Price Capped Services TSS Pricing Proposal CATEGORY SERVICE DESCRIPTION CHARGE TYPE PERMUTATIONS 2017/18 2017/18 % change Connections Pre-Connection Services Connection Applications Services Application assessment, design review and audit real estate development (sub- division) connection services - resubmission Design Assessment and Preparation of Offer - Resubmission Price Cap 169.69 $ 169.34 $ -0.21% Negotiation services involved in negotiating a connection agreement - simple Standard jobs for Small Customer Connections and Real Estate Developments (sub-divisions). Please note that if job goes above & beyond standard POA arrangement may apply instead. Price Cap 1,584.32 $ 1,581.06 $ -0.21% Protection and Power Quality assessment prior to connection - simple Solar PV 30-150kW Price Cap 3,960.80 $ 3,952.66 $ -0.21% Pre-Connection Consultation Services Site inspection in order to determine nature of connection (small or large customer connection) Price Cap 339.39 $ 338.69 $ -0.21% Provision of site-specific connection information and advice for small or large customer connections. Protection Devices & Settings, Fault level, Network Information Price Cap 678.77 $ 677.38 $ -0.20% Connection Services Price Cap Sch 8 BUSINESS HOURS - NO CT $ 1,636.32 $ 1,632.96 -0.21% Price Cap AFTER HOURS - NO CT $ 2,298.62 $ 2,293.90 -0.21% Price Cap ANYTIME - NO CT $ 2,298.62 $ 2,293.90 -0.21% Price Cap AFTER HOURS - NO CT - TRAFFIC CONTROL $ 3,404.77 $ 3,397.77 -0.21% Price Cap ANYTIME - NO CT - TRAFFIC CONTROL $ 3,404.77 $ 3,397.77 -0.21% Price Cap Sch 8 BUSINESS HOURS - CT $ 2,787.98 $ 2,782.25 -0.21% Customer request a temporary connection for short term supply (includes metered and unmetered) - Simple (Temporary Builder pole for construction of premises) Customer requested temporary Connection (Short Term) and recovery of the temporary builders supply. Applies to connections <12 months for SAC's (including temporary builders supply), typically up to 10 kVA where Page 1
14
Embed
Price Capped Services - Home - Energex · Overhead Service Line Replacement at customers request (no material change to load) Customer requests their existing overhead service to
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Price Capped Services
TSS Pricing Proposal
CATEGORY SERVICE DESCRIPTION CHARGE TYPE PERMUTATIONS 2017/18 2017/18 % change
Connections
Pre-Connection Services
Connection Applications Services
Application assessment, design review and audit real estate development (sub-
division) connection services - resubmission
Design Assessment and Preparation of
Offer - Resubmission Price Cap 169.69$ 169.34$ -0.21%
Negotiation services involved in negotiating a connection agreement - simple
Standard jobs for Small Customer
Connections and Real Estate
Developments (sub-divisions). Please note
that if job goes above & beyond standard
POA arrangement may apply instead.
Price Cap 1,584.32$ 1,581.06$ -0.21%
Protection and Power Quality assessment prior to connection - simple Solar PV 30-150kW
Price Cap 3,960.80$ 3,952.66$ -0.21%
Pre-Connection Consultation Services
Site inspection in order to determine nature of connection (small or large customer connection) Price Cap 339.39$ 338.69$ -0.21%
Provision of site-specific connection information and advice for small or large
customer connections.
Protection Devices & Settings, Fault level,
Network Information Price Cap 678.77$ 677.38$ -0.20%
Connection Services
Price Cap Sch 8 BUSINESS HOURS - NO CT $ 1,636.32 $ 1,632.96 -0.21%
Price Cap AFTER HOURS - NO CT $ 2,298.62 $ 2,293.90 -0.21%
Price Cap ANYTIME - NO CT $ 2,298.62 $ 2,293.90 -0.21%
Price CapAFTER HOURS - NO CT - TRAFFIC
CONTROL $ 3,404.77 $ 3,397.77 -0.21%
Price Cap ANYTIME - NO CT - TRAFFIC CONTROL $ 3,404.77 $ 3,397.77 -0.21%
Price Cap Sch 8 BUSINESS HOURS - CT $ 2,787.98 $ 2,782.25 -0.21%
Customer request a temporary connection for short term supply (includes metered
and unmetered) - Simple
(Temporary Builder pole for construction of premises)
Customer requested temporary Connection
(Short Term) and recovery of the temporary
builders supply.
Applies to connections <12 months for
SAC's (including temporary builders
supply), typically up to 10 kVA where
minimum technical standards are required.
Page 1
Price Cap AFTER HOURS - CT $ 3,942.08 $ 3,933.98 -0.21%
Price Cap ANYTIME - CT $ 3,942.08 $ 3,933.98 -0.21%
Price Cap AFTER HOURS - CT - TRAFFIC CONTROL $ 5,048.23 $ 5,037.85 -0.21%
Price Cap ANYTIME - CT - TRAFFIC CONTROL $ 5,048.23 $ 5,037.85 -0.21%
Temporary Connection of unmetered
equipment to an existing LV supplyPrice Cap Sch 8 0 270.63$ 270.07$ -0.21%
Post Connection Services
Request to de-energise an Unmetered
Supply PointPrice Cap $ 415.53 414.68$ -0.20%
Price Cap BUSINESS HOURS $ 665.58 $ 664.22 -0.20%
Price Cap AFTER HOURS $ 821.73 $ 820.04 -0.21%
Price Cap ANYTIME $ 821.73 $ 820.04 -0.21%
Price Cap BUSINESS HOURS + TRAFFIC CONTROL $ 1,771.73 $ 1,768.09 -0.21%
Price Cap AFTER HOURS + TRAFFIC CONTROL $ 1,927.88 $ 1,923.91 -0.21%
Price Cap ANYTIME + TRAFFIC CONTROL $ 1,927.88 $ 1,923.91 -0.21%
Price Cap BUSINESS HOURS $ 125.40 $ 125.14 -0.21%
Price Cap AFTER HOURS $ 179.01 $ 178.64 -0.21%
Price Cap ANYTIME $ 179.01 $ 178.64 -0.21%
Price Cap BUSINESS HOURS $ 253.36 $ 252.84 -0.21%
Price Cap AFTER HOURS $ 361.56 $ 360.82 -0.20%
Price Cap ANYTIME $ 361.56 $ 360.82 -0.20%
Price Cap Single Phase - BUSINESS HOURS $ 643.15 $ 641.83 -0.21%
Price Cap Single Phase - AFTER HOURS $ 834.32 $ 832.61 -0.20%
Rearrange connection assets at customers request - simple (upgrade from overhead
to underground where main connection point is in existence)
Recovery of the overhead service and
connection of the consumer mains to the
pre-existing pillar for a customer requested
conversion of existing overhead service to
underground service.
Overhead Service Line Replacement at customers request (no material change to
load)
Customer requests their existing overhead
service to be replaced or relocated, e.g.as a
result of Point of Attachment relocation. No
material change to load.
Customer request a temporary connection for short term supply (includes metered
and unmetered) - Simple
(Temporary Builder pole for construction of premises)
Customer requested temporary Connection
(Short Term) and recovery of the temporary
builders supply.
Applies to connections <12 months for
SAC's (including temporary builders
supply), typically up to 10 kVA where
minimum technical standards are required.
Supply Abolishment - Simple
Retailer requests the Service Provider to
abolish supply at a specific connection point
(simple). To be used for single dwellings
and the community / unit one of multi-unit
residential complexes.
Retailer requests the Service Provider to
abolish supply at a specific connection point
(simple). To be used for multi-unit
residential complexes for all units after the
community / unit one.
Page 2
Price Cap Single Phase - ANYTIME $ 834.32 $ 832.61 -0.20%
Price CapSingle Phase - BUSINESS HOURS +
TRAFFIC CONTROL $ 1,749.29 $ 1,745.70 -0.21%
Price CapSingle Phase - AFTER HOURS + TRAFFIC
CONTROL $ 1,940.47 $ 1,936.48 -0.21%
Price CapSingle Phase - ANYTIME + TRAFFIC
CONTROL $ 1,940.47 $ 1,936.48 -0.21%
Price Cap Multi Phase - BUSINESS HOURS $ 903.17 $ 901.31 -0.21%
Price Cap Multi Phase - AFTER HOURS $ 1,144.52 $ 1,142.17 -0.21%
Price Cap Multi Phase - ANYTIME $ 1,144.52 $ 1,142.17 -0.21%
Price CapMulti Phase - BUSINESS HOURS +
TRAFFIC CONTROL $ 2,009.31 $ 2,005.18 -0.21%
Price CapMulti Phase - AFTER HOURS + TRAFFIC
CONTROL $ 2,250.67 $ 2,246.05 -0.21%
Price CapMulti Phase - ANYTIME + TRAFFIC
CONTROL $ 2,250.67 $ 2,246.05 -0.21%
Price Cap 0-6 $ 465.29 $ 464.34 -0.20%
Price Cap 7-30 $ 744.47 $ 742.94 -0.21%
Price Cap 31-60 $ 890.70 $ 888.87 -0.21%
Price Cap 60+ $ 992.63 $ 990.59 -0.21%
Price Cap No Dismantling - BUSINESS HOURS $ 363.41 $ 362.67 -0.20%
Price Cap No Dismantling - AFTER HOURS $ 518.61 $ 517.54 -0.21%
Price Cap No Dismantling - ANYTIME $ 518.61 $ 517.54 -0.21%
Price Cap Dismantling - BUSINESS HOURS $ 593.74 $ 592.52 -0.21%
Price Cap Dismantling - AFTER HOURS $ 847.29 $ 845.55 -0.21%
Price Cap Dismantling - ANYTIME $ 847.29 $ 845.55 -0.21%
Price CapSingle Phase Upgrade - BUSINESS
HOURS $ 1,061.70 $ 1,059.52 -0.21%
Temporary disconnections and reconnections (which may involve a line drop) - Low
Voltage
Temporary LV Service
Disconnection/Reconnection (Primary Fuse
- No Dismantling
Customer initiated supply enhancement
Overhead Service Upgrade to Single Phase
Overhead Service Line Replacement at customers request (no material change to
load)
Customer requests their existing overhead
service to be replaced or relocated, e.g.as a
result of Point of Attachment relocation. No
material change to load.
Auditing services – auditing/re-inspection of connection assets after energisation to
network - simple
Auditing / re-inspection of connection
assets after energisation - real estate
development (sub-division)
Number of new, modified or recovered sites
(i.e. stations numbers excluding street light
pits and conduits)
Page 3
Price CapSingle Phase Upgrade (Fuse Only) -
BUSINESS HOURS $ 183.88 New subset
Price Cap Single Phase Upgrade - AFTER HOURS $ 1,380.83 $ 1,377.99 -0.21%
Price CapSingle Phase Upgrade (Fuse Only) -
AFTER HOURS $ 262.41 New subset
Price CapSingle Phase Upgrade - BUSINESS
HOURS + TRAFFIC CONTROL $ 2,167.85 $ 2,163.40 -0.21%
Price CapSingle Phase Upgrade - AFTER HOURS +
TRAFFIC CONTROL $ 2,486.98 $ 2,481.86 -0.21%
Price CapSingle Phase to Multi Phase - BUSINESS
HOURS $ 1,196.53 $ 1,194.07 -0.21%
Price CapSingle Phase to Multi Phase -AFTER
HOURS $ 1,606.36 $ 1,603.06 -0.21%
Price CapSingle Phase to Multi Phase - BUSINESS
HOURS - TRAFFIC CONTROL $ 2,302.68 $ 2,297.94 -0.21%
Price CapSingle Phase to Multi Phase - AFTER
HOURS - TRAFFIC CONTROL $ 2,712.51 $ 2,706.93 -0.21%
Price Cap BUSINESS HOURS - SINGLE PHASE $ 130.52 $ 130.25 -0.21%
Price Cap AFTER HOURS - SINGLE PHASE $ 186.25 $ 185.87 -0.20%
Price Cap BUSINESS HOURS - TO MULTIPHASE $ 63.98 $ 63.85 -0.20%
Price Cap AFTER HOURS - TO MULTIPHASE $ 91.30 $ 91.11 -0.21%
Price CapBUSINESS HOURS - TO MULTIPHASE CT
Metering $ 460.66 $ 459.71 -0.21%
Price CapAFTER HOURS - TO MULTIPHASE CT
Metering $ 657.38 $ 656.03 -0.21%
Price Cap Complex 230.33$ 229.86$ -0.20%
Price Cap Simple $ 104.93 $ 104.71 -0.21%
Price Cap Sch 8 NO CT $ 64.14 $ 64.01 -0.20%
Price Cap Sch 8 CT $ 315.10 $ 314.45 -0.21%
Price Cap Sch 8 NON PAYMENT - NO CT $ 64.14 $ 64.01 -0.20%
Price Cap Sch 8 NON PAYMENT - CT $ 319.51 $ 318.86 -0.20%
Customer consultation or appointment.A visit to the customers premise to advise
on electrical supply matters, could be for
various reasons.
De-Energisation
Retailer Requested de-energisation of the
customer's premises where the de-
energisation can be performed at the
premise ie by a method other than main
switch seal (eg pole, pillar or meter isolation
link)
Customer initiated supply enhancement
Overhead Service Upgrade to Single Phase
Overhead Service Upgrade to Multiphase
Underground Service Upgrade
Page 4
Price Cap Sch 8 NON PAYMENT $ 21.01 $ 20.97 -0.19%
Price Cap Sch 8 REASON OTHER THAN NON PAYMENT $ 21.01 $ 20.97 -0.19%
Price Cap Sch 8 BUSINESS HOURS - NO CT $ 49.00 $ 48.90 -0.20%
Price Cap Sch 8 AFTER HOURS - NO CT $ 69.48 $ 69.34 -0.20%
Price Cap Sch 8 ANYTIME - NO CT $ 69.48 $ 69.34 -0.20%
Price Cap Sch 8 BUSINESS HOURS - CT $ 49.00 $ 48.90 -0.20%
Price Cap Sch 8 AFTER HOURS - CT $ 69.48 $ 69.34 -0.20%