25 1,65

Pelindo 3 FS, Uji coba 0,25 0,25 - - 0,10 0,60

4,80 6,10 70,80 71,45 2,85 156,00Total Pertahun (M)

Instansi Peran Tahun Total Instansi

(M)

Page 8: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Item Kondisi terkini Target program 2024

Mission Analysis Diluar negeri telah dilakukan pembangunan harbour tug dual fuel Di Indonesia telah dibangun satu unit milik Pertamina Trans Kontinental (PTK)

Target 2024 adalah standarisasi desain harbour tug dual fuel dan terselesaikannya prototip harbour tug dual fuel sesuai kebutuhan

Desain dan Analisis Conceptual dan Basic Design Terselesaikannya Keyplan dan Approval desain di 2021

Produksi dan Manufaktur Belum Dimulai Produksi selesai di 2023 beserta dengan Sea Trial dan test alinnya

Sertifikasi Belum (dimulai tahun 2021, saat proses approval desain dan Keyplan)

Selesai sertifikasi dan standarisasi

QA/QC Belum (Dimulai saat proses produksi di Tahun 2022)

Selesai (Sesuai jadwal pembangunan dan sea trial) dan kualitas yang sesuai standart

Target Program

Page 9: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Harbour Tugboat Dual Fuel

Inovasi Teknologi Pengembangan Kapal Dual-Fuel

Harbour Tug

WBS 1.0

Mission Analysis

WBS 2.0

Desain dan Analisis

WBS 3.0

Produksi & Manufaktur

WBS 4.0

Sertifikasi

WBS 5.0

QA & QC

BPPT, Kemenhub,

Kemenperin,

PT. Pelindo, ITS

BPPT, PT. PAL, ITS PT. PAL & Industri Penunjang BKI, Kemenhub

(Hubla) BPPT, PT. PAL, BKI

Design Requirement &

Objectives

Kajian Ekonomi dan

Operasional

Kajian Regulasi

Preliminary Design

Basic Design

Pemodelan Numerik

Pengujian

Hidrodinamika

Analisa Struktur &

Kekuatan

Detail drawing dan

engineering estimation

Hull Structure

Propulsion Plant

Electrical Plant

Navigation &

Communication

Auxilliary Systems

Deck Machineries &

Outfitting

Interior & Furnishings

Sertifikasi Desain/

Design Approval

Sertifikasi Komponen

Sertifikasi Statutoria

Jaminan Kualitas

Pengendalian Kualitas

Bollard Pull Test & Sea

Trial

Work Breakdown Structure Riset Nasional

Page 10: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detail setiap WBS

WBS Target detil WBS

2020 2021 2022 2023 2024

WBS 1 Mission Analysis

• Terselesaikannya Design Requirement & Objectives

• Terlaksananya Kajian Ekonomi dan Operasional

• Terlaksananya Kajian Regulasi

• Terselesaikannya Kajian Ekonomi dan Operasional

• Terlaksananya Kajian Regulasi

• Terselesaikannya Kajian Regulasi

WBS 2 Desain dan Analisis

• Terselesaikannya Conceptual dan Basic Design

• Terselesaikannya • numerical analysis

• Terselesaikannya Ship model test

• Terselesaikannya Terselesaikannya Keyplan dan DED beserta class approval

Terlaksananya pengembangan desain harbour tug dual fuel

Terselesaikannya Sea trial dan Bollard Pull Test

Terselesaikannya pengembangan desain harbour tug dual fuel

WBS 3 Produksi dan Manufaktur

Terlaksananya produksi dan manufaktur Harbour Tug Dual Fuel

Terselesaikannya produksi dan manufaktur Harbour Tug Dual Fuel

WBS 4 Sertifikasi

Diterbitkannya class approval untuk desain harbour tug dual fuel

Pelaksanaan sertifikasi dan class approval selama proses pembangunan

Pelaksanaan sertifikasi dan class approval selama proses pembangunan

Diterbitkannya approval class untuk harbour tug dual fuel

WBS 5 QA dan QC

QA dan QC untuk Basic Design

QA dan QC untuk Keyplan dan ship model test

QA dan QC untuk Proses Produksi dan Manufaktur

QA dan QC untuk Proses Produksi dan Manufaktur

QA dan QC untuk Proses Sea trial dan bollard pull test

Page 11: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM SETIAP WBS

WBS SDM

Nama Lembaga

WBS 1 Mission Analysis Pelindo 3

WBS 2 Desain dan Analisa Ir. Muryadin, MSc. BTH-BPPT

WBS 3 Produksi dan Manufaktur Divisi Kapal Niaga PT. PAL

WBS 4 Sertifikasi Fredhi Agung Prasetyo PT. BKI

WBS 5 QA dan QC PT. PAL/BPPT

Nama Kepala Program : Prof. Buana Maruf / BPPT / PTRIM Nama Program Manager : Cahyo Sasmito ST. Meng / BPPT / PTRIM Nama Tehnik Manager : Fariz Maulana Noor ST. MSc. / BPPT / BTH

Page 12: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil Output Work Package (WP) WBS 1 (Mission Analysis)

WP Target detil WP

2020 2021 2022 2023 2024

WP 1.1. Design Requirement & Objectives

Pengumpulan data teknis kapal Pembanding harbour tugboat sebagai referensi

Preliminary Design

WP 1.2. Kajian Ekonomi dan Operasional

Analisa Tekno ekonomi dan Operasional di wilayah Pelindo 1 dan 2

Analisa Tekno ekonomi dan Operasional di wilayah Pelindo 3 dan 4

WP 1.3. Kajian Regulasi

Kajian Pengembangan regulasi harbour tug dual fuel

Kajian Pengembangan regulasi kapal berbahan bakar dual fuel

Kajian pengembangan regulasi fasiitas pendukung pengisian bahan bakar LNG Kapal

Target WBS 1: Diperolehnya dokumen hasil mission analysis Harbour Tug Dual Fuel

Page 13: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil Output Work Package (WP) WBS 2 (Desain dan Analisa)

WP Target detil WP

2020 2021 2022 2023 2024

WP 2.1. Preliminary design

Tersedianya data utama kapal

WP 2.2. Basic Desain

Tersedianya: Lines Plan General Arrangement

Penyempurnaan basic design

WP 2.3. Pemodelan Numerik

WP 2.4 Pengujian Hidrodinamika

Diperolehnya hasil uji hidrodinamika yang meliputi: Resistance, propulsion, seakeeping dan manuvering test

Diperolehnya hasil uji hidrodinamika yang meliputi: Resistance, propulsion, seakeeping dan manuvering test

WP 2.5 Analisa Struktur & Kekuatan

Diperolehnya hasil analisa uji kekuatan struktur lambung kapal

Diperolehnya hasil analisa uji kekuatan struktur lambung kapal

WP 2.6 Detail Drawing and Engineering Estimation

Dihasilkannya Detail drawing (Keyplan) dan Engineering Estimation

Dihasilkannya Detail drawing (Keyplan) dan Engineering Estimation

Target WBS 2: Diperolehnya Desain dan Hasil Pengujian Harbour Tug Dual Fuel yang telah tersertifikasi

Page 14: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 1 (Mission Analysis)

WP SDM

Nama Lembaga

WP 1.1. Design Requirement & Objectives

Pelindo 1-4

WP 1.2. Kajian Ekonomi dan Operasional

PTRIM dan Pelindo 1-4

WP 1.3. Kajian Regulasi

BKI, Puslit laut Balitbang Kemenhub, BPPT

Target WBS 1: Diperolehnya dokumen hasil mission analysis Harbour Tug Dual Fuel

Page 15: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 2 (Desain dan Analisa)

WP SDM

Nama Lembaga

WP 2.1. Preliminary design

Pelindo 1-4, PTRIM

WP 2.2. Basic Desain

PTRIM dan BTH

WP 2.3. Pemodelan Numerik

ITS, PTRIM BPPT

WP 2.4 Pengujian Hidrodinamika

BTH BPPT

WP 2.5 Analisa Struktur & Kekuatan

B2TKS BPPT

WP 2.6 Detail Drawing and Engineering Estimation

BPPT dan PT. PAL

Target WBS 2: Diperolehnya Desain dan Hasil Pengujian Harbour Tug Dual Fuel yang telah tersertifikasi

Page 16: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Total Anggaran Program

2020 2021 2022 2023 2024

BPPT Desain, uji model 3,30 4,00 4,95 0,95 0,50 13,70

Kemenhub Regulasi 0,45 0,50 0,10 - - 1,05

ITSDesain struktur dan

konstruksi bollard0,10 0,40 0,25 - - 0,75

PT PALProduksi, komponen,

sistem propulsi0,50 0,75 65,00 70,00 2,00 138,25

PT BKI Rule Klas, survey 0,20 0,20 0,50 0,50 0,25 1,65

Pelindo 3 FS, Uji coba 0,25 0,25 - - 0,10 0,60

4,80 6,10 70,80 71,45 2,85 156,00Total Pertahun (M)

Instansi Peran Tahun Total Instansi

(M)

Page 17: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Road Map Kapal Harbour Tug Dual Fuel

2020:

Studi dan Penguiian Numerik Preliminary Desain Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel

2021:

Desain Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel

2022:

Uji model kapal Harbour Tug

2023:

Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel

2024:

Review & evaluasi desain Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel

Page 18: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Action Plan Kapal Harbour Tugboat Dual Fuel 1500 HP x 2…. (1)

Prioritas Riset Nasional : Pengembangan Kapal Harbour Tugboat Asal Kementerian/Lembaga : BPPT Bidang Prioritas : Maritim

Diisi oleh : BPPT Periode Pelaksanaan : 2020 - 2024

Disetujui oleh : K/L terkait : BAPPENAS, BPPT, KEMENHUB, ITS, PT. PAL INDONESIA, PT. BKI, Pelindo 3, PT. LEN, PT. INTI

Tanggal :

Teknologi Kunci Output/Outcome tiap K/L

Aktivitas dan Kegiatan

2020 2021 2022 2023 2024 No Teknologi dan K/L terkait (1) (2) (3) (4) (5) (6) (7) (8) (9)

1

Ship Design and Certification (Hull Form, General arrangement, Keyplan drawing, Technical Spesification and Class Approval)

BPPT, ITS, Kemenhub, PT.PAL, PT.BKI, Pelindo 3

Aktivitas Tiap Tahun

KEMENHUB, Pelindo 3 & ITS : Feasibility study BPPT : 1) Preleminary Design

2) Update modul software CFD PT. PAL : Pengumpulan data teknis kapal harbour tugboat sebagai referensi PT. BKI : Quality

control design Harbour Tugboat berdasarkan rules untuk sertifikasi

KEMENHUB, Pelindo 3 & ITS : Penentuan karakteristik kapal hasil FS (ukuran kapal, daerah pelayaran, dll) BPPT : Basic Design

PT. PAL : Penyiapan sarana dan sinkronisasi design PT. BKI : Quality control basic design untuk keperluan sertifikasi

BPPT : 1) Pembuatan key plan atau detail drawing 2) Pembuatan spesifikasi teknis PT. PAL : Penyiapan gambar produksi kapal Harbour Tugboat PT. BKI : Quality control detail drawing dan design approval

PT. PAL : Pembuatan as built drawing BPPT : Supervisi design dan produksi kapal Harbour Tugboat PT. BKI : Quality control as built drawing dan approval

BPPT, ITS, Kemenhub, PT.PAL, PT.BKI, Pelindo 3

KEMHUB

250.000.000

150.000.000 - - -

ITS

BPPT 1.000.000.000 500.000.000 1.500.000.000 350.000.000

PT.PAL 100.000.000 300.000.000 750.000.000 250.000.000

PT. BKI 100.000.000 100.000.000 300.000.000 200.000.000

2

Hydrodynamics Testing and Analysis (Resistance,Propulsion and Bollard pull)

BPPT (BTH and PTRIM), PT. BKI Aktivitas Tiap Tahun -

BPPT : 1. Ship resistance and power test 2. Ship propulsion test 3. Ship manouvering test 4. Hull design analysis from testing results 5. Ship hull optimization, if any PT. BKI : Quality control based on classification rules

BPPT : 1. Uji Bollard pull 2. Rekomendasi optimasi desain kapal PT. BKI : Quality control based on classification rules

- -

BPPT (BTH and PTRIM), PT. BKI BPPT

- 750.000.000 500.000.000

- - PT. BKI 150.000.000 150.000.000

3

Manouevering and Stability Analysis (Intact, Damage Stability and Tank Sloshing)

BPPT (BTH and PTRIM), PT. BKI Aktivitas Tiap Tahun -

BPPT : 1. Uji Manuvering 2. Pre - stability analysis for intact and damage (numerical) 3. Pengadaan dinamometer Podded Propeller PT. BKI : Quality control based on classification rules

BPPT : 1. Seakeeping test 2. Numerical analysis for tank sloshing 3. Final intact and damage stability analysis

4. Ship arrangement optimization, if any PT. BKI : Quality control based on classification rules

- -

BPPT (BTH and PTRIM), PT. BKI BPPT -

75.000.000.000 250.000.000 - -

PT. BKI 100.000.000 100.000.000

Page 19: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Action Plan Kapal Harbour Tugboat Dual Fuel 1500 HP x 2…. (2)

Teknologi Kunci Output/Outcome tiap K/L

Aktivitas dan Kegiatan

2020 2021 2022 2023 2024 No Teknologi dan K/L terkait (1) (2) (3) (4) (5) (6) (7) (8) (9)

4 Structure Analysis and Design Construction BPPT (BTH and PTRIM),

PT.BKI, PT. Krakatau Steel

Aktivitas Tiap Tahun -

BPPT : 1. analisa struktur kapal 2. desain konstruksi kapal 3. Desain kekuatan konstruksi 4. Hull design analysis from testing results 5. Ship hull optimization, if any PT. BKI : Quality control based on classification rules

BPPT : 1. analisa struktur kapal 2. desain konstruksi kapal 3. Desain kekuatan konstruksi 4. Hull design analysis from testing results 5. Ship hull optimization, if any PT. BKI : Quality control based on classification rules

- -

BPPT (BTH and PTRIM), PT.BKI, PT. Krakatau Steel BPPT -

1.000.000.000 1.000.000.000 - -

PT. BKI 100.000.000 100.000.000

5

Engine and Propulsion System Design (Engine Determination, Propulsion System Design and Propeller Design) BPPT (BTH and PTRIM),

PT.PAL, PT.BKI

Aktivitas Tiap Tahun

1) Desk study 2) Data collection 3) Refference collection 4) Coordination

BPPT : 1) Engine power determination 2) Propeller design 3) Numerical simulation of propeller design PT. PAL : 1) Propulsion system design (basic) 2) Production simulation on propulsion system PT. BKI : Quality control through process

BPPT : 1) Engine related system detail design 2) Finalization of Propeller design 3) Propeller modelling and testing 4) Propeller detail design PT. PAL : 1) Propulsion system detail design PT. BKI : Quality control through process

PT. PAL : Propeller and propulsion system as built drawing BPPT : Supervisi produksi propeller PT. BKI : Quality control & Class approval

-

BPPT (BTH and PTRIM), PT.PAL, PT.BKI BPPT

400.000.000

250.000.000 500.000.000 100.000.000

- PT. PAL 250.000.000 150.000.000 100.000.000 PT. BKI 75.000.000 75.000.000 75.000.000

6

Traction and Control system for tugboat winches BPPT (BTH and PTRIM), ITS, PT.BKI, PT. Pindad

Aktivitas Tiap Tahun -

BPPT : 1. Ship construction design 2. Structure analysis (numerical) FEM ITS : 1. Bollard design 2. traction control system 3. Winches design PT. BKI : Quality control based on classification rules

BPPT : 1. Ship construction design 2. Structure analysis (numerical) FEM ITS : 1. Bollard design 2. traction control system 3. Winches design PT. BKI : Quality control based on classification rules

- -

BPPT (BTH and PTRIM), ITS, PT.BKI, PT. Pindad BPPT

-

250.000.000 250.000.000

- - ITS 250.000.000 250.000.000 PT. BKI 75.000.000 75.000.000

Page 20: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Action Plan Kapal Harbour Tugboat Dual Fuel 1500 HP x 2…. (3)

Teknologi Kunci Output/Outcome tiap K/L

Aktivitas dan Kegiatan

2020 2021 2022 2023 2024 No Teknologi dan K/L terkait

(1) (2) (3) (4) (5) (6) (7) (8) (9)

7

Material (Marine Grade) - Structural Testing

BPPT (B2TKS), PT.BKI

Aktivitas Tiap Tahun

- -

BPPT :

Matreial strength testing and analysis PT. BKI : Quality control based on classification rules

- -

BPPT (B2TKS), PT.BKI BPPT

- - 1.000.000.000

- - PT. BKI 100.000.000

8

Piping and General System

BPPT (BTH and PTRIM), PT.PAL, PT.BKI

Aktivitas Tiap Tahun

BPPT : 1) Upgrade software dan hardware untuk sistem perpipaan (autoCAD Mechanical) 2) Desk study

BPPT: Basic design sistem perpipaan dalam kapal dan kendali general sistem PT. BKI : Quality control based on classification rules

BPPT: Detail design sistem perpipaan dalam kapal dan general system for tugboat PT. BKI : Quality control based on classification rules

PT. PAL : Production drawing for ship piping system PT. BKI : Quality control based on classification rules and class approval

-

BPPT (BTH and PTRIM), PT.PAL, PT.BKI

BPPT 500.000.000 250.000.000 200.000.000 -

- PT. PAL -

- - 150.000.000

PT. BKI 100.000.000 75.000.000 75.000.000

9

Ship Electrical System and Automation BPPT (BTH, PTRIM and MEPPO), PT.PAL, PT.BKI, PT. LEN

Aktivitas Tiap Tahun

BPPT : 1) Feasibility study

BPPT: Basic design sistem kelistrikan kapal dan otomasi PT. BKI : Quality control based on classification rules

BPPT: Detail design sistem kelistrikan kapal dan sistem otomasi PT. BKI : Quality control based on classification rules

PT. PAL : Production drawing for ship electrical and automation PT. BKI : Quality control based on classification rules and class approval

-

BPPT (BTH, PTRIM and MEPPO), PT.PAL, PT.BKI, PT. LEN

BPPT 200.000.000 100.000.000 350.000.000 -

- PT. PAL -

- - 150.000.000

PT. BKI 75.000.000 75.000.000 75.000.000

Page 21: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Action Plan Kapal Harbour Tugboat Dual Fuel 1500 HP x 2…. (4)

Teknologi Kunci Output/Outcome tiap K/L

Aktivitas dan Kegiatan

2020 2021 2022 2023 2024 No Teknologi dan K/L terkait

(1) (2) (3) (4) (5) (6) (7) (8) (9)

10

Navigation and Communication System BPPT (BTH and PTRIM), PT.PAL, PT.BKI, PT. LEN, PT. INTI

Aktivitas Tiap Tahun

BPPT,PT. LEN dan PT. INTI: 1) pengembangan desain sistem navigasi kapal tugboat 2) Pengembangan desain sistem komunikasi kapal tugboat

BPPT, PT. LEN dan PT. INTI: Basic design peralatan navigasi dan komunikasi PT. BKI : Quality control based on classification rules

BPPT, PT. LEN dan PT. INTI: Detail design sistem navigasi dan komunikasi PT. BKI : Quality control based on classification rules

PT. LEn dan PT. INTI: - Prototip Peralatan Navigasi dan Komunikasi - PT. PAL : - Production drawing sistem Navigasi dan Komunikasi PT. BKI : Quality control based on classification rules and class approval

-

BPPT (BTH and PTRIM), PT.PAL, PT.BKI, PT. LEN, PT. INTI

BPPT, PT. LEN, PT. INTI 500.000.000 500.000.000 600.000.000

1.000.000.000,00

- PT. PAL

- - - 150.000.000

PT. BKI 75.000.000 100.000.000 75.000.000

11

Fire and Safety System

Kemenhub, PT.BKI

Aktivitas Tiap Tahun

Kajian mengenai Safety plan Harbour

Tugboat

Desain safety plan kapal Harbour Tugboat DED Safety and fire

Plan System -

Kemenhub, PT.BKI KEMHUB

250.000.000

300.000.000

500.000.000 -

PT. BKI

12

Ship Production Technology PT.PAL

Aktivitas Tiap Tahun

Feasibility study Kajian metode produksi pembangunan kapal Harbour Tugboat, persiapan fasilitas sarana dan prasarana

Pembangunan prototipe kapal Harbour Tugboat Tahap I

Pembangunan prototipe kapal Harbour Tugboat Tahap II -

PT.PAL PT. PAL 200.000.000 200.000.000 5.000.000.000 5.000.000.000 -

13

Sea Trial and Bolard Pull Test PT.PAL, PT. BKI, BPPT,

Pelindo 3

Aktivitas Tiap Tahun

- -

Sea Trial and Commisioning

Sea Trial and Bollard Pull Test

PT.PAL, PT. BKI, BPPT, Pelindo 3 PT. PAL - - 500.000.000 1.000.000.000

Page 22: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

DIREKTORAT JENDERAL PENGUATAN RISET DAN PENGEMBANGAN KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI

FOKUS RISET KEMARITIMAN PRODUK: KAPAL MINI LNG

Page 23: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

5 Teknologi operasional, perawatan, dan perbaikan Kapal Mini LNG dan rekomendasi teknologi kapal LNG lebih lanjut. : Operation

Manual, Maintenance Manual, Repair manual

(BPPT, PT.PAL, PT.BKI, ITS, PT PLN)

4. Pembangunan Kapal Mini LNG : Kerangka acuan pembangunan, penugasan pembangunan, pembangunan kapal, ujicoba & seertifikasi (BPPT , PT PAL, PT.BKI, PT PLN)

1. Misi teknologi pengembangan Kapal

Mini LNG : Design Requirements

(BPPT, ITS, Kemenhub, Kementerian ESDM, PT.

PLN, PT.PAL, PT.BKI)

3. Perancangan kapal mini LNG : Preliminiary design, Basic design, Keyplan drawing, Spesifikasi Teknis, class design approval (BPPT, ITS, PT PAL Ind, PT. BKI)

2. Pemantapan pemanfaatan regulasi sebagai acuan rancang bangun kapal mini LNG : Penetapan regulasi acuan (BPPT, Kementerian ESDM, Kementerian Perhubungan, SKK Migas, Kemenperin, PT. BKI, ITS)

2020 2021 2022 2023 2024 Anggaran : Rp. 3,45 M Rp. 3 M Rp. 454 M Rp. 251 M

Target : Prototype Kapal Mini LNG yang siap Operasi dan siap Produksi

Rp. 2 M

Pelaksana:

BPPT Koordinator

ITS, Kementerian ESDM,

Kementerian Perhubungan, ,

Kementerian Perindustrian , SKK

Migas, PT. PLN, PT.PAL, PT.BKI

Key Technology Kapal Mini LNG Carrier

Page 24: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Prioritas Riset Nasional : Inovasi Teknologi Pengembangan Kapal Mini LNG

Bidang Prioritas : Maritim

Periode Pelaksanaan : 2020 - 2024

K/L Terkait : BPPT, KEMENHUB, KEMENPERIN, KEMEN-ESDM, SKK Migas, BKI, PT. PAL, PT. PLN, ITS

Nama Kepala Program : Dr. Ir. Iskendar, MS

Nama Program Manager : Ir. Muhajirin N, MM

Nama Tehnik Manager : Ir. Abdul Muis

SDM

Page 25: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Item Kondisi terkini Target program 2024

Mission Analysis Identifikasi kebutuhan kapal mini LNG, dilakukan kajian awal terkait kebutuhan kapal Mini LNG untuk pasokan energi bagi PLN di kluster Kawasan Timur Indonesia.

Mission Analysis selesai di tahun 2020 berupa penentuan target operasi/ requirement untuk desain kapal mini LNG

Desain Penyiapan Conceptual Design Terselesaikan Desain Rinci (DED) pada tahun 2021

Produksi Identifikasi kesiapan kapasitas industri kapal dan industri penunjangnya untuk berperan dalam rancang bangun kapal mini LNG. Produksi diusulkan mulai awal tahun 2022.

Produksi, Assembly, Test & Trial direncanakan selesai akhir tahun 2023

Sertifikasi Penyiapan rencana pembuatan keyplan drawing dan proses approval design yang direncanakan dilakukan di tahun 2021

Selesai sertifikasi dan standarisasi

QA/QC Penyiapan rencana kegiatan jaminan mutu dan pengendalian kualitas yang akan dilakukan pada proses produksi di tahun 2022.

Selesai sesuai jadwal pembangunan dan sea trial) dan sesuai standar kualitas

Target Program

Page 26: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Work Breakdown Structure Inovasi Teknologi Pengembangan kapal Mini LNG

WBS 1.0 Mission Analisis

BPPT, Kemenhub, Kemenperin, Kemen ESDM, SKK Migas, BKI, PT.PAL, PT.PLN,

ITS)

Sistem Pasok LNG

Infrastruktur

Regulasi

WBS 2.0

Desain

BPPT, PT PAL, ITS

Pra-Desain

Basic Desain

Kontrak Desain

Sistem Control , Otomasi &

Safety

Engineering Design Doc

Paten

WBS 3.0

Produksi

PT PAL & Industri Penunjang

Hull

Tangki

Mesin ,Listrik, Otomasi

Propulsi

Perlengkapan &Sistem

Bongkar Muat

WBS 4.0

Sertifikasi

PT PAL, BKI

Sertifikasi Desain

Sertifikasi Bangunan

Kapal & Komponen

WBS 5.0

QA QC

BPPT, PT PAL, BKI

Jaminan kualitas

Pengendalian kualitas

Page 27: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil setiap WBS

WBS Target detil WBS

2020 2021 2022 2023 2024

WBS 1 Mission Analysis

• Penetapan Misi • Terselesaikannya

Design Requirement • Penetapan acuan

dasar / Project definition

WBS 2 Desain

• Terselesaikannya Conceptual Design

• Terselesaikannya Basic dan Preliminary Design

• Terselesaikannya Design Validation – Uji Model Hidrodinamik

• Final Design dan Keyplan Drawing

• Pembuatan acuan pembangunan

• Production Drawing

Production Drawing

WBS 3 Produksi

Penugasan pembangunan kapal

Pengadaan material, komponen, dan mesin produksi blok bangunan dan sistem kapal mini LNG

• Block Assembly • Instalasi Mesin • Tangki Muatan • Kesisteman

perlengkapan kapal • Finishing • Sea Trial

WBS 4 Sertifikasi

Diterbitkannya class approval untuk desain Kapal Mini LNG

Pelaksanaan sertifikasi dan class approval selama proses pembangunan

Pelaksanaan sertifikasi dan class approval selama proses pembangunan

Diterbitkannya approval class untuk kapal Mini LNG

WBS 5 QA dan QC

QA dan QC untuk Keyplan dan ship model test

QA dan QC untuk Proses Produksi dan Manufaktur

QA dan QC untuk Proses Test dan Trial

Page 28: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM SETIAP WBS

WBS SDM

Nama Lembaga

WBS 1 Mission Analysis Leader : BPPT BPPT/ESDM/SKK Migas/PLN/ITS

WBS 2 Desain Leader : BPPT BPPT/PT. PAL/ITS

WBS 3 Produksi Leader : PT PAL PT. PAL/PLN/BKI

WBS 4 Sertifikasi Leader : BKI PT. BKI

WBS 5 QA dan QC Leader : BKI PT. PAL/BPPT/BKI

Nama Kepala Program : Dr.Ir. Iskendar, MS / BPPT / PTRIM Nama Program Manager : Ir. Muhajirin N, MM / BPPT / PTRIM Nama Tehnik Manager : Ir. Abdul Muis/ BPPT / BTH

Page 29: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil Output Work Package (WP) WBS 1 (Mission Analysis)

WP Target detil WP

2020 2021 2022 2023 2024

WP 1.1. Sistem Pasok LNG

Analisa Tekno Ekonomi dan Operasional Kapal Mini LNG di Kawasan Timur Indonesia

- - - -

WP 1.2. Infrastruktur

Kajian kondisi infrastruktur penunjang dalam proses transport LNG

- - - -

WP 1.3. Kajian Regulasi

Melakukan pengumpulan dan analisa data terkait regulasi teknis dan non teknis Kapal Mini LNG

- - - -

Target WBS 1: Diperolehnya dokumen hasil mission analysis Kapal Mini LNG

Page 30: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil Output Work Package (WP) WBS 2 (Desain)

WP Target detil WP

2020 2021 2022 2023 2024

WP 2.1. Pra-Desgin

Tersedianya data utama kapal

Optimasi dan revisi preliminary design - - -

WP 2.2. Basic Desain

Tersedianya: Lines Plan General Arrangement

Penyempurnaan basic design - - -

WP 2.3. Kontrak Desain -

Final design dan Keyplan Drawing

Pembuatan acuan pembangunan

- -

WP 2.4 Sistem Control, Otomasi & Safety

- Selesainya desain sistem kontrol, otomasi dan safety

Optimasi dan revisi desain (Jika diperlukan - -

WP 2.5 Engineering Design Document

- Design Validation – Uji Model Hidrodinamik

Production Drawing

Production Drawing

-

WP 2.6 Paten

-

Pengumpulan data persiapan pengajuan paten

Dihasilkannya Detail drawing (Keyplan) dan Engineering Estimation

- -

Target WBS 2: Diperolehnya Desain kapal Mini LNG yang telah tersertifikasi

Page 31: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil Output Work Package (WP) WBS 3 (Produksi)

WP Target detil WP

2020 2021 2022 2023 2024

WP 3.1. Hull

-

List Material/Komponen yang akan dibeli Penugasan pembangunan kapal

Pengadaan material, komponen, dan mesin produksi blok bangunan dan sistem kapal mini LNG

Block Assembly Kesisteman perlengkapan kapal, Finishing, Sea Trial

-

WP 3.2. Tangki

-

List Material/Komponen yang akan dibeli Penugasan pembangunan kapal

Pengadaan material, komponen, dan mesin produksi blok bangunan dan sistem kapal mini LNG

Block Assembly Tangki Muatan Kesisteman perlengkapan kapal, Finishing

-

WP 3.3. Mesin, Listrk, Otomasi

-

List Material/Komponen yang akan dibeli Penugasan pembangunan kapal

Pengadaan material, komponen, dan mesin produksi blok bangunan dan sistem kapal mini LNG

Block Assembly Instalasi Mesin Kesisteman perlengkapan kapal ,Finishing, Sea Trial

-

WP 3.4 Propulsi

-

List Material/Komponen yang akan dibeli Penugasan pembangunan kapal

Pengadaan material, komponen, dan mesin produksi blok bangunan dan sistem kapal mini LNG

Block Assembly Instalasi Mesin Kesisteman perlengkapan kapal, Finishing Sea Trial

-

WP 3.5 Perlengkapan & Sistem Bongkar Muat -

List Material/Komponen yang akan dibeli Penugasan pembangunan kapal

Pengadaan material, komponen, dan mesin produksi blok bangunan dan sistem kapal mini LNG

Block Assembly Instalasi Mesin Kesisteman perlengkapan kapal, Finishing

-

Target WBS 3: Terselesaikannya proses produksi Kapal Mini LNG

Page 32: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil Output Work Package (WP) WBS 4 (Sertifikasi)

WP Target detil WP

2020 2021 2022 2023 2024

WP 4.1. Sertifikasi Desain

- Diterbitkannya class approval untuk desain Kapal Mini LNG

Pelaksanaan sertifikasi dan class approval untuk production drawing

Pelaksanaan sertifikasi dan class approval untuk production drawing

-

WP 4.2. Sertifikasi Bangunan Kapal dan Komponen

- -

Pelaksanaan sertifikasi dan class approval selama proses pembangunan

Pelaksanaan sertifikasi dan class approval selama proses pembangunan

Diterbitkannya approval class untuk kapal Mini LNG

Target WBS 4: Diperolehnya Dokumen Sertifikasi Kapal Mini LNG

Page 33: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil Output Work Package (WP) WBS 5 (QA QC)

WP Target detil WP

2020 2021 2022 2023 2024

WP 5.1. Jaminan Kualitas

- QA untuk Keyplan dan ship model test

QA untuk Proses Produksi dan Manufaktur

QA untuk Proses Test dan Trial -

WP 5.2. Pengendalian Kualitas -

QC untuk Keyplan dan ship model test

QC untuk Proses Produksi dan Manufaktur

QC untuk Proses Test dan Trial -

Target WBS 5: Terpenuhinya standard kapal Mini LNG

Page 34: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 1 (Mission Analysis)

WP SDM

Nama/Leader Lembaga

WP 1.1. Sistem Pasok LNG

Leader : BPPT BPPT/ESDM/ITS/PLN

WP 1.2. Infrastruktur

Leader : BPPT BPPT/ESDM/PLN

WP 1.3. Kajian Regulasi

Leader : BPPT Kemenhub/ESDM/BKI/PT PAL

Page 35: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 2 (Desain)

WP SDM

Nama/Leader Lembaga

WP 2.1. Pra-Desgin

Leader : BPPT BPPT/PT PAL/PLN/ITS

WP 2.2. Basic Desain

Leader : BPPT BPPT/PT. PAL/ITS

WP 2.3. Kontrak Desain

Leader : PT PLN/ESDM ESDM/PT. PAL/PLN/BKI

WP 2.4 Sistem Control, Otomasi & Safety

Leader : BPPT BPPT/PT PAL/BKI

WP 2.5 Engineering Design Document

Leader : BPPT BPPT/PT. PAL/BKI

WP 2.6 Paten

Leader : BKI BPPT/Kemenristekdikti

Page 36: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 3 (Produksi)

WP SDM

Nama/Leader Lembaga

WP 3.1. Hull

Leader : BPPT PT PAL/PLN/ITS/BKI

WP 3.2. Tangki

Leader : PT PAL BPPT/PT. PAL/ITS/BKI

WP 3.3. Mesin, Listrk, Otomasi

Leader : PT PAL BPPT/PT. PAL/PLN/BKI

WP 3.4 Propulsi

Leader : PT PAL BPPT/ITS/BKI

WP 3.5 Perlengkapan & Sistem Bongkar Muat

Leader : PT PAL BPPT/SKK Migas/PLN/BKI

Page 37: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 4 (Sertifikasi)

WP SDM

Nama/Leader Lembaga

WP 4.1. Sertifikasi Desain

Leader : BKI BPPT/PT PAL/ITS

WP 4.2. Sertifikasi Bangunan Kapal dan Komponen

Leader : BKI BPPT/Kemenperin/PT. PAL/ITS

Page 38: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 5 (QA QC)

WP SDM

Nama/Leader Lembaga

WP 5.1. Jaminan Kualitas

Leader : PT PAL BPPT/ITS/BKI

WP 5.2. Pengendalian Kualitas

Leader : BKI PT. PAL/BPPT/Kemenperin/ITS

Page 39: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Total Anggaran Program

Page 40: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

2020 2021 2022 2023 2024

Kegiatan

Penetapan misi

Design Requirements Penetapan acuan dasar /Project definition

Preliminary design Basic Design

Design validation – uji model hydrodinamik - Pengusulan specification teknis

Design Rinci (DED) - procurement - awal produksi Produksi, Assembly, Test & trial

Operasi & Rekomendasi

KAPAL MINI LNG

Target

operasi/

requirements

Spesifikasi (full

specification),

Dokumen hasil

desain dan

hasil uji hidro,

Key plan

drawing.

Contract

specification,

Production

drawing,

Blok – blok

bangunan kpl.

Dokumen QA

QC, produk

bangunan

kapal Mini

LNG, dokumen

uji & trial,

dokumen

gambar final.

Dokumen

penunjang

operasional

kapal/sertifikat

klas, dokumen

laporan &

rekomendasi.

SKEMA PENCAPAIAN SASARAN 5 TAHUN

R&D

Roadmap Mini LNG Carrier

Page 41: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Action Plan Mini LNG Carrier

KAPAL MINI LNG (Liquefied Natural Gas)

TAHUN SASARAN HASIL RISET

2020 Penyusunan design requirement kapal mini scale LNG dan penetapan acuan dasar

pembangunan kapal mini scale LNG

2021

Preliminary design, basic design, uji model hydrodynamic, final design, keyplan drawing,

spesifikasi teknis, classification approval design kapal mini scale LNG, penugasan

pembangunan kapal

2022

Pembuatan acuan pembangunan dan production drawing, pengadaan material-

komponen-dan mesin produksi blok bangunan, dan sistem kapal mini LNG bekerja sama

dengan PT. PAL, PT. BKI, PT. PLN

2023

Koordinasi pengerjaan dengan PT. PAL, PT. BKI, PT. PLN terkait pekerjaan assembly

blok, instalasi mesin, Tangki muat, dan kesisteman perlengkapan kapal, Finishing, dan

sea trial

2024

Pemantauan pelayaran, Penyusunan operation manual, penyusunan panduan

perawatan, Perumusan rekomendasi pengembangan lebih lanjut bekerja sama dengan

PT. PAL, PT. BKI, PT. PLN

Page 42: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Action Plan Mini LNG Carrier_1

Page 43: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Action Plan Mini LNG Carrier_2

Page 44: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Action Plan Mini LNG Carrier_3

Page 45: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

DIREKTORAT JENDERAL PENGUATAN RISET DAN PENGEMBANGAN KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI

FOKUS RISET KEMARITIMAN PRODUK: WAHANA ANGKUT ALPO

Page 46: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

46

Page 47: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Prioritas Riset Nasional: Inovasi Teknologi

Desain & Pembangunan Wahana Angkut ALPO (2020 – 2024)

Bidang Prioritas : Transportasi dan Kemaritiman Periode Pelaksanaan : 2020-2024 K/L terkait : BPPT, PT. BKI, PT. PAL, PT.BBI, ESDM, SKK MIGAS, ITS, PPNS, Kemenhub.

Page 48: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Item Kondisi terkini Target program 2024

Mission Analysis Potensi 600 Anjungan Lepas Pantai menjadi ALPO, dimana saat ini sudah sekitar 60 telah menjadi ALPO di perairan Indonesia dan sudah dilakukan kajian awal terkait kebutuhan Wahana Angkut ALPO

Mission Analysis selesai di tahun 2020 (Penentuan target operasi/requirement Wahana Angkut ALPO)

DESAIN & ANALISIS Basic Design Adanya As Built Drawing pada tahun 2024

PRODUKSI & MANUFAKTUR Belum dimulai Produksi, Assembly, Test & Trial selesai

PENGUJIAN & SERTIFIKASI Belum (dimulai saat pembuatan contract design di tahun 2021)

Selesai

PROJECT MANAGEMENT Belum (dimulai seiring dengan proses produksi di tahun 2022)

Selesai (Setelah proses produksi selesai)

Target Program

Page 49: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

WBS Wahana Angkut ALPO

Page 50: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil setiap WBS

WBS

Target Detil WBS

2020 2021 2022 2023 2024

WBS 1 DESAIN & ANALISIS

Approval Desain, Model Test

DED Drawing DED Drawing (update)

Desain ROV As Built Drawing Wahana Angkut ALPO & ROV

WBS 2 PRODUKSI & MANUFAKTUR

Persiapan Produksi Dan Manufaktur

Produksi Manufaktur Tahap 1

Produksi Manufaktur Tahap 2

Produksi Manufaktur Tahap 3, Sea Trial

Delivery

WBS 3 PENGUJIAN & SERTIFIKASI

Sertifikasi Desain Sertifikasi Komponen Kapal

Sertifikasi Komponen Kapal

Sertifikasi Komponen Kapal

Sertifikasi Approval Ship Delivery

WBS 4 PROJECT MANAGEMENT

Persiapan Scheduling, Pekerjaan & Budgeting

Monitoring Monitoring Monitoring

Page 51: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM SETIAP WBS

WBS

SDM

Nama Lembaga

WBS 1 DESAIN & ANALISIS TBD BPPT, ITS, PPNS, PT.PAL, ESDM, SKK MIGAS

WBS 2 PRODUKSI & MANUFAKTUR TBD PT.PAL, BBI

WBS 3 PENGUJIAN & SERTIFIKASI TBD BPPT, HUBLA, PT. BKI, PT.PAL

WBS 4 PROJECT MANAGEMENT TBD BPPT, PT.PAL

Nama Kepala Program : TBD Nama Program Manager : TBD Nama Tehnik Manager : TBD

Page 52: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

52

Target Detil Output Work Package (WP) WBS 1 (DESAIN & ANALISIS)

WP Target detil WP

2020 2021 2022 2023 2024

WP 1.1. BANGUNAN KAPAL

Desain Drawing Desain Drawing (Update)

Desain Drawing (Update)

Desain Drawing (Update)

As Built Drawing

WP 1.2. OFFSHORE STRUCTURE INTEGRITY MANAGEMENT

Offshore Structural Decommissioning Analysis

Offshore Structural Decommissioning Analysis

Offshore Structural Decommissioning Analysis

Offshore Structural Decommissioning Analysis

Offshore Structural Decommissioning Analysis

WP 1.3. POWER SYSTEM

Desain Drawing Desain Drawing (Update)

Desain Drawing (Update)

Desain Drawing (Update)

As Built Drawing

WP 1.4. SISTEM DALAM KAPAL

Desain Drawing Desain Drawing (Update)

Desain Drawing (Update)

Desain Drawing (Update)

As Built Drawing

WP 1.5. SISTEM KELISTRIKAN, ELEKTRONIKA & NAVIGASI

Desain Drawing Desain Drawing (Update)

Desain Drawing (Update)

Desain Drawing (Update)

As Built Drawing

WP 1.6. REMOTELY OPERATED VEHICLE (ROV)

- - - Desain Drawing ROV

As Built Drawing ROV

Target WBS 1: As Built Drawing Wahana Angkut ALPO & ROV

Page 53: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil Output Work Package (WP) WBS 2 (PRODUKSI & MANUFAKTUR)

WP Target Detil WP

2020 2021 2022 2023 2024

WP 2.1. HULL STRUCTURE

Persiapan Produksi Hull

Produksi Hull Tahap 1

Produksi Hull Tahap 2

Produksi Hull Tahap 3

Hull Contruction

WP 2.2. PROPULSION PLANT

Persiapan Propulsion Plant

Pemasangan Propulsion Plant Tahap 1

Pemasangan Propulsion Plant Tahap 2

Pemasangan Propulsion Plant Tahap 3

Delivery Propulsion Plant

WP 2.3. ELECTRICAL PLANT

Persiapan Electrical Plant

Pemasangan Electrical Plant Tahap 1

Pemasangan Electrical Plant Tahap 2

Pemasangan Electrical Plant Tahap 3

Delivery Electrical Plant

WP 2.4. COMMAND/ COMUNICATION

Persiapan Command/ Comunication System

Pemasangan Command/ Comunication System Tahap 1

Pemasangan Command/ Comunication System Tahap 2

Pemasangan Command/ Comunication System Tahap 3

Delivery Command/Comunication System

WP 2.5. AUXILARY SYSTEM

Persiapan Auxilary System

Pemasangan Auxilary System Tahap 1

Pemasangan Auxilary System Tahap 2

Pemasangan Auxilary System Tahap 3

Delivery Auxilary System

WP 2.6. OUTFIT AND FURNISHINGS

Persiapan Outfit and Furnishing

Pemasangan Outfit and Furnishing Tahap 1

Pemasangan Outfit and Furnishing Tahap 2

Pemasangan Outfit and Furnishing Tahap 3

Delivery Outfit and Furnishing

Target WBS 2: Prototype Wahana Angkut ALPO & ROV

Page 54: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil Output Work Package (WP) WBS 3 (PENGUJIAN & SERTIFIKASI)

WP Target Detil WP

2020 2021 2022 2023 2024

WP 3.1. SERTIFIKASI DESAIN

Class Approval Desain Drawing

Persiapan As Built Drawing

Persiapan As Built Drawing

Persiapan As Built Drawing

As Built Drawing Approval

WP 3.2. UJI & SERTIFIKASI KOMPONEN

- Sertifikasi Komponen Tahap 1

Sertifikasi Komponen Tahap 2

Sertifikasi Komponen Tahap 3

-

WP 3.3. SHIP BUILDING SURVEY

- Ship Class Surveying Tahap 1

Ship Class Surveying Tahap 2

Ship Class Surveying Tahap 3

Sea Trial Ship Surveying

WP 3.4. SEA TRIAL

- - - Sea Trial Process Sea Trial Process

WP 3.5. CLASS APPROVAL

Class Approval Desain Drawing

Class Approval Ship Komponen And Construction Tahap 1

Class Approval Ship Komponen And Construction Tahap 2

Class Approval Ship Komponen And Construction Tahap 3

Class Approval Sea Trial

Target WBS 3: Class Approval Pada As Built Drawing, Ship Contruction, Components And Sea Trial

Page 55: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil Output Work Package (WP) WBS 4 (PROJECT MANAGEMENT)

WP Target Detil WP

2020 2021 2022 2023 2024

WP 4.1. PROJECT MONITORING

PCM PCM PCM PCM PCM

WP 4.2. COMMERCIAL PROSESSES

- EPC Pembangunan Kapal

EPC Pembangunan Kapal

EPC Pembangunan Kapal

Pembiayaan Delivery

WP 4.3. RISK & INSURANCE

Analisa Resiko Asuransi Pembangunan Kapal Dan Delivery

Asuransi Pembangunan Kapal Dan Delivery

Asuransi Pembangunan Kapal Dan Delivery

Asuransi Pembangunan Kapal Dan Delivery

WP 4.4. QA/QC

- Quality Control, Assurance Process And Documentation

Quality Control, Assurance Process And Documentation

Quality Control, Assurance Process And Documentation

Quality Control, Assurance Process And Documentation

Target WBS 4: Memastikan Kegiatan Desain & Pembangunan Wahana Angkut Berjalan Sesuai Jadwal dan Selesai Tepat Waktu serta Berkualitas Tinggi

Page 56: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 1 (DESAIN & ANALISIS)

WP SDM

Nama Lembaga

WP 1.1. BANGUNAN KAPAL

TBD BPPT

WP 1.2. OFFSHORE STRUCTURE INTEGRITY MANAGEMENT

TBD ITS

WP 1.3. POWER SYSTEM

TBD BPPT

WP 1.4. SISTEM DALAM KAPAL

TBD BPPT

WP 1.5. SISTEM KELISTRIKAN, ELEKTRONIKA & NAVIGASI

TBD BPPT

WP 1.6. REMOTELY OPERATED VEHICLE (ROV)

TBD PPNS

Target WBS 1: As Built Drawing Wahana Angkut ALPO & ROV

Page 57: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 2 (PRODUKSI & MANUFAKTUR)

WP SDM

Nama Lembaga

WP 2.1. HULL STRUCTURE

TBD PT. PAL

WP 2.2. PROPULSION PLANT

TBD PT. PAL

WP 2.3. ELECTRICAL PLANT

TBD PT. PAL

WP 2.4. COMMAND/ COMUNICATION

TBD PT. PAL

WP 2.5. AUXILARY SYSTEM

TBD PT. PAL

WP 2.6. OUTFIT AND FURNISHINGS

TBD PT. PAL

Target WBS 2: Prototype Wahana Angkut ALPO & ROV

Page 58: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 3 (PENGUJIAN & SERTIFIKASI)

WP SDM

Nama Lembaga

WP 3.1. SERTIFIKASI DESAIN

TBD PT. BKI

WP 3.2. UJI & SERTIFIKASI KOMPONEN

TBD PT. BKI

WP 3.3. SHIP BUILDING SURVEY

TBD PT. BKI

WP 3.4. SEA TRIAL

TBD PT. BKI

WP 3.5. CLASS APPROVAL

TBD PT. BKI

Target WBS 3: Class Approval Pada As Built Drawing, Ship Contruction, Components And Sea Trial

Page 59: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 4 (PROJECT MANAGEMENT)

WP SDM

Nama Lembaga

WP 4.1. PROJECT MONITORING

TBD BPPT

WP 4.2. COMMERCIAL PROSESSES

TBD PT. PAL

WP 4.3. RISK & INSURANCE

TBD PT. PAL

WP 4.4. QA/QC

TBD BPPT

Target WBS 4: Memastikan Kegiatan Desain & Pembangunan Wahana Angkut Berjalan Sesuai Jadwal dan Selesai Tepat Waktu serta Berkualitas Tinggi

Page 60: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Anggaran Pengelolaan dan Sinergi Kegiatan 2020 - 2024

WBS Anggaran WBS

2020 2021 2022 2023 2024

Anggaran Pengelolaan dan sinergi Program

800.000.000 1.000.000.000

850.000.000

600.000.000 275.000.000

WBS 1 DESAIN & ANALISIS

8.700.000.000 12.250.000.000 8.950.000.000 8.800.000.000 5.950.000.000

WBS 2 PRODUKSI & MANUFAKTUR

1.000.000.000 240.700.000.000 350.300.000.000 210.750.000.000 275.000.000

WBS 3 PENGUJIAN & SERTIFIKASI

800.000.000 1.000.000.000

850.000.000

600.000.000 275.000.000

WBS 4 PROJECT MANAGEMENT

800.000.000 1.000.000.000

850.000.000

600.000.000 275.000.000

TOTAL ANGGARAN PENGELOLAAN DAN PROGRAM

12.100.000.000 255.950.000.000 361.800.000.000 221.350.000.000 7.050.000.000

Page 61: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

WP ANGGARAN WP

2020 2021 2022 2023 2024

WP 1.1. BANGUNAN KAPAL

Jenis riset: disain Anggaran: 2.450.000.000

Jenis riset: disain Anggaran: 3.500.000.000

Jenis riset: disain Anggaran: 2.550.000.000

Jenis riset: disain Anggaran: 2.500.000.000

Jenis riset: disain Anggaran: 1.700.000.000

WP 1.2. OFFSHORE STRUCTURE INTEGRITY MANAGEMENT

Jenis riset: analisa Anggaran: 1.250.000.000

Jenis riset: analisa Anggaran: 1.750.000.000

Jenis riset: analisa Anggaran: 1.280.000.000

Jenis riset: analisa Anggaran: 1.260.000.000

Jenis riset: analisa Anggaran: 850.000.000

WP 1.3. POWER SYSTEM

Jenis riset: disain Anggaran: 1.250.000.000

Jenis riset: disain Anggaran: 1.750.000.000

Jenis riset: disain Anggaran: 1.280.000.000

Jenis riset: disain Anggaran: 1.260.000.000

Jenis riset: disain Anggaran: 850.000.000

WP 1.4. SISTEM DALAM KAPAL

Jenis riset: disain Anggaran: 1.250.000.000

Jenis riset: disain Anggaran: 1.750.000.000

Jenis riset: disain Anggaran: 1.280.000.000

Jenis riset: disain Anggaran: 1.260.000.000

Jenis riset: disain Anggaran: 850.000.000

WP 1.5. SISTEM KELISTRIKAN, ELEKTRONIKA & NAVIGASI

Jenis riset: disain Anggaran: 1.250.000.000

Jenis riset: disain Anggaran: 1.750.000.000

Jenis riset: disain Anggaran: 1.280.000.000

Jenis riset: disain Anggaran: 1.260.000.000

Jenis riset: disain Anggaran: 850.000.000 Sumber dana: kemenristekdikti

WP 1.6. REMOTELY OPERATED VEHICLE (ROV)

Jenis riset: disain Anggaran: 1.250.000.000

Jenis riset: disain Anggaran: 1.750.000.000

Jenis riset: disain Anggaran: 1.280.000.000

Jenis riset: disain Anggaran: 1.260.000.000

Jenis riset: disain Anggaran: 850.000.000

Target WBS 1: As Built Drawing Wahana Angkut ALPO & ROV

ANGGARAN WBS 1 (DESAIN & ANALISIS)

Page 62: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

ANGGARAN WBS 2 (PRODUKSI & MANUFAKTUR)

WP ANGGARAN WP

2020 2021 2022 2023 2024

WP 2.1. HULL STRUCTURE

Jenis riset: teknologi produksi Anggaran: 330.000.000

Jenis riset: teknologi produksi Anggaran: 80.200.000.000

Jenis riset: teknologi produksi Anggaran: 116.300.000.000

Jenis riset: teknologi produksi Anggaran: 70.000.000.000

Jenis riset: teknologi produksi Anggaran: 90.000.000

WP 2.2. PROPULSION PLANT

Jenis riset: teknologi produksi Anggaran: 230.000.000

Jenis riset: teknologi produksi Anggaran: 53.500.000.000

Jenis riset: teknologi produksi Anggaran: 78.000.000.000

Jenis riset: teknologi produksi Anggaran: 46.000.000.000

Jenis riset: teknologi produksi Anggaran: 61.000.000

WP 2.3. ELECTRICAL PLANT

Jenis riset: teknologi produksi Anggaran: 110.000.000

Jenis riset: teknologi produksi Anggaran: 26.750.000.000

Jenis riset: teknologi produksi Anggaran: 39.000.000.000

Jenis riset: teknologi produksi Anggaran: 23.500.000.000

Jenis riset: eknologi produksi Anggaran: 31.000.000

WP 2.4. COMMAND/ COMUNICATION

Jenis riset: teknologi produksi Anggaran: 110.000.000

Jenis riset: teknologi produksi Anggaran: 26.750.000.000

Jenis riset: teknologi produksi Anggaran: 39.000.000.000

Jenis riset: teknologi produksi Anggaran: 23.500.000.000

Jenis riset: teknologi produksi Anggaran: 31.000.000

WP 2.5. AUXILARY SYSTEM

Jenis riset: teknologi produksi Anggaran: 110.000.000

Jenis riset: teknologi produksi Anggaran: 26.750.000.000

Jenis riset: teknologi produksi Anggaran: 39.000.000.000

Jenis riset: teknologi produksi Anggaran: 23.500.000.000

Jenis riset: teknologi produksi Anggaran: 31.000.000

WP 2.6. OUTFIT AND FURNISHINGS

Jenis riset: teknologi produksi Anggaran: 110.000.000

Jenis riset: teknologi produksi Anggaran: 26.750.000.000

Jenis riset: teknologi produksi Anggaran: 39.000.000.000

Jenis riset: teknologi produksi Anggaran: 23.500.000.000

Jenis riset: teknologi produksi Anggaran: 31.000.000

Target WBS 2: Prototype Wahana Angkut ALPO & ROV

Page 63: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

ANGGARAN WBS 3 (PENGUJIAN & SERTIFIKASI)

WP ANGGARAN WP

2020 2021 2022 2023 2024

WP 3.1. SERTIFIKASI DESAIN

Jenis riset: sertifikasi produk Anggaran: 115.000.000

Jenis riset: sertifikasi produk Anggaran: 145.000.000

Jenis riset: sertifikasi produk Anggaran: 122.000.000

Jenis riset: sertifikasi produk Anggaran: 86.000.000

Jenis riset: sertifikasi produk Anggaran: 40.000.000

WP 3.2. UJI & SERTIFIKASI KOMPONEN

Jenis riset: sertifikasi produk Anggaran: 227.500.000

Jenis riset: sertifikasi produk Anggaran: 282.500.000

Jenis riset: sertifikasi produk Anggaran: 242.000.000

Jenis riset: sertifikasi produk Anggaran: 171.000.000

Jenis riset: sertifikasi produk Anggaran: 77.500.000

WP 3.3. SHIP BUILDING SURVEY

Jenis riset: sertifikasi produk Anggaran: 227.500.000

Jenis riset: sertifikasi produk Anggaran: 282.500.000

Jenis riset: sertifikasi produk Anggaran: 242.000.000

Jenis riset: sertifikasi produk Anggaran: 171.000.000

Jenis riset: sertifikasi produk Anggaran: 77.500.000

WP 3.4. SEA TRIAL

Jenis riset: sertifikasi produk Anggaran: 115.000.000

Jenis riset: sertifikasi produk Anggaran: 145.000.000

Jenis riset: sertifikasi produk Anggaran: 122.000.000

Jenis riset: sertifikasi produk Anggaran: 86.000.000

Jenis riset: sertifikasi produk Anggaran: 40.000.000

WP 3.5. CLASS APPROVAL

Jenis riset: sertifikasi produk Anggaran: 115.000.000

Jenis riset: sertifikasi produk Anggaran: 145.000.000

Jenis riset: sertifikasi produk Anggaran: 122.000.000

Jenis riset: sertifikasi produk Anggaran: 86.000.000

Jenis riset: sertifikasi produk Anggaran: 40.000.000

Target WBS 3: Class Approval Pada As Built Drawing, Ship Contruction, Components And Sea Trial

Page 64: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

ANGGARAN WBS 4 (PROJECT MANAGEMENT)

WP ANGGARAN WP

2020 2021 2022 2023 2024

WP 4.1. PROJECT MONITORING

Jenis riset: Risk Analysis Anggaran: 160.000.000

Jenis riset: Risk Analysis Anggaran: 200.000.000

Jenis riset: Risk Analysis Anggaran: 170.000.000

Jenis riset: Risk Analysis Anggaran: 120.000.000

Jenis riset: Risk Analysis Anggaran: 55.000.000

WP 4.2. COMMERCIAL PROSESSES

Jenis riset: Risk Analysis Anggaran: 160.000.000

Jenis riset: Risk Analysis Anggaran: 200.000.000

Jenis riset: Risk Analysis Anggaran: 170.000.000

Jenis riset: Risk Analysis Anggaran: 120.000.000

Jenis riset: Risk Analysis Anggaran: 55.000.000

WP 4.3. RISK & INSURANCE

Jenis riset: Risk Analysis Anggaran: 320.000.000

Jenis riset: Risk Analysis Anggaran: 400.000.000

Jenis riset: Risk Analysis Anggaran: 340.000.000

Jenis riset: Risk Analysis Anggaran: 240.000.000

Jenis riset: Risk Analysis Anggaran: 110.000.000

WP 4.4. QA/QC

Jenis riset: Risk Analysis Anggaran: 160.000.000

Jenis riset: Risk Analysis Anggaran: 200.000.000

Jenis riset: Risk Analysis Anggaran: 170.000.000

Jenis riset: Risk Analysis Anggaran: 120.000.000

Jenis riset: Risk Analysis Anggaran: 55.000.000

Target WBS 4: Memastikan Kegiatan Desain & Pembangunan Wahana Angkut Berjalan Sesuai Jadwal dan Selesai Tepat Waktu serta Berkualitas Tinggi

Page 65: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

DIREKTORAT JENDERAL PENGUATAN RISET DAN PENGEMBANGAN KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI

FOKUS RISET KEMARITIMAN PRODUK: PENGOLAHAN MAKANAN HASIL LAUT

Page 66: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal
Page 67: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

TEKNOLOGI REPRODUKSI DAN KONSERVASI IKAN SIDAT UNTUK MENDUKUNG INDUSTRI BUDIDAYA IKAN SIDAT BERKELANJUTAN

• INDUKSI HORMONAL PEMIJAHAN INDUK

•RILIS INDUK MATANG GONAD KE ALAM UNTUK MENJAMIN STOK BENIH (GLASS EEL DAN ELVER) ALAMIAH

•MANAJEMEN KUALITAS AIR PEMIJAHAN INDUK

•TEKNOLOGI PENANGKAPAN BENIH DAN INDUK ALAM

•HOLDING BENIH (GLASS EEL DAN ELVER) HASIL TANGKAPAN DARI ALAM

•TEKNOLOGI PENETASAN DAN PENDEDERAN BENIH

•KUALITAS MEDIA/WADAH PEMELIHARAAN

•PAKAN LARVA-BENIH

•PADAT PENEBARAN PEMELIHARAAN BENIH

•RILIS TELUR, LARVA HASIL PENETASAN KE ALAM UNTUK PENYEDIAAN BENIH ALAMIAH

•KONSERVASI DAERAH DAN PENGENDALIAN PENANGKAPAN BENIH ALAM

• INDUKSI PEMATANGAN GONAD INDUK JANTAN DAN BETINA SECARA HORMONAL DAN LINGKUNGAN

•FORMULASI PAKAN INDUK

•MANAJEMEN KUALITAS AIR PEMELIHARAAN INDUK

•PADAT PENEBARAN

•MANAJEMEN KESEHATAN INDUK

•PEMBESARAN SIDAT UNTUK KONSUMSI DAN PENYEDIAAN CALON INDUK

•MANAJEMEN PEMBERIAN PAKAN

•MANAJEMEN KESEHATAN IKAN

•MANAJEMEN KUALITAS AIR

•PADAT PENEBARAN

•SELEKSI CALON INDUK

•MANIPULASI LINGKUNGAN DAN HORMONAL UNTUK PERCEPATAN PERTUMBUHAN DAN PEMATANGAN GONAD

•HANDLING DAN PENGOLAHAN HASIL PERIKANAN SIDAT

PEMBESARAN, PENGOLAHAN

MANAJEMEN INDUK

PEMIJAHAN INDUK

PENETASAN TELUR DAN

PEMELIHARAAN LARVA-

GLASSEEL-ELVER, KONSERVASI

Rationale : Benih untuk budidaya ikan sidat masih berasal dari hasil tangkapan dari alam yang jumlahnya terus menurun sementara teknologi pembenihan

masih belum berkembang.

Tujuan: Penyediaan teknologi untuk menjamin ketersedian pasokan benih sidat alamiah dan hasil reproduksi induk di hatchery yang berkualitas secara

berkelanjutan

OUTPUT 2: 1. 2021:FORMULASI PREMIK HORMON DAN SISTEM INDUKSI PEMATANGAN GONAD

INDUK SIDAT

HASIL TANGKAPAN

1. 2021: FORMULASI PAKAN INDUK IKAN SIDAT

2. 2022: PAKAN INDUK IKAN SIDAT

3. 2023: PREMIKS HORMON UNTUK PERCEPATAN PEMATANGAN GONAD INDUK SIDAT

4. 2023: SISTEM INDUKSI PEMATANGAN GONAD IKAN SIDAT JANTAN DAN BETINA

HASIL BUDIDAYA

5. 2023: ALAT SENSOR UNTUK MONITORING KUALITAS AIR PEMELIHARAAN INDUK

(SMART AND

6. PRECISE EEL CULTURE)

7. 2024: MANAJEMEN RILIS INDUK MATANG GONAD HASIL INDUKSI KE ALAM

OUTPUT 3: 1. 2022: PREMIKS HORMON DAN SISTEM INDUKSI PEMIJAHAN GONAD IKAN SIDAT

2. 2023: PAKAN INDUK UNTUK INDUKSI PEMATANGAN GONAD IKAN SIDAT

3. 2023: ALAT SENSOR MONITORING STATUS KEMATANGAN GONAD DAN KESEHATAN INDUK IKAN SIDAT

4. 2024: SMART AND PRECISE EEL HACHERY

5. 2024: SISTEM DAN MANAJEMEN RILIS INDUK SIAP PIJAH KE ALAM

OUTPUT 4 1. 2020: TEKNOLOGI PENANGKAPAN : ALAT TANGKAP BENIH DAN INDUK ALAM

2. 2020: ALAT DAN SISTEM HOLDING EFEKTIF EFISIEN BENIH DAN INDUK

3. 2020: SISTEM MANAJEMEN KONSERVASI DAERAH PENANGKAPAN BENIH ALAM IKAN

SIDAT

4. 2021: TEKNOLOGI TRANSPORTASI GLASS EEL/ELVER DAN INDUK DARI ALAM

5. 2022: PAKAN BENIH SIDAT

6. 2023: SISTEM DAN TEKNOLOGI PENETASAN TELUR DAN PENDEDERAN BENIH IKAN

SIDAT

7. 2023: SISTEM DAN TEKNOLOGI PENDEDERAN GLASS EEL HINGGA BENIH/ELVER

8. 2024: SISTEM DAN TEKNOLOGI PENDEDERAN BENIH SIDAT

OUTPUT 1: 1. 2021: TEKNOLOGI PENGARAHAN KELAMIN SIDAT

2. 2021: PAKAN PEMBESARAN IKAN SIDAT

3. 2021: AUTOMATIC FEEDER IKAN SIDAT

4. 2022: ALAT SENSOR UNTUK MONITORING KUALITAS AIR

(SMART AND PRECISEEEL CULTURE)

5. 2022: TEKNOLOGI MEMPERCEPAT PERTUMBUHAN

6. 2022: SISTEM DAN TEKNOLOGI PEMBESARAN SIDAT

7. 2023: SISTEM SELEKSI CALON INDUK IKAN SIDAT

8. 2023: TEKNOLOGI INDUKSI PEMATANGAN GONAD

9. 2024: HANDLING DAN PENGOLAHAN HASIL PERIKANAN SIDAT

INSTITUSI: IPB, UGM, UNHAS, LIPI, PT. SUI, PT JSI, PT IROHA

RISET 1 RISET 2

RISET 3

RISET 4

2020 2021 2022 2023 2024

4,5M 5,5M 4,8M 6,5M 8M ANGGARAN

Page 68: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Prioritas Riset Nasional: Hasil Laut “Mikroalga dan Makroalga Laut

Strain Asli Indonesia” Bidang Prioritas : Kemaritiman Periode Pelaksanaan : 2020-2024

K/L terkait : LIPI, IPB, UGM, UNPAD, UNAND, BADAN LITBANG KEMENPERIN

PROGRAM MANUAL

Nama Program Manager : Dr. Masteria Yunovilsa Putra Nama Manager Teknis/Substansi : Dr. Ratih Pangestuti Nama Tehnik Manager : Deni Sutansyah, S.Sos

Page 69: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Program

Page 70: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Item Kondisi terkini Target program 2024

Kontrol parameter pertumbuhan a. Suhu air b. pH

a. Salinitas b. Oksigen terlarut c. Carbon terlarut d. Nitrat e. Optical density (konsentrasi

biomassa)

Alat ukur manual Alat ukur manual Alat ukur manual Tidak tersedia Tidak tersedia Tidak tersedia Spectrofotometer dan kepekatan

Digitalisasi/automasi pengukuran suhu siang-malam Pengembangan pH stat pada sistem photobioreactor dengan gas CO2 Pengukuran digital Dissolved-oxygen meter (on daylight period) Kit/reagent ukur ekonomis Kit/reagent ukur ekonomis Pengukuran biomassa berbasis turbiditas yg dipakai untuk menentukan waktu panen di dalam kultur phorobioreactor

Energi penggerak peralatan lutivasi Menggunakan listrik dan mesin diesel Pengembangan green energy (solar panel dan wind turbine) khususnya untuk lokasi kultivasi di lahan persawahan

4 Standarisasi produk raw material dan turunan Spirulina powder Pigments (klorofil, karotenoid dan fikosianin)

Powder alga spesisikasi 80 mesh dan hasil rendemen 40% Belum ada pengukuran kadar klorofil, karotenoid dan fikosianin

Superfine powder mesh >100dan hasil rendemen >80%. Peningkatan teknologi mesin penepung Data analisis komposisi klorofil, karotenoid dan fikosianin per berat kering Spirulina Indonesia. Bila mengacu standard global: klorofil (6.1-10 g/kg), karotenoid (3.7-6 g/kg) dan fikosianin (140 g/kg)

5 Uji klinis, vaidasi metode, dan klaim produk

Belum lengkap Pengujian aktivitas antioksidan, anti kanker, anti bakteri, sitotoksis sampai dengan uji pra klinis.

Target Program (lanjutan)

Page 71: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Program (lanjutan)

Page 72: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Work Breakdown Structure Organization Structure

Page 73: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

WBS SDM

Nama Lembaga

WBS 1. Database MALSAI berpotensi sebagai

bahan pangan & komoditas industri

Dr. Eng. Asep Bayu Pusat Penelitian Oseanografi - LIPI

WBS 2. Rekayasa kultur untuk meningkatkan

produktivitas dan nutrisi MALSAI

Dr. Erina Sulistiani SEAMEO BIOTROP

WBS 3. Teknologi paska panen MALSAI yang

menghasilkan biomassa dan kualitas tinggi

Prof. Sri Purwaningsih IPB

WBS 4. Tekno Ekonomi dan Industrialisasi Dr. Suharman SP, M.Si Kementerian Perindustrian

WBS 5. Diversifikasi Produk Inovatif Iskandar Azmi Harahap, M.Sc Pusat Penelitian Oseanografi - LIPI

WBS 6. Standardisasi bahan baku dan produk

inovatif MALSAI

Prof. Endang S. Rahayu Universitas Gadjah Mada

WBS 7. Diseminasi MALSAI, Teknologi Kultur,

produk inovatif

Dr. Souvia Rahimah Universitas Padjajaran

Nama Program Manager : Dr. Masteria Yunovilsa Putra Nama Manager Teknis/Substansi : Dr. Ratih Pangestuti Nama Tehnik Manager : Deni Sutansyah, S.Sos

SDM SETIAP WBS

Page 74: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil Setiap WBS 2020 2021 2022 2023

WBS 1

WBS 2

WBS 3

Database nutrisi & fungsional MALSAI Penentuan kandungan nutrisi & potensi MALSAI Aklimatisasi & manipulasi kultur MALSAI Monitoring kualitas Biomassa KS Diaspora: IOCAS (China), Algae Energy (Spanyol)

▪ Pengembangan teknologi pasca panen MALSAI dgn kualitas tinggi

▪ Optimasi material fungsional yg berasal dari MALSAI

▪ Monitoring kualitas Biomassa

▪ Pengembangan teknologi produksi biomassa MALSAI

▪ Optimasi strain unggul MALSAI ▪ Aklimatisasi & manipulasi MALSAI KS Diaspora: IOCAS (China), Algae Energy (Spanyol)

Kultur & produksi MALSAI semi pilot

▪ Teknologi pasca panen biomassa MALSAI dengan kualitas tinggi

▪ Rekayasa proses pengolahan biomassa MALSAI

▪ Optimasi recovery biomassa MALSAI

2024

Kultur & produksi MALSAI pilot

Industrialisasi & alih teknologi produksi MALSAI skala industri

▪ Desain proses pengolahan biomassa MALSAI

▪ Quality Control

Produk MALSAI

Page 75: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

MALSAI ROADMAP

2020 2021 2022 2023

WBS 4

WBS 5

WBS 6

WBS 7 Diseminasi

▪ Diversifikasi produk pangan, intermediate & pakan berbasis MALSAI

Validasi pengujian analisis produk

2024

▪ Teknologi produksi bahan baku & produk berbasis MALSAI

▪ Teknologi pengemasan

Pilot scale produk terpilih di industri pangan

Diseminasi / transfer teknologi produksi & pengembangan produk inovatif berbasis MALSAI

Karakteristik bahan baku &produk meliputi organoleptik, kimia, fisik, mikrobiologi standard BPOM

Standarisasi produk inovatif berbasis MALSAI

Life cycle assesment produk berbasis MALSAI

Analisis kelayakan tekno-ekonomi produksi MALSAI

Analisis tekno-ekonomi proses

Diseminasi

Page 76: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil Output Work Package (WP) WBS 1

WP Target detil WP

2020 2021 2022 2023 2024

WP 1.1 Informasi metadata biodiversitas MALSAI

Tersedianya informasi metadata biodiversitas makroalga asal perairan Indonesia

Tersedianya informasi metadata biodiversitas mikroalga laut asal perairan Indonesia

Updating informasi metadata biodiversitas makro- dan mikroalga laut asal perairan Indonesia

WP 1.2 Informasi metadata biokimia MALSAI

Tersedianya informasi metadata biokimia makroalga asal perairan Indonesia

Tersedianya informasi metadata biokimia mikroalga laut asal perairan Indonesia

Updating informasi metadata biokimia makro- dan mikroalga laut asal perairan Indonesia

WP 1.3 Database MALSAI

Inisiasi basis data makroalga asal perairan Indonesia

Inisiasi basis data mikroalga asal perairan Indonesia

Updating basis data makro-dan mikroalga asal perairan Indonesia

Tersedianya basis data makro-dan mikroalga asal perairan Indonesia yang terintegrasi

Target WBS 1: Database MALSAI berpotensi sebagai bahan pangan & komoditas industri

Page 77: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil OUTPUT Work Package (WP) WBS 2 Target WBS 2: Rekayasa kultur untuk meningkatkan produktivitas dan nutrisi MALSAI

WP Target detil WP

2020 2021 2022 2023 2024

WP 2.1 Bibit unggul dan strain MALSAI potensial

Tersedianya strain

mikroalga laut

potensial

WP 2.2. Teknologi kultur &

Rekayasa mikroalga semi

pilot

Tersedianya bibit

mikroalga unggul

skala lab

Tersedianya bibit

mikroalga semipilot

WP 2.3 Teknologi kultur MALSAI skala semi pilot

Tersedianya teknologi

kultur mikroalga sistem

ponds

Tersedianya teknologi

kultur MALSAI skala

semi pilot dan sistem

photobioreactor

WP 2.4 Teknologi kultur MALSAI skala pilot

Tersedianya teknologi

kultur MALSAI skala

pilot

WP 2.5 Alih teknologi dan industrialisasi teknologi kultur MLASAI

Diseminasi teknologi

kultur MALSAI

Industrialisasi

teknologi kultur

MALSAI

Page 78: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal
Page 79: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal
Page 80: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil OUTPUT Work Package (WP) WBS 3 Target WBS 3: Teknologi paska panen MALSAI yang menghasilkan biomassa dan kualitas tinggi

Page 81: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil OUTPUT Work Package (WP) WBS 4

Target WBS 4: Tekno Ekonomi dan Industrialisasi

Page 82: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil OUTPUT Work Package (WP) WBS 5 Target WBS 5: Diversifikasi Produk Inovatif

Page 83: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil OUTPUT Work Package (WP) WBS 6 Target WBS 6: Standardisasi bahan baku dan produk inovatif MALSAI

Page 84: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Target Detil OUTPUT Work Package (WP) WBS 7

WP Target detil WP

2020 2021 2022 2023 2024

WP 7.1 Kerjasama

dengan Industri dan

stake holder MALSAI

-.terselenggaranya

workshop kerjasama

riset MALSAI

-Ditandatangani

kerjasama antar

lembaga sinergi MALSAI

-Tersedianya draft

dokumen kerjasama

dengan Industri dan

Stake holder

-Terselenggaranya Kick

off kerjasama Industri

-tersedianya dokumen

kerjasama dengan

Industri

Lisensi teknologi dan

produk hasil riset

MALSAI

Lisensi teknologi dan

produk hasil riset

MALSAI

WP 7.2 Ekspose hasil

penelitian dan

pengembangan MALSAI

Ekspose teknologi dan

atau produk hasil riset

dan pengembangan

MALSAI, media brief,

talkshow

Ekspose teknologi dan

atau produk hasil riset

dan pengembangan

MALSAI

Ekspose teknologi dan

atau produk hasil riset

dan pengembangan

MALSAI

WP 7.3 Alih teknologi

hasil riset dan

pengembangan MALSAI

Link & Match Kebutuhan

Industri terhadap produk

Alih teknologi kultur

MALSAI ke Industri dan

stake holder

Alih teknologi produksi

produk inovatif MALSAI

Inkubasi teknologi Launching produk dan

komersialiasi oleh

Industri

Target WBS 7: Diseminasi MALSAI, teknologi kultur, dan produk inovatif

Page 85: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 1

WP SDM

Nama Lembaga

WP 1.1. Informasi metadata biodiversitas MALSAI

Tri Handayani, M.Si; Diah Radini Noerdjito, M.Si; Dr. Ratih Pangestuti, Ardi Ardiansyah, M.Sc; Indyaswan Tegar Suryaningtyas, M.Sc; Sandi Permadi, S.T; Jasmadi S.T; Bayu Kumayanjati, S.Pi; Rany Dwimayasanti, S.Pi

Pusat Penelitian Oseanografi - LIPI

Dr. Erina Sulistianingsih SEAMEO BIOTROP

Prof. Dr. Sri Purwaningsih IPB

WP 1.2. Informasi metadata biokimia MALSAI Dr. Eng. Asep Bayu, Dr. Masteria Y. Putra, Dr. Tutik Murniasih, Abdullah Rasyid S.Si, Iskandar Azmi Harahap, M.Sc

Pusat Penelitian Oseanografi - LIPI

Prof. Dr. Sri Purwaningsih IPB

Prof. Dr. Endang S. Rahayu UGM

Dr. Souvia Rahimah Universitas Padjajaran

Prof. Abdi Dharma Universitas Andalas

WP 1.3. Database MALSAI Dr. Eng. Asep Bayu; Bayu Prayuda, M.Si; Dr. Joko Tri Wibowo

Pusat Penelitian Oseanografi - LIPI

Target WBS 1:

Page 86: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 2

WP SDM

Nama Lembaga

WP 2.1. Bibit unggul dan strain MALSAI potensial

Dr. Ratih Pangestuti, Dr. Safar Dody, Diah Radini

Noerdjito, M.Si, Indyaswan Tegar, M.Sc,

Jasmadi, S.Pi, Sandi Permadi, S.ST

Pusat Penelitian Oseanografi-LIPI

Dr. Eko Agus Suyono, M.App.Sc Fakultas Biologi, UGM

Target WBS 2

Page 87: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

WP SDM

Nama Lembaga

WP 2.2. Teknologi kultur & Rekayasa mikroalga

semi pilot

Dr. Ratih Pangestuti, Dr. Safar Dody, Jasmadi,

S.Pi, Sandi Permadi, S.ST

Pusat Penelitian Oseanografi-LIPI

Dr. Eko Agus Suyono, M.App.Sc Fakultas Biologi, UGM

Rangga Warsita Algae Park

Mahmud, Ganang Neo Algae

Target WBS 2

Page 88: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

WP SDM

Nama Lembaga

WP 2.3. Teknologi kultur MALSAI skala semi pilot

Dr. Ratih Pangestuti, Dr. Safar Dody,

Diah Radini Noerdjito, M.Si,

Indyaswan Tegar, M.Sc, Jasmadi, S.Pi,

Sandi Permadi, S.ST

Pusat Penelitian Oseanografi-LIPI

Lisa Fajar Indriani, M.Si, Yanuariska

Putra, M.Fish.Sc.

BBIL LIPI

Dr. Eko Agus Suyono, M.App.Sc Fakultas Biologi, UGM

Rangga Warsita Algae Park

Mahmud, Ganang Neo Algae

Target WBS 2

Page 89: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

WP SDM

Nama Lembaga

WP 2.4. Teknologi kultur MALSAI skala pilot

Dr. Ratih Pangestuti, Dr. Safar Dody, Diah Radini

Noerdjito, M.Si, Indyaswan Tegar, M.Sc, Jasmadi,

S.Pi, Sandi Permadi, S.ST

Pusat Penelitian Oseanografi-LIPI

Lisa Fajar Indriani, M.Si, Yanuariska Putra,

M.Fish.Sc.

BBIL LIPI

Dr. Eko Agus Suyono, M.App.Sc Fakultas Biologi, UGM

Rangga Warsita Algae Park

Mahmud, Ganang Neo Algae

Target WBS 2

Page 90: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

WP SDM

Nama Lembaga

WP 2.5. Alih teknologi dan industrialisasi teknologi kultur MLASAI

Dr. Ratih Pangestuti, Dr. Safar Dody, Diah Radini

Noerdjito, M.Si, Indyaswan Tegar, M.Sc, Jasmadi, S.Pi,

Sandi Permadi, S.ST

Pusat Penelitian Oseanografi-LIPI

Lisa Fajar Indriani, M.Si, Yanuariska Putra, M.Fish.Sc. BBIL LIPI

Dr. Eko Agus Suyono, M.App.Sc Fakultas Biologi, UGM

Rangga Warsita Algae Park

Mahmud, Ganang Neo Algae

Target WBS 2

Page 91: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM WBS 2

Page 92: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 3

WP SDM

Nama Lembaga

WP 3.1 Rekayasa proses panen MALSAI Dr. Ratih Pangestuti, Dr. Masteria YP, Dr. Asep Bayu, Dr. Tutik

Murniasih, Dr. Safar Doddy, Abdullah rasyid, S.Si, Indyaswan Tegar

S, M.Sc, Jasmadi, S.Pi, Sandi P, S.Sc, Iskandar Azmy H, Fitri B, Bayu

KJ, Rani D

P2O LIPI

Prof. Dr. Sri Purwaningsih IPB

Prof. Abdi Dharma UNAND

Evi Amelia S, Lisa F, Yanuariska BBIL

Machmud Lutfi H, ST Neoalgae

Rangga Warsita Aji, ST Algaepark

Target WBS 3:

Page 93: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 3

WP SDM

Nama Lembaga

WP 3.2 Desain proses pengolahan MALSAI bentuk

powder

Dr. Ratih P, Dr. Masteria YP, Dr. Asep bayu, Dr. Tutik Murniasih, Dr.

Safar Doddy, Abdullah Rasyid, Indyaswan Tegar S, Jasmadi, Sandi

P, Iskandar Azmy, Fitri B, Bayu KJ, Rani D

P2O LIPI

Prof. Dr. Sri Purwaningsih IPB

Prof. Dr. Ir. Endang S. Rahayu, MS, Eko Agus Suyono, M.App.Sc, Dr.

Widiastuti Setyaningsih

UGM

Prof. Abdi Dharma UNAND

Evi Amelia S, Lisa F, Yanuariska BBIL

Mahmud Neoalgae

Rangga Warsita Aji Algaepark

Rima Mustika Sari, Diki P2TTG

Target WBS 3:

Page 94: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 3

WP SDM

Nama Lembaga

WP 3.3 Teknologi produksi bahan baku MALSAI

yang optimal

Dr. Ratih P, Dr. Masteria YP, Dr. Asep bayu, Dr. Tutik Murniasih, Dr.

Safar Doddy, Abdullah Rasyid, Indyaswan Tegar S, Jasmadi, Sandi

P, Iskandar Azmy, Fitri B, Bayu KJ, Rani D

P2O LIPI

Prof. Sri Purwaningsih IPB

Evi Amelia S, Lisa F, Yanuariska BBIL

Mahmud Neoalgae

Rangga Warsita Aji Algaepark

Rima Mustika Sari, Diki P2TTG

Target WBS 3:

Page 95: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 4

WP SDM

Nama Lembaga

WP 4.1 tekno ekonomi produksi dan pengolahan mikroalga dan produk turunannya

1.Dr. Tutik Murniasih, Dr. Masteria YP, Dr. Asep bayu, Dr. Safar Doddy, Abdullah Rasyid, Indyaswan Tegar S, Jasmadi, Sandi

P, Iskandar Azmy, Fitri B, Bayu KJ, Rani D

2.Lisa Fajar Indriani, M.Si, Evi Amelia Siahaan, M.Sc,

3.Rangga Warsita Aji

4.Machmud Lutfi Husain

5.Prof. Dr. Erica Budiarti Laconi, Prof. Dr. Ir. Sri Purwaningsih, M.Si, Prof. Linawati, Dr. Kustiariyah Tarman

6.Prof. Dr. Ir. Endang S. Rahayu, MS, Dr. Eko Agus Suyono, M.App.Sc, Dr. Widiastuti Setyaningsih

7.Dr. Ir. Erina Sulistiani, Msi, Dr. Zulhamsyah ImranDr. Aslan, Dr. Ichsan Achmad Fauzi

8.Dr. Ir. Siti Agustina, M.Si ;Dr. Suharman SP, M.Si

1.P2O LIPI

2.BBIL LIPI

3.Algaepark (industri)

4.Neoalgae (industri)

5.IPB

6.UGM

7.SEAMEO BIOTROP

8.Kementrian perindustrian

WP 4.2 Teknoekonomi produksi dan pengolahan makroalga

1.Dr. Tutik Murniasih, Dr. Masteria YP, Dr. Asep bayu, Dr. Safar Doddy, Abdullah Rasyid, Indyaswan Tegar S, Jasmadi, Sandi

P, Iskandar Azmy, Fitri B, Bayu KJ, Rani D

2.Lisa Fajar Indriani, M.Si, Evi Amelia Siahaan, M.Sc,

3.Rangga Warsita Aji

4.Machmud Lutfi Husain

5.Prof. Dr. Erica Budiarti Laconi, Prof. Dr. Ir. Sri Purwaningsih, M.Si, Prof. Linawati, Dr. Kustiariyah Tarman

6.Prof. Dr. Ir. Endang S. Rahayu, MS, Dr. Eko Agus Suyono, M.App.Sc, Dr. Widiastuti Setyaningsih

7.Dr. Ir. Erina Sulistiani, Msi, Dr. Zulhamsyah ImranDr. Aslan, Dr. Ichsan Achmad Fauzi

8.Siti Agustina, Dr. Suharman SP, M.Si

1.P2O LIPI

2.BBIL LIPI

3.Algaepark (industri)

4.Neoalgae (industri)

5.IPB

6.UGM

7.SEAMEO BIOTROP

8.Kementrian perindustrian

WP 4.3 Peningkatan kapasitas produksi skala industri

1.Dr. Tutik Murniasih, Dr. Masteria YP, Dr. Asep bayu, Dr. Safar Doddy, Abdullah Rasyid, Indyaswan Tegar S, Jasmadi, Sandi

P, Iskandar Azmy, Fitri B, Bayu KJ, Rani D

2.Lisa Fajar Indriani, M.Si, Evi Amelia Siahaan, M.Sc,

3.Rangga Warsita Aji

4.Machmud Lutfi Husain

5.Prof. Dr. Erica Budiarti Laconi, Prof. Dr. Ir. Sri Purwaningsih, M.Si, Prof. Linawati, Dr. Kustiariyah Tarman

6.Prof. Dr. Ir. Endang S. Rahayu, MS, Dr. Eko Agus Suyono, M.App.Sc, Dr. Widiastuti Setyaningsih

7.Dr. Ir. Erina Sulistiani, Msi, Dr. Zulhamsyah ImranDr. Aslan, Dr. Ichsan Achmad Fauzi

8.Dr. Ir. Siti Agustina, M.Si ; Dr. Suharman SP, M.Si

1.P2O LIPI

2.BBIL LIPI

3.Algaepark (industri)

4.Neoalgae (industri)

5.IPB

6.UGM

7.SEAMEO BIOTROP

8.Kementrian perindustrian

Target WBS 4: Tekno Ekonomi dan Industrialisasi

Page 96: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 5 Target WBS 5: Diversifikasi Produk Inovatif

WP SDM

Nama Lembaga

WP 5.1 Formulasi produk pangan dan turunannya (kandungan nutrisi bioaktif, food safety & quality)

1. 1.Iskandar Azmy H., MSc; Dr. Masteria YP; Dr. Tutik Murniasih; Dr. Asep Bayu; Dr. Ratih P; Bayu Kumayanjati, S.Pi; Rany

Dwimayasanti, S.Pi

2. 2. Dr. Souvia Rahimah – FTIP, Dr. M. Djali – FTIP, Diana – FEB, Dr. Kiki – FPIK, Dr. Iis – FPIK

3. 3. Prof. Dr. Ir. Endang S. Rahayu, MS; Dr. Ir. Tyas Utami, M.Sc; Dr. Ir. Chusnul Hidayat; Rachma Wikandari, PhD; Dr. Widiastuti

Setyaningsih, S.T.P., M. Sc; Dian Anggraini Suroto, STP. M.,M.Eng., PhD; Dr. Ir. Muhammad Nur Cahyanto. M. Sc.; Dr, Rini

Yanti, S.TP, MP

4. 4. Prof. Dr. Abdi Dharma; Prof. Dr. Zulkarnain Chaidir; Dr. Armaini; Dr. Syafrizayanti; Dra. Elida Mardiah, MS; Dra. Marniati

Salim, MS; Dr. Ir. Idra Junaidi Zakaria

5. 5. Prof. Dr Linawati Hardjito; Dr. Iriani Setyaningsih; Prof. Dr Joko Santoso; Dr. Eng Uju; Dr. Kustiariyah Tarman; Dr. Eng.

Safrina Dyah Hardiningtyas; Prof. Dr. Ir. Sri Purwaningsih, M.Si; Prof Drh Ekowati Handharyani, MS, PhD, APVet; Prof.Dr.Ir Evi

Damayanti, MSi.; Dr. Ir. Wiwik, MSi.; Dr. Agus; Eka Deskawati, MSi.; Ir. Prodina, MSi

1. P2O LIPI

2. UNPAD

3. UGM

4. UNAND

5. IPB

WP 5.2 Optimasi proses & teknologi produk pangan (filtrasi, ekstraksi, purifikasi, fermentasi, pasteurisasi/ sterilisasi)

1. Iskandar Azmy H., MSc; Dr. Masteria YP; Dr. Tutik Murniasih; Dr. Asep Bayu; Dr. Ratih P; Bayu Kumayanjati, S.Pi; Rany

Dwimayasanti, S.Pi

2. Dr. Souvia Rahimah – FTIP, Dr. M. Djali – FTIP, Diana – FEB, Dr. Kiki – FPIK, Dr. Iis – FPIK

3. Prof. Dr. Ir. Endang S. Rahayu, MS; Dr. Ir. Tyas Utami, M.Sc; Dr. Ir. Chusnul Hidayat; Rachma Wikandari, PhD; Dr. Widiastuti

Setyaningsih, S.T.P., M. Sc; Dian Anggraini Suroto, STP. M.,M.Eng., PhD; Dr. Ir. Muhammad Nur Cahyanto. M. Sc.; Dr, Rini

Yanti, S.TP, MP

4. Prof. Dr. Abdi Dharma; Prof. Dr. Zulkarnain Chaidir; Dr. Armaini; Dr. Syafrizayanti; Dra. Elida Mardiah, MS; Dra. Marniati

Salim, MS; Dr. Ir. Idra Junaidi Zakaria

5. Prof. Dr Linawati Hardjito; Dr. Iriani Setyaningsih; Prof. Dr Joko Santoso; Dr. Eng Uju; Dr. Kustiariyah Tarman; Dr. Eng. Safrina

Dyah Hardiningtyas; Prof. Dr. Ir. Sri Purwaningsih, M.Si; Prof Drh Ekowati Handharyani, MS, PhD, APVet; Prof.Dr.Ir Evi

Damayanti, MSi.; Dr. Ir. Wiwik, MSi.; Dr. Agus; Eka Deskawati, MSi.; Ir. Prodina, Msi

6. Machmud Lutfi Huzain & Rangga Warsita Aji

1. P2O LIPI

2. UNPAD

3. UGM

4. UNAND

5. IPB

6. Neoalga & Algaepark

WP 5.3 Transfer teknologi produk pangan inovatif (feasibility studies, up scaling, pilot plant)

1. Iskandar Azmy H., MSc; Dr. Masteria YP; Dr. Tutik Murniasih; Dr. Asep Bayu; Dr. Ratih P; Bayu Kumayanjati, S.Pi; Rany Dwimayasanti, S.Pi

2. Dr. Souvia Rahimah – FTIP, Dr. M. Djali – FTIP, Diana – FEB, Dr. Kiki – FPIK, Dr. Iis – FPIK 3. Prof. Dr. Ir. Endang S. Rahayu, MS; Dr. Ir. Tyas Utami, M.Sc; Dr. Ir. Chusnul Hidayat; Rachma Wikandari, PhD; Dr. Widiastuti

Setyaningsih, S.T.P., M. Sc; Dian Anggraini Suroto, STP. M.,M.Eng., PhD; Dr. Ir. Muhammad Nur Cahyanto. M. Sc.; Dr, Rini Yanti, S.TP, MP

4. Machmud Lutfi Huzain & Rangga Warsita Aji

1. P2O LIPI

2. UNPAD

3. UGM

4. Neoalga & Algaepark

Page 97: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 6

WP SDM

Nama Lembaga

6.1 Standarisasi bahan baku 1. Dr. Tutik Murniasih, Dr. Ratih P, Dr. Masteria YP, Dr. Asep bayu, Dr. Safar Doddy, Abdullah Rasyid, Ardi Ardiansyah, M.Sc; Indyaswan Tegar S, Jasmadi, Sandi P, Iskandar Azmy, Fitri B, Bayu KJ, Rani D 2. Dr. Erina Sulistiani 3. Prof. Dr. Sri Purwaningsih 4. Prof. Dr. Endang S. Rahayu 5. Dr. Souvia Rahimah 6. Prof. Abdi Dharma

Pusat Penelitian Oseanografi - LIPI SEAMEO BIOTROP IPB UGM UNPAD UNAND

6.2 Standarisasi Produk BPOM

6.3 Standarisasi Produk MUI

6.4 Standarisasi Produk SNI

1.Dr. Tutik Murniasih, Dr. Ratih P, Dr. Masteria YP, Dr. Asep bayu, Abdullah

Rasyid, Ardi Ardiansyah, Iskandar Azmy, Fitri B, Bayu KJ, Rani D

2.Dr. Erina Sulistiani

3. Prof. Dr. Sri Purwaningsih

4. Prof. Dr. Endang S. Rahayu

5. Dr. Souvia Rahimah

6. Prof. Abdi Dharma

6. Siti Agustina

7. Machmud Lutfi H, ST

8. Rangga Warsita Aji, ST

Pusat Penelitian Oseanografi - LIPI

SEAMEO BIOTROP

IPB

UGM

UNPAD

UNAND

Balai Besar Kimia Kemasan

Neoalgae

Algaepark

Target WBS 6: Standardisasi bahan baku dan produk inovatif MALSAI

Page 98: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

SDM Work Package (WP) WBS 7

WP SDM

Nama Lembaga

WP 7.1

Kerjasama

dengan Industri

dan stake holder

MALSAI

1.Dr. Tutik Murniasih, Dr. Ratih P, Dr. Masteria YP, Dr. Asep bayu, Dr. Safar Doddy, Abdullah Rasyid, Indyaswan Tegar S, Jasmadi, Sandi P, Iskandar

Azmy, Fitri B, Bayu KJ, Rani D

2.Lisa Fajar Indriani, M.Si, Evi Amelia Siahaan, M.Sc, Yanuariska Putra, M.Fish.Sc.

3.Dr. Dwi Susilaningsih, Mpharm, Dr. Delicia Yunita Rahman

4.Rangga Warsita Aji

5.Machmud Lutfi Husain

6.Prof. Dr. Erica Budiarti Laconi, Prof. Indra Jaya, Prof. Dr. Ir. Sri Purwaningsih, M.Si, Prof. Linawati Hardjito, Prof. Dr. Ridwan Affandi, Dr. Kustiariyah

Tarman

7.Prof. Dr. Ir. Endang S. Rahayu, MS, Eko Agus Suyono, M.App.Sc, Dr. Widiastuti Setyaningsih

8.Dr. Ir. Erina Sulistiani, Msi, Dr. Zulhamsyah ImranDr. Aslan, Dr. Ichsan Achmad Fauzi, Prof. Dr. Suharsono, DEA

9.Dr. Emma Rochima

10.Dr. A.B. Susanto

11.Prof. Abdi Dharma

12.Siti Agustina, Dr. Suharman SP, M.Si

1.P2O LIPI

2.BBIL LIPI

3.P2B LIPI

4.Algaepark (industri)

5.Neoalgae (industri)

6.IPB

7.UGM

8.SEAMEO BIOTROP

9.UNPAD

10.UNDIP

11.UNAND

12.Kemenperin

WP 7.2 Ekspose

hasil penelitian

dan

pengembangan

MALSAI

1.Dr. Tutik Murniasih, Dr. Ratih P, Dr. Masteria YP, Dr. Asep bayu, Dr. Safar Doddy, Abdullah Rasyid, Indyaswan Tegar S, Jasmadi, Sandi P, Iskandar

Azmy, Fitri B, Bayu KJ, Rani D

2.Lisa Fajar Indriani, M.Si, Evi Amelia Siahaan, M.Sc, Yanuariska Putra, M.Fish.Sc.

3.Dr. Dwi Susilaningsih, Mpharm, Dr. Delicia Yunita Rahman

4.Rangga Warsita Aji

5.Machmud Lutfi Husain

6.Prof. Dr. Erica Budiarti Laconi, Prof. Indra Jaya, Prof. Dr. Ir. Sri Purwaningsih, M.Si, Prof. Linawati Hardjito, Prof. Dr. Ridwan Affandi, Dr. Kustiariyah

Tarman

7.Prof. Dr. Ir. Endang S. Rahayu, MS, Eko Agus Suyono, M.App.Sc, Dr. Widiastuti Setyaningsih

8.Dr. Ir. Erina Sulistiani, Msi, Dr. Zulhamsyah ImranDr. Aslan, Dr. Ichsan Achmad Fauzi, Prof. Dr. Suharsono, DEA

9.Dr. Emma Rochima

10.Dr. A.B. Susanto

11.Prof. Abdi Dharma

12.Siti Agustina, Dr. Suharman SP, M.Si

1.P2O LIPI

2.BBIL LIPI

3.P2B LIPI

4.Algaepark (industri)

5.Neoalgae (industri)

6.IPB

7.UGM

8.SEAMEO BIOTROP

9.UNPAD

10.UNDIP

11.UNAND

12.Kemenperin

Page 99: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

WP SDM

Nama Lembaga

WP 7.3 Alih

teknologi

hasil riset dan

pengembanga

n MALSAI

1.Dr. Tutik Murniasih, Dr. Ratih P, Dr. Masteria YP, Dr. Asep bayu, Dr. Safar Doddy, Abdullah Rasyid, Indyaswan Tegar S, Jasmadi,

Sandi P, Iskandar Azmy, Fitri B, Bayu KJ, Rani D

2.Lisa Fajar Indriani, M.Si, Evi Amelia Siahaan, M.Sc, Yanuariska Putra, M.Fish.Sc.

3.Dr. Dwi Susilaningsih, Mpharm, Dr. Delicia Yunita Rahman

4.Rangga Warsita Aji

5.Machmud Lutfi Husain

6.Prof. Dr. Erica Budiarti Laconi, Prof. Indra Jaya, Prof. Dr. Ir. Sri Purwaningsih, M.Si, Prof. Linawati Hardjito, Prof. Dr. Ridwan

Affandi, Dr. Kustiariyah Tarman

7.Prof. Trisye, Prof. Dr. Ir. Endang S. Rahayu, MS, Eko Agus Suyono, M.App.Sc, Dr. Widiastuti Setyaningsih

8.Dr. Ir. Erina Sulistiani, Msi, Dr. Zulhamsyah ImranDr. Aslan, Dr. Ichsan Achmad Fauzi, Prof. Dr. Suharsono, DEA

9.Dr. Emma Rochima

10.Dr. A.B. Susanto

11.Prof. Abdi Dharma

12.Siti Agustina

1.P2O LIPI

2.BBIL LIPI

3.P2B LIPI

4.Algaepark

(industri)

5.Neoalgae (industri)

6.IPB

7.UGM

8.SEAMEO BIOTROP

9.UNPAD

10.UNDIP

11.UNAND

12.Kemenperin

SDM Work Package (WP) WBS 7

Page 100: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Anggaran Pengelolaan dan sinergi kegiatan 2020 - 2024

Page 101: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

ANGGARAN WBS 1

WP Anggaran WP

2020 2021 2022 2023 2024

WP 1.1. Informasi metadata biodiversitas MALSAI

Jenis riset:Laboratorium dan Lapangan Anggaran: 6 M Sumber dana: PRN

Jenis riset: Laboratorium dan Lapangan Anggaran: 1 M Sumber dana: PRN

WP 1.2. Informasi metadata biokimia MALSAI

Jenis riset: Laboratorium dan Lapangan Anggaran: 2 M Sumber dana: PRN

Jenis riset: Laboratorium dan Lapangan Anggaran: 2 M Sumber dana: PRN

WP 1.3. Database Malsai

Jenis riset: Laboratorium Anggaran: 2 M Sumber dana: PRN

Jenis riset: Laboratorium Anggaran: 1, 8 M Sumber dana: PRN

Target WBS 1: <detil>

Page 102: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

ANGGARAN WBS 2

WP Anggaran WP

2020 2021 2022

WP 2.1 Bibit unggul dan strain MALSAI potensial

Jenis riset: Laboratorium dan Lapangan Anggaran: 3,8 M Sumber dana: PRN

WP 2.2 Teknologi kultur & rekayasa mikroalga semi pilot

Jenis riset: Laboratorium dan Lapangan Anggaran: 2 M Sumber dana: PRN

Jenis riset: Laboratorium dan Lapangan Anggaran: 1 M Sumber dana: PRN

WP 2.3 Teknologi kultur MALSAI skala semi pilot

Jenis riset: Laboratorium dan Lapangan Anggaran: 1,05 M Sumber dana: PRN

Jenis riset: Laboratorium dan Lapangan Anggaran: 1.144 M Sumber dana: PRN

WP 2.4 Teknologi kultur MALSAI skala pilot

Jenis riset: Laboratorium dan Lapangan Anggaran: 1 M Sumber dana: PRN

WP 2.5 Alih teknologi dan industrialisasi teknologi kultur MLASAI

Jenis riset: Laboratorium dan Lapangan Anggaran: 1 M Sumber dana: PRN

Target WBS 2

Page 103: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal
Page 104: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

ANGGARAN WBS 3

WP Anggaran WP

2020 2021 2022 2023 2024

WP 3.1 Rekayasa

proses panen

MALSAI

Jenis riset: lapangan

& laboratoris

Anggaran: 3 M

Sumber dana: PRN

Jenis riset: lapangan

& laboratoris

Anggaran: 2 M

Sumber dana: PRN

Jenis riset: lapangan

& laboratoris

Anggaran: 2 M

Sumber dana: PRN

WP 3.2 Desain

proses pengolahan

MALSAI bentuk

powder

Jenis riset: lapangan

& laboratoris

Anggaran: 3 M

Sumber dana: PRN

Jenis riset: lapangan

& laboratoris

Anggaran: 1 M

Sumber dana: PRN

Jenis riset: lapangan

& laboratoris

Anggaran: 2 M

Sumber dana: PRN

WP 3.3 Teknologi

produksi bahan baku

MALSAI yang optimal

Jenis riset: lapangan

& laboratoris

Anggaran: 3 M

Sumber dana: PRN

Jenis riset: lapangan

& laboratoris

Anggaran: 1 M

Sumber dana: PRN

Jenis riset: lapangan

& laboratoris

Anggaran: 2 M

Sumber dana: PRN

Target WBS 3:

Page 105: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

ANGGARAN WBS 4

WP Anggaran WP

2020 2021 2022 2023 2024

WP 4.1 tekno ekonomi produksi dan pengolahan mikroalga dan produk turunannya

Jenis riset: analisis ekonomi, eksperimental Anggaran: 2 M Sumber dana: PRN

WP 4.2 Teknoekonomi produksi dan pengolahan makroalga

Jenis riset: analisis ekonomi, eksperimental Anggaran: 2 M Sumber dana: PRN

Jenis riset: analisis ekonomi, eksperimental Anggaran: 3 M Sumber dana: PRN

WP 4.3 Peningkatan kapasitas produksi skala industri

Jenis riset: analisis ekonomi, eksperimental Anggaran: 2, 35 M Sumber dana: PRN

Target WBS 4: Tekno Ekonomi dan Industrialisasi

Page 106: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

ANGGARAN WBS 5 Target WBS 5: Diversifikasi Produk Inovatif

WP Anggaran WP

2020 2021 2022 2023 2024

WP 5.1 Formulasi produk pangan dan turunannya (nutrition content, bioactive compound, food safety & quality)

Jenis riset: Eksperimental Anggaran: 1,8 M Sumber dana: PRN

Jenis riset: Eksperimental Anggaran: 3 M Sumber dana: PRN

WP 5.2 Optimasi proses & teknologi produk pangan (filtrasi, ekstraksi, purifikasi, fermentasi, pasteurisasi/ sterilisasi)

Jenis riset: Eksperimental Anggaran: 1 M Sumber dana: PRN

Jenis riset: Eksperimental Anggaran: 3 M Sumber dana: PRN

Jenis riset: Eksperimental Anggaran: 5M Sumber dana: PRN

WP 5.3 Transfer teknologi produk pangan inovatif (feasibility studies, up scaling, pilot plant)

Jenis riset: Aplikasi/Terapan Anggaran: 5 M Sumber dana: PRN

Page 107: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

ANGGARAN WBS 6 Target WBS 6: Standardisasi bahan baku dan produk inovatif MALSAI

WP Anggaran WP

2020 2021 2022 2023 2024

6.1 Standarisasi bahan baku

Jenis riset: eksperimental Anggaran: 2 M Sumber Dana: PRN

Jenis riset: eksperimental Anggaran: 2 M Sumber Dana: PRN

6.2 Standarisasi Produk BPOM

Jenis riset: eksperimental Anggaran: 1 M Sumber Dana: PRN

Jenis riset: eksperimental Anggaran: 2 M Sumber Dana: PRN

6.3 Standarisasi Produk MUI

Jenis riset: eksperimental Anggaran: 1 M Sumber Dana: PRN

Jenis riset: eksperimental Anggaran: 2 M Sumber Dana: PRN

6.4 Standarisasi Produk SNI

Jenis riset: eksperimental Anggaran: 2 M Sumber Dana: PRN

Jenis riset: eksperimental Anggaran: 3 M Sumber Dana: PRN

Page 108: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

ANGGARAN WBS 7

WP Anggaran WP

2020 2021 2022 2023 2024

WP 7.1 Kerjasama

dengan Industri dan

stake holder MALSAI

Jenis Kegiatan:

Lapangan

Anggaran: 2.35

Sumber dana: PRN

Jenis Kegiatan:

Lapangan

Anggaran: 3

Sumber dana: PRN

WP 7.2 Ekspose hasil

penelitian dan

pengembangan

MALSAI

Jenis Kegiatan:

Lapangan

Anggaran: 2 M

Sumber dana: PRN

Jenis Kegiatan:

Lapangan

Anggaran: 3 M

Sumber dana: PRN

WP 7.3 Alih

teknologi hasil riset

dan pengembangan

MALSAI

Jenis Kegiatan:

Lapangan

Anggaran: 2 M

Sumber dana: PRN

Jenis Kegiatan:

Lapangan

Anggaran: 4 M

Sumber dana: PRN

Target WBS 7: Diseminasi MALSAI, teknologi kultur, dan produk inovatif

Page 109: PRIORITAS RISET NASIONAL 2020-2024 FOKUS RISET … · Keyplan Sistem Permesinan & Propulsi Kapal Harbor Tug Dual Fuel 2024: Review & evaluasi desain Sistem Permesinan & Propulsi Kapal

Total anggaran program = 113, 5 M

Anggaran Pengelolaan dan sinergi kegiatan 2020 – 2024 + Anggaran setiap WBS

Instansi 2020 2021 2022 2023 2024

P2O LIPI 8,000,000,000 16.600.000.000 16.000.000.000 16.000.000.000 16.000.000.000

Seameo Biotrop

3,500,000,000 4,900,000,000 4,500,000,000 3,800,000,000 3,600,000,000

UGM 1,000,000,000 2,000,000,000 1,000,000,000 1,000,000,000 600,000,000

UNPAD 1,300,000,000 3.000,000,000 2,800,000,000 2,600,000,000 1,400,000,000

UNAND 1,500,000,000 1,800,000,000 850,000,000 750,000,000 400,000,000

IPB 14,000,000,000 9,000,000,000 14,000,000,000 14,000,000,000 14,000,000,000

Total 29,800,000,000 17,800,000,000 23,350,000,000 22,350,000,000 19,000,000,000