Primjer uspješnog projekta EnDurCRete Doc.dr.sc. Irina Stipanović Oslaković, d.i.g. INFRA PLAN konzalting, Zagreb, Hrvatska 1 MZO, Zagreb, 08.02.2018.
24

Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Jan 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Primjer uspješnog projekta

EnDurCRete

Doc.dr.sc. Irina Stipanović Oslaković, d.i.g.

INFRA PLAN konzalting, Zagreb, Hrvatska

1MZO, Zagreb, 08.02.2018.

Page 2: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Sadržaj

■ Iskustva u EU projektima

■ Primjer tekućeg projekta

■ Kako napisati uspješan prijedlog projekta

■ Kako stvoriti konzorcij

■ Proces od prijave do provedbe

2MZO, Zagreb, 08.02.2018.

Page 3: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Zaposlenja

■ 2001 – 2007 Građevinski fakultet Sveučilišta u Zagrebu,

Znanstveni novak

■ 2007 – 2011 Institut IGH d.d., Voditelj Laboratorija, Voditelj

Razvoja i Istraživanja

■ 2011 – 2012 University of Twente, Nizozemska, Post doktorant

■ 2012 – danas, Docent University of Twente

■ 2016 – Infra Plan konzalting j.d.o.o.

3MZO, Zagreb, 08.02.2018.

Page 4: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Sudjelovanje u EU projektima od početka karijere

■ 2002-2005: EUREKA project E!2823 Fire-Tunnel

''Precast fire resistant segments for secondary

tunnel lining'', (150.000 EUR, 8 partners, WP

leader)

■ 2008-2011 – EUREKA project E!4166

EUREKABUILD FIRECON Fire Resistant Concrete

Made with slag from Steel Industry (150.000 EUR,

5 partners)

■ 2006–2009 – FP6 project ''Assessment and

rehabilitation of Central European highway

structures'', ARCHES, (2.5 Mil EUR, 13 partners, WT

leader) (GF IGH)

4MZO, Zagreb, 08.02.2018.

Page 5: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Sudjelovanje u EU projektima

■ 2010-2011 – ERANET Road project ASCAM ''Asset service condition

assessment methodology’’ (267.000 EUR, 5 partners, WP leader, tool

for cross asset management),

■ 2010-2011 – FP 7 ACP SPIN “Spearhead network for innovative, clean

and safe cement & -concrete technologies” (2.5 Mil EUR, 12 partners,

networking, dissemination, workshops, transfer of knowledge)

■ 2011 – 2014 FP7 TRIMM Tomorrow's Road Infrastructure

Monitoring and Management, 3 Mil EUR, 15 partners, WT leader

■ 2011 – 2014: Sustainable Maintenance Policy: A Climate Change

Perspective5MZO, Zagreb, 08.02.2018.

Page 6: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

■ 2011 – 2014 - FP 7 SMART RAIL “Smart Maintenance and

Analysis of Railway Transport Infrastructure“ (2.5 Mil EUR, 15

EU partners, WP leader) IGH UT

■ 2015 – 2018 - H2020 DESTination RAIL Decision Support Tool

for Railway infrastructure Managers (4 Mil EUR, 3 Mil EUR EU

funding, 15 EU partners, UT, WP leader)

■ 2016 – 2019 – S2R project GoSAFE RAIL Global Safety

Management Framework for Rail Operations (1.3 Mil EUR, WP

leader, Infra Plan)

■ 2017 - 2020 H2020 project SAFE-10-T Safety of Transport

Infrastructure on the TEN-T Network (3 Mil EUR, 15 partners,

WP leader, Infra Plan)

■ 2018 – 2022 H2020 Project EnDurCrete New Environmental

Friendly and Durable Concrete, integrating industrial by-

products and hybrid systems, for civil, industrial and offshore

applications (6 Mil. EUR, 16 partners, Task leader Infra Plan)6MZO, Zagreb, 08.02.2018.

Page 7: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

COST projekti

■ 2002–2007 COST 534 Improvement of properties of grouts for

prestressing tendons and/or ground anchors

■ 2012 – 2016 COST TU 1202 Impact of climate change on engineered

slopes for infrastructure

■ 2015 – 2019 COST TU 1406 Quality Specifications for Roadway

Bridges - Standardization at a European Level, WG leader

7MZO, Zagreb, 08.02.2018.

http://www.cost.eu/

Page 8: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

GoSAFE Rail

2016-2019

SAFE-10-T

2017-2020

EnDurCrete

2018 - 2022

Tekući H2020 projekti

8

Data driven decision making

Decision Support Tool

Life cycle cost model

Global Safety Framework

Demonstration project for

Corrosion monitoring project

& different innovative solutions

MZO, Zagreb, 08.02.2018.

Page 9: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

New Environmental friendly and Durable conCrete, integrating industrial by-products and hybrid systems,

for civil, industrial and offshore applications

EnDurCrete

MZO, Zagreb, 08.02.2018. 9

Page 10: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

MZO, Zagreb, 02.02.2018. 10

Konzorcij

■ 16 partnera, 12 zemalja

■ 4 velika industrijska partnera

(HC, Sika, Acciona, KVAERNER, GEONARDO)

■ 3 Instituta (CEA, VITO, ZAG)

■ 6 SME

■ 2 sveučilišta (UNIVPM, NTNU)

Page 11: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Objectives

■ The main goal: to develop a new cost-effective sustainable reinforced concrete

for long lasting and added value applications.

■ The concept is based on the integration of:

– novel low-clinker cement including high-value industrial by-products,

– new nano and micro technologies and hybrid systems ensuring enhanced

durability of sustainable concrete structures with high mechanical properties,

– self-healing and self-monitoring capacities.

■ Among key technologies there are:

– nano-enabled smart corrosion inhibitors,

– self-sensing carbon-based nanofillers,

– multifunctional coatings with self-healing properties and

– sensorised non-metallic reinforcement systems.

MZO, Zagreb, 08.02.2018. 11

Page 12: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

MZO, Zagreb, 02.02.2018. 12

Page 13: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Impact

■ Demonstrators will be tested in working sites of tunnels, ports and offshore structures, in order to prove the enhanced durability (+40%, i.e. +30 years) and decreased cost (-35%) of the new concrete systems in such critical applications.

MZO, Zagreb, 08.02.2018. 13

The Project will have a strong economic and social impact (1billion €and 6900 high quality jobs by 2025), considering concrete markets and related applications.

Project duration is 3.5 years.

Page 14: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

MZO, Zagreb, 02.02.2018. 14

Page 15: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Task 6.5 Demonstration project in Croatia

■ Task leader: INFRA PLAN (setting up the demonstrator, contribution to

ready-mix concrete prototyping, contribution to ND monitoring)

■ Contributors:

– ZAG (ready-mix concrete prototyping, contribution to setting up the

demonstration, corrosion monitoring and destructive assessment,)

– AMSolution, IBOX, VITO, SIKA (materials and technology providers),

– HC (cement provider),

– CEA (ND testing related to ion migration),

– UNIVPM (provision of self-sensing micro-fillers, HS and environmental

monitoring)

09/02/2018 Location

Page 16: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Demo site under the Krk bridge, Croatia

09/02/2018 Location

Page 17: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Transport infrastructure innovation to increase the transport system safety at modal and intermodal level (including nodes

and interchanges)

Call MG-3.4-2016

19

Types of action: RIA Research and Innovation action

DeadlineModel:

Opening date:

two-stage

15-10-2015 Deadline:

2nd stage Deadline:

20-01-2016 17:00:00

29-09-2016 17:00:00

Primjer natječaja

MZO, Zagreb, 08.02.2018.

Projekt započeo s provedbom 01.05.2017.

Page 18: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Koraci

■ 1. Analiza teksta natječaja, ideja

■ 2. Ključni partneri (5 do 6 partnera)

■ 3. Sastanak konzorcija (face to face)

– Diskutiranje i razvoj ideje

– Preliminarna struktura projekta

– Identificiranje partnera koji nedostaju

– Plan za sljedeće korake

■ 4. Svaki partner šalje svoj doprinos (1 A4)

■ 5. Draft proposal – pišu 1 do 2 osobe

■ 6. Pregled - slanje svim partnerima

■ 7. Predaja20MZO, Zagreb, 08.02.2018.

Page 19: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

PROBLEM SOLUTION EFFECT

- Limited resources

- Climate change effects

(flooding, landslides…)

- Increased traffic load

(traffic jam, failures of

structures)

- IT engineering

- AI & machine learning

tools

- Engineering specialist

(bridge, tunnels, traffic

planning, risk

management, …)

- Owners and users

requirements

- Better use of available

budgets by implementing

DST

- Increased safety of

infrastructure

- Increased mobility by

communicating with the

end users

- Decreased traffic jams

decreased impact on the

environment

Analiza teksta natječaja

MZO, Zagreb, 08.02.2018. 21

Page 20: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

WEATHER DATA TRAFFIC

DATA

EMBEDDED

SENSORS BIG DATA

EXTREME

WEATHER

TRAFFIC

LOAD

AGING OF

INFRASTRUCTURE

SAFETYOF INFRASTRUCTURE AT

NODES & INTERCHANGES

MAINTENANCE AND

ADAPTATION STRATEGIESUSERS WORKERS TRAFFIC FLOW

MODELING FUTURE

PERFORMANCE USING

MACHINE LEARNING AND

ARTIFICIAL INTELLIGENCE

Page 21: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

WP 1 SAFE-ty framework

- Decisiton Support Tool

- BIG DATA

- AI

WP 2 MAP

- Modelling and monitoring

(bridges, tunnels, earthworks)

WP 3 FLOW

- Multi-modal traffic flow

model

- user demand analysis

- visualization of conflicts

- LCCA (consequences)

WP 4 DEMO

- Case studies

- Stress test (e.g. natural hazard and

/ or failure of the object) on

different parts of the network

WP 5 GUIDELINES

Page 22: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Provedba

■ Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci

■ Od obavijesti do početka provedbe projekta oko 3 mjeseca

■ Najvažnije je isporučivati obećano na vrijeme (Deliverable)

■ U prosjeku svakih 6 mjeseci sastanci po radnih grupama,

svakih 12 mjeseci cijeli konzorcij

■ Izvještaj za EC nakon 18 mjeseci i na kraju projekta

MZO, Zagreb, 08.02.2018. 24

Page 23: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Dobit za SME /Sveučilište

■ Zapošljavanje mladih ljudi - doktoranata

■ Publiciranje radova

■ Pozicioniranje na EU tržište

■ Validiranje vlastitog rada

■ Otvaranje mogućnosti za nove projekte

■ Komercijalizacija razvijenih proizvoda

25MZO, Zagreb, 08.02.2018.

Page 24: Primjer uspješnog projekta EnDurCRete EnDuRCrete - Infra plan konzalting.pdf · Nakon predaje projekta obavijest o prolasku nakon 3 do 5 mjeseci Od obavijesti do početka provedbe

Hvala na paž[email protected]

26MZO, Zagreb, 08.02.2018.