Top Banner

of 507

Primavera 10.0...Contract Manager

Apr 02, 2018

Download

Documents

Diane Mahal KO
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 7/27/2019 Primavera 10.0...Contract Manager

    1/506

    Primavera

    Contract Manager Users Guide

  • 7/27/2019 Primavera 10.0...Contract Manager

    2/506

    Copyright 1996, 2009, Oracle and/or its affiliates. All rights reserved. .

    The Programs (which include both the software and documentation) contain proprietary information; they are

    provided under a license agreement containing restrictions on use and disclosure and are also protected by

    copyright, patent, and other intellectual and industrial property laws. Reverse engineering, disassembly, or

    decompilation of the Programs, except to the extent required to obtain interoperability with other independentlycreated software or as specified by law, is prohibited.

    The information contained in this document is subject to change without notice. If you find any problems in the

    documentation, please report them to us in writing. This document is not warranted to be error-free. Except as

    may be expressly permitted in your license agreement for these Programs, no part of these Programs may be

    reproduced or transmitted in any form or by any means, electronic or mechanical, for any purpose.

    If the Programs are delivered to the United States Government or anyone licensing or using the Programs on

    behalf of the United States Government, the following notice is applicable:

    U.S. GOVERNMENT RIGHTS Programs, software, databases, and related documentation and technical data

    delivered to U.S. Government customers are "commercial computer software" or "commercial technical data"

    pursuant to the applicable Federal Acquisition Regulation and agency-specific supplemental regulations. Assuch, use, duplication, disclosure, modification, and adaptation of the Programs, including documentation and

    technical data, shall be subject to the licensing restrictions set forth in the applicable Oracle license agreement,

    and, to the extent applicable, the additional rights set forth in FAR 52.227-19, Commercial Computer Software--

    Restricted Rights (June 1987). Oracle USA, Inc., 500 Oracle Parkway, Redwood City, CA 94065.

    The Programs are not intended for use in any nuclear, aviation, mass transit, medical, or other inherently

    dangerous applications. It shall be the licensee's responsibility to take all appropriate fail-safe, backup, redun-

    dancy and other measures to ensure the safe use of such applications if the Programs are used for such purposes,

    and we disclaim liability for any damages caused by such use of the Programs.

    Oracle, JD Edwards, PeopleSoft, and Siebel are registered trademarks of Oracle Corporation and/or its affiliates.

    Other names may be trademarks of their respective owners.

    The Programs may provide links to Web sites and access to content, products, and services from third parties.

    Oracle is not responsible for the availability of, or any content provided on, third-party Web sites. You bear all

    risks associated with the use of such content. If you choose to purchase any products or services from a third

    party, the relationship is directly between you and the third party. Oracle is not responsible for: (a) the quality of

    third-party products or services; or (b) fulfilling any of the terms of the agreement with the third party, including

    delivery of products or services and warranty obligations related to purchased products or services. Oracle is not

    responsible for any loss or damage of any sort that you may incur from dealing with any third party.

    Certain products included in the software require the following disclosures:

    * * * * *

    Portions copyright (c) Macromedia, Inc. All rights reserved.

    * * * * *

    Portions (c) Microsoft Corporation. All rights reserved.

  • 7/27/2019 Primavera 10.0...Contract Manager

    3/506

    * * * * *

    Copyright 2002 Sybase, Inc. All Rights Reserved.

    * * * * *

    Apache Software License Version 1.1 Components

    Commons-codec, Jakarta-poi, POI are licensed under the Apache Software License Version 1.1, which requires

    the following disclosures:

    Copyright (c) 2000 The Apache Software Foundation. All rights reserved.

    Redistribution and use in source and binary forms, with or without modification, are permitted provided that the

    following conditions are met:

    1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following

    disclaimer.

    2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the

    following disclaimer in the documentation and/or other materials provided with the distribution.

    3. The end-user documentation included with the redistribution, if any, must include the following acknowl-

    edgment:

    "This product includes software developed by the Apache Software Foundation (http://www.apache.org/)."

    Alternately, this acknowledgment may appear in the software itself, if and wherever such third-party acknowl-

    edgments normally appear.

    4. The names "Apache" and "Apache Software Foundation" must not be used to endorse or promote products

    derived from this software without prior written permission. For written permission, please contact

    [email protected].

    5. Products derived from this software may not be called "Apache", nor may "Apache" appear in their name,

    without prior written permission of the Apache Software Foundation.

    THIS SOFTWARE IS PROVIDED ``AS IS'' AND ANY EXPRESSED OR IMPLIED WARRANTIES,

    INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND

    FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE APACHE

    SOFTWARE FOUNDATION OR ITS CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT,

    INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT

    LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR

    PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF

    LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR

    OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OFTHE POSSIBILITY OF SUCH DAMAGE.

    * * * * *

    Apache License, Version 2.0 Components

  • 7/27/2019 Primavera 10.0...Contract Manager

    4/506

    Apache Commons CSV, Commons-digester, Struts, Xerces are licensed under the Apache License, Version 2.0

    (the "License"); you may not use these components except in compliance with the License. You may obtain a

    copy of the License at http://www.apache.org/licenses/LICENSE-2.0.

    Unless required by applicable law or agreed to in writing, software distributed under the License is distributed on

    an "AS IS" BASIS, WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.

    * * * * *

    Jacob requires the following disclosures:

    Copyright (c) 1999-2001 Dan Adler, 315 E72 St. NY, NY, 10021, USA.

    mailto:[email protected]. All rights reserved.

    Redistribution and use in source and binary forms, with or without modification, are permitted provided that the

    following conditions are met:

    1. Redistributions of source code must retain the above copyright notice, this list of conditions and the followingdisclaimer.

    2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the

    following disclaimer in the documentation and/or other materials provided with the distribution.

    3. Redistributions in any form must be accompanied by information on how to obtain complete source code for

    the JACOB software.

    Redistribution of the JACOB software is not permitted as part of any commercial product that is targeted

    primarily at Java developers. Such products include, but are not limited to: Java virtual machines, integrated

    development environments, code libraries, and application server products. Licensing terms for such distribution

    may be obtained from the copyright holder.

    THIS SOFTWARE IS PROVIDED ``AS IS'' AND ANY EXPRESS OR IMPLIED WARRANTIES,

    INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND

    FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE

    COPYRIGHT HOLDER BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL,

    EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT LIMITED TO,

    PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR

    BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER

    IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING

    IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF

    SUCH DAMAGE.

    * * * * *

    Jaxen-core, Jaxen-jdom, and Saxpath (now part of the Jaxen project) require the following disclosures:

    Copyright 2003-2006 The Werken Company. All Rights Reserved. Redistribution and use in source and binary

    forms, with or without modification, are permitted provided that the following conditions are met:

  • 7/27/2019 Primavera 10.0...Contract Manager

    5/506

    * Redistributions of source code must retain the above copyright notice, this list of conditions and the following

    disclaimer.

    * Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the

    following disclaimer in the documentation and/or other materials provided with the distribution.

    * Neither the name of the Jaxen Project nor the names of its contributors may be used to endorse or promote

    products derived from this software without specific prior written permission.

    THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND

    ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED

    WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE

    DISCLAIMED. IN NO EVENT SHALL THE COPYRIGHT OWNER OR CONTRIBUTORS BE LIABLE

    FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL

    DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR

    SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED

    AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT

    (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS

    SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

    * * * * *

    Jdom requires the following disclosures:

    Copyright (C) 2000-2004 Jason Hunter & Brett McLaughlin. All rights reserved.

    Redistribution and use in source and binary forms, with or without modification, are permitted provided that the

    following conditions are met:

    1. Redistributions of source code must retain the above copyright notice, this list of conditions, and the following

    disclaimer.

    2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions, and the

    disclaimer that follows these conditions in the documentation and/or other materials provided with the distri-

    bution.

    3. The name "JDOM" must not be used to endorse or promote products derived from this software without prior

    written permission. For written permission, please contact .

    4. Products derived from this software may not be called "JDOM", nor may "JDOM" appear in their name,

    without prior written permission from the JDOM Project Management . In

    addition, we request (but do not require) that you include in the end-user documentation provided with the

    redistribution and/or in the software itself an acknowledgement equivalent to the following:

    "This product includes software developed by the JDOM Project (http://www.jdom.org/)." Alternatively, theacknowledgment may be graphical using the logos available at http://www.jdom.org/images/logos."

  • 7/27/2019 Primavera 10.0...Contract Manager

    6/506

    THIS SOFTWARE IS PROVIDED ``AS IS'' AND ANY EXPRESSED OR IMPLIED WARRANTIES,

    INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND

    FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL THE JDOM

    AUTHORS OR THE PROJECT CONTRIBUTORS BE LIABLE FOR ANY DIRECT, INDIRECT,

    INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING, BUT NOT

    LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, ORPROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF

    LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR

    OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF

    THE POSSIBILITY OF SUCH DAMAGE.

    * * * * *

    Jericho HTML Parser requires the following disclosures:

    The source code for this program is available from the link provided on Primavera Systems, Inc.'s open source

    licensing website. The source code is also available from Sourceforge.net.

    Primavera Systems, Inc. provides no provisions in connection with this software component which differ from

    those provided under the Eclipse Public License version 1.0.

    THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND

    ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED

    WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE

    DISCLAIMED. IN NO EVENT SHALL THE CONTRIBUTORS BE LIABLE FOR ANY DIRECT,

    INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUDING,

    BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE,

    DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF

    LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR

    OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OFTHE POSSIBILITY OF SUCH DAMAGE.

    * * * * *

    Pdfbox requires the following disclosures

    Copyright (c) 2002-2007, www.pdfbox.org. All rights reserved.

    Redistribution and use in source and binary forms, with or without modification, are permitted provided that the

    following conditions are met:

    1. Redistributions of source code must retain the above copyright notice, this list of conditions and the following

    disclaimer.

    2. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the

    following disclaimer in the documentation and/or other materials provided with the distribution.

  • 7/27/2019 Primavera 10.0...Contract Manager

    7/506

    3. Neither the name of pdfbox; nor the names of its contributors may be used to endorse or promote products

    derived from this software without specific prior written permission.

    THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND

    ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED

    WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE AREDISCLAIMED. IN NO EVENT SHALL THE REGENTS OR CONTRIBUTORS BE LIABLE FOR ANY

    DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES

    (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES;

    LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON

    ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING

    NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE,

    EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE.

    * * * * *

    Scriptaculous requires the following disclosures:

    Copyright (c) 2005-2007 Thomas Fuchs (http://script.aculo.us, http://mir.aculo.us)

    Permission is hereby granted, free of charge, to any person obtaining a copy of this software and associated

    documentation files (the "Software"), to deal in the Software without restriction, including without limitation the

    rights to use, copy, modify, merge, publish, distribute, sublicense, and/or sell copies of the Software, and to

    permit persons to whom the Software is furnished to do so, subject to the following conditions:

    The above copyright notice and this permission notice shall be included in all copies or substantial portions of

    the Software.

    THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR

    IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS

    FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE AUTHORS OR

    COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER LIABILITY, WHETHERIN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, OUT OF OR IN

    CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE SOFTWARE

  • 7/27/2019 Primavera 10.0...Contract Manager

    8/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    9/506

    ix

    Table of Contents

    Preface.................................................................................................xvContract Manager Module Documentation ....................................................... xvi

    About this Manual ............................................................................................ xviiCustomer Support ............................................................................................ xviii

    Getting Started

    Overview...............................................................................................3Starting Contract Manager.................................................................................... 4

    The Contract Manager Workspace ....................................................................... 5

    Key Concepts....................................................................................................... 9

    Sample Projects .................................................................................................. 12

    Roles ................................................................................................................... 14

    Planning and Adding a Contract Manager Project........................17First Steps ........................................................................................................... 18

    Adding a Project and Entering General Information.......................................... 19

    Creating a Project Template................................................................................ 22

    Setting Access Rights (Project Access).............................................................. 24

    Setting Up the Company Directory .................................................................... 28

    Customizing the Control Center ......................................................................... 35

    Setting Up Distribution Lists .............................................................................. 37

    Assigning Default Contacts ................................................................................ 40

    Using the Approval Process................................................................................ 41

    Entering Initial Contract Information ................................................................. 54Creating Submittal Packages and Submittals ..................................................... 56

    Linking with a Project Management Module Schedule ..................................... 57

  • 7/27/2019 Primavera 10.0...Contract Manager

    10/506

    x Table of Contents

    Primavera - Contract Manager

    Working with a Project

    Working with Log and Document Windows ...................................61Using Log and Document Windows ................................................................... 62

    Adding, Editing, and Deleting Documents ......................................................... 63Using the Spelling Checker.................................................................................64

    Creating, Editing, and Assigning Layouts .......................................................... 66

    Selecting Layouts................................................................................................ 69

    Filtering Data in Layouts ....................................................................................70

    Sorting Data in Layouts ......................................................................................76

    Grouping Data in Layouts...................................................................................79

    Attaching Files and URLs to Documents ........................................................... 82

    Customizing Log and Document Windows .....................................85Customizing the Project View.............................................................................86

    Customizing Text in Contract Manager .............................................................. 87Choosing Acronyms and Descriptions................................................................89

    Creating User-Defined Document Types ............................................................ 90

    Creating and Using Custom Fields ..................................................................... 91

    Setting Up Dictionaries and Preferences .........................................95Defining Dictionaries..........................................................................................96

    Defining Project Dictionaries............................................................................105

    Specifying Project Settings ............................................................................... 107

    Specifying User Settings...................................................................................121

    Setting Layout Options .....................................................................................122

    Maintaining a Contract Manager Database..................................123Adding Contract Manager Databases ...............................................................124

    Backing Up a Sybase Server Database ............................................................. 126

    Printing Logs, Forms, and Reports................................................129Printing Overview............................................................................................. 130

    Printing a Log.................................................................................................... 131

    Printing Forms................................................................................................... 132

    Printing Reports ................................................................................................134

    Printing Multi-Project Reports..........................................................................135

    Printing Dunning Letters...................................................................................137

    Using Print Preview ..........................................................................................139

    Communicating Project Information

    Sending Contract Manager Documents to Other Users...............143Inbox Overview.................................................................................................144

    Setting Up the Inbox ......................................................................................... 146

    Entering E-Mail Addresses for Contacts .......................................................... 147

  • 7/27/2019 Primavera 10.0...Contract Manager

    11/506

    Table of Contents xi

    Primavera - Contract Manager

    Preparing Transmittals....................................................................149Preparing a New Transmittal ............................................................................ 150

    Using Distribution Lists in Transmittals........................................................... 153

    Copying a Transmittal ...................................................................................... 154

    Generating Transmittals from Other Documents.............................................. 155Delivering Transmittals .................................................................................... 156

    Recording and Tracking Communications....................................159Sending Documents to a Correspondence Log................................................. 160

    Adding Correspondence Documents Manually................................................ 163

    Recording Letters.............................................................................................. 165

    Using Requests for Information........................................................................ 171

    Sending Notices................................................................................................ 174

    Sending Noncompliance Notices...................................................................... 175

    Generating a New Document from an Existing One ........................................ 176

    Writing Notes with Notepads ........................................................................... 178Documenting Telephone Calls.......................................................................... 180

    E-mailing Forms ............................................................................................... 181

    Importing E-mail into the Correspondence Received Log ............................... 183

    Tracking E-mail Sent Through Contract Manager ........................................... 186

    Managing Safety Notices and Reports ............................................................. 188

    Recording Meeting Minutes............................................................193Adding a Meeting ............................................................................................. 194

    Producing an Agenda from the Minutes of the Last Meeting .......................... 197

    Using the Advanced Print Function.................................................................. 198

    Working with Contracts, Project Costs, and Changes

    Setting Up and Using the Cost Worksheet.....................................201How Costs are Tracked..................................................................................... 202

    Items the Cost Worksheet Tracks ..................................................................... 203

    Adding Cost Codes........................................................................................... 205

    Adding Cost Code Definitions.......................................................................... 208

    Copying Cost Codes and Titles ........................................................................ 210

    Distributing Costs to the Cost Worksheet......................................................... 211

    Distributing Costs Using Change Management ............................................... 214

    Getting the Information You Need from the Cost Worksheet .......................... 216Using the Custom Cost Worksheet Section ...................................................... 218

    Managing Contracts and Purchase Orders...................................221Adding a Contract or Purchase Order............................................................... 222

    Creating Submittals from a Contract or Purchase Order .................................. 226

    Generating Materials Delivery Records from a Contract or Purchase Order ... 227

    Generating Requisitions from a Contract or Purchase Order ........................... 229

    Distributing Budgeted and Committed Costs to the Cost Worksheet............... 231

    Reviewing Contract Status................................................................................ 233

    Using Trends.....................................................................................235

  • 7/27/2019 Primavera 10.0...Contract Manager

    12/506

    xii Table of Contents

    Primavera - Contract Manager

    Why Use Trends?..............................................................................................236

    Adding a Trend .................................................................................................237

    Generating a Trend............................................................................................238

    Distributing Costs to the Cost Worksheet ......................................................... 239

    Preparing Requisitions for Payment ..............................................243Process Overview..............................................................................................244

    Setting Up Requisitions .................................................................................... 246

    Adding a Requisition ........................................................................................254

    Recording Progress ...........................................................................................255

    Certifying a Requisition....................................................................................262

    Distributing Actual Costs to the Cost Worksheet..............................................266

    Sending a Requisition .......................................................................................268

    Recording Invoices...........................................................................271Adding Invoices to a Contract/PO .................................................................... 272

    Distributing Actual Costs to the Cost Worksheet.............................................. 277

    Using Change Management ............................................................281The Change Management Process .................................................................... 282

    Specifying Change Management Project Settings ............................................ 284

    Defining Reason Codes.....................................................................................286

    Initiating Change Management from Other Documents...................................287

    Adding Change Documents .............................................................................. 288

    Proposals and Change Orders ........................................................................... 293

    Applying Markup..............................................................................................298

    Collecting into Change Orders..........................................................................301

    Approving Change Orders ................................................................................ 303Generating Change Documents from Change Management.............................304

    Costing Generated Documents..........................................................................307

    Adding Multiple Commitment Documents to the Estimated Phase ................. 308

    Entering Change Orders and Proposals without Using Change Management

    311Prerequisite: Turn on the Functionality.............................................................312

    Adding a Change Order to the Change Order Log File .................................... 313

    Adding a Proposal to the Proposals Log File....................................................319

    Using Procurement ..........................................................................325The Procurement Process..................................................................................326Initiating Procurement.......................................................................................327

    Award Procurement Items to a Bidder .............................................................. 340

    Creating and Tracking Issues .........................................................349Linking Contract Manager Module Documents Using Issues .......................... 350

    Searching for Documents to Build Issues ......................................................... 353

    Logging and Tracking Information

    Tracking Drawings...........................................................................359

  • 7/27/2019 Primavera 10.0...Contract Manager

    13/506

    Table of Contents xiii

    Primavera - Contract Manager

    Drawings Overview.......................................................................................... 360

    Setting Up Drawing Data.................................................................................. 363

    Adding Drawing Documents ............................................................................ 365

    Creating Drawing Sets...................................................................................... 368

    Managing Submittals.......................................................................373The Submittal Process ...................................................................................... 374

    Adding a Submittal Package............................................................................. 375

    Adding a Submittal........................................................................................... 377

    Copying a Submittal ......................................................................................... 379

    Tracking and Updating a Submittal Using Review Cycles............................... 380

    Tracking Multiple Reviewers............................................................................ 383

    Updating Submittals from a Package ............................................................... 385

    Using Schedule Activities for Reference and to Update Submittals ................ 387

    Compiling a Submittal Distribution List .......................................................... 393

    Producing Transmittals from Submittals .......................................................... 395Tracking Materials Delivery ...........................................................399

    Adding Materials Delivery Records ................................................................. 400

    Adding a Materials Delivery Ticket and Posting to Multiple Materials at Once405

    Including Materials Deliveries on Requisitions................................................ 407

    Using Daily Reports .........................................................................413Preparing a Daily Report .................................................................................. 414

    Reporting Resource Use ................................................................................... 415

    Listing Visitors.................................................................................................. 416

    Recording Materials Deliveries ........................................................................ 417

    Including Schedule Activities........................................................................... 419Recording Weather Conditions......................................................................... 421

    Adding Attachments......................................................................................... 422

    Generating Daily Reports ................................................................................. 423

    Tracking Insurance Certificates .....................................................425Adding an Insurance Certificate ....................................................................... 426

    Producing Punch Lists.....................................................................429Creating Punch Lists......................................................................................... 430

    Adding Items to a Punch List ........................................................................... 431

    Exchanging Contract Manager Module Data

    Exchanging Contract Manager Module Data with a Project Management

    Module Schedule ..............................................................................437Setting Up Project Management Module Schedules for Use with Contract Manager438

    Linking to a Project Management Module Schedule ....................................... 440

    Importing Contract Manager Module Data into Project Management Module Projects to C

    or Status Activities............................................................................................ 443

    Assigning Activity IDs to Contract Manager Module Documents .................. 445

  • 7/27/2019 Primavera 10.0...Contract Manager

    14/506

    xiv Table of Contents

    Primavera - Contract Manager

    Importing Field Mappings from Contract Manager into the Project Management Module447

    Retrieving Field Mappings from the Project Management Module into Contract Manager449

    Exchanging Contract Manager Module Data with Other Applications455Exporting Contract Manager Module Data to Other Applications ................... 456

    Importing Data from Other Applications..........................................................460Import Specifications ........................................................................................ 463

    Index..................................................................................................481

  • 7/27/2019 Primavera 10.0...Contract Manager

    15/506

    xv

    Primaveras Contract Manager module is

    contract-control software designed to help

    you manage your projects more easily. From

    submittals to change orders, all the facts

    about your project are at your fingertips.

    This manual shows you ways to plan and

    create a project in Contract Manager, and

    how to manage that project by logging and

    tracking project information, using meeting

    minutes, transmittals, contracts, purchase

    orders, requisitions, change orders, and soon. You will learn how to exchange data

    between the module and other programs, and

    identify the best methodology for tailoring

    the control process to your workflow.

    In this chapter

    Contract Manager Module

    Documentation

    About this Manual

    Customer Support

    Preface

  • 7/27/2019 Primavera 10.0...Contract Manager

    16/506

    xvi Preface

    Primavera - Contract Manager

    Contract Manager Module Documentation

    Contract Manager Installation Guide explains how to install the

    module for Microsoft SQL, Oracle, and Sybase, and explains how to

    convert data from previous versions for use in 10.0.The network ordatabase administrator responsible for the initial installation of the

    module, ongoing maintenance of the system and database, and

    general troubleshooting should read this manual.

    Contract Manager Users Guide (this manual) shows how to manage

    and monitor documents from initial contracts through the last change

    order. All individuals who use the module should read this guide, even

    if they are already familiar with previous versions of the software.

    See Help for the latestContract Manager

    information. Use it as yourprimary source ofinformation.

    Contract Manager Help is an integrated comprehensive help system

    that supplements the printed documentation. Help is available while

    you are working in the module for quick access to information aboutdialog boxes and fields. Help also includes step-by-step procedures

    for performing the module functions and answers to common

    questions. The Table of Contents provides a starting point for many

    major topics. You can also use Helps powerful Search and Index

    features to find topics related to any text you enter. Click How To for a

    list of all procedures contained in Help.

    Online Documentation can be accessed by inserting the Contract

    Manager CD-ROM in your computers CD-ROM drive, then clicking

    View Documentation from the setup program menu. In addition to the

    Contract Manager Users Guide andInstallation Guide, the followingdocumentation is available online:

    Project Management Module Integration Field Mappings contains

    the field mappings from Contract Manager to the Project

    Management module.

    A Getting Startedmanual tohelp you use InfoMaker, the report

    writer included with the module software.

    For a summary of some ofthese questions and their

    answers, see F r e q u e n t l y A s k e d Q u e s t i o n s in Help.

    Technical Bulletins on the Primavera Web site provide detailed,

    technical documents generated by Primavera Customer Support to

    answer questions asked by users.

    Several areas of Contract Manager are customizable, such asthe Project View, document names, log column headings, anddocument field labels. The examples throughout this manualand in the online help use the default settings shipped with thesoftware.

  • 7/27/2019 Primavera 10.0...Contract Manager

    17/506

    Preface xvii

    Primavera - Contract Manager

    About this Manual

    Anyone who will be using Contract Manager to track projects should

    use this manual. This includes owners, construction managers, general

    contractors, subcontractors, architects, designers, engineers,administrators responsible for setting up the module, and persons who

    will enter data in. Whether you are an experienced user or are new to the

    program, the Users Guide contains the information you need to use the

    module to organize all your projects successfully.

    Part Contents

    Getting Started Provides an introduction to Contract Manager, including workflow, the

    module workspace, sample projects, and the initial steps required to plan

    and add a project. Instructions are included for setting access rights,

    entering contacts, creating distribution lists, entering initial contract

    information, creating submittals, and linking with a Project Managemen

    module schedule.

    Working with a Contract Manager Project Explains how to work with, and customize, the module log and documen

    windows, set up dictionaries and preferences, and print logs, forms, and

    reports.

    Communicating Project Information Describes how to send Contract Manager module documents to other

    users, prepare transmittals, track different types of communications,

    record meeting minutes, and manage safety-related documents.

    Working with Contracts, Project Costs,and Changes

    Describes how to set up the Cost Worksheet, manage contracts andpurchase orders, use trends, prepare requisitions for payment, record

    invoices, use the Change Management module to customize the workflow

    for your companys needs, use procurement to track bidding, and create

    and track issues.

    Logging and Tracking Information Illustrates how the module logs and tracks important project information

    such as drawings, submittals, materials, daily reports, insurance

    certificates, and punch lists.

    Exchanging Contract Manager Data Describes how to link schedule data to the module, exchange module

    data with a Project Management module schedule, and export/import

    data to and from other applications.

  • 7/27/2019 Primavera 10.0...Contract Manager

    18/506

    xviii Preface

    Primavera - Contract Manager

    Customer Support

    If you have a question about using Contract Manager that you or your

    network administrator cannot answer using the documentation or Help,

    contact Customer Support at the times and locations listed below.

    Please have your Contract Manager module serial number ready when you

    call. This number is printed on your serial number diskette. It can also be

    displayed when using the module by right-clicking on the Help icon in the

    header. Each interaction is logged to help Primavera resolve your

    questions quickly.

    In the United States, Primavera periodically and randomlymonitors Customer Support calls to ensure that you arereceiving the highest quality support.

    Contract Manager databases contain calculations calledstored procedures. Although a Contract Manager databaseadministrator has the ability to modify these procedures,Primavera does not recommend changing them. Modifyingthese procedures voids your Primavera Customer Supportagreement.

    OfficeTimeZone Hours Telephone FAX E-mail Address*

    Bala Cynwyd,PA,

    US

    ET 8:00-8:00(Mon.-Fri.)

    1-610-668-3030 1-610-667-0652 [email protected]

    London,

    England,

    UK

    GMT 8:30-6:30

    (Mon.-Fri.)

    44-20-8563-5555 44-20-8563-5533 [email protected]

    *Primaveras Web site at http:www.primavera.com/customer/index.asp provides support and product information

    such as knowledgebases, file downloads, user group and news group information, and a product enhancement

    request form.

  • 7/27/2019 Primavera 10.0...Contract Manager

    19/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    20/506

    This part describes key concepts for using Contract Managercontract-control software. Contract Manager was formerly

    known as Expedition or Expedition Professional.

    Overview explains how to start Contract Manager and how to use

    the sample projects provided with this release. It also discusses

    Contract Manager module terms and defines the different project

    roles that users perform.

    Planning and Adding a Contract Manager Module Project

    describes how to set up your Contract Manager module database,

    including the company directory and distribution list, and how to

    assign access rights.

  • 7/27/2019 Primavera 10.0...Contract Manager

    21/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    22/506

    4 Part 1: Getting Started

    Primavera - Contract Manager

    Starting Contract Manager

    Users open Contract Manager from a client Browser - there is no client

    software to install. The Contract Manager administrator provides a Web

    address to users for accessing Contract Manager. To connect, openMicrosoft Internet Explorer, and type the Web address of the Contract

    Manager Web server provided to you.

    The Contract Manager administrator usually provides user IDs and

    passwords. Type your user ID and password, then click Log In.

    For information aboutchanging these defaults ona network, see C o n t r a c t M a n a g e r A dm i n is t r a t io n

    A p p l i c a t i o n in Help.

    The default Contract Manager user ID and passwordshipped with Contract Manager is EXP (for both fields).

    The minimum supported monitor resolution is 1024x768.

  • 7/27/2019 Primavera 10.0...Contract Manager

    23/506

    Overview 5

    Primavera - Contract Manager

    The Contract Manager Workspace

    When you open the Contract Manager, the Workspace appears; this is

    where all Contract Manager tasks begin.

    The Workspace is divided into two main areas: the Project View on the

    left and the Control Center (Workspace) on the right.

    Project View The Project View shows your project hierarchy, whichincludes the top-level folder called All Projects, followed by the folder

    for each project, the folders in each project, and the modules (logs and

    documents) inside these folders. It also contains a Templates folder

    which consists of any project templates you may have created, including

    the default templates, DESIGN and SCHOOL. The Project Viewfunctions the same way as Microsoft Windows Explorer. When a folder

    is collapsed, click its icon to display the names of the items in that

    folder. To collapse the folder, click the folder icon again.

    Templates

    Modules (logs

    and

    documents)

    Projects

    Project view

  • 7/27/2019 Primavera 10.0...Contract Manager

    24/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    25/506

    Overview 7

    Primavera - Contract Manager

    You can quickly accessdocuments in your court that

    require you to take an action,then print a report corresponding

    to these action items for theproject. An example of an action

    is shown on the next page.

    Click to display theselected report.

    Click a section of the chart todisplay a list of Requests for

    Information documents.

  • 7/27/2019 Primavera 10.0...Contract Manager

    26/506

    8 Part 1: Getting Started

    Primavera - Contract Manager

    To display available forms andreports, from the document window,

    click Select an Action, Advanced

    Print, then click Go. Select the type odocument, select the type ofdocument, and then click Print or

    Preview.

    The example at the left shows thePreview function. To print the

    document, click the printer icon nextto Save a copy on the tool bar at the

    top of the document.

  • 7/27/2019 Primavera 10.0...Contract Manager

    27/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    28/506

    10 Part 1: Getting Started

    Primavera - Contract Manager

    Change Managementenables you to manage project modifications due

    to changes. You specify which change documents are created, when

    they are created, and where they are calculated on the Cost Worksheet.

    By recording all necessary contract, contractor, and cost data early in

    the change process, you can evaluate the effect of the change on allcontracts involved and see the current status of the change at a glance.

    Markup provides a way to manage overhead and profit by adding

    markup values to change documents. The module can calculate

    overhead and profit automatically, and add additional costs to change

    orders and proposals. You can set default values for overhead, profit,

    and any other markup categories you create. Typically you will collect

    all proposals from committed parties, and then roll the costs and codes

    of each document to create a quote to the customer or owner of a

    project. With markup, you can add your overhead and profit prior to

    submitting the quote.

    Daily Reportsprovide a record of daily activities and conditions. Usethese reports to record conditions observed in the field, such as soil,

    rock, or underground utilities that were not moved correctly, as well as

    to track and communicatethe potential effect of these recordedconditions in a timely manner. You can also include underway activities

    from Contract Manager module schedules that are linked to the project

    to see where the work is taking place on that report day.

    Telephone Records, Meeting Minutes, Correspondence, Requests forInformation (RFIs), and Noticesenable you to record information thatmay affect both the submittal and change processes. For example, a

    change in condition may result in meetings, phone calls, notes, letters,

    and correspondence that lead to a formal contract change.

    Change Orders result from changes in the scope of work, site

    conditions, or schedule delays. You can post costs associated with

    changes to the Cost Worksheet so you have a total financial picture of

    past events and projected future costs. With this view, you can measure

    the impact of each change order on any contract or purchase order.

    Track submittals Submittals include contract drawings, samplematerials, and permits that need approval. Submittals help you ensure

    contract compliance by tracking who received what and when they

    received it.

  • 7/27/2019 Primavera 10.0...Contract Manager

    29/506

    Overview 11

    Primavera - Contract Manager

    Daily Reports, Telephone Records, Meeting Minutes, Correspondence,

    RFIs, andNoticesalso support the submittal process. For example,during a submittal cycle a reviewer may reject a submittal; as a result,

    the project team may have meetings and exchange phone calls, letters,

    and correspondence to clarify the requirements for resubmittal.

    Drawings andDrawing Sets maintain a list of project drawings,

    facilitate the dissemination of these drawings to other parties, and

    provide information about the status of revisions. When you add

    distributions to drawing sets or create revisions, an entry is made in the

    Transmittal Creation Queue for each contact on the distribution list.

    Transmittals accompany documents, such as submittals and drawings to

    create a permanent record of the actions taken. Submittal items and

    drawing revisions are automatically placed in the Transmittal Creation

    Queue; you can add any transmittals in this queue to the database and

    print them for recipients on your distribution list. The module can

    quickly generate transmittals, or you can customize your own.

    Dunning Letters remind participants of overdue items such as submittals

    and drawings. Contract Manager can quickly generate dunning letters,

    or you can customize your own.

    Reports and Forms provide quick and accurate project information in

    various formats. The flexible reporting feature produces reports that

    summarize when items such as submittals are due, who received whatand when, what has been approved and what is pending, and how many

    days items are overdue.

    Use the cross-document tools The Issues feature cross-references and links documents from any Contract Manager module log

    to issues you define. You can link documents to issues directly as you

    add records to the documents, or you can link documents to issues

    automatically based on keywords such as underground, electrical, or

    some other item that may be related to a problem or other situation. The

    module then assembles the documents for review in a fully organized,

    indexed list so you can easily trace the sequence of actions taken, saving

    hours of work.

    The Inboxstores items sent to you electronically by other participants.

    You can also use this feature to communicate quickly with other project

    team members by sending documents related to submittals and changes.

  • 7/27/2019 Primavera 10.0...Contract Manager

    30/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    31/506

    Overview 13

    Primavera - Contract Manager

    ENGR (Office Building) contains drawings and drawing sets for theDesign Review phase of the drawing process. This project is used in the

    examples in the Tracking Drawings chapter to show how designers (or

    architects or engineers) track drawings.

  • 7/27/2019 Primavera 10.0...Contract Manager

    32/506

    14 Part 1: Getting Started

    Primavera - Contract Manager

    Roles

    The roles of the construction manager, general contractor, owner, and

    the engineer/architect/designer are described in this section to help you

    understand how Contract Manager is implemented by various teammembers in a business workflow.

    Construction manager As the construction manager, you will usethe module to manage changes and project costs, monitor progress, and

    communicate with other team members.

    Because you represent the owners interests throughout the design,

    construction, and post-construction phases of the project, you

    continually answer questions about costs, quality, and progress. How

    much funding is required to complete the project? What is the budget,

    given the changes to date? What are the pending changes and problemareas? Is the project progressing according to the schedule? Who is

    responsible for the overdue submittals? What are the areas of

    noncompliance?

    The following list includes tasks that are usually the responsibility of the

    construction manager in the contract process. Included with each task is

    the corresponding chapter/part in this manual where you can find more

    information about those tasks.

    Managing submittals Managing Submittals chapter

    Maintaining updated estimates of cost overruns or underruns Setting Up and Using the Cost Worksheetchapter

    Tracking changes for each project issue and their effect on the cost

    at completion Part 4: Working with Contracts, Project Costs, and

    Changes

    Quickly finding all the documents you need to resolve open issues

    Creating and Tracking Issues chapter

    Monitoring progress through written and verbal communications

    Part 3: Communicating Project Information

    Customizing Contract Manager to match your companys standards

    Customizing Log and Document Windows and Setting Up

    Dictionaries and Preferences chapters

    Generating supporting reports Printing Logs, Forms, and Reports

    chapter

  • 7/27/2019 Primavera 10.0...Contract Manager

    33/506

    Overview 15

    Primavera - Contract Manager

    General contractor As the general contractor, you will use themodule to manage shop drawings and submittal items, track project

    issues, document the change process, and record daily progress. When

    you want to compare progress to the schedule, you can retrieve your

    schedule.

    The following list includes tasks that are usually the responsibility of the

    general contractor in the contract process. Included with each task is the

    corresponding chapter/part in this manual where you can find more

    information about those tasks.

    Using the Drawing and Submittals logs to track shop drawings and

    submittal items Tracking Drawings andManaging Submittals

    chapters

    Coordinating submittal activities with the project schedule

    Managing Submittals andExchanging Contract Manager Datawith a Project Management Module Schedule chapters

    Identifying issues that require resolution and creating change

    documents Creating and Tracking Issues chapter and Part 4:

    Working with Contracts, Project Costs, and Changes

    Identifying areas with significant cost variance and analyzing the

    effects of pending changes on profit Setting Up and Using the

    Cost Worksheetchapter, and Part 4: Working with Contracts,

    Project Costs, and Changes

    Tracking items that must be completed before final payment ismade Part 4: Working with Contracts, Project Costs, and

    Changes

    Reporting daily progress Using Daily Reports chapter

    Generating supporting reports Printing Logs, Forms, and Reports

    chapter

    Owner As the project owner, you will use the module to organizeproject data so you can stay on top of progress, coordinate activities

    with your operations people, and make sure that all of the project detailsare handled by the appropriate people. You will find the comprehensive

    records of documents, correspondence, and changes invaluable for

    claims avoidance.

    The following list includes tasks that are usually the responsibility of the

    owner in the contract process. Included with each task is the

    corresponding chapter/part in this manual where you can find more

    information about those tasks.

  • 7/27/2019 Primavera 10.0...Contract Manager

    34/506

    16 Part 1: Getting Started

    Primavera - Contract Manager

    Analyzing the projected cost and identifying areas with significant

    cost variances Setting Up and Using the Cost Worksheetchapter

    Approving requisitions Preparing Requisitions for Payment

    chapter

    Identifying unfinished tasks for which final payment should be

    withheld Part 4: Working with Contracts, Project Costs, and

    Changes

    Identifying issues that require resolution and issuing change orders

    Creating and Tracking Issues chapter and Part 4: Working with

    Contracts, Project Costs, and Changes

    Managing submittals Managing Submittals chapter

    Comparing daily progress to the schedule Using Daily Reports

    chapter

    Generating supporting reports Printing Logs, Forms, and Reports

    chapter

    Engineer/Architect/Designer As the project designer, you will usethe module to track specifications and drawings, control the submittal

    review process, monitor progress by the design team, communicate with

    other team members, and coordinate the activities of outside

    consultants.

    The following list includes tasks that are usually the responsibility of thedesigner in the contract process. Included with each task is the

    corresponding chapter/part in this manual where you can find more

    information about those tasks.

    Managing design and contract drawings Tracking Drawings

    chapter

    Recording the design budget and expenses Setting Up and Using

    the Cost Worksheetchapter

    Tracking changes in scope and their effect on the cost at completion

    Part 4: Working with Contracts, Project Costs, and Changes

    Quickly finding all the documents you need to resolve open issues

    Creating and Tracking Issues chapter

    Monitoring progress through written and verbal communications

    Part 3: Communicating Project Information

    Generating supporting reports Printing Logs, Forms, and Reports

    chapter

  • 7/27/2019 Primavera 10.0...Contract Manager

    35/506

    17

    This chapter presents a general approach for

    structuring and entering project information

    in the Contract Manager. Use these

    guidelines to set up Contract Manager

    functionality in the most effective way for

    your business.

    In this chapter

    First Steps

    Adding a Project and EnteringGeneral Information

    Creating a Project Template

    Setting Access Rights (ProjectAccess)

    Setting Up the Company Directory

    Customizing the Control Center

    Setting Up Distribution Lists

    Assigning Default Contacts

    Using the Approval Process

    Setting Up Cost Codes andModifying Cost WorksheetHeadings

    Creating Submittal Packages and

    Submittals

    Linking with a Project

    Management Module Schedule

    Planning and Adding a ContractManager Project

  • 7/27/2019 Primavera 10.0...Contract Manager

    36/506

    18 Part 1: Getting Started

    Primavera - Contract Manager

    First Steps

    Contract Manager offers a wide range of features and functions.

    Depending on how you currently manage contractsor how you want

    to manage themyou can use all the features or select only the ones youneed to support your work process.

    The following figure is a general plan for setting up and implementing

    Primavera. Step 1 is described in theInstallationGuide. The remainder

    of this chapter describes steps 2 through 5.

    Contract Manager flexibility enables you to realize its benefits even if

    you do not have all the details about your project at the beginning. As

    the project progresses, you can add and/or modify the information

    entered during the initial setup, such as new negotiated contracts, new or

    changed companies, and more clearly defined submittals and submittal

    packages.

    For details on tailoring

    Contract Managerfunctions to your

    companys requirements,see the Cu s t om i z in g L o g a n d D o cu m e n t W i n d o w s

    chapter.

    These are the basic steps to get started in Contract Manager; adapt them

    to your own work processes.

    2.Add the project and

    enter generalinformation.

    1.Set up and start

    ContractManager.

    3.Set up the

    initial CompanyDirectory.

    4.Enter initial contractinformation (and

    define cost codes).

    5.Create initial

    submittalpackages.

    3a.Optionally link to &

    use the scheduleactivities.

  • 7/27/2019 Primavera 10.0...Contract Manager

    37/506

    Planning and Adding a Contract Manager Project 19

    Primavera - Contract Manager

    Adding a Project and Entering General InformationFor detailed information onadding a new project, inHelp click How To, then

    click A d d a N e w P r o j e ct .From there, you can chooselinks torelated topics.

    Add a new project You can add a new project in Contract Managerat any time. Right-click on the top-level folder. You can choose from

    two ways to create a project. Choose New Project to use the Add Project Wizard, which guides

    you from start to finish. This method is best when you have most of

    the information prepared for the project or are unfamiliar with

    creating a new project.

    Choose Publish Project to create a project name and assign it to an

    administrator, who will then enter the project information. Contract

    Manager notifies the administrator that a project has been added

    that requires information.

    The New Project option is not available if you do not haverights to create a new project.

    See Help for detailed information on using either of these options to

    create a new project.

    The following shows the dialog box that displays when you choose New

    Project to add a project using the Add Project Wizard.

    Type a uniqueabbreviation and title for

    the project. You mustenter data in these fields

    to add a project.

    Click Next to continuecreating the project.

    Select any of thesetopics to move directly to

    that phase in the wizard.

  • 7/27/2019 Primavera 10.0...Contract Manager

    38/506

    20 Part 1: Getting Started

    Primavera - Contract Manager

    The preceding figure shows the dialog box that displays when you

    choose Publish Project to add a project.

    For more informationabout setting access rights,

    see S e t t i n g A c c e s s R ig h t s ( P r o j e c t A c c e ss ) later in

    this chapter.

    When you add a new project, you become the projectadministrator. Project administrators have access to alldocuments in their projects. (Contract Manageradministrators have access to all documents in all projects.)By default, all other users have no access rights to newprojects. Assign users access to a project in the ProjectAccess window (right-click on a project and choose ProjectAccess).

    Delete a project To delete an entire project, right-click on the project

    in the Project View, then choose Delete Project.

    When you delete a project, you permanently remove thatproject and all its associated documents.

    Select the administrator;Contract Manager notifies

    that person that a requesthas been made to create a

    new project.

  • 7/27/2019 Primavera 10.0...Contract Manager

    39/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    40/506

    22 Part 1: Getting Started

    Primavera - Contract Manager

    Creating a Project Template

    If you will be adding projects that use the same key parties, currency, and

    schedule information, you can create a project template that contains this

    information. Use this template as the basis for each new project youcreate.

    Add a new project template You can make an existing project atemplate. Right-click on the project and select Save As Template.

    Use the template as a basis for a new project When you want to

    create a new project that uses the information in the template, do the

    following:

    1 right-click on the top level folder and choose New Project.

    2 Enter a project name and title, then click Template on the left.

    3 Choose the first option, Use Template, and select the template from

    the drop-down list.

    Click Template to choose atemplate.

    Select the template you wantto use for this project.

  • 7/27/2019 Primavera 10.0...Contract Manager

    41/506

    Planning and Adding a Contract Manager Project 23

    Primavera - Contract Manager

    When you select a template, Contract Manager creates the new project

    based on the information contained in the template. You can edit this

    information in the new project.

  • 7/27/2019 Primavera 10.0...Contract Manager

    42/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    43/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    44/506

    26 Part 1: Getting Started

    Primavera - Contract Manager

    To restrict a users access to documents that have a certain To or From

    Contact, and to submittals in which that same contact is listed as a

    Received, Sent, Returned, or Forwarded reviewer, click Select next to

    the Access by Company field (at the bottom of the dialog box). Click

    Select next to the company you want to assign.

    You cannot change Access rights for administrators. Theyalways have full access to all projects.

    Click to set the users

    access rights to allmodules at once.

  • 7/27/2019 Primavera 10.0...Contract Manager

    45/506

    Planning and Adding a Contract Manager Project 27

    Primavera - Contract Manager

    Set access rights for a group of users across projects Tosave time, the project administrator can copy the access rights for users

    in one project to another project. Right-click on the project to which you

    want to copy access rights, then choose Copy User Access.

    Click Select to choose theproject from which to copy

    users access rights.

    Use these buttons to addand remove user access

    rights to your project.

    Select the users.

  • 7/27/2019 Primavera 10.0...Contract Manager

    46/506

    28 Part 1: Getting Started

    Primavera - Contract Manager

    Setting Up the Company Directory

    The Company Directory enables you to store information about everyone

    involved in your project. You can include names, phone numbers, and

    addresses of subcontractors, managers, suppliers, your own staff, and anyother companies or individuals involved in the project.

    Nearly all Contract Manager documents use the information included in

    the Company Directory. Entering this information at the beginning of the

    project ensures that your unique abbreviations are consistent, avoiding

    confusion and mistakes. Even if you have only part of the companys

    information, enter at least the company abbreviation, name, office address,

    and a key contact; you can add missing details later.

    For more information on

    adding companies andcontacts, see A d dCom p a n i e s a n d C o n t a c t s in

    Help.

    Add a company and contact Click Companies in the Project

    Information folder, then click Add Company.

    Click Add to create acontact for the

    company. The firstcontact you add

    becomes the keycontact.

    Type important details

    about the company inthe Remarks section.

    In the Details section,mark to indicate if the

    company is aDisadvantaged-

    (DBE), Minority-

    (MBE), or Woman-owned (WBE)

    business enterprise.

  • 7/27/2019 Primavera 10.0...Contract Manager

    47/506

    Planning and Adding a Contract Manager Project 29

    Primavera - Contract Manager

    Contract Manage requiresthat you enter the keycontacts initials.

    In the Company section, enter an abbreviation for the company and the

    company name. The key contact is the person to whom most documents

    will be addressed. This field is filled once the first contact is entered in

    the Contacts section.

    Select a specification section code. Specification section codes are a part

    of a standard coding system developed by the Construction

    Specification Institute (CSI). You can select these codes from any

    Specification Section data field, or you can create your own codes

    (right-click on the top-level folder, then choose Dictionaries,

    Specification Sections).

    For information on creatingyour own roles andspecification section codes,

    s e e S et t i n g U p D i c t i o n a r i e s a n d P r e f e r e n c e s , or C r e a t e Con t a c t R o l e s in Help.

    Select the companys role. You can select an existing role, or you can

    create a new role and add it to the list (right-click on the top-level folder,

    then choose Dictionaries, Company Roles).

    Add contacts for the company To add contacts for the company,click the edit icon beside the company, expand the Contacts section in

    the Company document window, and click Add. You can add as many

    contacts as needed for each company.

    Link a User Account with a contact In order to use a contact inthe document approval and document owner processes of Contract

    Manager, you must link a valid user account with the contact. One user

    account can have multiple contacts linked to it. Contacts without valid

    user accounts linked with them will not be available for selection duringdocument approval and document owner processes.

    To associate a user account with a contact, click the Select link next to

    the User Account field. On the Select User dialog box, choose the

    correct user account, and click the Select button.

    Add remarks to a contact Expand the Remarks section in theCompany document window and type any important details, such as

    directions or office hours.

    To define standard papersizes, right-click on the top-level folder and chooseDictionaries, Drawings,Paper Sizes.

    Add an address, paper size, and number of copies fordrawing distribution to a contact Expand the Contacts section inthe Company document window and click the document icon next to the

    contact you want to update. Enter information for all applicable

    addresses, such as office, shipping, or billing; phone numbers; and e-

    mail information. Select the paper size, and type the number of copies

    you will be using to send drawings for design review or distribution for

    this contact. This information is used in the Drawings and Drawing Sets

    logs. Click Save & Close when finished.

  • 7/27/2019 Primavera 10.0...Contract Manager

    48/506

    30 Part 1: Getting Started

    Primavera - Contract Manager

    Contract Manager does not apply changes you make in thiswindow to any documents where the original addressalready appears (such as contracts). This practice protectsthe validity of the original document information.

    Copy the Company Directory To set up a new project more

    quickly, you can copy the Company Directory from a similar project in

    the same database or from the group Company Directory. Right-click on

    the project and choose Copy Companies.

    Define custom paper sizes that will

    appear here by right-clicking on the top-level folder and choosing Dictionaries,

    Drawings, Paper Sizes.

    Click Selectnext to User

    Account tochoose theaccount to

    associate with

    the contact.

    Scroll down toenter more contact

    information.

  • 7/27/2019 Primavera 10.0...Contract Manager

    49/506

    Planning and Adding a Contract Manager Project 31

    Primavera - Contract Manager

    You can also copy companies and contacts from a project to the group

    level. Right-click on the top-level folder and choose Copy Companies.

    Click Select to choose the

    project (or group) fromwhich to copy companies.

    Select the companies

    to copy to the project,then click Add.

    Click Select to choose the project from

    which to copy companies and contacts.

    Select the companiesto copy to the group,

    then click Add.

  • 7/27/2019 Primavera 10.0...Contract Manager

    50/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    51/506

    Planning and Adding a Contract Manager Project 33

    Primavera - Contract Manager

    Saving Companies and Contacts in theProject/Group List

    Each project contains its own directory of project companies. ContractManager also maintains a directory of database companies that all

    projects in the same database can share.

    For more information onhow to set contact

    preferences, see S e t t i n g P r o j e c t P r e f e r e n c e s in theS e t t i n g U p D i c t i o n a r i e s a n d

    P r e f e r e n c e s chapter.

    When you add a new project, Contract Manager uses the Project

    Company Directory by default. To use the same companies for all of

    your projects, switch to the Group (database) Company Directory.

    Right-click on a project and choose Project Settings. In the Companies

    section, click Switch. Project will change to Group to indicate that

    the Group directory is in use.

    You can save new companies in the Group Company Directory while

    using the Project Company Directory. In Project Settings, mark the AddCompany to Group After Adding to Project checkbox.

    If you change an existing company in a project, Contract Manager also

    updates the Group Company Directory, even if the active directory is

    Project, as long as you marked the Update Group When Project

    Company Edited checkbox in the Project Settings dialog box.

  • 7/27/2019 Primavera 10.0...Contract Manager

    52/506

    34 Part 1: Getting Started

    Primavera - Contract Manager

    Adding Companies and Contacts fromOther Documents

    When you add a document, you may need to enter information for acompany that is not in the Company Directory. Rather than interrupt

    your current task, you can add companies and contacts from most

    documents without going back to the Companies dialog box.

    For more information, seeS e le c t C o n t a c t d i a l o g b o x in Help.

    When you click Select for a company or contact field, the Select

    Company or Select Contact dialog box opens. To add a new company or

    contact, choose whether to organize by company or contact, then click

    Add Contact or Add Company, depending on which you want to add.

    Type the company name and abbreviation (if adding a new company),the contacts full name and initials, and other information, if available,

    then click Save. Primavera adds the company and contact information to

    the Company Directory. You can edit the information later if necessary.

  • 7/27/2019 Primavera 10.0...Contract Manager

    53/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    54/506

    36 Part 1: Getting Started

    Primavera - Contract Manager

    Customize the Control Center Click Customize this Page to selectwhich items appear in the Control Center and where they are placed.

    For detailed information oncustomizing your desktop,see Cu s t om i z e W o r k s p a c e d i a l o g b o x in Help.

    Items can be included more than once in the Control Center. For

    example, if you want issues to appear as a graph, a bar chart, and a pie

    chart, move three Issue items to the Layout area, then edit each items

    appearance by clicking the Edit link above it in the Control Center.

    Select the items to includein the Control Center, then

    click Add to move theitems to the Layout area.

  • 7/27/2019 Primavera 10.0...Contract Manager

    55/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    56/506

    38 Part 1: Getting Started

    Primavera - Contract Manager

    Any changes you make toyour company directoryare also reflected for thecorresponding company in

    distribution lists.

    Click Select in the Contacts section to open the Select Contacts dialog

    box. To easily find the contacts you need, you can organize by contact,

    company, or distribution list. All companies in the current project appear

    if the Project Setting is set to Project; all group companies appear if the

    Project Setting is set to Group. Companies assigned to the Group level

    apply to all projects in that group. Click Select next to each contact you

    want to add, then click Save.

    To remove items from a distribution list, click Unselect next to the name

    of the contact you want to remove. Click Save and Return to Menu

    when you finish defining the list. To delete the distribution list, click

    Delete next to the list you want to remove.

    Tomodify alist, click

    its icon.

    Establish a distribution list by

    selecting companies.

  • 7/27/2019 Primavera 10.0...Contract Manager

    57/506

    Planning and Adding a Contract Manager Project 39

    Primavera - Contract Manager

    Edit a distribution list You can also edit an existing distribution listname and/or title. In the Company Directory log window, click Define

    Distribution Lists, then click the document icon next to the list you want

    to modify. Make the changes. Click Save and Return to Menu when you

    finish modifying the current list. Primavera reflects any changes infuture uses of the list; the original version of the list (before editing)

    remains unchanged where it is already used in Primavera. Click Close

    from the Distribution Lists dialog box when you finish defining

    distribution lists.

    Copy a distribution list to a new list To save time, you can createa new distribution list based on an existing one. In the Company

    Directory log window, click Define Distribution Lists, then click the

    Save Distribution List As icon next to the list you want to copy. A new

    distribution list is created containing the names from the copied list.

    Type an

    abbreviation andtitle for the new

    distribution list.

    Click Select toadd additional

    names to the

    distribution list.

  • 7/27/2019 Primavera 10.0...Contract Manager

    58/506

    40 Part 1: Getting Started

    Primavera - Contract Manager

    Assigning Default Contacts

    To specify which contacts will automatically display in the To and From

    fields of a particular document, right-click on the project and choose

    Default Field Values.

    The Set Default Field Values window displays the default contact

    assignments for the currently open project.

    Customize contact assignments To customize this information,click Select next to the field to which you want to assign a default

    contact. In the Select Company dialog box, click Select next to the

    company you want to assign as the default, then click OK.

    You can edit or delete default contacts at any time.Changing the default contact affects new documents only.Contact names for existing documents remain unchanged.

  • 7/27/2019 Primavera 10.0...Contract Manager

    59/506

    Planning and Adding a Contract Manager Project 41

    Primavera - Contract Manager

    Using the Approval Process

    Overview of the approval process Prior to Contract Manager12.0, there were several document fields related to approval, but no

    formal approval process. In Contract Manager version 12.0 and later,there is an approval process for the following types of documents:

    Contracts

    Change Order documents

    Purchase Orders

    Request for Information (RFI) documents

    Payment Requisitions

    The approval process is the same for each of these documents. For eachof these types of documents, a document owner must be specified. This

    can be done at the project level by right-clicking the project name and

    selecting project settings to display the Project Settings dialog box that

    you can use to set the document owners for the entire project.

    When set at the project level, each time one of these types of documents

    is created, the name of the document owner will automatically be

    entered in the Document Owner field. the document owner can also be

    selected when the document is created. Once the document owner is

    selected, only the Contract Manager administrator, the project owner, or

    the document owner can select a different document owner.

    Contract Manager documents can be added by anyone who has both the

    security privilege to add documents, and who has access to the project.

    Documents can be approved by the Contract Manager administrator, the

    project owner, or the document owner who is acting for any contact on

    the document review list.

    Prerequisites The following prerequisites must be met before you

    can use the approval process:

    1 The companies for the project must be created.

    2 The contacts for the companies must be created, and each contact

    must be linked to a user account.

    3 The contacts must have view, add, and edit rights for the project.

    This is done in the Contract Manager Administration application

    when the user account is created.

  • 7/27/2019 Primavera 10.0...Contract Manager

    60/506

    42 Part 1: Getting Started

    Primavera - Contract Manager

    Log onto the Administration application, and click the User

    Accounts link in the left pane to display the User Account

    dialog box. Use this to add a User Account.

    After the user account is created, you can change access rights

    when running Contract Manager by right-clicking on the project

    name and selecting Project Access to display the Project

    Access dialog box.

    Once on the Project Access dialog box, click the icon to the left

    of the to the user name to display the User Project Access

    dialog box, and set the user project access rights.

    If the user is not listed for this project, click the Add Users to

    this Project button on the Project Access dialog box. This

    displays the Select User dialog box. Use this dialog box to

    select the users to add to the project.

  • 7/27/2019 Primavera 10.0...Contract Manager

    61/506

    Planning and Adding a Contract Manager Project 43

    Primavera - Contract Manager

    4 The contacts must have approval rights for the project.

    This is done in the Contract Manager Administration

    application when a user access template is created. Log onto the

    Administration application, and click the Access Templates link

    to display the Access Templates window. After that, the

    template is assigned to the user account when the user account

    is created on the User Account dialog box. Once the template has been assigned to a user account, you can

    change the approval rights when running Contract Manager by

    right-clicking on the project name and selecting Project Access

    to display the Project Access dialog box.

    Once on the Project Access dialog box, click the icon next to the

    user name to display the User Project Access dialog box, and

    set the approval rights.

    If the user is not listed for this project, click the Add Users to

    this Project button on the Project Access dialog box. Thisdisplays the Select User dialog box. Use this dialog box to

    select the users to add to the project.

    5 Contacts must have an approval limit that is greater than or equal to

    the amount of the document being created. If you select a contact

    for the reviewer list, and that contact does not have a limit greater

    than or equal to the amount of the document, an error message

    displays when you initiate the approval process. In that case, you

    must remove that contact name, and reinitiate the approval process.

  • 7/27/2019 Primavera 10.0...Contract Manager

    62/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    63/506

  • 7/27/2019 Primavera 10.0...Contract Manager

    64/506

  • 7/27/2019 Primavera 10.0...Contract Manager