IndexThyssenKruppIndustrial SolutionsLOY KRATHONG
PROJECTSCHEDULE OF PRICE AND RATESProject No. : 01-5004Rev 00Title
of Works: Piping Fabrication and Erection / Mechanical
ErectionCONTENTSSCHEDULE ACONTRACT PRICESCHEDULE BSCHEDULE OF RATES
- CONTRACTSCHEDULE B1-B11SCHEDULE OF RATES - CONTRACT (BREAK
DOWN)SCHEDULE CSCHEDULE OF RATES - HOUR / DAYWORKS RATE(To be
proposed by Contractor)
&R&"Arial,Bold"&12
Sched A-Subcont PriceThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTCONTRACT PRICEProject No. : 01-5004Schedule ARev
00Title of Works: Piping Fabrication and Erection / Mechanical
Erectiona) The price's set out in this Schedule constitutes the
Contract Price for the full performance of the WORKS in accordance
with the Contract. The Contract Price is a lump sum and is
inclusive of all costs and the like to perform the WORKS including
Temporary Works and Defects Liability. Profit and overhead shall be
included as a separate portion, Item No 7 and shall be fixed and
only subject to variance/adjustment if the value of Item No 6
SUBTOTAL is increased by + (plus) 20% (twenty percent) or decreased
- (minus) 20% (twenty percent). The Lump Contract Price is in the
currency as stated below and is fixed and firm and not subject to
fluctuation, except as specifically provided for in accordance with
the Contract.b) Where the Contract Price is expressed as" Estimated
Contract Price" then the basis of the Contract is Schedule of Rates
and the "Estimated Contract Price" is calculated as the total of
all rates items extended by multiplying the estimated quantities by
the CONTRACTORS rates. In all other respects rates and prices shall
be inclusive as above.c) Should the ESTIMATED CONTRACT PRICE be
varied by more than 20% (twenty percent) then Contract shall:- 1)
If increased by more than 20% (twenty percent) be entiled to 10%
profit and overhead on the amount which exceeds the 20%. 2) If
decreased by more than 20% (twenty percent) then decrease the
profit and overhead by 10% when the decreased amount exceeds the
20%Item No.DescriptionPrice Thai Baht1Sch.AMobilization and
establishment of site facilities2Sch.AManagement and
Supervision3Sch.ADemobilization from site4TOTAL LUMP SUM PRICE for
Sch.A0.05Sch.B1Pipe fabrication and installation (estimated
price)6Sch.B2Tie-In work (estimated price)7Sch.B3Pipe supports
fabrication and installation (estimated price)8Sch.B4Paint pipe
spools and pipe supports (estimated price)9Sch.B5Installation of
Valves (estimated price)10Sch.B6Presure test (estimated
price)11Sch.B7NDT (estimated price)12Sch.B8Post Weld Heat Treatment
(estimated price)13Sch.B9Equipment Internal Installation (estimated
price)14Sch.B10Miscellaneous Work (estimated price)15SUBTOTAL of
items 5 - 120.016Profit and Overhead on item - 13
Subtotal0.017TOTAL PRICE for Sch.B0.0TOTAL PRICE0.0Page 4 of 4
Sched A - Price BreakdownThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTCONTRACT PRICE BREAKDOWNProject No. :
01-5004Schedule ATitle of Works: Piping Fabrication and Erection /
Mechanical ErectionRev 00Section 2: Contract Price BreakdownThe
amounts shown in this Schedule are the breakdown of the Lump Sum
Contract Price for accounting and progress payment purposes and are
inclusive of all customs duties and assessments, taxes, insurances,
permits, fees, transport, delivery, escorts, craneage, labour,
inspection, providing amenities as necessary, consumables,
temporary construction materials, tools, plant, equipment,
temporary services, derived from compliance with the requirements
of the Contract and other like charges.Item
No.DescriptionUnitQuantityRateTotal Thai BahtManhours1Mobilise to
siteL/S2Management and supervisionL/S3Demobilise from siteL/STOTAL
FOR INDIRECT
Sched B-Sched of RatesThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - BProject No. :
01-5004Schedule BRev 00Title of Works: Piping Fabrication and
Erection / Mechanical ErectionWhere the Contract Price is expressed
as"Estimated Contract Price" in Schedule A then the basis of the
Contract is Schedule of Rates and the "Estimated Contract Price" is
calculated as the total of all rates items below, each extended by
multiplying the estimated quantities by the CONTRACTORS rates.Item
No.DescriptionUnitQty EstimatedUnit Rate (Thai Baht)Amount
Estimated1B1Piping Fabrication and installationUnder Ground Piping-
FRP PipeDB663.00Above Ground Piping- Welding Type- Carbon
SteelDB16,199.00- Carbon Steel ( to Hot dip Galv. after fab. pipe
spool)DB425.00- Stainless Steel TP304L abnd TP316LDB23,246.00-
Threaded Type- GalvanizedDB500.00- Plastic pipe- PE
100DB1442B2Tie-in WorkWelding typeDB50.00Flanged
typePoint5.003B3Pipe Support Fabrication & Installation-
Fabrication and InstallationKgs.51,440.00- Installation only
(Spring support, etc.)Ea10.004B4Painting WorkSq.m3,145.005B5Valves
InstallationEa756.006B6Pressure Testlot1.007B7Non Destrcutive
TestingJoint1,679.008B8Post Weld Heat TreatmentJointN/A9B9Equipment
Internal InstallationLot1.0010B10Miscellaneous WorkLot1.00TOTAL
ESTIMATED CONTRACT PRICE0.00
Sched B-Rates Measure B1ThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF
MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B1Rev
00Title of Works: Piping Fabrication and Erection / Mechanical
ErectionThe scope of items included in Schedule B1 are defined in
the following table together with the manner in which the items are
measured and payments made. Attached to this schedule are a set of
quantities, derived electronically from design data. These
quantities are issued to clarify the basis of the Schedule of Rates
quantities and are for INFORMATION ONLY to establish the ESTIMATED
PRICE. The final quantities for DB will be remeasured on completion
of the works and the rate set out in this Schedule will be applied
to the final quantities to establish the final
value.ItemDescriptionUnitQ'tyEst. Unit PriceEst. Total
PriceRemarks1PIPING WORK11.1 DIRECT COST1.1.1Under Ground
Piping1.1.1.1FRP Pipe- Pipelines DN: 15DI0.00.0- Pipelines DN:
20DI0.00.0- Pipelines DN: 25DI0.00.0- Pipelines DN: 40DI0.00.0-
Pipelines DN: 50DI0.00.0- Pipelines DN: 80DI30.0- Pipelines DN:
100DI160.0- Pipelines DN: 150DI1980.0- Pipelines DN: 200DI3360.0-
Pipelines DN: 250DI1100.0- Pipelines DN: 300DI0.00.0- Pipelines DN:
350DI0.00.0- Pipelines DN: 400DI0.00.0- Pipelines DN: 450DI0.00.0-
Pipelines DN: 500DI0.00.0SUBTOTAL FOR UG PIPING6630.01.1.2Above
Ground Piping1.1.2.1Welding Type-Carbons Steel (A53 Gr.B, A106
Gr.B, API 5L Gr.B)- Pipelines DN: 15DI1,5580.0- Pipelines DN:
20DI850.0- Pipelines DN: 25DI2,1030.0- Pipelines DN: 40DI1,6840.0-
Pipelines DN: 50DI2,7780.0- Pipelines DN: 65DI720.0- Pipelines DN:
80DI8620.0- Pipelines DN: 100DI9620.0- Pipelines DN: 150DI1,6150.0-
Pipelines DN: 200DI1,3730.0- Pipelines DN: 250DI2,9510.0- Pipelines
DN: 300DI1560.0- Pipelines DN: 350DI0.0- Pipelines DN: 400DI0.0-
Pipelines DN: 450DI0.0- Pipelines DN: 500DI0.0- Pipelines DN:
600DI0.0- Pipelines DN: 700DI0.0- Pipelines DN: 800DI0.0SUBTOTAL
FOR AG CABON STEEL16,199.00.0-Non-Metallic pipe PE 100 (butt-
fusion)- Pipelines DN: 15DI1110.0- Pipelines DN: 20DI0.00.0-
Pipelines DN: 25DI330.0- Pipelines DN: 40DI0.00.0- Pipelines DN:
50DI0.00.0- Pipelines DN: 80DI0.00.0- Pipelines DN: 100DI0.00.0-
Pipelines DN: 150DI0.00.0- Pipelines DN: 200DI0.00.0- Pipelines DN:
250DI0.00.0- Pipelines DN: 300DI0.00.0- Pipelines DN: 350DI0.00.0-
Pipelines DN: 400DI0.00.0- Pipelines DN: 450DI0.00.0- Pipelines DN:
500DI0.00.0- Pipelines DN: 600DI0.00.0- Pipelines DN: 700DI0.00.0-
Pipelines DN: 800DI0.00.0SUBTOTAL FOR AG PE 100144.00.0-Stainless
Steel TP-304L- Pipelines DN: 15DI6120.0- Pipelines DN: 20DI660.0-
Pipelines DN: 25DI1,7300.0- Pipelines DN: 40DI450.0- Pipelines DN:
50DI1,5780.0- Pipelines DN: 80DI8460.0- Pipelines DN:
100DI1,2380.0- Pipelines DN: 150DI7490.0- Pipelines DN:
200DI1,5700.0- Pipelines DN: 250DI1,1180.0- Pipelines DN:
300DI0.00.0- Pipelines DN: 350DI0.00.0- Pipelines DN: 400DI370.0-
Pipelines DN: 450DI0.00.0- Pipelines DN: 500DI460.0- Pipelines DN:
600DI0.00.0- Pipelines DN: 700DI640.0- Pipelines DN: 750DI3450.0-
Pipelines DN: 800DI2580.0-Stainless Steel TP-316L- Pipelines DN:
15DI1570.0- Pipelines DN: 20DI120.0- Pipelines DN: 25DI4290.0-
Pipelines DN: 40DI590.0- Pipelines DN: 50DI1,6150.0- Pipelines DN:
80DI4950.0- Pipelines DN: 100DI1,5080.0- Pipelines DN: 125DI50.0-
Pipelines DN: 150DI5,9750.0- Pipelines DN: 200DI6860.0- Pipelines
DN: 250DI390.0- Pipelines DN: 300DI470.0- Pipelines DN:
350DI1090.0- Pipelines DN: 400DI0.00.0- Pipelines DN: 450DI0.00.0-
Pipelines DN: 500DI0.00.0- Pipelines DN: 600DI8280.0- Pipelines DN:
700DI0.00.0- Pipelines DN: 750DI690.0- Pipelines DN: 800DI0.00.0-
Pipelines DN: 900DI9110.0SUBTOTAL FOR AG SS TP
304L,316L23,246.00.01.1.2.2Threaded Type-Galvanized Pipe (CS+Hot
Dip Galvnized)- Pipelines DN: 15 (completed with Galvanized)DI0.0-
Pipelines DN: 20 (completed with Galvanized)DI0.0- Pipelines DN: 25
(completed with Galvanized)DI200.0- Pipelines DN: 40 (completed
with Galvanized)DI250.0- Pipelines DN: 50 (completed with
Galvanized)DI300.0- Pipelines DN: 80 (to be hot dip
Galvanized)DI660.0- Pipelines DN: 100 (to be hot dip
Galvanized)DI3590.0- Pipelines DN: 150DI0.0- Pipelines DN:
200DI0.0- Pipelines DN: 250DI0.00.0- Pipelines DN: 300DI0.00.0-
Pipelines DN: 350DI0.00.0- Pipelines DN: 400DI0.00.0- Pipelines DN:
450DI0.00.0- Pipelines DN: 500DI0.00.0- Pipelines DN: 600DI0.00.0-
Pipelines DN: 700DI0.00.0- Pipelines DN: 800DI0.00.0SUBTOTAL FOR AG
THREADED TYPE500.00.0Sub Total to Schedule B140,752.00.0
Sched B-Rate Measure B2ThyssenKruppLOY KRATHONG
PROJECTIndustrial SolutionsSCHEDULE OF RATES - CONTRACT - METHOD OF
MEASUREMENT & PAYMENT - BSchedule B2Project No. : 01-5004RevRev
00Title of Works: Piping Fabrication and Erection / Mechanical
ErectionThe scope of items included in Schedule B2 are defined in
the following table together with the manner in which the items are
measured and payments made. Attached to this schedule are a set of
quantities, derived electronically from design data. These
quantities are issued to clarify the basis of the Schedule of Rates
quantities and are for INFORMATION ONLY to establish the ESTIMATED
PRICE. The final quantities for DB will be remeasured on completion
of the works and the rate set out in this Schedule will be applied
to the final quantities to establish the final value.Tie In list
Pricing tableNo.Tie-in No.Existing LineNew LineP&ID No.Fluid
ServiceFluid PhaseNDEPWHT / Stress RelieveType of Tie-in (See also
General Notes)RemarksExiting Line No.Line Size (Inch)Pipe
ClassInsulationHeat TraceShort description of lineOperating
ConditionDesign ConditionNew Line No.Line Size (inch)Pipe
ClassInsulationHeat TraceTypeTHK (mm)E=Electrical
S=SteamPressure(Barg)Temp (Deg C)Pressure(Barg)Temp (Deg C)TypeTHK
(mm)E=Electrical
S=Steam1IP-P-VENDOR/BIR-0001(HOLD)6"(HOLD)N/A640875U-1000/2714/6"/CO26"2714--N/A130040-010604-PID-UTL-501CO2VapourVISUALN/AFlangedSPX
is to confirm the operating pressure of
CO22IP-P-VENDOR/BIR-0002(HOLD)4"(HOLD)N/A20300FV/36350U-1001/1802/4"/Ve364"1802H70N/A130040-010604-PID-UTL-501Ve36VapourVISUALN/AFlanged3IP-P-VENDOR/BIR-0003(HOLD)2"(HOLD)N/A1678FV/36300U-1034/1802/2"/Ec362"1802H70N/A130040-010604-PID-UTL-501Ec36LiquidVISUALN/AFlanged4IP-P-VENDOR/BIR-0004(HOLD)4"(HOLD)N/A336550U-1003/1771/4"
/Ep4"1771--N/A130040-010604-PID-UTL-501EpLiquidVISUALN/AFlanged5IP-P-VENDOR/BIR-0005(HOLD)6"(HOLD)N/A536850U-1004/1701/6"/Eb6"1701--N/A130040-010604-PID-UTL-501EbLiquidVISUALN/AFlanged6IP-P-VENDOR/BIR-0006Cooling
tower
basinN/A(HOLD)N/A0.05311050U-1005/1701/10"/Er12"1701--N/A130040-010604-PID-UTL-501ErLiquid100
% RTN/AWelded7IP-P-VENDOR/BIR-0007Cooling
towerN/A(HOLD)N/A0.6381060U-1006/1701/10"/Err10"1701--N/A130040-010604-PID-UTL-501ErrLiquid100
%
RTN/AWelded8IP-P-VENDOR/BIR-0008(HOLD)8"(HOLD)N/A11361450U-1007/1771/8"/Ei8"1771--N/A130040-010604-PID-UTL-501EiLiquid100
% RTN/AWelded10IP-P-VENDOR/BIR-001040-A/150001-SS51
1/2"(HOLD)N/A7361050U-1009/2704/2"/Ai2"2704--N/A130040-010604-PID-UTL-501AiVapour100
%
RTN/AWelded11IP-P-VENDOR/BIR-0011(HOLD)2"(HOLD)N/A3.236550U-1035/_/2"/H22"(HOLD)--N/A130040-010604-PID-UTL-501H2Vapour100
%
RTN/AWelded12IP-P-VENDOR/BIR-0012(HOLD)(HOLD)(HOLD)N/A10361450U-1154/_/N2(HOLD)(HOLD)--N/A130040-010604-PID-UTL-501N2Vapour100
% RTN/AWeldedGENERAL NOTE1)SPX is to confirm type of Tie-in
aboveType of Tie-in shall be specificed as followings;Flanged=
Tie-in requires bolt up to provided flanges connections.Welded=
Tie-in requires welding to existing lines (hot work and line shut
down).Hot-tap= Tie-in requies installation of valved stub to
existing line or split tee for same size connection (avoid shut
down).Cold-tap= Tie-in requires installation to existing line by
stub branch or split tee (line shut down line).2)(HOLD) = SPX to
confirm
Sched B-Rates Measure B3ThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF
MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B3Rev
00Title of Works: Piping Fabrication and Erection / Mechanical
ErectionThe scope of items included in Schedule C3 are defined in
the following table together with the manner in which the items are
measured and payments made. Attached to this schedule are a set of
quantities, derived electronically from design data. These
quantities are issued to clarify the basis of the Schedule of Rates
quantities and are for INFORMATION ONLY to establish the ESTIMATED
PRICE. The rate set out in this Schedule will be applied to the
final quantities to establish the final value.PIPE SUPPORT
FABRICATION&INSTALLATION BY CONTRACTORPipe
SupportDescriptionQ'tyWeight KgsRate per KgsPrice1. Fabrication and
installation- Fabrication and Install Pipe Shoes, U-bolts, Clamp
(Painting is included)For Carbon Steel Pipe8,2100.0- Fabrication
and Install Pipe Shoes, U-bolts, Clamp (Painting is included)For
Stainless Steel Pipe12,0000.0- Fabrication and Install Steel
standard Pipe Supports Standard and Special pipe support ( Painting
is Included)For Carbon Steel Pipe and Stainless31,2300.02.
Installation Only- Install onlyFor Spring Supports100.0For PTFE
sliding plate100.0Sub Total to Schedule B351,4400.0
Sched B-Rates Measure B4ThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF
MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B4Rev
00Title of Works: Piping Fabrication and Erection / Mechanical
ErectionThe scope of items included in Schedule B4 are defined in
the following table together with the manner in which the items are
measured and payments made. Attached to this schedule are a set of
quantities, derived electronically from design data. These
quantities are issued to clarify the basis of the Schedule of Rates
quantities and are for INFORMATION ONLY to establish an ESTIMATED
PRICE. The final quantities for the painting of the pipe spools
will be remeasurable from the isometric drawings and these rates
shall be applied, method of measurement will be from flange face to
flange face, measuring through all fittings but excluding valves
(valves not painted). Pipe spools with no flange will be
remeasurable from weld joint to weld joint .Price Table For
Painting of Piping Fabrication & InstallationItemSeqPaint
SystemPaint SystemQuantityUnit Area (m2)Total Area (m2)Unit
rateTotalQ'tyUnitBaht/M2Baht1A1Non-Insulated carbon steel (inside
building)1,100.00- Surface praparation ISO-8501-10.0- Required
primer,intermediate and final layer total dry film thickness 160
micron0.00.02A2Non-Insulated carbon steel (outside building)700.00-
Surface praparation-ISO-8501-10.0- Required primer,intermediate and
final layer total dry film thickness 320 micron0.03B1Non-Insulated
galvanized steel (inside building)15.00- Surface praparation-Sweep
blast0.0- Required primer and final layer total dry film thickness
120 micron0.00.04B2Non-Insulated galvanized steel (outside
building)80.00- Surface praparation-Sweep blast0.0- Required
primer, intermediate and final layer total dry film thickness 200
micron0.00.05C2Insulated carbon steel (outside building)50.00-
Surface praparation ISO-8501-10.0- Required primer and final layer
total dry film thickness 100 micron0.00.06D1Insulated stainless
steel (inside building)1,200.00- Surface praparation-Sweep
blast0.0- Required primer and final layer total dry film thickness
200 micron0.00.0Sub Total to Schedule B43,145.000.0
thanup:
Sched B-Rates Measure B5ThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF
MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B5Title
of Works: Piping Fabrication and Erection / Mechanical ErectionRev
00Section : Contract Price BreakdownThe scope of items included in
Schedule B6 are defined in the following table together with the
manner in which the items are measured and payments made. Attached
to this schedule are a set of quantities, derived electronically
from design data. These quantities are issued to clariy the basis
of the Schedule of Rates quantities and are for INFORMATION ONLY to
establish the ESTIMATED PRICE. The final quantities of Valves will
be remeasured with Isometric drawings and the rate set out in this
Schedule will be applied to the final quantities to establish the
final value.Table of Vale InstallationItemDescriptionQuantityUnit
priceTotal pricepcBaht/pcBaht1Manual Valve Installation (Flange
type)0.0- Valves DN: 151100.0- Valves DN: 20240.0- Valves DN:
252760.0- Valves DN: 4030.0- Valves DN: 50640.0- Valves DN:
80200.0- Valves DN: 100390.0- Valves DN: 150730.0- Valves DN:
20090.0- Valves DN: 250200.0- Valves DN: 30010.0- Valves DN:
3500.0- Valves DN: 4000.0- Valves DN: 5000.0- Valves DN:
6000.02Control Valve, Instruments In-line Installation (Flange
Type)0.0- DN: 15100.0- DN: 20- DN: 25360.0- DN: 400.0- DN: 50170.0-
DN: 8070.0- DN: 10080.0- DN: 150160.0- DN: 200130.0- DN: 25090.0-
DN: 30010.00.00.00.0Sub Total to Schedule B67560.0
Sched B-Rates Measure B6ThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF
MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B6Rev
00Title of Works: Piping Fabrication and Erection / Mechanical
ErectionPRICE TABLE FOR PRESURE TESTALL PIPING CLASSItemUnitPRICE
COMPONENT (BAHT)DESCRIPTIONNUMBERRATE EACHTOTALREMARKEDBLIND
IN/OUTPcs0.0THESE ARE THE ESTIMATE NUMBER USED FOR REFERENCE ONLY.
THE COST OF PRESSURE TEST SHALL BE INCLUDED IN UNIT RATE OF BAHT
PER DB. AS STAGED IN C-9.GASKETSEach0.0TEST PACKPack0.0Sub Total to
Schedule B70.0
Sched B-Rates Measure B7ThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF
MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B7Rev
00Title of Works: Piping Fabrication and Erection / Mechanical
ErectionThe scope of items included in Schedule B8 are defined in
the following table together with the manner in which the items are
measured and payments made. Attached to this schedule are a set of
quantities, derived electronically from design data. These
quantities are issued to clarify the basis of the Schedule of Rates
quantities and are for INFORMATION ONLY to ESTABLISH THE ESTIMATED
PRICE. The final quantities will measured at the completion of the
works and the rates applied to the final quantitative to establish
the final value.PRICE TABLE FOR PIPE NDTItemDescriptionNumber of
jointPRICE COMPONENTS (BAHT)Rate Per jointOther
CostsPrice1Rediographic Exam. (RT)- RT DN: 15266- RT DN: 2050- RT
DN: 25427- RT DN: 40120- RT DN: 50300- RT DN: 8076- RT DN: 10087-
RT DN: 150139- RT DN: 20046- RT DN: 25042- RT DN: 3002- RT DN:
3501- RT DN: 4001- RT DN: 450-- RT DN: 5001- RT DN: 6004- RT DN:
7001- RT DN: 7502- RT DN: 8001- RT DN: 90032Liquid Dry Penetration
Testing (PT)- PT DN: 1530- PT DN: 2025- PT DN: 2543- PT DN: 4012-
PT DN: 50-- PT DN: 80-- PT DN: 100-- PT DN: 150-- PT DN: 200-Sub
Total to Schedule B81,679.000.0
Sched B-Rates Measure B8ThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF
MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B8Rev
00Title of Works: Piping Fabrication and Erection / Mechanical
ErectionThe scope of items included in Schedule B9 are defined in
the following table together with the manner in which the items are
measured and payments made. Attached to this schedule are a set of
quantities, derived electronically from design data. These
quantities are issued to clarify the basis of the Schedule of Rates
quantities and are for INFORMATION ONLY to ESTABLISH THE ESTIMATED
PRICE. The final quantities will measured at the completion of the
works and the rates applied to the final quantitative to establish
the final value.PRICE TABLE FOR PIPE PWHTItemDescriptionNumber of
jointPRICE COMPONENTS (BAHT)Rate Per jointOther CostsPrice1Post
Weld Heat Treatment (PWHT)- PWHT DN: 15none- PWHT DN: 20none- PWHT
DN: 25none- PWHT DN: 40none- PWHT DN: 50none- PWHT DN: 80none- PWHT
DN: 100none- PWHT DN: 150none- PWHT DN: 200none- PWHT DN: 250none-
PWHT DN: 300none- PWHT DN: 350none- PWHT DN: 400none- PWHT DN:
450none- PWHT DN: 500none0.00.00.0Sub Total to Schedule
B9None0.0
Sched B-Rates Measure B9ThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF
MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule
B9Section 2: Contract Price BreakdownThe scope of items included in
Schedule B5 are defined in the following table together with the
manner in which the items are measured and payments made. Attached
to this schedule are a set of quantities, derived electronically
from design data. These quaPrice Table for Equipment
InstallationItemEquip TypeTagDescriptionQtyEmpty WeightInstallation
CostTotal (BAHT)RemarkLabor (BAHT)Equipment (BAHT)Tool &
Consum.
(BAHT)SubTotalNo.KgU/PAMOUNTU/PAMOUNTU/PAMOUNTU/PAMOUNTAMOUNT1P1TR-SD/1SD
silo134,0000.00.00.00.00.00.02P1TR-SD/2SD
silo134,0000.00.00.00.00.00.03P1VB-TRSD/1SD silo vibrating
bottom11,5300.00.00.00.00.00.04P1VB-TRSD/2SD silo vibrating
bottom11,5300.00.00.00.00.00.05P7TR/1Silo 0/50 +
27/5013,0000.00.00.00.00.00.06P7TR/2Silo 0/50 +
27/5013,0000.00.00.00.00.00.07P7TR/3Silo 0/50 +
27/5013,0000.00.00.00.00.00.08P7TR/4Silo 0/50 +
27/5013,0000.00.00.00.00.00.09P7VB-TR/1Vibrating bin activators
0/50 + 27/5012900.00.00.00.00.00.010P7VB-TR/2Vibrating bin
activators 0/50 + 27/5012900.00.00.00.00.00.011P7VB-TR/3Vibrating
bin activators 0/50 +
27/5012900.00.00.00.00.00.012P7VB-TR/4Vibrating bin activators 0/50
+ 27/5012900.00.00.00.00.00.013P7TR/5Silo
0/1313,0000.00.00.00.00.00.014P7TR/6Silo
0/1313,0000.00.00.00.00.00.015P7TR/7Silo
0/1313,0000.00.00.00.00.00.016P7TR/8Silo
0/1313,0000.00.00.00.00.00.017P7VB-TR/5Vibrating bin activators
0/1312900.00.00.00.00.00.018P7VB-TR/6Vibrating bin activators
0/1312900.00.00.00.00.00.019P7VB-TR/7Vibrating bin activators
0/1312900.00.00.00.00.00.020P7VB-TR/8Vibrating bin activators
0/1312900.00.00.00.00.00.021P14ECR-TRSD/1SD silo outlet rotary
valve11600.00.00.00.00.00.022P14ECR-TRSD/2SD silo outlet rotary
valve11600.00.00.00.00.00.023P14TR-EMOTSD/1Lump breaker
hopper11,0000.00.00.00.00.00.024P14TR-EMOTSD/2Lump breaker
hopper11,0000.00.00.00.00.00.025P14EMOT-SD/1SD lump
breaker14500.00.00.00.00.00.026P14EMOT-SD/2SD lump
breaker14500.00.00.00.00.00.027P14TR-TPVSDDVSD buffer
hopper14000.00.00.00.00.00.028P14TPV-SDDVSD dosing
screw18500.00.00.00.00.00.029P14CP-TPPSDSD pneumatic transport
compressor15800.00.00.00.00.00.030P14CY-TPPSDSD pneumatic transport
cyclone11,0000.00.00.00.00.00.031RECR-CYSVARotary valve outlet
CYSVA11800.00.00.00.00.00.032RECR-DPSVARotary valve outlet
DPCYSVA11800.00.00.00.00.00.033RECR-VT/1Rotary valve to
sieves11800.00.00.00.00.00.034RECR-VT/2Rotary valve to
sieves11800.00.00.00.00.00.035RECR-TR/1BIR Silo outlet rotary
valve11500.00.00.00.00.00.036RECR-TR/2BIR Silo outlet rotary
valve11500.00.00.00.00.00.037RECR-TR/3BIR Silo outlet rotary
valve11500.00.00.00.00.00.038RECR-TR/4BIR Silo outlet rotary
valve11500.00.00.00.00.00.039RECR-TR/5BIR Silo outlet rotary
valve11500.00.00.00.00.00.040RECR-TR/6BIR Silo outlet rotary
valve11500.00.00.00.00.00.041RECR-TR/7BIR Silo outlet rotary
valve11500.00.00.00.00.00.042RECR-TR/8BIR Silo outlet rotary
valve11500.00.00.00.00.00.043RVD-TRSD/1SD silo inlet diverter
valve1700.00.00.00.00.00.044RVD-TRSD/2SD silo inlet diverter
valve1700.00.00.00.00.00.045RVD-/1BIR silos feeding diverter
valve11400.00.00.00.00.00.046RVD-/2BIR silos feeding diverter
valve21400.00.00.00.00.00.047RVD-TPVTR/9Diverter valve outlet TPV
0/13 (FFS 1 or 2)1300.00.00.00.00.00.048RVD-TPVTR/8Diverter valve
outlet TPV 0/13 Pharma (FFS 1 or
2)1300.00.00.00.00.00.049RVD-TPVTR/7Diverter valve outlet TPV 0/50
+ 27/50 (FFS1 or 2)1300.00.00.00.00.00.050ATPV-ESSCentrifuge outlet
screw conveyor15250.00.00.00.00.00.051ATPV-TR/4Screw conveyor to
silos 0/13 Pharma18000.00.00.00.00.00.052ATPV-TR/5Screw conveyor to
silos 0/13 FCC18000.00.00.053ATPV-TR/3Screw conveyor to silo 27/50
(or 0/50)18000.00.00.00.00.00.054ATPV-TR/2Screw conveyor to silos
0/50 TEC/Z or HN18000.00.00.00.00.00.055ATPV-TR/1Screw conveyor to
silos 0/50 TEC/Z17000.00.00.00.00.00.056ATPV-TR/6Screw conveyor
left/right outlet silos 0/50 TEC/Z or
HN18000.00.00.00.00.00.057ATPV-TR/7Screw conveyor left/right outlet
silos 0/50 + 27/5018000.00.00.00.00.00.058ATPV-TR/9Screw conveyor
left/right outlet silos 0/1318000.00.00.00.00.00.059ATPV-TR/8Screw
conveyor left/right outlet silos 0/13
Pharma18000.00.00.00.00.00.060ATPV-FFS/1Screw conveyor to
FFS115000.00.00.00.00.00.061ATPV-FFS/2Screw conveyor to
FFS214000.00.00.00.00.00.062ATPV-BBScrew conveyor to
BB11,5000.00.00.00.00.00.063ATPV-SVASVA inlet screw
conveyor15000.00.00.00.00.00.064P6VT/1Vibrating sieve
111,7000.00.00.00.00.00.065P6VT/2Vibrating sieve
211,70066P6VT-FFS/1Safety sieve # 3,2 x 3,2 mm to
FFS1145067P6VT-FFS/2Safety sieve # 3,2 x 3,2 mm to
FFS2145068ATRS-VTSieves distribution
conveyor12,21069ATRS-0/13Conveyor to TPV
0/1312,50070ATRS-FFS/2Collecting conveyor to
FFS216,00071ATRS-FFS/1Collecting conveyor to FFS112,00072ADV-SDSD
dissolver17,57373ACRBIR crystalliser134,32074ARG-CRCR
cooler135,52575ARS-LDCBLDCB vessel117,42876ARS-EMMother liquor
vessel19,12377AFLSLDCB sand filter113,01678ARS-HCYHCY
vessel121779ARS-EdchHot demineralised water vessel15,87080AHCYBIR
slurry hydrocyclone135281ACY-SVASVA cyclone12,31482ACV-SVASVA
feeding small tank11,90283AHX-RGCRHeat exchanger for
RGCR11,36984ARH-EdDemineralised water heater117085AFLC-CO2CO2
filter139086AFLC-CaCl2CaCl2 filter139087AFL-EdDemineralised water
filter111088RAGIT-DVSDDVSD agitator11,56089RAGIT-CVSVACVSVA
agitator11,50090RPC-CRCR recycle pump14,13091RPC-RGCRRGCR recycle
Ed pump13,00092RPC-DVSDDVSD outlet pump160093RPC-LDCBLDCB
pump160094RPC-LCRBIR slurry outlet CR pump160095RPC-Edch1Edch
Pump160096RPC-Edch2Edch Pump160097RPC-ErCooling water
pump12,60098RPC-EMMother liquor pump160099RPC-VSB/1VSB
pumps1110100RPC-VSB/2VSB pumps1110101RPC-HXRGCRHXRGCR
pump1500102RPC-EdGNEd pump to GN Ve11,300103RPC-FO1Wash sump (1st
compartment) vertical pump1600104RPC-FO2Wash sump vertical
pump1600105RPC-PDA/1CaCl2 30% dosing pump1200106RPC-PDA/2CaCl2 30%
dosing pump1200107P9ESSCentrifuge15,000108AVTL-DVSDDVSD
fan1500109AVTL-WETWet building wall extraction
fan1200110P3VTL-SVASVA fan with silencer12,000111P3FL-SVASVA fan
inlet air filter (two stages)12,000112P3RH-SVASVA air
heater11,200113PDP-FFS/1Packaging dedusters (bag filters, one on
each TRS)12,700114PDP-FFS/2Packaging dedusters (bag filters, one on
each TRS)12,700115PVTL-DPFFS/1Fans for packaging
dedusters1280116PECR-DPFFS/1Rotary valves outlet packaging
dedusters1300117PVTL-DPFFS/2Fans for packaging
dedusters1280118PECR-DPFFS/2Rotary valves outlet packaging
dedusters1300119PDP-TRSDSD silos dust filter12,000120PDP-VTSieves
dedusting - bag filter115121PDP-TRS0/13TRS dedusting - bag
filter115122PDP-TR/1BIR Silo deduster (bag filter)115123PDP-TR/2BIR
Silo deduster (bag filter)115124PDP-TR/3BIR Silo deduster (bag
filter)115125PDP-TR/4BIR Silo deduster (bag
filter)115126PDP-TR/5BIR Silo deduster (bag
filter)115127PDP-TR/6BIR Silo deduster (bag
filter)115128PDP-TR/7BIR Silo deduster (bag
filter)115129PDP-TR/8BIR Silo deduster (bag
filter)115130PFLM-DPSVACYSVA bag filter11,280131PDP-SVACYSVA
deduster11,280132P10VSBVenturi scrubber16,200133P11FLCA/1-2LDCB
carbon bed199,050134P2BWF/1-2Second step LDCB
filter1860135P4GN-VeSteam generator (main heat
exchanger)12,050136P4RH-GNSteam generator (pre
heater)1420137P4RS-EcGNVeGNVe condensates
vessel12,050138P4SEP-VeSteam separator12,050139P15N/ADemineralised
water production (skid)N/A112,000BY SPX140P13N/ASpray
Dryer12,500141P5CP-AcAir compressor13,430142P5SH-CPAc/1 to 2CPAc
dryer12,000143P5FL-AcAir filter121144P5RS-AcCompressed air
tank17,000145ASPM-FFS/1-2Magnetic separators to
FFS1/21100146AUV-EdDemineralised water UV1500147P8FFS/1FFS bagging
machine Pharma (0/13)19,200148P8FFS/2FFS bagging machine (27/50 or
0/50)19,200149P803Z101Clean room for FFS Pharma14,000150P830H101Bag
conveyors12,400151P830H102Bag conveyors12,400152P8PAL/1Palletiser
for FFS1113,000153P8PAL/2Palletiser for FFS2113,000154P8HOUSStretch
hooding machine13,500155P12BB-BIREmergency manual bigbag
station12,500156P12BB-PRGVibrating big-bag loading
system11,500157AECH/1Samplers (0/50)180158AECH/2Samplers (VT1
0/13)180159AECH/3Samplers (VT1 27/50)180160AECH/4Samplers (VT2
0/13)180161AECH/5Samplers (VT2 27/50)180162RN/AHoist
CentrifugeN/A5,000163RN/AHoist Drop ZoneN/A1,200Sub Total to
Schedule B5612,9750.00.0NOTE:1. Installation details and scope of
work refer to TKIS-PI-000-EC-0021 - Construction Contract
Requisition for Mechanical and Piping WorkEquipment
GroupAStationary EquipmentRRotatingUPackage unitPackage
No.DesicriptionP1SD silos with wibrating bottomsP2Back-wash
filtersP3SVA hot air productionP4Steam generationP5Dry air
productionP6Sieves distribution conveyor with rotary valvesP7BIR
silos with vibrating bin activatorsP8Packaging linesP9Centrifuge
with hydraulic groupP10Venturi scrubberP11Carbon bed filtersP12Big
bag station packageP13Spray dryer packageP14SD pneumatic transport
packageP15Demineralised water production skid
&RPage &P of &N
Sched B-Rates Measure B10ThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTSCHEDULE OF RATES - CONTRACT - METHOD OF
MEASUREMENT & PAYMENT - BProject No. : 01-5004Schedule B10Title
of Works: Piping Fabrication and Erection / Mechanical ErectionRev
00The scope of items included in Schedule B11 are defined in the
following table together with the manner in which the items are
measured and payments made. Attached to this schedule are a set of
quantities, derived electronically from design data. These
quantities are issued to clarify the basis of the Schedule of Rates
quantities and are for INFORMATION ONLY to ESTABLISH THE ESTIMATED
PRICE. The final quantities will measured at the completion of the
works and the rates applied to the final quantitative to establish
the final value.Table of Miscellaneous
WorkItemDescriptionQuantityUNIT PriceTOTAL ( Baht)UnitQ'ty1Grouting
work0.0- Equipment groutingCu.m100.0- Pipe support foundation and
groutingCu.m250.02Under Ground Piping0.0- Excavation work for pipe
size 8" ( Deep 0.9 m.)m.2000.0- Sandlot10.03Special item and Fire
protection equipmet Items0.0Standard Wet bulb sprinkler nozzle
(install only)Ea651Outdoor Fire Hose Box (install only)Ea60.0Indoor
Fire Hose Carbinet (install only)Ea140.0Fire Water Hydrant (install
only)Ea60.0Fixed Fire Monitor (install only)Ea30.0Portable Dry
Chemical (install only)Ea330.0Deluge valv size 3"Ea10.0Safety
Shower and Eye washer (install only)Ea20.0Portable Eye washer
(install only)Ea90.0Expension Joint (install only)Ea20.0Sampling
Valve (install only)Ea100.0Supple sleeve, clamp connection (install
only)Ea400.0Spring Support (install only)Ea100.00.0Sampling point
cabinet (material + labor)Ea100.00.04Manpower supply for
commissioningMan-Day10.00.00.00.00.00.0Sub Total to Schedule
B110.0
Sched C - Dayworks C1ThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTSCHEDULE OF RATES - HOUR / DAYWORKS - CProject No.
: 01-5004Schedule CRev 00Title of Works: Mechanical and Piping
Fabrication and ErectionThe Rates set out in this Schedule shall be
used to value additions to the scope of Work where dayworks is
instructed. Rates shall be all inclusive of all costs , in
particular, the followingLabour rates shall include overhead,
profit, supervision, insurance, accommodation, consumables, small
tools,PPEPlant rates shall include overhead, profit, fuel,
maintenance, insurance, consumables, operator's wagesMaterials
percentage shall include overheads, profit, freight, handling,
administration. Payment of material costs shall be evidenced by
CONTRACTORValue of any dayworks shall be included in the Final
Contract price, one Change Order will be issued on completion of
the day works to establish the final contract priceItem
No.DescriptionUnitRate1LABOURFOREMANBaht/HourFITTERBaht/HourHELPERBaht/HourPAINTERBaht/HourLABORERSBaht/HourWELDERBaht/HourMILLWRIGHTBaht/Hour2MANAGEMENT
AND SUPERVISIONPROJECT MANAGERBaht/HourSITE
MANAGERBaht/HourENGINEERBaht/HourSUPERVISORBaht/Hour3PLANTTRUCK
CRANE (Incld.Fuel) 5 TonsBaht/DayGENERATOR (Incld.Fuel) 90
KVABaht/DayAIR COMPRESSOR (Incld.Fuel) 375 CFMBaht/DayWELDING
GENERATOR (Incld.Fuel) 700 AMPBaht/DayPICK UP (Incld.Fuel) 1
TonsBaht/DayMOBILE CRANE (Incld.Fuel) 25-80 TonsBaht/DayMOBILE
CRANE (Incld.Fuel) 100-150 TonsBaht/DayTRUCK AND TRAILER
(Incld.Fuel)Baht/DayAC/DC WELDING M/C 300 AMPBaht/DayGRINDING M/C
4"Baht/DayGRINDING M/C 7"Baht/DayDRILLING M/CBaht/DayHOLIDAY
DETECTORBaht/Day4MATERIALSORIGINAL PRICE 15%Remark :1. This offered
rate is for normal working day and work period from 8.00 AM to 5.00
PMfor Monday to Saturday only.2. If working for Sunday and Holiday
the unit rate should be 2 time of offered rate. ( 8.00 AM to 5.00
PM ).3. If working for overtime of normal working day ( After 5.00
PM ), the unit rate should be 1.5 timeof offered rate.4. If working
for overtime of Sunday and Holiday ( After 5.00 PM ), the unit rate
shound be 3 timeof offered rate.
Sched C - Tepmo material C2ThyssenKruppIndustrial SolutionsLOY
KRATHONG PROJECTSCHEDULE OF RATES - UNIT OF EMPORARY MATERAILS FOR
COMMISSIONING - CProject No. : 01-5004Schedule C1Rev 00Title of
Works: Mechanical and Piping Fabrication and ErectionThe Rates set
out in this Schedule shall be used to value additions to the scope
of Work where dayworks is instructed. Rates shall be all inclusive
of all costs.Item No.DescriptionUnitRate1TEMPORARY GASKET (Rate
150/300#) Compress fiber- DN: 15Baht/piece- DN: 20Baht/piece- DN:
25Baht/piece- DN: 40Baht/piece- DN: 50Baht/piece- DN: 80Baht/piece-
DN: 100Baht/piece- DN: 150Baht/piece- DN: 200Baht/piece- DN:
250Baht/piece- DN: 300Baht/piece- DN: 350Baht/piece- DN:
400Baht/piece2TEMPORARY GASKET (Rate 150/300#) Spiral wound Carbon
steel- DN: 15Baht/piece- DN: 20Baht/piece- DN: 25Baht/piece- DN:
40Baht/piece- DN: 50Baht/piece- DN: 80Baht/piece- DN:
100Baht/piece- DN: 150Baht/piece- DN: 200Baht/piece- DN:
250Baht/piece- DN: 300Baht/piece- DN: 350Baht/piece- DN:
400Baht/piece3TEMPORARY GASKET (Rate 150/300#) Spiral wound
Stainless steel- DN: 15Baht/piece- DN: 20Baht/piece- DN:
25Baht/piece- DN: 40Baht/piece- DN: 50Baht/piece- DN: 80Baht/piece-
DN: 100Baht/piece- DN: 150Baht/piece- DN: 200Baht/piece- DN:
250Baht/piece- DN: 300Baht/piece- DN: 350Baht/piece- DN:
400Baht/piece4TEMPORARY BLIND AND SPADE (Rate 150/300#)- DN:
15Baht/piece- DN: 20Baht/piece- DN: 25Baht/piece- DN: 40Baht/piece-
DN: 50Baht/piece- DN: 80Baht/piece- DN: 100Baht/piece- DN:
150Baht/piece- DN: 200Baht/piece- DN: 250Baht/piece- DN:
300Baht/piece- DN: 350Baht/piece- DN: 400Baht/piece