Page 1
6/24/2015Determination Date:
HighwayProject Classification:
15-04227Serial Number:
8/18/2015Contract Award Date:
Awarding Agency:
Installation of Durable Pavement Markings (151-03-03)Project Name:
PREVAILING WAGES PROJECT RATES
Assigned Field Office:
Dauphin County
800-932-0665Toll Free Phone Number:
717-787-4763Field Office Phone Number:
Harrisburg
PA Turnpike Commission
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
6/28/2010 $20.13$30.63 $50.76Asbestos & Insulation Workers
6/27/2011 $21.09$31.67 $52.76Asbestos & Insulation Workers
7/2/2012 $21.59$32.17 $53.76Asbestos & Insulation Workers
7/1/2013 $22.59$32.17 $54.76Asbestos & Insulation Workers
6/30/2014 $23.86$31.90 $55.76Asbestos & Insulation Workers
1/1/2010 $15.15$23.59 $38.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2011 $16.02$24.22 $40.24Boilermaker (Commercial, Institutional,
and Minor Repair Work)
5/1/2012 $16.90$24.84 $41.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
4/1/2013 $17.51$25.53 $43.04Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2014 $17.95$25.79 $43.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2015 $18.22$26.52 $44.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2011 $28.12$37.35 $65.47Boilermakers
1/1/2012 $29.85$37.62 $67.47Boilermakers
1/1/2013 $31.13$38.69 $69.82Boilermakers
4/1/2013 $31.43$38.54 $69.97Boilermakers
1/1/2014 $32.81$39.06 $71.87Boilermakers
1/1/2015 $33.31$40.31 $73.62Boilermakers
Page 1 of 14 06/24/2015
Page 2
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2013 $14.49$30.75 $45.24Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2014 $14.96$31.08 $46.04Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2015 $15.18$31.71 $46.89Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2016 $15.53$32.26 $47.79Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
6/1/2010 $12.02$25.71 $37.73Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2011 $12.52$26.86 $39.38Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2012 $13.25$26.88 $40.13Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2013 $13.80$27.18 $40.98Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2014 $14.25$27.78 $42.03Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
5/1/2011 $18.45$25.00 $43.45Cement Finishers
5/1/2012 $20.10$25.20 $45.30Cement Finishers
5/1/2013 $20.10$26.05 $46.15Cement Finishers
5/1/2014 $21.40$25.65 $47.05Cement Finishers
5/1/2015 $21.90$26.00 $47.90Cement Finishers
1/1/2010 $12.25$29.95 $42.20Dockbuilder, Pile Drivers
1/1/2011 $13.10$30.35 $43.45Dockbuilder, Pile Drivers
1/1/2012 $13.70$30.85 $44.55Dockbuilder, Pile Drivers
1/1/2013 $14.20$31.45 $45.65Dockbuilder, Pile Drivers
5/1/2013 $11.04$23.30 $34.34Drywall Finisher
5/1/2014 $11.14$23.30 $34.44Drywall Finisher
5/1/2015 $11.49$23.30 $34.79Drywall Finisher
5/1/2016 $11.89$23.30 $35.19Drywall Finisher
5/1/2017 $12.39$23.30 $35.69Drywall Finisher
6/3/2013 $18.31$40.78 $59.09Electric Lineman
6/2/2014 $19.35$42.68 $62.03Electric Lineman
6/1/2015 $19.88$44.63 $64.51Electric Lineman
Page 2 of 14 Serial Number: 15-04227
Page 3
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/30/2016 $20.29$46.16 $66.45Electric Lineman
6/1/2013 $20.18$28.00 $48.18Electricians
6/1/2014 $20.70$28.75 $49.45Electricians
6/1/2015 $21.34$29.50 $50.84Electricians
1/1/2012 $26.06$41.84 $67.90Elevator Constructor
1/1/2015 $28.69$42.20 $70.89Elevator Constructor
1/1/2008 $0.00$0.00 $0.00Elevator Tender (Use Elevator Apprentice
or Constructor)
5/1/2010 $9.44$23.64 $33.08Glazier
5/1/2011 $9.44$24.64 $34.08Glazier
5/1/2012 $9.44$26.14 $35.58Glazier
7/1/2010 $23.09$27.77 $50.86Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2011 $24.09$29.02 $53.11Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2012 $25.11$29.52 $54.63Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2013 $25.11$31.05 $56.16Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2014 $25.11$32.58 $57.69Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
5/1/2010 $8.68$19.66 $28.34Laborers (Class 01 - See notes)
5/1/2011 $9.18$19.66 $28.84Laborers (Class 01 - See notes)
5/1/2012 $9.98$19.66 $29.64Laborers (Class 01 - See notes)
5/1/2013 $10.43$19.91 $30.34Laborers (Class 01 - See notes)
5/1/2014 $11.23$20.06 $31.29Laborers (Class 01 - See notes)
5/1/2015 $12.03$20.21 $32.24Laborers (Class 01 - See notes)
5/1/2016 $12.83$20.31 $33.14Laborers (Class 01 - See notes)
5/1/2010 $8.68$21.66 $30.34Laborers (Class 02 - See notes)
5/1/2011 $9.18$21.66 $30.84Laborers (Class 02 - See notes)
5/1/2012 $9.98$21.66 $31.64Laborers (Class 02 - See notes)
5/1/2013 $10.43$21.91 $32.34Laborers (Class 02 - See notes)
5/1/2014 $11.23$22.06 $33.29Laborers (Class 02 - See notes)
5/1/2015 $12.03$22.21 $34.24Laborers (Class 02 - See notes)
5/1/2016 $12.83$22.31 $35.14Laborers (Class 02 - See notes)
5/1/2014 $11.41$23.41 $34.82Laborers (Class 03 - See notes)
Page 3 of 14 Serial Number: 15-04227
Page 4
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2015 $12.21$23.56 $35.77Laborers (Class 03 - See notes)
5/1/2016 $13.01$23.76 $36.77Laborers (Class 03 - See notes)
5/1/2014 $11.41$24.91 $36.32Laborers (Class 04 - See notes)
5/1/2015 $12.21$25.06 $37.27Laborers (Class 04 - See notes)
5/1/2016 $13.01$25.26 $38.27Laborers (Class 04 - See notes)
5/1/2014 $11.41$25.41 $36.82Laborers (Class 05 - See notes)
5/1/2015 $12.21$25.56 $37.77Laborers (Class 05 - See notes)
5/1/2016 $13.01$25.76 $38.77Laborers (Class 05 - See notes)
5/1/2011 $9.18$21.66 $30.84Laborers (Class 06 - See notes)
5/1/2012 $9.98$21.66 $31.64Laborers (Class 06 - See notes)
5/1/2013 $10.43$21.91 $32.34Laborers (Class 06 - See notes)
5/1/2014 $11.23$22.06 $33.29Laborers (Class 06 - See notes)
5/1/2015 $12.03$22.21 $34.24Laborers (Class 06 - See notes)
5/1/2016 $12.83$22.31 $35.14Laborers (Class 06 - See notes)
5/1/2010 $13.99$28.91 $42.90Millwright
5/1/2011 $14.63$30.27 $44.90Millwright
5/1/2012 $15.26$31.14 $46.40Millwright
5/1/2013 $15.74$32.16 $47.90Millwright
5/1/2014 $16.23$33.17 $49.40Millwright
5/1/2015 $16.98$33.27 $50.25Millwright
5/1/2016 $17.51$33.59 $51.10Millwright
5/1/2017 $18.16$33.79 $51.95Millwright
5/1/2010 $17.85$30.76 $48.61Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2011 $18.85$32.06 $50.91Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2012 $20.25$32.06 $52.31Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2013 $21.65$32.06 $53.71Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2014 $22.41$32.70 $55.11Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2010 $18.51$33.01 $51.52Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2011 $19.51$34.31 $53.82Operators (Building/Heavy, Class 01a -
See Notes)
Page 4 of 14 Serial Number: 15-04227
Page 5
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2012 $20.91$34.31 $55.22Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2013 $22.31$34.31 $56.62Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2014 $23.07$34.95 $58.02Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2010 $17.77$30.47 $48.24Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2011 $18.77$31.77 $50.54Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2012 $20.17$31.77 $51.94Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2013 $21.57$31.77 $53.34Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2014 $22.33$32.41 $54.74Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2010 $18.44$32.72 $51.16Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2011 $19.44$34.02 $53.46Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2012 $20.84$34.02 $54.86Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2013 $22.24$34.02 $56.26Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2014 $23.00$34.66 $57.66Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2010 $16.91$27.55 $44.46Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2011 $17.91$28.85 $46.76Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2012 $19.31$28.85 $48.16Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2013 $20.71$28.85 $49.56Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2014 $21.47$29.49 $50.96Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2010 $16.57$26.42 $42.99Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2011 $17.57$27.72 $45.29Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2012 $18.97$27.72 $46.69Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2013 $20.37$27.72 $48.09Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2014 $21.14$28.35 $49.49Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2010 $16.44$25.97 $42.41Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2011 $17.44$27.27 $44.71Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2012 $18.84$27.27 $46.11Operators (Building/Heavy, Class 05 -
See Notes)
Page 5 of 14 Serial Number: 15-04227
Page 6
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2013 $20.24$27.27 $47.51Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2014 $21.01$27.90 $48.91Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2010 $16.18$25.09 $41.27Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2011 $17.18$26.39 $43.57Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2012 $18.58$26.39 $44.97Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2013 $19.98$26.39 $46.37Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2014 $20.75$27.02 $47.77Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2010 $20.43$36.91 $57.34Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2011 $21.53$38.47 $60.00Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2012 $23.16$38.47 $61.63Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2013 $24.79$38.47 $63.26Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2014 $25.69$39.24 $64.93Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2010 $20.33$36.56 $56.89Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2011 $21.43$38.12 $59.55Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2012 $23.06$38.12 $61.18Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2013 $24.69$38.12 $62.81Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2014 $25.59$38.89 $64.48Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2013 $11.92$23.07 $34.99Painters Class 1 (see notes)
5/1/2014 $12.42$23.47 $35.89Painters Class 1 (see notes)
5/1/2015 $12.42$23.47 $35.89Painters Class 1 (see notes)
5/1/2016 $12.82$23.47 $36.29Painters Class 1 (see notes)
5/1/2017 $13.32$23.47 $36.79Painters Class 1 (see notes)
5/1/2011 $11.32$24.05 $35.37Painters Class 2 (see notes)
5/1/2012 $11.12$24.95 $36.07Painters Class 2 (see notes)
5/1/2013 $11.92$24.95 $36.87Painters Class 2 (see notes)
5/1/2014 $12.42$25.35 $37.77Painters Class 2 (see notes)
5/1/2015 $12.42$25.60 $38.02Painters Class 2 (see notes)
5/1/2016 $12.82$25.60 $38.42Painters Class 2 (see notes)
Page 6 of 14 Serial Number: 15-04227
Page 7
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2017 $13.32$25.60 $38.92Painters Class 2 (see notes)
5/1/2011 $11.32$28.05 $39.37Painters Class 3 (see notes)
5/1/2012 $11.12$29.95 $41.07Painters Class 3 (see notes)
5/1/2013 $11.92$29.95 $41.87Painters Class 3 (see notes)
5/1/2014 $12.42$30.35 $42.77Painters Class 3 (see notes)
5/1/2015 $12.42$31.35 $43.77Painters Class 3 (see notes)
5/1/2016 $12.82$31.35 $44.17Painters Class 3 (see notes)
5/1/2017 $13.32$31.35 $44.67Painters Class 3 (see notes)
1/1/2007 $10.77$40.40 $51.17Pile Driver Divers (Building, Heavy,
Highway)
1/1/2010 $12.25$44.39 $56.64Pile Driver Divers (Building, Heavy,
Highway)
1/1/2011 $13.00$45.53 $58.53Pile Driver Divers (Building, Heavy,
Highway)
1/1/2012 $13.60$46.28 $59.88Pile Driver Divers (Building, Heavy,
Highway)
1/1/2013 $14.10$47.18 $61.28Pile Driver Divers (Building, Heavy,
Highway)
5/1/2014 $19.53$23.48 $43.01Plasterers
5/1/2015 $20.03$23.83 $43.86Plasterers
5/1/2014 $22.16$33.97 $56.13Plumbers and Steamfitters
5/1/2015 $22.56$34.87 $57.43Plumbers and Steamfitters
5/1/2013 $28.40$31.05 $59.45Roofers (Composition)
5/1/2014 $28.65$32.15 $60.80Roofers (Composition)
5/1/2015 $28.65$33.65 $62.30Roofers (Composition)
5/1/2012 $16.37$24.00 $40.37Roofers (Shingle, Slate, Tile)
5/1/2014 $17.37$24.50 $41.87Roofers (Shingle, Slate, Tile)
5/1/2015 $18.37$25.00 $43.37Roofers (Shingle, Slate, Tile)
6/1/2013 $30.45$31.58 $62.03Sheet Metal Workers
1/6/2014 $30.95$31.58 $62.53Sheet Metal Workers
6/1/2014 $30.98$32.55 $63.53Sheet Metal Workers
12/1/2014 $31.39$32.64 $64.03Sheet Metal Workers
6/1/2015 $32.39$32.64 $65.03Sheet Metal Workers
12/1/2015 $32.89$32.64 $65.53Sheet Metal Workers
7/1/2009 $15.99$24.17 $40.16Sign Makers and Hangars
Page 7 of 14 Serial Number: 15-04227
Page 8
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/21/2010 $16.37$24.33 $40.70Sign Makers and Hangars
1/1/2010 $17.60$33.85 $51.45Sprinklerfitters
1/1/2011 $18.45$33.35 $51.80Sprinklerfitters
4/1/2011 $18.45$34.18 $52.63Sprinklerfitters
1/1/2012 $18.60$34.18 $52.78Sprinklerfitters
4/1/2012 $18.65$35.21 $53.86Sprinklerfitters
1/1/2013 $18.80$35.21 $54.01Sprinklerfitters
4/1/2013 $20.12$33.03 $53.15Sprinklerfitters
7/1/2013 $20.12$33.69 $53.81Sprinklerfitters
4/1/2014 $20.47$34.36 $54.83Sprinklerfitters
4/1/2015 $20.62$35.05 $55.67Sprinklerfitters
5/1/2013 $14.58$29.13 $43.71Terrazzo Finisher
5/1/2014 $14.99$29.47 $44.46Terrazzo Finisher
5/1/2013 $17.54$28.39 $45.93Terrazzo Setter
5/1/2014 $18.01$28.67 $46.68Terrazzo Setter
5/1/2013 $12.73$24.62 $37.35Tile & Marble Finisher
5/1/2014 $13.14$24.91 $38.05Tile & Marble Finisher
5/1/2015 $13.30$25.55 $38.85Tile & Marble Finisher
5/1/2016 $13.56$26.19 $39.75Tile & Marble Finisher
5/1/2013 $14.21$27.28 $41.49Tile & Marble Layer
5/1/2014 $14.68$27.51 $42.19Tile & Marble Layer
5/1/2015 $14.90$28.09 $42.99Tile & Marble Layer
5/1/2016 $15.25$28.64 $43.89Tile & Marble Layer
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 8 of 14 Serial Number: 15-04227
Page 9
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2013 $12.84$27.92 $40.76Carpenters
5/1/2014 $13.24$28.72 $41.96Carpenters
5/1/2015 $13.83$29.13 $42.96Carpenters
5/1/2016 $14.54$29.67 $44.21Carpenters
5/1/2017 $15.34$30.12 $45.46Carpenters
5/1/2013 $14.04$18.16 $32.20Laborers (Class 01 - See notes)
5/1/2014 $14.69$18.66 $33.35Laborers (Class 01 - See notes)
5/1/2015 $15.34$19.21 $34.55Laborers (Class 01 - See notes)
5/1/2009 $11.03$22.84 $33.87Laborers (Class 02 - See notes)
5/1/2010 $11.88$23.39 $35.27Laborers (Class 02 - See notes)
5/1/2011 $12.78$23.94 $36.72Laborers (Class 02 - See notes)
5/1/2012 $13.39$24.33 $37.72Laborers (Class 02 - See notes)
5/1/2013 $14.04$24.78 $38.82Laborers (Class 02 - See notes)
5/1/2014 $14.69$25.28 $39.97Laborers (Class 02 - See notes)
5/1/2015 $15.34$25.83 $41.17Laborers (Class 02 - See notes)
5/1/2009 $11.03$19.83 $30.86Laborers (Class 03 - See notes)
5/1/2010 $11.88$20.38 $32.26Laborers (Class 03 - See notes)
5/1/2011 $12.78$20.93 $33.71Laborers (Class 03 - See notes)
5/1/2012 $13.39$21.32 $34.71Laborers (Class 03 - See notes)
5/1/2013 $14.04$21.77 $35.81Laborers (Class 03 - See notes)
5/1/2014 $14.69$22.27 $36.96Laborers (Class 03 - See notes)
5/1/2015 $15.34$22.82 $38.16Laborers (Class 03 - See notes)
5/1/2009 $11.03$20.18 $31.21Laborers (Class 04 - See notes)
5/1/2010 $11.88$20.73 $32.61Laborers (Class 04 - See notes)
5/1/2011 $12.78$21.28 $34.06Laborers (Class 04 - See notes)
5/1/2012 $13.39$21.67 $35.06Laborers (Class 04 - See notes)
5/1/2013 $14.04$22.12 $36.16Laborers (Class 04 - See notes)
5/1/2014 $14.69$22.62 $37.31Laborers (Class 04 - See notes)
5/1/2015 $15.34$23.17 $38.51Laborers (Class 04 - See notes)
5/1/2009 $11.03$20.85 $31.88Laborers (Class 05 - See notes)
5/1/2010 $11.88$21.40 $33.28Laborers (Class 05 - See notes)
Page 9 of 14 Serial Number: 15-04227
Page 10
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2011 $12.78$21.95 $34.73Laborers (Class 05 - See notes)
5/1/2012 $13.39$22.34 $35.73Laborers (Class 05 - See notes)
5/1/2013 $14.04$22.79 $36.83Laborers (Class 05 - See notes)
5/1/2014 $14.69$23.29 $37.98Laborers (Class 05 - See notes)
5/1/2015 $15.34$23.84 $39.18Laborers (Class 05 - See notes)
5/1/2009 $11.03$20.27 $31.30Laborers (Class 06 - See notes)
5/1/2010 $11.88$20.82 $32.70Laborers (Class 06 - See notes)
5/1/2011 $12.78$21.37 $34.15Laborers (Class 06 - See notes)
5/1/2012 $13.39$21.76 $35.15Laborers (Class 06 - See notes)
5/1/2013 $14.04$22.21 $36.25Laborers (Class 06 - See notes)
5/1/2014 $14.69$22.71 $37.40Laborers (Class 06 - See notes)
5/1/2015 $15.34$23.26 $38.60Laborers (Class 06 - See notes)
5/1/2009 $11.03$20.56 $31.59Laborers (Class 07 - See notes)
5/1/2010 $11.88$21.11 $32.99Laborers (Class 07 - See notes)
5/1/2011 $12.78$21.66 $34.44Laborers (Class 07 - See notes)
5/1/2012 $13.39$22.05 $35.44Laborers (Class 07 - See notes)
5/1/2013 $14.04$22.50 $36.54Laborers (Class 07 - See notes)
5/1/2014 $14.69$23.00 $37.69Laborers (Class 07 - See notes)
5/1/2015 $15.34$23.55 $38.89Laborers (Class 07 - See notes)
5/1/2009 $11.03$21.04 $32.07Laborers (Class 08 - See notes)
5/1/2010 $11.88$21.59 $33.47Laborers (Class 08 - See notes)
5/1/2011 $12.78$22.14 $34.92Laborers (Class 08 - See notes)
5/1/2012 $13.39$22.53 $35.92Laborers (Class 08 - See notes)
5/1/2013 $14.04$22.98 $37.02Laborers (Class 08 - See notes)
5/1/2014 $14.69$23.48 $38.17Laborers (Class 08 - See notes)
5/1/2015 $15.34$24.03 $39.37Laborers (Class 08 - See notes)
5/1/2009 $16.30$27.45 $43.75Operators (Highway, Class 01 - See
Notes)
5/1/2010 $17.26$28.79 $46.05Operators (Highway, Class 01 - See
Notes)
5/1/2011 $18.26$30.09 $48.35Operators (Highway, Class 01 - See
Notes)
5/1/2012 $19.51$30.09 $49.60Operators (Highway, Class 01 - See
Notes)
Page 10 of 14 Serial Number: 15-04227
Page 11
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2013 $20.76$30.09 $50.85Operators (Highway, Class 01 - See
Notes)
5/1/2014 $21.72$30.38 $52.10Operators (Highway, Class 01 - See
Notes)
5/1/2009 $16.98$29.70 $46.68Operators (Highway, Class 01a - See
Notes)
5/1/2010 $17.94$31.04 $48.98Operators (Highway, Class 01a - See
Notes)
5/1/2011 $18.94$32.34 $51.28Operators (Highway, Class 01a - See
Notes)
5/1/2012 $20.19$32.34 $52.53Operators (Highway, Class 01a - See
Notes)
5/1/2013 $21.44$32.34 $53.78Operators (Highway, Class 01a - See
Notes)
5/1/2014 $22.40$32.63 $55.03Operators (Highway, Class 01a - See
Notes)
5/1/2009 $15.96$26.27 $42.23Operators (Highway, Class 02 - See
Notes)
5/1/2010 $16.92$27.61 $44.53Operators (Highway, Class 02 - See
Notes)
5/1/2011 $17.92$28.91 $46.83Operators (Highway, Class 02 - See
Notes)
5/1/2012 $19.17$28.91 $48.08Operators (Highway, Class 02 - See
Notes)
5/1/2013 $20.42$28.91 $49.33Operators (Highway, Class 02 - See
Notes)
5/1/2014 $21.37$29.21 $50.58Operators (Highway, Class 02 - See
Notes)
5/1/2009 $15.75$25.58 $41.33Operators (Highway, Class 03 - See
Notes)
5/1/2010 $16.72$26.91 $43.63Operators (Highway, Class 03 - See
Notes)
5/1/2011 $17.72$28.21 $45.93Operators (Highway, Class 03 - See
Notes)
5/1/2012 $18.97$28.21 $47.18Operators (Highway, Class 03 - See
Notes)
5/1/2013 $20.22$28.21 $48.43Operators (Highway, Class 03 - See
Notes)
5/1/2014 $21.18$28.50 $49.68Operators (Highway, Class 03 - See
Notes)
5/1/2009 $15.62$25.13 $40.75Operators (Highway, Class 04 - See
Notes)
5/1/2010 $16.59$26.46 $43.05Operators (Highway, Class 04 - See
Notes)
5/1/2011 $17.59$27.76 $45.35Operators (Highway, Class 04 - See
Notes)
5/1/2012 $18.85$27.75 $46.60Operators (Highway, Class 04 - See
Notes)
5/1/2013 $20.10$27.75 $47.85Operators (Highway, Class 04 - See
Notes)
5/1/2014 $21.05$28.05 $49.10Operators (Highway, Class 04 - See
Notes)
Page 11 of 14 Serial Number: 15-04227
Page 12
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2009 $15.47$24.62 $40.09Operators (Highway, Class 05 - See
Notes)
5/1/2010 $16.44$25.95 $42.39Operators (Highway, Class 05 - See
Notes)
5/1/2011 $17.44$27.25 $44.69Operators (Highway, Class 05 - See
Notes)
5/1/2012 $18.69$27.25 $45.94Operators (Highway, Class 05 - See
Notes)
5/1/2013 $19.94$27.25 $47.19Operators (Highway, Class 05 - See
Notes)
5/1/2014 $20.90$27.54 $48.44Operators (Highway, Class 05 - See
Notes)
5/1/2009 $16.36$27.69 $44.05Operators (Highway, Class 06 - See
Notes)
5/1/2010 $17.32$29.03 $46.35Operators (Highway, Class 06 - See
Notes)
5/1/2011 $18.32$30.33 $48.65Operators (Highway, Class 06 - See
Notes)
5/1/2012 $19.57$30.33 $49.90Operators (Highway, Class 06 - See
Notes)
5/1/2013 $20.82$30.33 $51.15Operators (Highway, Class 06 - See
Notes)
5/1/2014 $21.78$30.62 $52.40Operators (Highway, Class 06 - See
Notes)
5/1/2009 $17.02$29.94 $46.96Operators (Highway, Class 06/A - See
Notes)
5/1/2010 $17.98$31.28 $49.26Operators (Highway, Class 06/A - See
Notes)
5/1/2011 $18.98$32.58 $51.56Operators (Highway, Class 06/A - See
Notes)
5/1/2012 $20.23$32.59 $52.82Operators (Highway, Class 06/A - See
Notes)
5/1/2013 $21.48$32.58 $54.06Operators (Highway, Class 06/A - See
Notes)
5/1/2014 $22.44$32.87 $55.31Operators (Highway, Class 06/A - See
Notes)
5/1/2009 $18.67$32.94 $51.61Operators (Highway, Class 07/A - See
Notes)
5/1/2010 $19.72$34.55 $54.27Operators (Highway, Class 07/A - See
Notes)
5/1/2011 $20.83$36.10 $56.93Operators (Highway, Class 07/A - See
Notes)
5/1/2012 $22.28$36.10 $58.38Operators (Highway, Class 07/A - See
Notes)
5/1/2013 $23.73$36.10 $59.83Operators (Highway, Class 07/A - See
Notes)
5/1/2014 $24.88$36.45 $61.33Operators (Highway, Class 07/A - See
Notes)
5/1/2009 $18.25$31.53 $49.78Operators (Highway, Class 07/B - See
Notes)
5/1/2010 $19.31$33.13 $52.44Operators (Highway, Class 07/B - See
Notes)
Page 12 of 14 Serial Number: 15-04227
Page 13
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2011 $20.41$34.69 $55.10Operators (Highway, Class 07/B - See
Notes)
5/1/2012 $21.86$34.69 $56.55Operators (Highway, Class 07/B - See
Notes)
5/1/2013 $23.31$34.69 $58.00Operators (Highway, Class 07/B - See
Notes)
5/1/2014 $24.46$35.04 $59.50Operators (Highway, Class 07/B - See
Notes)
5/1/2009 $9.86$25.30 $35.16Piledrivers
5/1/2010 $10.83$25.98 $36.81Piledrivers
5/1/2011 $11.43$27.03 $38.46Piledrivers
5/1/2010 $26.09$30.27 $56.36Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2012 $26.86$34.87 $61.73Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2013 $27.73$36.02 $63.75Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2014 $28.83$37.19 $66.02Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 13 of 14 Serial Number: 15-04227
Page 14
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
Notes:
If you can not find a classification under Heavy/Highway please refer to the Building classifications.
The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes to clarify existing
tasks performed throughout the Commonwealth. The “Building Laborer Notes” link on the Bureau’s website provides a list
of those tasks that should be read in conformity with custom and usage of the construction industry in the geographic
region in which they are utilized.
For further information on construction types review the
on the Labor and Industry Website. Go to www.dli.state.pa.us, scroll down to the picture labeled "Labor Law Compliance"
and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link.
"Notes as Referenced in Predeterminations"
Page 14 of 14 Serial Number: 15-04227
Page 15
6/24/2015Determination Date:
HighwayProject Classification:
15-04228Serial Number:
8/18/2015Contract Award Date:
Awarding Agency:
Installation of Durable Pavement Markings (151-03-03)Project Name:
PREVAILING WAGES PROJECT RATES
Assigned Field Office:
Lebanon County
800-932-0665Toll Free Phone Number:
717-787-4763Field Office Phone Number:
Harrisburg
PA Turnpike Commission
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
6/28/2010 $20.13$30.63 $50.76Asbestos & Insulation Workers
6/27/2011 $18.88$33.88 $52.76Asbestos & Insulation Workers
7/2/2012 $21.59$32.17 $53.76Asbestos & Insulation Workers
7/1/2013 $22.59$32.17 $54.76Asbestos & Insulation Workers
6/30/2014 $23.86$31.90 $55.76Asbestos & Insulation Workers
1/1/2010 $15.15$23.59 $38.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2011 $16.02$24.22 $40.24Boilermaker (Commercial, Institutional,
and Minor Repair Work)
5/1/2012 $16.90$24.84 $41.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
4/1/2013 $17.51$25.53 $43.04Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2014 $17.95$25.79 $43.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2015 $18.22$26.52 $44.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2011 $28.12$37.35 $65.47Boilermakers
1/1/2012 $29.85$37.62 $67.47Boilermakers
1/1/2013 $31.13$38.69 $69.82Boilermakers
4/1/2013 $31.43$38.54 $69.97Boilermakers
1/1/2014 $32.81$39.06 $71.87Boilermakers
1/1/2015 $33.31$40.31 $73.62Boilermakers
Page 1 of 15 06/24/2015
Page 16
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2013 $14.49$30.75 $45.24Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2014 $14.96$31.08 $46.04Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/3/2015 $15.18$31.71 $46.89Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2016 $15.53$32.26 $47.79Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
6/1/2008 $11.02$23.31 $34.33Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2009 $11.52$24.56 $36.08Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2010 $12.02$25.71 $37.73Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2011 $12.52$26.86 $39.38Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2012 $13.25$26.88 $40.13Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2013 $13.80$27.18 $40.98Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2014 $14.25$27.78 $42.03Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
5/1/2010 $10.75$30.85 $41.60Cement Finishers
5/1/2011 $11.15$32.45 $43.60Cement Finishers
5/1/2012 $11.15$33.30 $44.45Cement Finishers
5/1/2013 $11.15$34.15 $45.30Cement Finishers
5/1/2014 $11.15$35.05 $46.20Cement Finishers
5/1/2015 $11.58$35.47 $47.05Cement Finishers
1/1/2010 $12.25$29.95 $42.20Dockbuilder, Pile Drivers
1/1/2011 $13.10$30.35 $43.45Dockbuilder, Pile Drivers
1/1/2012 $13.70$30.85 $44.55Dockbuilder, Pile Drivers
1/1/2013 $14.20$31.45 $45.65Dockbuilder, Pile Drivers
5/1/2013 $11.04$23.30 $34.34Drywall Finisher
5/1/2014 $11.14$23.30 $34.44Drywall Finisher
5/1/2015 $11.49$23.30 $34.79Drywall Finisher
5/1/2015 $16.67$27.01 $43.68Drywall Finisher
Page 2 of 15 Serial Number: 15-04228
Page 17
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2016 $11.89$23.30 $35.19Drywall Finisher
5/1/2017 $12.39$23.30 $35.69Drywall Finisher
6/3/2013 $18.31$40.78 $59.09Electric Lineman
6/2/2014 $19.35$42.68 $62.03Electric Lineman
6/1/2015 $19.88$44.63 $64.51Electric Lineman
5/30/2016 $20.29$46.16 $66.45Electric Lineman
6/1/2013 $20.18$28.00 $48.18Electricians
6/1/2014 $20.70$28.75 $49.45Electricians
6/1/2015 $21.34$29.50 $50.84Electricians
1/1/2009 $21.20$37.33 $58.53Elevator Constructor
1/1/2010 $22.82$38.84 $61.66Elevator Constructor
1/1/2011 $24.44$40.33 $64.77Elevator Constructor
1/1/2012 $26.06$41.84 $67.90Elevator Constructor
1/1/2008 $0.00$0.00 $0.00Elevator Tender (Use Elevator Apprentice
or Constructor)
5/1/2009 $7.53$25.05 $32.58Glazier
5/1/2010 $9.44$23.64 $33.08Glazier
5/1/2011 $9.44$24.64 $34.08Glazier
5/1/2012 $9.44$26.14 $35.58Glazier
7/1/2009 $21.85$27.07 $48.92Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2010 $23.09$27.77 $50.86Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2011 $24.09$29.02 $53.11Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2012 $25.11$29.52 $54.63Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2013 $25.11$31.05 $56.16Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2014 $25.11$32.58 $57.69Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
5/1/2013 $13.09$19.67 $32.76Laborers (Class 01 - See notes)
5/1/2014 $13.74$19.97 $33.71Laborers (Class 01 - See notes)
5/1/2015 $14.19$20.47 $34.66Laborers (Class 01 - See notes)
5/1/2016 $15.59$19.97 $35.56Laborers (Class 01 - See notes)
5/1/2010 $11.13$21.43 $32.56Laborers (Class 02 - See notes)
5/1/2011 $11.84$21.42 $33.26Laborers (Class 02 - See notes)
Page 3 of 15 Serial Number: 15-04228
Page 18
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2012 $12.64$21.42 $34.06Laborers (Class 02 - See notes)
5/1/2013 $13.09$21.67 $34.76Laborers (Class 02 - See notes)
5/1/2014 $13.74$21.97 $35.71Laborers (Class 02 - See notes)
5/1/2015 $14.19$22.47 $36.66Laborers (Class 02 - See notes)
5/1/2016 $15.59$21.97 $37.56Laborers (Class 02 - See notes)
5/1/2014 $13.82$21.69 $35.51Laborers (Class 03 - See notes)
5/1/2015 $14.27$22.19 $36.46Laborers (Class 03 - See notes)
5/1/2016 $15.77$21.69 $37.46Laborers (Class 03 - See notes)
5/1/2014 $13.82$23.19 $37.01Laborers (Class 04 - See notes)
5/1/2015 $14.27$23.69 $37.96Laborers (Class 04 - See notes)
5/1/2016 $15.77$23.19 $38.96Laborers (Class 04 - See notes)
5/1/2014 $13.82$23.69 $37.51Laborers (Class 05 - See notes)
5/1/2015 $14.27$24.19 $38.46Laborers (Class 05 - See notes)
5/1/2016 $15.77$23.69 $39.46Laborers (Class 05 - See notes)
5/1/2011 $11.84$20.77 $32.61Laborers (Class 06 - See notes)
5/1/2012 $12.64$20.77 $33.41Laborers (Class 06 - See notes)
5/1/2013 $13.09$21.02 $34.11Laborers (Class 06 - See notes)
5/1/2014 $13.74$21.32 $35.06Laborers (Class 06 - See notes)
5/1/2015 $14.19$21.82 $36.01Laborers (Class 06 - See notes)
5/1/2016 $15.59$21.32 $36.91Laborers (Class 06 - See notes)
5/1/2010 $13.99$28.91 $42.90Millwright
5/1/2011 $14.63$30.27 $44.90Millwright
5/1/2012 $15.26$31.14 $46.40Millwright
5/1/2013 $15.74$32.16 $47.90Millwright
5/1/2014 $16.23$33.17 $49.40Millwright
5/1/2015 $16.98$33.27 $50.25Millwright
5/1/2016 $17.51$33.59 $51.10Millwright
5/1/2017 $18.16$33.79 $51.95Millwright
5/1/2009 $16.89$29.42 $46.31Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2010 $17.85$30.76 $48.61Operators (Building/Heavy, Class 01 -
See Notes)
Page 4 of 15 Serial Number: 15-04228
Page 19
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2011 $18.85$32.06 $50.91Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2012 $20.25$32.06 $52.31Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2013 $21.65$32.06 $53.71Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2014 $22.41$32.70 $55.11Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2009 $17.55$31.67 $49.22Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2010 $18.51$33.01 $51.52Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2011 $19.51$34.31 $53.82Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2012 $20.91$34.31 $55.22Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2013 $22.31$34.31 $56.62Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2014 $23.07$34.95 $58.02Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2009 $16.81$29.13 $45.94Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2010 $17.77$30.47 $48.24Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2011 $18.77$31.77 $50.54Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2012 $20.17$31.77 $51.94Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2013 $21.57$31.77 $53.34Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2014 $22.33$32.41 $54.74Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2009 $17.48$31.38 $48.86Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2010 $18.44$32.72 $51.16Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2011 $19.44$34.02 $53.46Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2012 $20.84$34.02 $54.86Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2013 $22.24$34.02 $56.26Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2014 $23.00$34.66 $57.66Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2009 $15.94$26.22 $42.16Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2010 $16.91$27.55 $44.46Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2011 $17.91$28.85 $46.76Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2012 $19.31$28.85 $48.16Operators (Building/Heavy, Class 03 -
See Notes)
Page 5 of 15 Serial Number: 15-04228
Page 20
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2013 $20.71$28.85 $49.56Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2014 $21.47$29.49 $50.96Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2009 $15.61$25.08 $40.69Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2010 $16.57$26.42 $42.99Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2011 $17.57$27.72 $45.29Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2012 $18.97$27.72 $46.69Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2013 $20.37$27.72 $48.09Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2014 $21.14$28.35 $49.49Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2009 $15.47$24.64 $40.11Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2010 $16.47$25.97 $42.44Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2011 $17.44$27.27 $44.71Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2012 $18.84$27.27 $46.11Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2013 $20.24$27.27 $47.51Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2014 $21.01$27.90 $48.91Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2009 $15.21$23.76 $38.97Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2010 $16.18$25.09 $41.27Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2011 $17.18$26.39 $43.57Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2012 $18.58$26.39 $44.97Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2013 $19.98$26.39 $46.37Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2014 $20.75$27.02 $47.77Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2009 $19.38$35.30 $54.68Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2010 $20.43$36.91 $57.34Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2011 $21.53$38.47 $60.00Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2012 $23.16$38.47 $61.63Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2013 $24.79$38.47 $63.26Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2014 $25.69$39.24 $64.93Operators (Building/Heavy, Class 07/A -
See Notes)
Page 6 of 15 Serial Number: 15-04228
Page 21
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2009 $19.27$34.96 $54.23Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2010 $20.33$36.56 $56.89Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2011 $21.43$38.12 $59.55Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2012 $23.06$38.12 $61.18Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2013 $24.69$38.12 $62.81Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2014 $25.59$38.89 $64.48Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2013 $11.92$23.07 $34.99Painters Class 1 (see notes)
5/1/2014 $12.42$23.47 $35.89Painters Class 1 (see notes)
5/1/2012 $11.12$24.95 $36.07Painters Class 2 (see notes)
5/1/2013 $11.92$24.95 $36.87Painters Class 2 (see notes)
5/1/2014 $12.42$25.35 $37.77Painters Class 2 (see notes)
5/1/2012 $11.12$29.95 $41.07Painters Class 3 (see notes)
5/1/2013 $11.92$29.95 $41.87Painters Class 3 (see notes)
5/1/2014 $12.42$30.35 $42.77Painters Class 3 (see notes)
1/1/2010 $12.25$44.39 $56.64Pile Driver Divers (Building, Heavy,
Highway)
1/1/2011 $13.00$45.53 $58.53Pile Driver Divers (Building, Heavy,
Highway)
1/1/2012 $13.60$46.28 $59.88Pile Driver Divers (Building, Heavy,
Highway)
1/1/2013 $14.10$47.18 $61.28Pile Driver Divers (Building, Heavy,
Highway)
5/1/2014 $19.53$23.48 $43.01Plasterers
5/1/2015 $20.03$23.83 $43.86Plasterers
5/1/2014 $22.16$33.97 $56.13Plumbers and Steamfitters
5/1/2015 $22.56$34.87 $57.43Plumbers and Steamfitters
5/1/2013 $28.40$31.05 $59.45Roofers (Composition)
5/1/2014 $28.65$32.15 $60.80Roofers (Composition)
5/1/2015 $28.65$33.65 $62.30Roofers (Composition)
5/1/2012 $16.37$24.00 $40.37Roofers (Shingle, Slate, Tile)
5/1/2014 $17.37$24.50 $41.87Roofers (Shingle, Slate, Tile)
5/1/2015 $18.37$25.00 $43.37Roofers (Shingle, Slate, Tile)
6/1/2013 $30.45$31.58 $62.03Sheet Metal Workers
Page 7 of 15 Serial Number: 15-04228
Page 22
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
1/6/2014 $30.95$31.58 $62.53Sheet Metal Workers
6/1/2014 $30.98$32.55 $63.53Sheet Metal Workers
12/1/2014 $31.39$32.64 $64.03Sheet Metal Workers
6/1/2015 $32.39$32.64 $65.03Sheet Metal Workers
12/1/2015 $32.89$32.64 $65.53Sheet Metal Workers
7/1/2009 $15.99$24.17 $40.16Sign Makers and Hangars
5/21/2010 $16.37$24.33 $40.70Sign Makers and Hangars
1/1/2010 $17.60$33.85 $51.45Sprinklerfitters
1/1/2011 $18.45$33.35 $51.80Sprinklerfitters
4/1/2011 $18.45$34.18 $52.63Sprinklerfitters
1/1/2012 $18.60$34.18 $52.78Sprinklerfitters
4/1/2012 $18.65$35.21 $53.86Sprinklerfitters
1/1/2013 $18.80$35.21 $54.01Sprinklerfitters
4/1/2013 $20.12$33.03 $53.15Sprinklerfitters
7/1/2013 $20.12$33.69 $53.81Sprinklerfitters
4/1/2014 $20.47$34.36 $54.83Sprinklerfitters
4/1/2015 $20.62$35.05 $55.67Sprinklerfitters
5/1/2013 $14.58$29.13 $43.71Terrazzo Finisher
5/1/2014 $14.99$29.47 $44.46Terrazzo Finisher
5/1/2013 $17.54$28.39 $45.93Terrazzo Setter
5/1/2014 $18.01$28.67 $46.68Terrazzo Setter
5/1/2013 $12.73$24.62 $37.35Tile & Marble Finisher
5/1/2014 $13.14$24.91 $38.05Tile & Marble Finisher
5/1/2015 $13.30$25.55 $38.85Tile & Marble Finisher
5/1/2016 $13.56$26.19 $39.75Tile & Marble Finisher
5/1/2013 $14.21$27.28 $41.49Tile & Marble Layer
5/1/2014 $14.68$27.51 $42.19Tile & Marble Layer
5/1/2015 $14.90$28.09 $42.99Tile & Marble Layer
5/1/2016 $15.25$28.64 $43.89Tile & Marble Layer
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
Page 8 of 15 Serial Number: 15-04228
Page 23
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 9 of 15 Serial Number: 15-04228
Page 24
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2013 $12.84$27.92 $40.76Carpenters
5/1/2014 $13.24$28.72 $41.96Carpenters
5/1/2015 $13.83$29.13 $42.96Carpenters
5/1/2016 $14.54$29.67 $44.21Carpenters
5/1/2017 $15.34$30.12 $45.46Carpenters
5/1/2009 $11.03$16.22 $27.25Laborers (Class 01 - See notes)
5/1/2010 $11.88$16.77 $28.65Laborers (Class 01 - See notes)
5/1/2011 $12.78$17.32 $30.10Laborers (Class 01 - See notes)
5/1/2012 $13.39$17.71 $31.10Laborers (Class 01 - See notes)
5/1/2013 $14.04$18.16 $32.20Laborers (Class 01 - See notes)
5/1/2014 $14.69$18.66 $33.35Laborers (Class 01 - See notes)
5/1/2015 $15.34$19.21 $34.55Laborers (Class 01 - See notes)
5/1/2009 $11.03$22.84 $33.87Laborers (Class 02 - See notes)
5/1/2010 $11.88$23.39 $35.27Laborers (Class 02 - See notes)
5/1/2011 $12.78$23.94 $36.72Laborers (Class 02 - See notes)
5/1/2012 $13.39$24.33 $37.72Laborers (Class 02 - See notes)
5/1/2013 $14.04$24.78 $38.82Laborers (Class 02 - See notes)
5/1/2014 $14.69$25.28 $39.97Laborers (Class 02 - See notes)
5/1/2015 $15.34$25.83 $41.17Laborers (Class 02 - See notes)
5/1/2009 $11.03$19.83 $30.86Laborers (Class 03 - See notes)
5/1/2010 $11.88$20.38 $32.26Laborers (Class 03 - See notes)
5/1/2011 $12.78$20.93 $33.71Laborers (Class 03 - See notes)
5/1/2012 $13.39$21.32 $34.71Laborers (Class 03 - See notes)
5/1/2013 $14.04$21.77 $35.81Laborers (Class 03 - See notes)
5/1/2014 $14.69$22.27 $36.96Laborers (Class 03 - See notes)
5/1/2015 $15.34$22.82 $38.16Laborers (Class 03 - See notes)
5/1/2009 $11.03$20.18 $31.21Laborers (Class 04 - See notes)
5/1/2010 $11.88$20.73 $32.61Laborers (Class 04 - See notes)
5/1/2011 $12.78$21.28 $34.06Laborers (Class 04 - See notes)
5/1/2012 $13.39$21.67 $35.06Laborers (Class 04 - See notes)
5/1/2013 $14.04$22.12 $36.16Laborers (Class 04 - See notes)
Page 10 of 15 Serial Number: 15-04228
Page 25
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2014 $14.69$22.62 $37.31Laborers (Class 04 - See notes)
5/1/2015 $15.34$23.17 $38.51Laborers (Class 04 - See notes)
5/1/2009 $11.03$20.85 $31.88Laborers (Class 05 - See notes)
5/1/2010 $11.88$21.40 $33.28Laborers (Class 05 - See notes)
5/1/2011 $12.78$21.95 $34.73Laborers (Class 05 - See notes)
5/1/2012 $13.39$22.34 $35.73Laborers (Class 05 - See notes)
5/1/2013 $14.04$22.79 $36.83Laborers (Class 05 - See notes)
5/1/2014 $14.69$23.29 $37.98Laborers (Class 05 - See notes)
5/1/2015 $15.34$23.84 $39.18Laborers (Class 05 - See notes)
5/1/2009 $11.03$20.27 $31.30Laborers (Class 06 - See notes)
5/1/2010 $11.88$20.82 $32.70Laborers (Class 06 - See notes)
5/1/2011 $12.78$21.37 $34.15Laborers (Class 06 - See notes)
5/1/2012 $13.39$21.76 $35.15Laborers (Class 06 - See notes)
5/1/2013 $14.04$22.21 $36.25Laborers (Class 06 - See notes)
5/1/2014 $14.69$22.71 $37.40Laborers (Class 06 - See notes)
5/1/2015 $15.34$23.26 $38.60Laborers (Class 06 - See notes)
5/1/2009 $11.03$20.56 $31.59Laborers (Class 07 - See notes)
5/1/2010 $11.88$21.11 $32.99Laborers (Class 07 - See notes)
5/1/2011 $12.78$21.66 $34.44Laborers (Class 07 - See notes)
5/1/2012 $13.39$22.05 $35.44Laborers (Class 07 - See notes)
5/1/2013 $14.04$22.50 $36.54Laborers (Class 07 - See notes)
5/1/2014 $14.69$23.00 $37.69Laborers (Class 07 - See notes)
5/1/2015 $15.34$23.55 $38.89Laborers (Class 07 - See notes)
5/1/2009 $11.03$21.04 $32.07Laborers (Class 08 - See notes)
5/1/2010 $11.88$21.59 $33.47Laborers (Class 08 - See notes)
5/1/2011 $12.78$22.14 $34.92Laborers (Class 08 - See notes)
5/1/2012 $13.39$22.53 $35.92Laborers (Class 08 - See notes)
5/1/2013 $14.04$22.98 $37.02Laborers (Class 08 - See notes)
5/1/2014 $14.69$23.48 $38.17Laborers (Class 08 - See notes)
5/1/2015 $15.34$24.03 $39.37Laborers (Class 08 - See notes)
Page 11 of 15 Serial Number: 15-04228
Page 26
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2009 $16.30$27.45 $43.75Operators (Highway, Class 01 - See
Notes)
5/1/2010 $17.26$28.79 $46.05Operators (Highway, Class 01 - See
Notes)
5/1/2011 $18.26$30.09 $48.35Operators (Highway, Class 01 - See
Notes)
5/1/2012 $19.51$30.09 $49.60Operators (Highway, Class 01 - See
Notes)
5/1/2013 $20.76$30.09 $50.85Operators (Highway, Class 01 - See
Notes)
5/1/2014 $21.72$30.38 $52.10Operators (Highway, Class 01 - See
Notes)
5/1/2009 $16.98$29.70 $46.68Operators (Highway, Class 01a - See
Notes)
5/1/2010 $17.94$31.04 $48.98Operators (Highway, Class 01a - See
Notes)
5/1/2011 $18.94$32.34 $51.28Operators (Highway, Class 01a - See
Notes)
5/1/2012 $20.19$32.34 $52.53Operators (Highway, Class 01a - See
Notes)
5/1/2013 $21.44$32.34 $53.78Operators (Highway, Class 01a - See
Notes)
5/1/2014 $22.40$32.63 $55.03Operators (Highway, Class 01a - See
Notes)
5/1/2009 $15.96$26.27 $42.23Operators (Highway, Class 02 - See
Notes)
5/1/2010 $16.92$27.61 $44.53Operators (Highway, Class 02 - See
Notes)
5/1/2011 $17.92$28.91 $46.83Operators (Highway, Class 02 - See
Notes)
5/1/2012 $19.17$28.91 $48.08Operators (Highway, Class 02 - See
Notes)
5/1/2013 $20.42$28.91 $49.33Operators (Highway, Class 02 - See
Notes)
5/1/2014 $21.37$29.21 $50.58Operators (Highway, Class 02 - See
Notes)
5/1/2009 $15.75$25.58 $41.33Operators (Highway, Class 03 - See
Notes)
5/1/2010 $16.72$26.91 $43.63Operators (Highway, Class 03 - See
Notes)
5/1/2011 $17.72$28.21 $45.93Operators (Highway, Class 03 - See
Notes)
5/1/2012 $18.97$28.21 $47.18Operators (Highway, Class 03 - See
Notes)
5/1/2013 $20.22$28.21 $48.43Operators (Highway, Class 03 - See
Notes)
5/1/2014 $21.18$28.50 $49.68Operators (Highway, Class 03 - See
Notes)
5/1/2008 $14.61$23.84 $38.45Operators (Highway, Class 04 - See
Notes)
5/1/2009 $15.62$25.13 $40.75Operators (Highway, Class 04 - See
Notes)
Page 12 of 15 Serial Number: 15-04228
Page 27
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2010 $16.59$26.46 $43.05Operators (Highway, Class 04 - See
Notes)
5/1/2011 $17.59$27.76 $45.35Operators (Highway, Class 04 - See
Notes)
5/1/2012 $18.85$27.75 $46.60Operators (Highway, Class 04 - See
Notes)
5/1/2013 $20.10$27.75 $47.85Operators (Highway, Class 04 - See
Notes)
5/1/2014 $21.05$28.05 $49.10Operators (Highway, Class 04 - See
Notes)
5/1/2009 $15.47$24.62 $40.09Operators (Highway, Class 05 - See
Notes)
5/1/2010 $16.44$25.95 $42.39Operators (Highway, Class 05 - See
Notes)
5/1/2011 $17.44$27.25 $44.69Operators (Highway, Class 05 - See
Notes)
5/1/2012 $18.69$27.25 $45.94Operators (Highway, Class 05 - See
Notes)
5/1/2013 $19.94$27.25 $47.19Operators (Highway, Class 05 - See
Notes)
5/1/2014 $20.90$27.54 $48.44Operators (Highway, Class 05 - See
Notes)
5/1/2009 $16.36$27.69 $44.05Operators (Highway, Class 06 - See
Notes)
5/1/2010 $17.32$29.03 $46.35Operators (Highway, Class 06 - See
Notes)
5/1/2011 $18.32$30.33 $48.65Operators (Highway, Class 06 - See
Notes)
5/1/2012 $19.57$30.33 $49.90Operators (Highway, Class 06 - See
Notes)
5/1/2013 $20.82$30.33 $51.15Operators (Highway, Class 06 - See
Notes)
5/1/2014 $21.78$30.62 $52.40Operators (Highway, Class 06 - See
Notes)
5/1/2009 $17.02$29.94 $46.96Operators (Highway, Class 06/A - See
Notes)
5/1/2010 $17.98$31.28 $49.26Operators (Highway, Class 06/A - See
Notes)
5/1/2011 $18.98$32.58 $51.56Operators (Highway, Class 06/A - See
Notes)
5/1/2012 $20.23$32.59 $52.82Operators (Highway, Class 06/A - See
Notes)
5/1/2013 $21.48$32.58 $54.06Operators (Highway, Class 06/A - See
Notes)
5/1/2014 $22.44$32.87 $55.31Operators (Highway, Class 06/A - See
Notes)
5/1/2009 $18.67$32.94 $51.61Operators (Highway, Class 07/A - See
Notes)
5/1/2010 $19.72$34.55 $54.27Operators (Highway, Class 07/A - See
Notes)
5/1/2011 $20.83$36.10 $56.93Operators (Highway, Class 07/A - See
Notes)
Page 13 of 15 Serial Number: 15-04228
Page 28
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2012 $22.28$36.10 $58.38Operators (Highway, Class 07/A - See
Notes)
5/1/2013 $23.73$36.10 $59.83Operators (Highway, Class 07/A - See
Notes)
5/1/2014 $24.88$36.45 $61.33Operators (Highway, Class 07/A - See
Notes)
5/1/2009 $18.25$31.53 $49.78Operators (Highway, Class 07/B - See
Notes)
5/1/2010 $19.31$33.13 $52.44Operators (Highway, Class 07/B - See
Notes)
5/1/2011 $20.41$34.69 $55.10Operators (Highway, Class 07/B - See
Notes)
5/1/2012 $21.86$34.69 $56.55Operators (Highway, Class 07/B - See
Notes)
5/1/2013 $23.31$34.69 $58.00Operators (Highway, Class 07/B - See
Notes)
5/1/2014 $24.46$35.04 $59.50Operators (Highway, Class 07/B - See
Notes)
5/1/2009 $9.86$25.30 $35.16Piledrivers
5/1/2010 $10.83$25.98 $36.81Piledrivers
5/1/2011 $11.43$27.03 $38.46Piledrivers
5/1/2010 $26.09$30.27 $56.36Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2012 $26.86$34.87 $61.73Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2013 $27.73$36.02 $63.75Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2014 $28.83$37.19 $66.02Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 14 of 15 Serial Number: 15-04228
Page 29
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
Notes:
If you can not find a classification under Heavy/Highway please refer to the Building classifications.
The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes to clarify existing
tasks performed throughout the Commonwealth. The “Building Laborer Notes” link on the Bureau’s website provides a list
of those tasks that should be read in conformity with custom and usage of the construction industry in the geographic
region in which they are utilized.
For further information on construction types review the
on the Labor and Industry Website. Go to www.dli.state.pa.us, scroll down to the picture labeled "Labor Law Compliance"
and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link.
"Notes as Referenced in Predeterminations"
Page 15 of 15 Serial Number: 15-04228
Page 30
6/24/2015Determination Date:
HighwayProject Classification:
15-04229Serial Number:
8/18/2015Contract Award Date:
Awarding Agency:
Installation of Durable Pavement Markings (151-03-03)Project Name:
PREVAILING WAGES PROJECT RATES
Assigned Field Office:
Lancaster County
800-932-0665Toll Free Phone Number:
717-787-4763Field Office Phone Number:
Harrisburg
PA Turnpike Commission
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
6/28/2010 $20.13$30.63 $50.76Asbestos & Insulation Workers
6/27/2011 $18.88$33.88 $52.76Asbestos & Insulation Workers
7/2/2012 $21.59$32.17 $53.76Asbestos & Insulation Workers
7/1/2013 $22.59$32.17 $54.76Asbestos & Insulation Workers
6/30/2014 $23.86$31.90 $55.76Asbestos & Insulation Workers
1/1/2010 $15.15$23.59 $38.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2011 $16.02$24.22 $40.24Boilermaker (Commercial, Institutional,
and Minor Repair Work)
5/1/2012 $16.90$24.84 $41.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
4/1/2013 $17.51$25.53 $43.04Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2014 $17.95$25.79 $43.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2015 $18.22$26.52 $44.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2011 $28.12$37.35 $65.47Boilermakers
1/1/2012 $29.85$37.62 $67.47Boilermakers
1/1/2013 $31.13$38.69 $69.82Boilermakers
4/1/2013 $31.43$38.54 $69.97Boilermakers
1/1/2014 $32.81$39.06 $71.87Boilermakers
1/1/2015 $33.31$40.31 $73.62Boilermakers
Page 1 of 15 06/24/2015
Page 31
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2013 $14.49$30.75 $45.24Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2014 $14.96$31.08 $46.04Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2015 $15.18$31.71 $46.89Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2016 $15.53$32.26 $47.79Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
6/1/2008 $11.02$23.31 $34.33Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2009 $11.52$24.56 $36.08Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2010 $12.02$25.71 $37.73Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2011 $12.52$26.86 $39.38Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2012 $13.25$26.88 $40.13Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2013 $13.80$27.18 $40.98Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2014 $14.37$27.57 $41.94Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
5/1/2014 $20.15$26.60 $46.75Cement Finishers
5/1/2015 $20.40$27.20 $47.60Cement Finishers
1/1/2010 $12.25$29.95 $42.20Dockbuilder, Pile Drivers
1/1/2011 $13.10$30.35 $43.45Dockbuilder, Pile Drivers
1/1/2012 $13.70$30.85 $44.55Dockbuilder, Pile Drivers
1/1/2013 $14.20$31.45 $45.65Dockbuilder, Pile Drivers
5/1/2013 $11.04$23.30 $34.34Drywall Finisher
5/1/2014 $11.14$23.30 $34.44Drywall Finisher
5/1/2015 $11.49$23.30 $34.79Drywall Finisher
5/1/2016 $11.89$23.30 $35.19Drywall Finisher
5/1/2017 $12.39$23.30 $35.69Drywall Finisher
6/3/2013 $18.31$40.78 $59.09Electric Lineman
6/2/2014 $19.35$42.68 $62.03Electric Lineman
6/1/2015 $19.88$44.63 $64.51Electric Lineman
Page 2 of 15 Serial Number: 15-04229
Page 32
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/30/2016 $20.29$46.16 $66.45Electric Lineman
9/1/2013 $18.57$33.62 $52.19Electricians
2/1/2014 $18.81$33.37 $52.18Electricians
9/1/2014 $19.58$33.87 $53.45Electricians
1/1/2009 $21.20$37.33 $58.53Elevator Constructor
1/1/2010 $22.82$38.84 $61.66Elevator Constructor
1/1/2011 $24.44$40.33 $64.77Elevator Constructor
1/1/2012 $26.06$41.84 $67.90Elevator Constructor
1/1/2005 $0.00$0.00 $0.00Elevator Tender (Use Elevator Apprentice
or Constructor)
5/1/2009 $7.53$25.05 $32.58Glazier
5/1/2010 $9.44$23.64 $33.08Glazier
5/1/2011 $9.44$24.64 $34.08Glazier
5/1/2012 $9.44$26.14 $35.58Glazier
7/1/2011 $22.70$29.50 $52.20Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2012 $22.70$30.50 $53.20Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2013 $22.70$31.75 $54.45Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2014 $25.25$30.70 $55.95Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
5/1/2009 $8.28$19.29 $27.57Laborers (Class 01 - See notes)
5/1/2010 $8.68$20.19 $28.87Laborers (Class 01 - See notes)
5/1/2011 $9.18$20.19 $29.37Laborers (Class 01 - See notes)
5/1/2012 $9.98$20.19 $30.17Laborers (Class 01 - See notes)
5/1/2013 $10.43$20.44 $30.87Laborers (Class 01 - See notes)
5/1/2014 $11.23$20.59 $31.82Laborers (Class 01 - See notes)
5/1/2015 $12.03$20.74 $32.77Laborers (Class 01 - See notes)
5/1/2016 $12.83$20.84 $33.67Laborers (Class 01 - See notes)
5/1/2009 $8.28$21.29 $29.57Laborers (Class 02 - See notes)
5/1/2010 $8.68$22.19 $30.87Laborers (Class 02 - See notes)
5/1/2011 $9.18$22.19 $31.37Laborers (Class 02 - See notes)
5/1/2012 $9.98$22.19 $32.17Laborers (Class 02 - See notes)
5/1/2013 $10.43$22.44 $32.87Laborers (Class 02 - See notes)
Page 3 of 15 Serial Number: 15-04229
Page 33
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2014 $11.23$22.59 $33.82Laborers (Class 02 - See notes)
5/1/2015 $12.03$22.74 $34.77Laborers (Class 02 - See notes)
5/1/2016 $12.83$22.84 $35.67Laborers (Class 02 - See notes)
5/1/2014 $11.41$22.87 $34.28Laborers (Class 03 - See notes)
5/1/2015 $12.21$23.02 $35.23Laborers (Class 03 - See notes)
5/1/2016 $13.01$23.22 $36.23Laborers (Class 03 - See notes)
5/1/2014 $11.41$24.37 $35.78Laborers (Class 04 - See notes)
5/1/2015 $12.21$24.52 $36.73Laborers (Class 04 - See notes)
5/1/2016 $13.01$24.72 $37.73Laborers (Class 04 - See notes)
5/1/2014 $11.41$24.87 $36.28Laborers (Class 05 - See notes)
5/1/2015 $12.21$25.02 $37.23Laborers (Class 05 - See notes)
5/1/2016 $13.01$25.22 $38.23Laborers (Class 05 - See notes)
5/1/2011 $9.18$22.19 $31.37Laborers (Class 06 - See notes)
5/1/2012 $9.98$22.19 $32.17Laborers (Class 06 - See notes)
5/1/2013 $10.43$22.44 $32.87Laborers (Class 06 - See notes)
5/1/2014 $11.23$22.59 $33.82Laborers (Class 06 - See notes)
5/1/2015 $12.03$22.74 $34.77Laborers (Class 06 - See notes)
5/1/2016 $12.83$22.84 $35.67Laborers (Class 06 - See notes)
5/1/2010 $13.99$28.91 $42.90Millwright
5/1/2011 $14.63$30.27 $44.90Millwright
5/1/2012 $15.26$31.14 $46.40Millwright
5/1/2013 $15.74$32.16 $47.90Millwright
5/1/2014 $16.33$33.17 $49.50Millwright
5/1/2009 $16.89$29.42 $46.31Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2010 $17.85$30.76 $48.61Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2011 $18.85$32.06 $50.91Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2012 $20.25$32.06 $52.31Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2013 $21.65$32.06 $53.71Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2014 $22.41$32.70 $55.11Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2009 $17.55$31.67 $49.22Operators (Building/Heavy, Class 01a -
See Notes)
Page 4 of 15 Serial Number: 15-04229
Page 34
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2010 $18.51$33.01 $51.52Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2011 $19.51$34.31 $53.82Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2012 $20.91$34.31 $55.22Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2013 $22.31$34.31 $56.62Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2014 $23.07$34.95 $58.02Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2009 $16.81$29.13 $45.94Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2010 $17.77$30.47 $48.24Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2011 $18.77$31.77 $50.54Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2012 $20.17$31.77 $51.94Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2013 $21.57$31.77 $53.34Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2014 $22.33$32.41 $54.74Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2009 $17.48$31.38 $48.86Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2010 $18.44$32.72 $51.16Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2011 $19.44$34.02 $53.46Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2012 $20.84$34.02 $54.86Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2013 $22.24$34.02 $56.26Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2014 $23.00$34.66 $57.66Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2009 $15.94$26.22 $42.16Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2010 $16.91$27.55 $44.46Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2011 $17.91$28.85 $46.76Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2012 $19.31$28.85 $48.16Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2013 $20.71$28.85 $49.56Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2014 $21.47$29.49 $50.96Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2009 $15.61$25.08 $40.69Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2010 $16.57$26.42 $42.99Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2011 $17.57$27.72 $45.29Operators (Building/Heavy, Class 04 -
See Notes)
Page 5 of 15 Serial Number: 15-04229
Page 35
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2012 $18.97$27.72 $46.69Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2013 $20.37$27.72 $48.09Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2014 $21.14$28.35 $49.49Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2009 $15.47$24.64 $40.11Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2010 $16.44$25.97 $42.41Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2011 $17.44$27.27 $44.71Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2012 $18.84$27.27 $46.11Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2013 $20.24$27.27 $47.51Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2014 $21.01$27.90 $48.91Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2009 $15.21$23.76 $38.97Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2010 $16.18$25.09 $41.27Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2011 $17.18$26.39 $43.57Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2012 $18.58$26.39 $44.97Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2013 $19.98$26.39 $46.37Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2014 $20.75$27.02 $47.77Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2009 $19.38$35.30 $54.68Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2010 $20.43$36.91 $57.34Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2011 $21.53$38.47 $60.00Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2012 $23.16$38.47 $61.63Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2013 $24.79$38.47 $63.26Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2014 $25.69$39.24 $64.93Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2009 $19.27$34.96 $54.23Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2010 $20.33$36.56 $56.89Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2011 $21.43$38.12 $59.55Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2012 $23.06$38.12 $61.18Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2013 $24.69$38.12 $62.81Operators (Building/Heavy, Class 07/B -
See Notes)
Page 6 of 15 Serial Number: 15-04229
Page 36
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2014 $25.59$38.89 $64.48Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2013 $11.92$23.07 $34.99Painters Class 1 (see notes)
5/1/2014 $12.42$23.47 $35.89Painters Class 1 (see notes)
5/1/2015 $12.42$23.47 $35.89Painters Class 1 (see notes)
5/1/2016 $12.82$23.47 $36.29Painters Class 1 (see notes)
5/1/2017 $13.32$23.47 $36.79Painters Class 1 (see notes)
5/1/2011 $11.32$24.05 $35.37Painters Class 2 (see notes)
5/1/2012 $11.12$24.95 $36.07Painters Class 2 (see notes)
5/1/2013 $11.92$24.95 $36.87Painters Class 2 (see notes)
5/1/2014 $12.82$24.95 $37.77Painters Class 2 (see notes)
5/1/2015 $12.42$25.60 $38.02Painters Class 2 (see notes)
5/1/2016 $12.82$25.60 $38.42Painters Class 2 (see notes)
5/1/2017 $13.32$25.60 $38.92Painters Class 2 (see notes)
5/1/2011 $11.32$28.05 $39.37Painters Class 3 (see notes)
5/1/2012 $11.12$29.95 $41.07Painters Class 3 (see notes)
5/1/2013 $11.92$29.95 $41.87Painters Class 3 (see notes)
5/1/2014 $12.42$30.35 $42.77Painters Class 3 (see notes)
5/1/2015 $12.42$31.35 $43.77Painters Class 3 (see notes)
5/1/2016 $12.82$31.35 $44.17Painters Class 3 (see notes)
5/1/2017 $13.32$31.35 $44.67Painters Class 3 (see notes)
1/1/2007 $10.77$40.40 $51.17Pile Driver Divers (Building, Heavy,
Highway)
1/1/2010 $12.25$44.39 $56.64Pile Driver Divers (Building, Heavy,
Highway)
1/1/2011 $13.00$45.53 $58.53Pile Driver Divers (Building, Heavy,
Highway)
1/1/2012 $13.60$46.28 $59.88Pile Driver Divers (Building, Heavy,
Highway)
1/1/2013 $14.10$47.18 $61.28Pile Driver Divers (Building, Heavy,
Highway)
5/1/2014 $19.53$23.48 $43.01Plasterers
5/1/2015 $20.03$23.83 $43.86Plasterers
5/1/2014 $22.16$33.97 $56.13Plumbers and Steamfitters
5/1/2015 $22.56$34.87 $57.43Plumbers and Steamfitters
5/1/2013 $28.40$31.05 $59.45Roofers (Composition)
Page 7 of 15 Serial Number: 15-04229
Page 37
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2014 $28.65$32.15 $60.80Roofers (Composition)
5/1/2015 $28.65$33.65 $62.30Roofers (Composition)
5/1/2012 $16.37$24.00 $40.37Roofers (Shingle, Slate, Tile)
5/1/2014 $17.37$24.50 $41.87Roofers (Shingle, Slate, Tile)
5/1/2015 $18.37$25.00 $43.37Roofers (Shingle, Slate, Tile)
6/1/2013 $30.45$31.58 $62.03Sheet Metal Workers
1/6/2014 $30.95$31.58 $62.53Sheet Metal Workers
6/1/2014 $30.98$32.55 $63.53Sheet Metal Workers
12/1/2014 $31.39$32.64 $64.03Sheet Metal Workers
6/1/2015 $32.39$32.64 $65.03Sheet Metal Workers
12/1/2015 $32.89$32.64 $65.53Sheet Metal Workers
7/1/2009 $15.99$24.17 $40.16Sign Makers and Hangars
5/21/2010 $16.37$24.33 $40.70Sign Makers and Hangars
1/1/2010 $17.60$33.85 $51.45Sprinklerfitters
1/1/2011 $18.45$33.35 $51.80Sprinklerfitters
4/1/2011 $18.45$34.18 $52.63Sprinklerfitters
1/1/2012 $18.60$34.18 $52.78Sprinklerfitters
4/1/2012 $18.65$35.21 $53.86Sprinklerfitters
1/1/2013 $18.80$35.21 $54.01Sprinklerfitters
4/1/2013 $20.12$33.03 $53.15Sprinklerfitters
7/1/2013 $20.12$33.69 $53.81Sprinklerfitters
4/1/2014 $20.47$34.36 $54.83Sprinklerfitters
4/1/2015 $20.62$35.05 $55.67Sprinklerfitters
5/1/2013 $14.58$29.13 $43.71Terrazzo Finisher
5/1/2014 $14.99$29.47 $44.46Terrazzo Finisher
5/1/2013 $17.54$28.39 $45.93Terrazzo Setter
5/1/2014 $18.01$28.67 $46.68Terrazzo Setter
5/1/2013 $12.73$24.62 $37.35Tile & Marble Finisher
5/1/2014 $13.14$24.91 $38.05Tile & Marble Finisher
5/1/2015 $13.30$25.55 $38.85Tile & Marble Finisher
5/1/2016 $13.56$26.19 $39.75Tile & Marble Finisher
Page 8 of 15 Serial Number: 15-04229
Page 38
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2013 $14.21$27.28 $41.49Tile & Marble Layer
5/1/2014 $14.68$27.51 $42.19Tile & Marble Layer
5/1/2015 $14.90$28.09 $42.99Tile & Marble Layer
5/1/2016 $15.25$28.64 $43.89Tile & Marble Layer
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 9 of 15 Serial Number: 15-04229
Page 39
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2009 $9.86$25.30 $35.16Carpenters
5/1/2010 $10.83$25.98 $36.81Carpenters
5/1/2011 $11.43$27.03 $38.46Carpenters
5/1/2012 $12.38$27.18 $39.56Carpenters
5/1/2013 $12.84$27.92 $40.76Carpenters
5/1/2014 $13.24$28.72 $41.96Carpenters
5/1/2013 $14.04$18.16 $32.20Laborers (Class 01 - See notes)
5/1/2014 $14.69$18.66 $33.35Laborers (Class 01 - See notes)
5/1/2015 $15.34$19.21 $34.55Laborers (Class 01 - See notes)
5/1/2009 $11.03$22.84 $33.87Laborers (Class 02 - See notes)
5/1/2010 $11.88$23.39 $35.27Laborers (Class 02 - See notes)
5/1/2011 $12.78$23.94 $36.72Laborers (Class 02 - See notes)
5/1/2012 $13.39$24.33 $37.72Laborers (Class 02 - See notes)
5/1/2013 $14.04$24.78 $38.82Laborers (Class 02 - See notes)
5/1/2014 $14.69$25.28 $39.97Laborers (Class 02 - See notes)
5/1/2015 $15.34$25.83 $41.17Laborers (Class 02 - See notes)
5/1/2009 $11.03$19.83 $30.86Laborers (Class 03 - See notes)
5/1/2010 $11.88$20.38 $32.26Laborers (Class 03 - See notes)
5/1/2011 $12.78$20.93 $33.71Laborers (Class 03 - See notes)
5/1/2012 $13.39$21.32 $34.71Laborers (Class 03 - See notes)
5/1/2013 $14.04$21.77 $35.81Laborers (Class 03 - See notes)
5/1/2014 $14.69$22.27 $36.96Laborers (Class 03 - See notes)
5/1/2015 $15.34$22.82 $38.16Laborers (Class 03 - See notes)
5/1/2009 $11.03$20.18 $31.21Laborers (Class 04 - See notes)
5/1/2010 $11.88$20.73 $32.61Laborers (Class 04 - See notes)
5/1/2011 $12.78$21.28 $34.06Laborers (Class 04 - See notes)
5/1/2012 $13.39$21.67 $35.06Laborers (Class 04 - See notes)
5/1/2013 $14.04$22.12 $36.16Laborers (Class 04 - See notes)
5/1/2014 $14.69$22.62 $37.31Laborers (Class 04 - See notes)
5/1/2015 $15.34$23.17 $38.51Laborers (Class 04 - See notes)
5/1/2009 $11.03$20.85 $31.88Laborers (Class 05 - See notes)
Page 10 of 15 Serial Number: 15-04229
Page 40
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2010 $11.88$21.40 $33.28Laborers (Class 05 - See notes)
5/1/2011 $12.78$21.95 $34.73Laborers (Class 05 - See notes)
5/1/2012 $13.39$22.34 $35.73Laborers (Class 05 - See notes)
5/1/2013 $14.04$22.79 $36.83Laborers (Class 05 - See notes)
5/1/2014 $14.69$23.29 $37.98Laborers (Class 05 - See notes)
5/1/2015 $15.34$23.84 $39.18Laborers (Class 05 - See notes)
5/1/2009 $11.03$20.27 $31.30Laborers (Class 06 - See notes)
5/1/2010 $11.88$20.82 $32.70Laborers (Class 06 - See notes)
5/1/2011 $12.78$21.37 $34.15Laborers (Class 06 - See notes)
5/1/2012 $13.39$21.76 $35.15Laborers (Class 06 - See notes)
5/1/2013 $14.04$22.21 $36.25Laborers (Class 06 - See notes)
5/1/2014 $14.69$22.71 $37.40Laborers (Class 06 - See notes)
5/1/2015 $15.34$23.26 $38.60Laborers (Class 06 - See notes)
5/1/2009 $11.03$20.56 $31.59Laborers (Class 07 - See notes)
5/1/2010 $11.88$21.11 $32.99Laborers (Class 07 - See notes)
5/1/2011 $12.78$21.66 $34.44Laborers (Class 07 - See notes)
5/1/2012 $13.39$22.05 $35.44Laborers (Class 07 - See notes)
5/1/2013 $14.04$22.50 $36.54Laborers (Class 07 - See notes)
5/1/2014 $14.69$23.00 $37.69Laborers (Class 07 - See notes)
5/1/2015 $15.34$23.55 $38.89Laborers (Class 07 - See notes)
5/1/2009 $11.03$21.04 $32.07Laborers (Class 08 - See notes)
5/1/2010 $11.88$21.59 $33.47Laborers (Class 08 - See notes)
5/1/2011 $12.78$22.14 $34.92Laborers (Class 08 - See notes)
5/1/2012 $13.39$22.53 $35.92Laborers (Class 08 - See notes)
5/1/2013 $14.04$22.98 $37.02Laborers (Class 08 - See notes)
5/1/2014 $14.69$23.48 $38.17Laborers (Class 08 - See notes)
5/1/2015 $15.34$24.03 $39.37Laborers (Class 08 - See notes)
5/1/2009 $16.30$27.45 $43.75Operators (Highway, Class 01 - See
Notes)
5/1/2010 $17.26$28.79 $46.05Operators (Highway, Class 01 - See
Notes)
5/1/2011 $18.26$30.09 $48.35Operators (Highway, Class 01 - See
Notes)
Page 11 of 15 Serial Number: 15-04229
Page 41
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2012 $19.51$30.09 $49.60Operators (Highway, Class 01 - See
Notes)
5/1/2013 $20.76$30.09 $50.85Operators (Highway, Class 01 - See
Notes)
5/1/2014 $21.72$30.38 $52.10Operators (Highway, Class 01 - See
Notes)
5/1/2009 $16.98$29.70 $46.68Operators (Highway, Class 01a - See
Notes)
5/1/2010 $17.94$31.04 $48.98Operators (Highway, Class 01a - See
Notes)
5/1/2011 $18.94$32.34 $51.28Operators (Highway, Class 01a - See
Notes)
5/1/2012 $20.19$32.34 $52.53Operators (Highway, Class 01a - See
Notes)
5/1/2013 $21.44$32.34 $53.78Operators (Highway, Class 01a - See
Notes)
5/1/2014 $22.40$32.63 $55.03Operators (Highway, Class 01a - See
Notes)
5/1/2009 $15.96$26.27 $42.23Operators (Highway, Class 02 - See
Notes)
5/1/2010 $16.92$27.61 $44.53Operators (Highway, Class 02 - See
Notes)
5/1/2011 $17.92$28.91 $46.83Operators (Highway, Class 02 - See
Notes)
5/1/2012 $19.17$28.91 $48.08Operators (Highway, Class 02 - See
Notes)
5/1/2013 $20.42$28.91 $49.33Operators (Highway, Class 02 - See
Notes)
5/1/2014 $21.37$29.21 $50.58Operators (Highway, Class 02 - See
Notes)
5/1/2009 $15.75$25.58 $41.33Operators (Highway, Class 03 - See
Notes)
5/1/2010 $16.72$26.91 $43.63Operators (Highway, Class 03 - See
Notes)
5/1/2011 $17.72$28.21 $45.93Operators (Highway, Class 03 - See
Notes)
5/1/2012 $18.97$28.21 $47.18Operators (Highway, Class 03 - See
Notes)
5/1/2013 $20.22$28.21 $48.43Operators (Highway, Class 03 - See
Notes)
5/1/2014 $21.18$28.50 $49.68Operators (Highway, Class 03 - See
Notes)
5/1/2009 $15.62$25.13 $40.75Operators (Highway, Class 04 - See
Notes)
5/1/2010 $16.59$26.46 $43.05Operators (Highway, Class 04 - See
Notes)
5/1/2011 $17.59$27.76 $45.35Operators (Highway, Class 04 - See
Notes)
5/1/2012 $18.85$27.75 $46.60Operators (Highway, Class 04 - See
Notes)
5/1/2013 $20.10$27.75 $47.85Operators (Highway, Class 04 - See
Notes)
Page 12 of 15 Serial Number: 15-04229
Page 42
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2014 $21.05$28.05 $49.10Operators (Highway, Class 04 - See
Notes)
5/1/2009 $15.47$24.62 $40.09Operators (Highway, Class 05 - See
Notes)
5/1/2010 $16.44$25.95 $42.39Operators (Highway, Class 05 - See
Notes)
5/1/2011 $17.44$27.25 $44.69Operators (Highway, Class 05 - See
Notes)
5/1/2012 $18.69$27.25 $45.94Operators (Highway, Class 05 - See
Notes)
5/1/2013 $19.94$27.25 $47.19Operators (Highway, Class 05 - See
Notes)
5/1/2014 $20.90$27.54 $48.44Operators (Highway, Class 05 - See
Notes)
5/1/2009 $16.36$27.69 $44.05Operators (Highway, Class 06 - See
Notes)
5/1/2010 $17.32$29.03 $46.35Operators (Highway, Class 06 - See
Notes)
5/1/2011 $18.32$30.33 $48.65Operators (Highway, Class 06 - See
Notes)
5/1/2012 $19.57$30.33 $49.90Operators (Highway, Class 06 - See
Notes)
5/1/2013 $20.82$30.33 $51.15Operators (Highway, Class 06 - See
Notes)
5/1/2014 $21.78$30.62 $52.40Operators (Highway, Class 06 - See
Notes)
5/1/2009 $17.02$29.94 $46.96Operators (Highway, Class 06/A - See
Notes)
5/1/2010 $17.98$31.28 $49.26Operators (Highway, Class 06/A - See
Notes)
5/1/2011 $18.98$32.58 $51.56Operators (Highway, Class 06/A - See
Notes)
5/1/2012 $20.23$32.59 $52.82Operators (Highway, Class 06/A - See
Notes)
5/1/2013 $21.48$32.58 $54.06Operators (Highway, Class 06/A - See
Notes)
5/1/2014 $22.44$32.87 $55.31Operators (Highway, Class 06/A - See
Notes)
5/1/2009 $18.67$32.94 $51.61Operators (Highway, Class 07/A - See
Notes)
2/1/2010 $19.72$34.55 $54.27Operators (Highway, Class 07/A - See
Notes)
5/1/2011 $20.83$36.10 $56.93Operators (Highway, Class 07/A - See
Notes)
5/1/2012 $22.28$36.10 $58.38Operators (Highway, Class 07/A - See
Notes)
5/1/2013 $23.73$36.10 $59.83Operators (Highway, Class 07/A - See
Notes)
5/1/2014 $24.88$36.45 $61.33Operators (Highway, Class 07/A - See
Notes)
5/1/2009 $18.25$31.53 $49.78Operators (Highway, Class 07/B - See
Notes)
Page 13 of 15 Serial Number: 15-04229
Page 43
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2010 $19.31$33.13 $52.44Operators (Highway, Class 07/B - See
Notes)
5/1/2011 $20.41$34.69 $55.10Operators (Highway, Class 07/B - See
Notes)
5/1/2012 $21.86$34.69 $56.55Operators (Highway, Class 07/B - See
Notes)
5/1/2013 $23.31$34.69 $58.00Operators (Highway, Class 07/B - See
Notes)
5/1/2014 $24.46$35.04 $59.50Operators (Highway, Class 07/B - See
Notes)
5/1/2009 $9.86$25.30 $35.16Piledrivers
5/1/2010 $10.83$25.98 $36.81Piledrivers
5/1/2011 $11.43$27.03 $38.46Piledrivers
5/1/2010 $26.09$30.27 $56.36Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2012 $26.86$34.87 $61.73Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2013 $27.73$36.02 $63.75Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2014 $28.83$37.19 $66.02Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 14 of 15 Serial Number: 15-04229
Page 44
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
Notes:
If you can not find a classification under Heavy/Highway please refer to the Building classifications.
The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes to clarify existing
tasks performed throughout the Commonwealth. The “Building Laborer Notes” link on the Bureau’s website provides a list
of those tasks that should be read in conformity with custom and usage of the construction industry in the geographic
region in which they are utilized.
For further information on construction types review the
on the Labor and Industry Website. Go to www.dli.state.pa.us, scroll down to the picture labeled "Labor Law Compliance"
and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link.
"Notes as Referenced in Predeterminations"
Page 15 of 15 Serial Number: 15-04229
Page 45
6/24/2015Determination Date:
HighwayProject Classification:
15-04230Serial Number:
8/18/2015Contract Award Date:
Awarding Agency:
Installation of Durable Pavement Markings (151-03-03)Project Name:
PREVAILING WAGES PROJECT RATES
Assigned Field Office:
Berks County
877-214-3962Toll Free Phone Number:
570-963-4577Field Office Phone Number:
Scranton
PA Turnpike Commission
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
6/28/2010 $20.13$30.63 $50.76Asbestos & Insulation Workers
6/27/2011 $21.09$31.67 $52.76Asbestos & Insulation Workers
7/2/2012 $21.59$32.17 $53.76Asbestos & Insulation Workers
7/1/2013 $22.59$32.17 $54.76Asbestos & Insulation Workers
6/30/2014 $23.86$31.90 $55.76Asbestos & Insulation Workers
1/1/2010 $15.15$23.59 $38.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2011 $16.02$24.22 $40.24Boilermaker (Commercial, Institutional,
and Minor Repair Work)
5/1/2012 $16.90$24.84 $41.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
4/1/2013 $17.51$25.53 $43.04Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2014 $17.95$25.79 $43.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2015 $18.22$26.52 $44.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2012 $29.85$37.62 $67.47Boilermakers
1/1/2013 $31.13$38.69 $69.82Boilermakers
4/1/2013 $31.43$38.54 $69.97Boilermakers
1/1/2014 $32.81$39.06 $71.87Boilermakers
1/1/2015 $33.31$40.31 $73.62Boilermakers
5/1/2013 $14.40$31.54 $45.94Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
Page 1 of 13 06/24/2015
Page 46
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2014 $14.72$32.02 $46.74Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2015 $14.79$32.80 $47.59Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2016 $14.91$33.58 $48.49Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
6/1/2008 $9.67$24.42 $34.09Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2009 $10.27$25.69 $35.96Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2010 $11.02$26.71 $37.73Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2011 $11.77$27.61 $39.38Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2012 $13.25$26.88 $40.13Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2013 $13.80$27.18 $40.98Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2014 $14.37$27.57 $41.94Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
5/1/2010 $10.75$30.85 $41.60Cement Finishers
5/1/2011 $11.15$32.45 $43.60Cement Finishers
5/1/2012 $11.15$33.30 $44.45Cement Finishers
5/1/2013 $11.15$34.15 $45.30Cement Finishers
5/1/2014 $11.15$35.05 $46.20Cement Finishers
5/1/2015 $11.58$35.47 $47.05Cement Finishers
1/1/2010 $12.25$29.95 $42.20Dockbuilder, Pile Drivers
1/1/2011 $13.10$30.35 $43.45Dockbuilder, Pile Drivers
1/1/2012 $13.70$30.85 $44.55Dockbuilder, Pile Drivers
1/1/2013 $14.20$31.45 $45.65Dockbuilder, Pile Drivers
5/1/2014 $16.12$26.51 $42.63Drywall Finisher
5/1/2015 $16.67$27.01 $43.68Drywall Finisher
6/3/2013 $18.31$40.78 $59.09Electric Lineman
6/2/2014 $19.35$42.68 $62.03Electric Lineman
6/1/2015 $19.88$44.63 $64.51Electric Lineman
Page 2 of 13 Serial Number: 15-04230
Page 47
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/30/2016 $20.29$46.16 $66.45Electric Lineman
9/1/2013 $18.57$33.62 $52.19Electricians
2/1/2014 $18.81$33.37 $52.18Electricians
9/1/2014 $19.58$33.87 $53.45Electricians
1/1/2008 $16.47$37.85 $54.32Elevator Constructor
1/1/2010 $20.24$40.08 $60.32Elevator Constructor
1/1/2011 $25.30$41.33 $66.63Elevator Constructor
1/1/2005 $0.00$0.00 $0.00Elevator Tender (Use Elevator Apprentice
or Constructor)
1/1/2012 $14.38$28.01 $42.39Glazier
5/1/2012 $15.38$28.01 $43.39Glazier
6/1/2013 $15.33$30.36 $45.69Glazier
5/1/2014 $15.33$32.26 $47.59Glazier
5/1/2015 $15.33$34.36 $49.69Glazier
7/1/2011 $22.70$29.50 $52.20Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2012 $22.70$30.50 $53.20Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2013 $22.70$31.75 $54.45Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2014 $25.25$30.70 $55.95Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
5/1/2014 $13.74$19.97 $33.71Laborers (Class 01 - See notes)
5/1/2015 $14.19$20.47 $34.66Laborers (Class 01 - See notes)
5/1/2016 $15.59$19.97 $35.56Laborers (Class 01 - See notes)
5/1/2014 $13.74$21.97 $35.71Laborers (Class 02 - See notes)
5/1/2015 $14.19$22.47 $36.66Laborers (Class 02 - See notes)
5/1/2016 $15.59$21.97 $37.56Laborers (Class 02 - See notes)
5/1/2014 $14.22$23.52 $37.74Laborers (Class 03 - See notes)
5/1/2015 $14.67$24.02 $38.69Laborers (Class 03 - See notes)
5/1/2016 $16.17$23.52 $39.69Laborers (Class 03 - See notes)
5/1/2014 $14.22$25.02 $39.24Laborers (Class 04 - See notes)
5/1/2015 $14.67$25.52 $40.19Laborers (Class 04 - See notes)
5/1/2016 $16.17$25.02 $41.19Laborers (Class 04 - See notes)
5/1/2014 $14.22$25.52 $39.74Laborers (Class 05 - See notes)
Page 3 of 13 Serial Number: 15-04230
Page 48
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2015 $14.67$26.02 $40.69Laborers (Class 05 - See notes)
5/1/2016 $16.17$25.52 $41.69Laborers (Class 05 - See notes)
5/1/2014 $13.74$21.32 $35.06Laborers (Class 06 - See notes)
5/1/2015 $14.19$21.82 $36.01Laborers (Class 06 - See notes)
5/1/2016 $15.59$21.32 $36.91Laborers (Class 06 - See notes)
5/1/2010 $13.99$28.91 $42.90Millwright
5/1/2011 $14.63$30.27 $44.90Millwright
5/1/2012 $15.26$31.14 $46.40Millwright
5/1/2013 $15.74$32.16 $47.90Millwright
5/1/2014 $16.33$33.17 $49.50Millwright
5/1/2009 $16.89$29.42 $46.31Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2010 $17.85$30.76 $48.61Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2011 $18.85$32.06 $50.91Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2012 $20.25$32.06 $52.31Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2013 $21.65$32.06 $53.71Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2014 $22.41$32.70 $55.11Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2009 $17.55$31.67 $49.22Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2010 $18.51$33.01 $51.52Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2011 $19.51$34.31 $53.82Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2012 $20.91$34.31 $55.22Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2013 $22.31$34.31 $56.62Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2014 $23.07$34.95 $58.02Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2009 $16.81$29.13 $45.94Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2010 $17.77$30.47 $48.24Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2011 $18.77$31.77 $50.54Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2012 $20.17$31.77 $51.94Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2013 $21.57$31.77 $53.34Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2014 $22.33$32.41 $54.74Operators (Building/Heavy, Class 02 -
See Notes)
Page 4 of 13 Serial Number: 15-04230
Page 49
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2009 $17.48$31.38 $48.86Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2010 $18.44$32.72 $51.16Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2011 $19.44$34.02 $53.46Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2012 $20.84$34.02 $54.86Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2013 $22.24$34.02 $56.26Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2014 $23.00$34.66 $57.66Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2009 $15.94$26.22 $42.16Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2010 $16.91$27.55 $44.46Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2011 $17.91$28.85 $46.76Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2012 $19.31$28.85 $48.16Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2013 $20.71$28.85 $49.56Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2014 $21.47$29.49 $50.96Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2009 $15.61$25.08 $40.69Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2010 $16.57$26.42 $42.99Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2011 $17.57$27.72 $45.29Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2012 $18.97$27.72 $46.69Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2013 $20.37$27.72 $48.09Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2014 $21.14$28.35 $49.49Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2009 $15.47$24.64 $40.11Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2010 $16.45$25.96 $42.41Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2011 $17.44$27.27 $44.71Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2012 $18.84$27.27 $46.11Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2013 $20.24$27.27 $47.51Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2014 $21.01$27.90 $48.91Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2009 $15.21$23.76 $38.97Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2010 $16.18$25.09 $41.27Operators (Building/Heavy, Class 06 -
See Notes)
Page 5 of 13 Serial Number: 15-04230
Page 50
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2011 $17.18$26.39 $43.57Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2012 $18.58$26.39 $44.97Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2013 $19.98$26.39 $46.37Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2014 $20.75$27.02 $47.77Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2009 $19.38$35.30 $54.68Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2010 $20.43$36.91 $57.34Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2011 $21.53$38.47 $60.00Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2012 $23.16$38.47 $61.63Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2013 $24.79$38.47 $63.26Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2014 $25.69$39.24 $64.93Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2009 $19.27$34.96 $54.23Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2010 $20.33$36.56 $56.89Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2011 $21.43$38.12 $59.55Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2012 $23.06$38.12 $61.18Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2013 $24.69$38.12 $62.81Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2014 $25.59$38.89 $64.48Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2014 $16.12$25.95 $42.07Painters Class 1 (see notes)
5/1/2015 $16.67$26.45 $43.12Painters Class 1 (see notes)
5/1/2016 $17.77$26.45 $44.22Painters Class 1 (see notes)
5/1/2017 $18.97$26.45 $45.42Painters Class 1 (see notes)
5/1/2014 $16.12$27.95 $44.07Painters Class 2 (see notes)
5/1/2015 $16.67$28.65 $45.32Painters Class 2 (see notes)
5/1/2016 $18.12$28.65 $46.77Painters Class 2 (see notes)
5/1/2017 $19.67$28.65 $48.32Painters Class 2 (see notes)
5/1/2014 $16.12$32.25 $48.37Painters Class 3 (see notes)
5/1/2015 $16.67$33.25 $49.92Painters Class 3 (see notes)
5/1/2016 $18.67$33.25 $51.92Painters Class 3 (see notes)
5/1/2017 $21.17$33.25 $54.42Painters Class 3 (see notes)
Page 6 of 13 Serial Number: 15-04230
Page 51
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
1/1/2009 $12.00$43.28 $55.28Pile Driver Divers (Building, Heavy,
Highway)
1/1/2010 $12.25$44.39 $56.64Pile Driver Divers (Building, Heavy,
Highway)
1/1/2010 $12.25$44.39 $56.64Pile Driver Divers (Building, Heavy,
Highway)
1/1/2011 $13.00$45.53 $58.53Pile Driver Divers (Building, Heavy,
Highway)
1/1/2012 $13.60$46.28 $59.88Pile Driver Divers (Building, Heavy,
Highway)
1/1/2013 $14.10$47.18 $61.28Pile Driver Divers (Building, Heavy,
Highway)
5/1/2014 $19.53$23.48 $43.01Plasterers
5/1/2015 $20.03$23.83 $43.86Plasterers
5/1/2015 $28.63$40.35 $68.98Plumbers
5/1/2013 $28.40$31.05 $59.45Roofers (Composition)
5/1/2014 $28.65$32.15 $60.80Roofers (Composition)
5/1/2015 $28.65$33.65 $62.30Roofers (Composition)
5/1/2012 $16.37$24.00 $40.37Roofers (Shingle, Slate, Tile)
5/1/2014 $17.37$24.50 $41.87Roofers (Shingle, Slate, Tile)
5/1/2015 $18.37$25.00 $43.37Roofers (Shingle, Slate, Tile)
6/1/2013 $30.45$31.58 $62.03Sheet Metal Workers
1/6/2014 $30.95$31.58 $62.53Sheet Metal Workers
6/1/2014 $30.98$32.55 $63.53Sheet Metal Workers
12/1/2014 $31.39$32.64 $64.03Sheet Metal Workers
6/1/2015 $32.39$32.64 $65.03Sheet Metal Workers
12/1/2015 $32.89$32.64 $65.53Sheet Metal Workers
7/1/2009 $15.99$24.17 $40.16Sign Makers and Hangars
5/21/2010 $16.37$24.33 $40.70Sign Makers and Hangars
1/1/2010 $17.60$33.85 $51.45Sprinklerfitters
1/1/2011 $18.45$33.35 $51.80Sprinklerfitters
4/1/2011 $18.45$34.18 $52.63Sprinklerfitters
1/1/2012 $18.60$34.18 $52.78Sprinklerfitters
4/1/2012 $18.65$35.21 $53.86Sprinklerfitters
1/1/2013 $18.80$35.21 $54.01Sprinklerfitters
4/1/2013 $20.12$33.03 $53.15Sprinklerfitters
Page 7 of 13 Serial Number: 15-04230
Page 52
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
7/1/2013 $20.12$33.69 $53.81Sprinklerfitters
4/1/2014 $20.47$34.36 $54.83Sprinklerfitters
4/1/2015 $20.62$35.05 $55.67Sprinklerfitters
5/1/2013 $27.83$41.41 $69.24Steamfitters
5/1/2014 $28.96$42.71 $71.67Steamfitters
5/1/2013 $14.58$29.13 $43.71Terrazzo Finisher
5/1/2014 $14.99$29.47 $44.46Terrazzo Finisher
5/1/2013 $17.54$28.39 $45.93Terrazzo Setter
5/1/2014 $18.01$28.67 $46.68Terrazzo Setter
5/1/2013 $12.73$24.62 $37.35Tile & Marble Finisher
5/1/2014 $13.14$24.91 $38.05Tile & Marble Finisher
5/1/2015 $13.30$25.55 $38.85Tile & Marble Finisher
5/1/2016 $13.56$26.19 $39.75Tile & Marble Finisher
5/1/2011 $13.86$25.85 $39.71Tile & Marble Layer
5/1/2012 $14.04$26.85 $40.89Tile & Marble Layer
5/1/2013 $14.12$27.37 $41.49Tile & Marble Layer
5/1/2014 $14.44$27.75 $42.19Tile & Marble Layer
5/1/2015 $14.51$28.48 $42.99Tile & Marble Layer
5/1/2016 $14.63$29.26 $43.89Tile & Marble Layer
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 8 of 13 Serial Number: 15-04230
Page 53
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2009 $9.86$25.30 $35.16Carpenters
5/1/2010 $10.83$25.98 $36.81Carpenters
5/1/2011 $11.43$27.03 $38.46Carpenters
5/1/2012 $12.38$27.18 $39.56Carpenters
5/1/2013 $12.84$27.92 $40.76Carpenters
5/1/2014 $13.24$28.72 $41.96Carpenters
5/1/2013 $14.04$18.16 $32.20Laborers (Class 01 - See notes)
5/1/2014 $14.69$18.66 $33.35Laborers (Class 01 - See notes)
5/1/2015 $15.34$19.21 $34.55Laborers (Class 01 - See notes)
5/1/2009 $11.03$22.84 $33.87Laborers (Class 02 - See notes)
5/1/2010 $11.88$23.39 $35.27Laborers (Class 02 - See notes)
5/1/2011 $12.78$23.94 $36.72Laborers (Class 02 - See notes)
5/1/2012 $13.39$24.33 $37.72Laborers (Class 02 - See notes)
5/1/2013 $14.04$24.78 $38.82Laborers (Class 02 - See notes)
5/1/2014 $14.69$25.28 $39.97Laborers (Class 02 - See notes)
5/1/2015 $15.34$25.83 $41.17Laborers (Class 02 - See notes)
5/1/2010 $11.88$20.38 $32.26Laborers (Class 03 - See notes)
5/1/2011 $12.78$20.93 $33.71Laborers (Class 03 - See notes)
5/1/2012 $13.39$21.32 $34.71Laborers (Class 03 - See notes)
5/1/2013 $14.04$21.77 $35.81Laborers (Class 03 - See notes)
5/1/2014 $14.69$22.27 $36.96Laborers (Class 03 - See notes)
5/1/2015 $15.34$22.82 $38.16Laborers (Class 03 - See notes)
5/1/2009 $11.03$20.18 $31.21Laborers (Class 04 - See notes)
5/1/2010 $11.88$20.73 $32.61Laborers (Class 04 - See notes)
5/1/2011 $12.78$21.28 $34.06Laborers (Class 04 - See notes)
5/1/2012 $13.39$21.67 $35.06Laborers (Class 04 - See notes)
5/1/2013 $14.04$22.12 $36.16Laborers (Class 04 - See notes)
5/1/2014 $14.69$22.62 $37.31Laborers (Class 04 - See notes)
5/1/2015 $15.34$23.17 $38.51Laborers (Class 04 - See notes)
5/1/2009 $11.03$20.85 $31.88Laborers (Class 05 - See notes)
5/1/2010 $11.88$21.40 $33.28Laborers (Class 05 - See notes)
Page 9 of 13 Serial Number: 15-04230
Page 54
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2011 $12.78$21.95 $34.73Laborers (Class 05 - See notes)
5/1/2012 $13.39$22.34 $35.73Laborers (Class 05 - See notes)
5/1/2013 $14.04$22.79 $36.83Laborers (Class 05 - See notes)
5/1/2014 $14.69$23.29 $37.98Laborers (Class 05 - See notes)
5/1/2015 $15.34$23.84 $39.18Laborers (Class 05 - See notes)
5/1/2009 $11.03$20.27 $31.30Laborers (Class 06 - See notes)
5/1/2010 $11.88$20.82 $32.70Laborers (Class 06 - See notes)
5/1/2011 $12.78$21.37 $34.15Laborers (Class 06 - See notes)
5/1/2012 $13.39$21.76 $35.15Laborers (Class 06 - See notes)
5/1/2013 $14.04$22.21 $36.25Laborers (Class 06 - See notes)
5/1/2014 $14.69$22.71 $37.40Laborers (Class 06 - See notes)
5/1/2015 $15.34$23.26 $38.60Laborers (Class 06 - See notes)
5/1/2009 $11.03$20.56 $31.59Laborers (Class 07 - See notes)
5/1/2010 $11.88$21.11 $32.99Laborers (Class 07 - See notes)
5/1/2011 $12.78$21.66 $34.44Laborers (Class 07 - See notes)
5/1/2012 $13.39$22.05 $35.44Laborers (Class 07 - See notes)
5/1/2013 $14.04$22.50 $36.54Laborers (Class 07 - See notes)
5/1/2014 $14.69$23.00 $37.69Laborers (Class 07 - See notes)
5/1/2015 $15.34$23.55 $38.89Laborers (Class 07 - See notes)
5/1/2009 $11.03$21.04 $32.07Laborers (Class 08 - See notes)
5/1/2010 $11.88$21.59 $33.47Laborers (Class 08 - See notes)
5/1/2011 $12.78$22.14 $34.92Laborers (Class 08 - See notes)
5/1/2012 $13.39$22.53 $35.92Laborers (Class 08 - See notes)
5/1/2013 $14.04$22.98 $37.02Laborers (Class 08 - See notes)
5/1/2014 $14.69$23.48 $38.17Laborers (Class 08 - See notes)
5/1/2015 $15.34$24.03 $39.37Laborers (Class 08 - See notes)
5/1/2010 $17.26$28.79 $46.05Operators (Highway, Class 01 - See
Notes)
5/1/2011 $18.26$30.09 $48.35Operators (Highway, Class 01 - See
Notes)
5/1/2012 $19.51$30.09 $49.60Operators (Highway, Class 01 - See
Notes)
5/1/2013 $20.76$30.09 $50.85Operators (Highway, Class 01 - See
Notes)
Page 10 of 13 Serial Number: 15-04230
Page 55
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2014 $21.72$30.38 $52.10Operators (Highway, Class 01 - See
Notes)
5/1/2010 $17.94$31.04 $48.98Operators (Highway, Class 01a - See
Notes)
5/1/2011 $18.94$32.34 $51.28Operators (Highway, Class 01a - See
Notes)
5/1/2012 $20.19$32.34 $52.53Operators (Highway, Class 01a - See
Notes)
5/1/2013 $21.44$32.34 $53.78Operators (Highway, Class 01a - See
Notes)
5/1/2014 $22.40$32.63 $55.03Operators (Highway, Class 01a - See
Notes)
5/1/2010 $16.92$27.61 $44.53Operators (Highway, Class 02 - See
Notes)
5/1/2011 $17.92$28.91 $46.83Operators (Highway, Class 02 - See
Notes)
5/1/2012 $19.17$28.91 $48.08Operators (Highway, Class 02 - See
Notes)
5/1/2013 $20.42$28.91 $49.33Operators (Highway, Class 02 - See
Notes)
5/1/2014 $21.37$29.21 $50.58Operators (Highway, Class 02 - See
Notes)
5/1/2010 $16.72$26.91 $43.63Operators (Highway, Class 03 - See
Notes)
5/1/2011 $17.72$28.21 $45.93Operators (Highway, Class 03 - See
Notes)
5/1/2012 $18.97$28.21 $47.18Operators (Highway, Class 03 - See
Notes)
5/1/2013 $20.22$28.21 $48.43Operators (Highway, Class 03 - See
Notes)
5/1/2014 $21.18$28.50 $49.68Operators (Highway, Class 03 - See
Notes)
5/1/2010 $16.59$26.46 $43.05Operators (Highway, Class 04 - See
Notes)
5/1/2011 $17.59$27.76 $45.35Operators (Highway, Class 04 - See
Notes)
5/1/2012 $18.85$27.75 $46.60Operators (Highway, Class 04 - See
Notes)
5/1/2013 $20.10$27.75 $47.85Operators (Highway, Class 04 - See
Notes)
5/1/2014 $21.05$28.05 $49.10Operators (Highway, Class 04 - See
Notes)
5/1/2010 $16.44$25.95 $42.39Operators (Highway, Class 05 - See
Notes)
5/1/2011 $17.44$27.25 $44.69Operators (Highway, Class 05 - See
Notes)
5/1/2012 $18.69$27.25 $45.94Operators (Highway, Class 05 - See
Notes)
5/1/2013 $19.94$27.25 $47.19Operators (Highway, Class 05 - See
Notes)
5/1/2014 $20.90$27.54 $48.44Operators (Highway, Class 05 - See
Notes)
Page 11 of 13 Serial Number: 15-04230
Page 56
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2010 $17.32$29.03 $46.35Operators (Highway, Class 06 - See
Notes)
5/1/2011 $18.32$30.33 $48.65Operators (Highway, Class 06 - See
Notes)
5/1/2012 $19.57$30.33 $49.90Operators (Highway, Class 06 - See
Notes)
5/1/2013 $20.82$30.33 $51.15Operators (Highway, Class 06 - See
Notes)
5/1/2014 $21.78$30.62 $52.40Operators (Highway, Class 06 - See
Notes)
5/1/2010 $17.98$31.28 $49.26Operators (Highway, Class 06/A - See
Notes)
5/1/2011 $18.98$32.58 $51.56Operators (Highway, Class 06/A - See
Notes)
5/1/2012 $20.23$32.59 $52.82Operators (Highway, Class 06/A - See
Notes)
5/1/2013 $21.48$32.58 $54.06Operators (Highway, Class 06/A - See
Notes)
5/1/2014 $22.44$32.87 $55.31Operators (Highway, Class 06/A - See
Notes)
5/1/2010 $19.72$34.55 $54.27Operators (Highway, Class 07/A - See
Notes)
5/1/2011 $20.83$36.10 $56.93Operators (Highway, Class 07/A - See
Notes)
5/1/2012 $22.28$36.10 $58.38Operators (Highway, Class 07/A - See
Notes)
5/1/2013 $23.73$36.10 $59.83Operators (Highway, Class 07/A - See
Notes)
5/1/2014 $24.88$36.45 $61.33Operators (Highway, Class 07/A - See
Notes)
5/1/2010 $19.31$33.13 $52.44Operators (Highway, Class 07/B - See
Notes)
5/1/2011 $20.41$34.69 $55.10Operators (Highway, Class 07/B - See
Notes)
5/1/2012 $21.86$34.69 $56.55Operators (Highway, Class 07/B - See
Notes)
5/1/2013 $23.31$34.69 $58.00Operators (Highway, Class 07/B - See
Notes)
5/1/2014 $24.46$35.04 $59.50Operators (Highway, Class 07/B - See
Notes)
5/1/2010 $10.83$25.98 $36.81Piledrivers
5/1/2011 $11.43$27.03 $38.46Piledrivers
5/1/2006 $22.48$27.01 $49.49Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2010 $26.09$30.27 $56.36Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2012 $26.86$34.87 $61.73Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2013 $27.73$36.02 $63.75Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2014 $28.83$37.19 $66.02Steamfitters (Heavy and Highway - Gas
Distribution)
Page 12 of 13 Serial Number: 15-04230
Page 57
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 3 (see notes)
Notes:
If you can not find a classification under Heavy/Highway please refer to the Building classifications.
The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes to clarify existing
tasks performed throughout the Commonwealth. The “Building Laborer Notes” link on the Bureau’s website provides a list
of those tasks that should be read in conformity with custom and usage of the construction industry in the geographic
region in which they are utilized.
For further information on construction types review the
on the Labor and Industry Website. Go to www.dli.state.pa.us, scroll down to the picture labeled "Labor Law Compliance"
and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link.
"Notes as Referenced in Predeterminations"
Page 13 of 13 Serial Number: 15-04230
Page 58
6/24/2015Determination Date:
HighwayProject Classification:
15-04231Serial Number:
8/18/2015Contract Award Date:
Awarding Agency:
Installation of Durable Pavement Markings (151-03-03)Project Name:
PREVAILING WAGES PROJECT RATES
Assigned Field Office:
Chester County
Toll Free Phone Number:
215-560-1858Field Office Phone Number:
Philadelphia
PA Turnpike Commission
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2012 $28.00$41.39 $69.39Asbestos & Insulation Workers
5/1/2013 $29.10$41.79 $70.89Asbestos & Insulation Workers
5/1/2014 $30.40$43.14 $73.54Asbestos & Insulation Workers
5/1/2015 $31.85$44.44 $76.29Asbestos & Insulation Workers
4/1/2013 $17.51$25.23 $42.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2014 $17.51$25.23 $42.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2014 $17.95$25.79 $43.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2015 $18.22$26.52 $44.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2011 $28.12$37.35 $65.47Boilermakers
1/1/2012 $29.85$37.62 $67.47Boilermakers
9/30/2012 $29.85$39.97 $69.82Boilermakers
1/1/2013 $31.13$38.69 $69.82Boilermakers
4/1/2013 $31.43$38.54 $69.97Boilermakers
1/1/2014 $32.81$39.06 $71.87Boilermakers
1/1/2015 $33.31$40.31 $73.62Boilermakers
5/1/2014 $23.59$38.02 $61.61Bricklayer
5/1/2015 $23.59$39.67 $63.26Bricklayer
Page 1 of 14 06/24/2015
Page 59
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2015 $25.79$43.87 $69.66Carpenter - Chief of Party (Surveying &
Layout)
5/1/2016 $25.79$45.43 $71.22Carpenter - Chief of Party (Surveying &
Layout)
5/1/2017 $25.79$46.98 $72.77Carpenter - Chief of Party (Surveying &
Layout)
5/1/2015 $25.79$38.15 $63.94Carpenter - Instrument Person (Surveying
& Layout)
5/1/2016 $25.79$39.50 $65.29Carpenter - Instrument Person (Surveying
& Layout)
5/1/2017 $25.79$40.85 $66.64Carpenter - Instrument Person (Surveying
& Layout)
5/1/2015 $18.76$19.08 $37.84Carpenter - Rodman (Surveying & Layout)
5/1/2016 $18.76$19.75 $38.51Carpenter - Rodman (Surveying & Layout)
5/1/2017 $18.76$20.43 $39.19Carpenter - Rodman (Surveying & Layout)
5/1/2015 $25.79$38.15 $63.94Carpenters
5/1/2016 $25.79$39.50 $65.29Carpenters
5/1/2017 $25.79$40.85 $66.64Carpenters
5/1/2014 $29.66$33.55 $63.21Cement Masons
5/1/2015 $30.51$34.15 $64.66Cement Masons
5/1/2014 $30.62$40.55 $71.17DockBuilder/Pile Drivers (Building, Heavy
& Highway)
5/1/2014 $30.62$48.66 $79.28DockBuilder/Pile Drivers Divers (Building
Heavy & Highway)
5/1/2009 $21.34$31.09 $52.43Drapery Installers
5/1/2010 $22.41$33.00 $55.41Drywall Finisher
5/1/2011 $23.45$33.11 $56.56Drywall Finisher
5/1/2012 $23.87$34.09 $57.96Drywall Finisher
5/1/2014 $25.63$35.23 $60.86Drywall Finisher
5/1/2015 $25.90$36.36 $62.26Drywall Finisher
6/3/2013 $21.29$50.19 $71.48Electric Lineman
6/2/2014 $21.81$51.64 $73.45Electric Lineman
6/5/2015 $22.17$52.93 $75.10Electric Lineman
5/30/2016 $22.61$54.56 $77.17Electric Lineman
6/3/2013 $24.04$39.24 $63.28Electricians
6/2/2014 $25.03$40.00 $65.03Electricians
6/1/2015 $25.76$41.27 $67.03Electricians
Page 2 of 14 Serial Number: 15-04231
Page 60
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/30/2016 $26.61$42.67 $69.28Electricians
1/1/2012 $23.84$49.30 $73.14Elevator Constructor
1/1/2013 $25.49$49.84 $75.33Elevator Constructor
1/1/2014 $27.09$50.69 $77.78Elevator Constructor
1/1/2006 $0.00$0.00 $0.00Elevator Tender (Use Elevator Apprentice
or Constructor)
5/1/2014 $26.11$40.21 $66.32Floor Layer
5/1/2015 $26.41$41.21 $67.62Floor Layer
5/1/2010 $24.53$36.67 $61.20Glazier
5/1/2011 $25.25$37.35 $62.60Glazier
5/1/2012 $25.75$38.35 $64.10Glazier
5/1/2014 $27.60$39.75 $67.35Glazier
5/1/2015 $28.70$40.60 $69.30Glazier
7/1/2012 $28.14$44.70 $72.84Iron Workers (Bridge, Structural,
Ornamental, Precast)
7/1/2013 $19.25$37.00 $56.25Iron Workers (Riggers)
7/1/2014 $19.75$38.00 $57.75Iron Workers (Riggers)
7/1/2013 $19.25$39.63 $58.88Iron Workers - Reinforcing Steel Mesh -
Rebar
7/1/2014 $19.75$40.73 $60.48Iron Workers - Reinforcing Steel Mesh -
Rebar
5/1/2010 $22.30$23.85 $46.15Laborers (Class 01 - See notes)
5/1/2011 $22.30$24.75 $47.05Laborers (Class 01 - See notes)
5/1/2012 $23.00$25.15 $48.15Laborers (Class 01 - See notes)
5/1/2013 $23.40$25.85 $49.25Laborers (Class 01 - See notes)
5/1/2014 $24.55$26.00 $50.55Laborers (Class 01 - See notes)
5/1/2010 $21.73$25.97 $47.70Laborers (Class 02 - See notes)
5/1/2011 $21.73$26.87 $48.60Laborers (Class 02 - See notes)
5/1/2012 $22.85$26.45 $49.30Laborers (Class 02 - See notes)
5/1/2013 $23.45$26.95 $50.40Laborers (Class 02 - See notes)
5/1/2014 $24.40$27.25 $51.65Laborers (Class 02 - See notes)
5/1/2009 $21.73$25.97 $47.70Laborers (Class 02 - see notes)
5/1/2010 $22.28$24.37 $46.65Laborers (Class 03 - See notes)
5/1/2011 $22.28$25.17 $47.45Laborers (Class 03 - See notes)
Page 3 of 14 Serial Number: 15-04231
Page 61
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2012 $23.23$25.45 $48.68Laborers (Class 03 - See notes)
5/1/2013 $23.83$25.92 $49.75Laborers (Class 03 - See notes)
5/1/2014 $24.78$26.27 $51.05Laborers (Class 03 - See notes)
5/1/2011 $21.65$25.27 $46.92Laborers (Class 04 - See notes)
5/1/2012 $23.23$25.45 $48.68Laborers (Class 04 - See notes)
5/1/2013 $23.83$25.92 $49.75Laborers (Class 04 - See notes)
5/1/2014 $24.78$26.27 $51.05Laborers (Class 04 - See notes)
5/1/2011 $21.45$25.42 $46.87Laborers (Class 05 - See notes)
5/1/2012 $22.80$25.35 $48.15Laborers (Class 05 - See notes)
5/1/2013 $23.40$25.85 $49.25Laborers (Class 05 - See notes)
5/1/2014 $24.35$26.20 $50.55Laborers (Class 05 - See notes)
4/1/2009 $19.98$18.31 $38.29Landscape Laborer
5/1/2012 $21.03$18.71 $39.74Landscape Laborer
5/1/2013 $21.63$19.11 $40.74Landscape Laborer
5/1/2014 $22.18$19.76 $41.94Landscape Laborer
5/1/2009 $19.22$28.63 $47.85Marble Finisher
5/1/2010 $19.97$28.63 $48.60Marble Finisher
5/1/2011 $20.72$28.68 $49.40Marble Finisher
5/1/2012 $21.02$29.27 $50.29Marble Finisher
5/1/2013 $21.02$30.34 $51.36Marble Finisher
5/1/2014 $21.02$31.92 $52.94Marble Finisher
5/1/2015 $21.02$33.50 $54.52Marble Finisher
5/1/2010 $21.77$34.36 $56.13Marble Mason
5/1/2011 $22.58$34.35 $56.93Marble Mason
5/1/2012 $22.90$35.25 $58.15Marble Mason
5/1/2013 $22.90$36.65 $59.55Marble Mason
5/1/2014 $22.90$38.30 $61.20Marble Mason
5/1/2015 $22.90$39.95 $62.85Marble Mason
5/1/2015 $30.29$38.36 $68.65Millwright
5/1/2009 $21.07$40.04 $61.11Operators Class 01 - See Notes (Building,
Heavy, Highway)
Page 4 of 14 Serial Number: 15-04231
Page 62
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2010 $22.07$40.04 $62.11Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2011 $23.42$40.04 $63.46Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2012 $24.48$40.43 $64.91Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2013 $25.55$40.81 $66.36Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2014 $26.20$41.81 $68.01Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2015 $26.56$42.85 $69.41Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2016 $26.92$44.09 $71.01Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2009 $21.96$43.04 $65.00Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2010 $22.96$43.04 $66.00Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2011 $24.31$43.04 $67.35Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2012 $25.38$43.42 $68.80Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2013 $26.45$43.80 $70.25Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2014 $27.08$44.82 $71.90Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2015 $27.44$45.86 $73.30Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2016 $27.80$47.10 $74.90Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2009 $21.00$39.79 $60.79Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2010 $22.00$39.79 $61.79Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2011 $23.35$39.79 $63.14Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2012 $24.41$40.18 $64.59Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2013 $25.48$40.56 $66.04Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2014 $26.12$41.57 $67.69Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2015 $26.48$42.61 $69.09Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2016 $26.85$43.84 $70.69Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2009 $21.88$42.80 $64.68Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2010 $22.88$42.80 $65.68Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2011 $24.23$42.80 $67.03Operators Class 02a - See Notes
(Building, Heavy, Highway)
Page 5 of 14 Serial Number: 15-04231
Page 63
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2012 $25.31$43.17 $68.48Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2013 $26.36$43.57 $69.93Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2014 $27.02$44.56 $71.58Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2015 $27.37$45.61 $72.98Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2016 $27.74$46.84 $74.58Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2009 $19.79$35.71 $55.50Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2010 $20.79$35.71 $56.50Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2011 $22.14$35.71 $57.85Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2012 $23.20$36.10 $59.30Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2013 $24.27$36.48 $60.75Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2014 $24.92$37.48 $62.40Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2015 $25.27$38.53 $63.80Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2016 $25.64$39.76 $65.40Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2009 $19.71$35.40 $55.11Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2010 $20.71$35.40 $56.11Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2011 $22.06$35.40 $57.46Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2012 $23.12$35.79 $58.91Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2013 $24.19$36.17 $60.36Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2014 $24.83$37.18 $62.01Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2015 $25.18$38.23 $63.41Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2016 $25.55$39.46 $65.01Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2009 $19.20$33.68 $52.88Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2010 $20.20$33.68 $53.88Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2011 $21.55$33.68 $55.23Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2012 $22.61$34.07 $56.68Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2013 $23.68$34.45 $58.13Operators Class 05 - See Notes (Building,
Heavy, Highway)
Page 6 of 14 Serial Number: 15-04231
Page 64
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2014 $24.32$35.46 $59.78Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2015 $24.68$36.50 $61.18Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2016 $25.04$37.74 $62.78Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2009 $18.91$32.69 $51.60Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2010 $19.91$32.69 $52.60Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2011 $21.26$32.69 $53.95Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2012 $22.32$33.08 $55.40Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2013 $23.39$33.46 $56.85Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2014 $24.03$34.47 $58.50Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2015 $24.39$35.51 $59.90Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2016 $24.75$36.75 $61.50Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2009 $24.43$48.05 $72.48Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2010 $25.55$48.05 $73.60Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2011 $27.10$48.05 $75.15Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2012 $28.38$48.51 $76.89Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2013 $29.66$48.97 $78.63Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2014 $30.41$50.17 $80.58Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2015 $30.87$51.42 $82.29Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2016 $31.30$52.91 $84.21Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2009 $24.35$47.75 $72.10Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2010 $25.47$47.75 $73.22Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2011 $27.02$47.75 $74.77Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2012 $28.30$48.21 $76.51Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2013 $29.58$48.67 $78.25Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2014 $30.32$49.88 $80.20Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2015 $30.78$51.13 $81.91Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
Page 7 of 14 Serial Number: 15-04231
Page 65
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2016 $31.22$52.61 $83.83Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2009 $19.24$32.31 $51.55Painters Class 1 (see notes)
10/1/2009 $20.12$32.31 $52.43Painters Class 1 (see notes)
5/1/2010 $20.84$32.31 $53.15Painters Class 1 (see notes)
5/1/2011 $21.49$32.94 $54.43Painters Class 1 (see notes)
5/1/2012 $21.91$33.92 $55.83Painters Class 1 (see notes)
5/1/2014 $23.40$35.38 $58.78Painters Class 1 (see notes)
5/1/2015 $24.50$36.03 $60.53Painters Class 1 (see notes)
5/1/2014 $22.66$47.67 $70.33Painters Class 2 (see notes)
2/1/2015 $24.34$50.88 $75.22Painters Class 2 (see notes)
5/1/2014 $23.40$35.76 $59.16Painters Class 3 (see notes)
5/1/2015 $24.50$36.41 $60.91Painters Class 3 (see notes)
5/1/2013 $27.05$34.70 $61.75Plasterers
5/1/2015 $30.60$47.38 $77.98Plumbers
5/1/2009 $20.85$35.05 $55.90Pointers, Caulkers, Cleaners
5/1/2010 $21.60$35.05 $56.65Pointers, Caulkers, Cleaners
5/1/2011 $22.45$35.10 $57.55Pointers, Caulkers, Cleaners
5/1/2012 $22.75$36.10 $58.85Pointers, Caulkers, Cleaners
5/1/2013 $22.75$37.50 $60.25Pointers, Caulkers, Cleaners
5/1/2014 $22.75$39.15 $61.90Pointers, Caulkers, Cleaners
5/1/2015 $22.75$40.80 $63.55Pointers, Caulkers, Cleaners
5/1/2013 $28.40$31.05 $59.45Roofers (Composition)
5/1/2014 $28.65$32.15 $60.80Roofers (Composition)
5/1/2015 $28.65$33.65 $62.30Roofers (Composition)
5/1/2012 $16.37$24.00 $40.37Roofers (Shingle, Slate, Tile)
5/1/2014 $17.37$24.50 $41.87Roofers (Shingle, Slate, Tile)
5/1/2015 $18.37$25.00 $43.37Roofers (Shingle, Slate, Tile)
5/1/2014 $33.98$42.95 $76.93Sheet Metal Workers (Building, Heavy,
Highway)
5/1/2015 $36.48$42.95 $79.43Sheet Metal Workers (Building, Heavy,
Highway)
5/21/2010 $16.37$24.33 $40.70Sign Makers and Hangars
Page 8 of 14 Serial Number: 15-04231
Page 66
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/20/2011 $17.69$23.70 $41.39Sign Makers and Hangars
4/1/2013 $20.12$33.03 $53.15Sprinklerfitters
7/1/2013 $20.12$33.69 $53.81Sprinklerfitters
4/1/2014 $20.47$34.36 $54.83Sprinklerfitters
4/1/2015 $20.62$35.05 $55.67Sprinklerfitters
5/1/2013 $28.00$48.03 $76.03Steamfitters
5/1/2014 $29.13$49.58 $78.71Steamfitters
5/1/2010 $21.77$34.36 $56.13Stone Masons
5/1/2011 $22.58$34.35 $56.93Stone Masons
5/1/2012 $22.90$35.25 $58.15Stone Masons
5/1/2013 $22.90$36.65 $59.55Stone Masons
5/1/2014 $22.90$38.30 $61.20Stone Masons
5/1/2015 $22.90$39.95 $62.85Stone Masons
5/1/2009 $18.31$32.41 $50.72Terrazzo Finisher
5/1/2010 $19.06$32.41 $51.47Terrazzo Finisher
5/1/2011 $19.96$32.41 $52.37Terrazzo Finisher
5/1/2012 $20.26$33.06 $53.32Terrazzo Finisher
5/1/2013 $20.26$34.19 $54.45Terrazzo Finisher
5/1/2014 $20.26$35.86 $56.12Terrazzo Finisher
5/1/2015 $20.26$37.53 $57.79Terrazzo Finisher
5/1/2011 $19.96$32.66 $52.62Terrazzo Grinder
5/1/2012 $20.26$33.31 $53.57Terrazzo Grinder
5/1/2013 $20.26$34.44 $54.70Terrazzo Grinder
5/1/2014 $20.26$36.12 $56.38Terrazzo Grinder
5/1/2015 $20.26$37.80 $58.06Terrazzo Grinder
5/1/2008 $19.47$35.41 $54.88Terrazzo Layers
5/1/2009 $20.92$35.41 $56.33Terrazzo Mechanics
5/1/2010 $21.67$35.41 $57.08Terrazzo Mechanics
5/1/2011 $21.78$36.30 $58.08Terrazzo Mechanics
5/1/2012 $22.08$37.05 $59.13Terrazzo Mechanics
5/1/2013 $22.08$38.30 $60.38Terrazzo Mechanics
Page 9 of 14 Serial Number: 15-04231
Page 67
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2014 $22.08$40.15 $62.23Terrazzo Mechanics
5/1/2015 $22.08$42.00 $64.08Terrazzo Mechanics
5/1/2009 $19.84$29.11 $48.95Tile Finisher
5/1/2010 $20.59$29.11 $49.70Tile Finisher
5/1/2011 $21.34$29.16 $50.50Tile Finisher
5/1/2012 $21.64$29.77 $51.41Tile Finisher
5/1/2013 $21.64$30.86 $52.50Tile Finisher
5/1/2014 $21.64$32.47 $54.11Tile Finisher
5/1/2015 $21.64$34.08 $55.72Tile Finisher
5/1/2009 $20.28$36.15 $56.43Tile Layers
5/1/2010 $21.03$36.15 $57.18Tile Layers
5/1/2011 $21.78$36.20 $57.98Tile Layers
5/1/2012 $22.08$36.95 $59.03Tile Layers
5/1/2013 $22.08$38.20 $60.28Tile Layers
5/1/2014 $22.08$40.05 $62.13Tile Layers
5/1/2015 $22.08$41.90 $63.98Tile Layers
5/1/2012 $14.16$27.54 $41.70Truckdriver class 1(see notes)
5/1/2014 $15.56$28.68 $44.24Truckdriver class 1(see notes)
5/1/2012 $14.16$27.64 $41.80Truckdriver class 2 (see notes)
5/1/2014 $15.56$28.78 $44.34Truckdriver class 2 (see notes)
5/1/2012 $14.16$27.89 $42.05Truckdriver class 3 (see notes)
5/1/2014 $15.56$29.03 $44.59Truckdriver class 3 (see notes)
Page 10 of 14 Serial Number: 15-04231
Page 68
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2015 $25.89$49.23 $75.12Carpenter - Chief of Party (Surveying &
Layout)
5/1/2016 $25.89$51.07 $76.96Carpenter - Chief of Party (Surveying &
Layout)
5/1/2015 $25.89$42.81 $68.70Carpenter - Instrument Person (Surveying
& Layout)
5/1/2016 $25.89$44.41 $70.30Carpenter - Instrument Person (Surveying
& Layout)
5/1/2015 $20.31$34.25 $54.56Carpenter - Rodman (Surveying & Layout)
5/1/2016 $20.31$35.53 $55.84Carpenter - Rodman (Surveying & Layout)
5/1/2014 $25.59$41.56 $67.15Carpenters
5/1/2015 $25.89$42.81 $68.70Carpenters
5/1/2016 $25.89$44.41 $70.30Carpenters
5/1/2014 $29.16$32.25 $61.41Cement Masons
5/1/2015 $30.26$32.55 $62.81Cement Masons
5/1/2016 $29.16$35.15 $64.31Cement Masons
7/1/2010 $26.69$44.70 $71.39Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2011 $27.19$44.70 $71.89Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2012 $28.14$44.70 $72.84Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 01 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 01 - See notes)
5/1/2012 $22.95$26.00 $48.95Laborers (Class 01 - See notes)
5/1/2013 $23.55$26.60 $50.15Laborers (Class 01 - See notes)
5/1/2014 $24.50$26.90 $51.40Laborers (Class 01 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 02 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 02 - See notes)
5/1/2012 $22.95$26.20 $49.15Laborers (Class 02 - See notes)
5/1/2013 $23.55$26.80 $50.35Laborers (Class 02 - See notes)
5/1/2014 $24.50$27.10 $51.60Laborers (Class 02 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 03 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 03 - See notes)
5/1/2012 $22.95$26.20 $49.15Laborers (Class 03 - See notes)
5/1/2013 $23.55$26.80 $50.35Laborers (Class 03 - See notes)
5/1/2014 $24.50$27.10 $51.60Laborers (Class 03 - See notes)
Page 11 of 14 Serial Number: 15-04231
Page 69
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2010 $22.00$25.15 $47.15Laborers (Class 04 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 04 - See notes)
5/1/2012 $22.95$20.80 $43.75Laborers (Class 04 - See notes)
5/1/2013 $23.55$21.40 $44.95Laborers (Class 04 - See notes)
5/1/2014 $24.50$21.70 $46.20Laborers (Class 04 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 05 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 05 - See notes)
5/1/2012 $22.95$26.85 $49.80Laborers (Class 05 - See notes)
5/1/2013 $23.55$27.45 $51.00Laborers (Class 05 - See notes)
5/1/2014 $24.50$27.75 $52.25Laborers (Class 05 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 06 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 06 - See notes)
5/1/2012 $22.95$26.90 $49.85Laborers (Class 06 - See notes)
5/1/2013 $23.55$27.50 $51.05Laborers (Class 06 - See notes)
5/1/2014 $24.50$27.80 $52.30Laborers (Class 06 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 07 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 07 - See notes)
5/1/2012 $22.95$26.75 $49.70Laborers (Class 07 - See notes)
5/1/2013 $23.55$27.35 $50.90Laborers (Class 07 - See notes)
5/1/2014 $24.50$27.65 $52.15Laborers (Class 07 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 08 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 08 - See notes)
5/1/2012 $22.95$26.50 $49.45Laborers (Class 08 - See notes)
5/1/2013 $23.55$27.10 $50.65Laborers (Class 08 - See notes)
5/1/2014 $24.50$27.40 $51.90Laborers (Class 08 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 09 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 09 - See notes)
5/1/2012 $22.95$26.35 $49.30Laborers (Class 09 - See notes)
5/1/2013 $23.55$26.95 $50.50Laborers (Class 09 - See notes)
5/1/2014 $24.50$27.25 $51.75Laborers (Class 09 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 10- See notes)
Page 12 of 14 Serial Number: 15-04231
Page 70
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2011 $22.00$25.95 $47.95Laborers (Class 10- See notes)
5/1/2012 $22.95$26.50 $49.45Laborers (Class 10- See notes)
5/1/2013 $23.55$27.10 $50.65Laborers (Class 10- See notes)
5/1/2014 $24.50$27.40 $51.90Laborers (Class 10- See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 11 -See Notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 11 -See Notes)
5/1/2012 $22.95$26.40 $49.35Laborers (Class 11 -See Notes)
5/1/2013 $23.55$27.00 $50.55Laborers (Class 11 -See Notes)
5/1/2014 $24.50$27.30 $51.80Laborers (Class 11 -See Notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 12 -See Notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 12 -See Notes)
5/1/2012 $22.95$28.10 $51.05Laborers (Class 12 -See Notes)
5/1/2013 $23.55$28.70 $52.25Laborers (Class 12 -See Notes)
5/1/2014 $24.50$29.00 $53.50Laborers (Class 12 -See Notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 13 -See Notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 13 -See Notes)
5/1/2012 $22.95$30.13 $53.08Laborers (Class 13 -See Notes)
5/1/2013 $23.55$30.73 $54.28Laborers (Class 13 -See Notes)
5/1/2014 $24.50$31.03 $55.53Laborers (Class 13 -See Notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 14 -See Notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 14 -See Notes)
5/1/2012 $22.95$26.15 $49.10Laborers (Class 14 -See Notes)
5/1/2013 $23.55$26.75 $50.30Laborers (Class 14 -See Notes)
5/1/2014 $24.50$27.05 $51.55Laborers (Class 14 -See Notes)
5/1/2013 $15.38$27.10 $42.48Laborers Utility (PGW ONLY)
5/1/2013 $15.38$20.07 $35.45Laborers Utility (PGW ONLY)
(Flagperson)
4/1/2009 $19.25$18.44 $37.69Landscape Laborer
4/1/2010 $19.90$18.44 $38.34Landscape Laborer
5/1/2012 $20.30$18.84 $39.14Landscape Laborer
5/1/2013 $20.90$19.24 $40.14Landscape Laborer
Page 13 of 14 Serial Number: 15-04231
Page 71
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2014 $21.45$19.89 $41.34Landscape Laborer
5/1/2013 $27.73$45.62 $73.35Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2014 $28.83$47.10 $75.93Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2013 $14.82$28.02 $42.84Truckdriver class 1(see notes)
5/1/2014 $15.56$28.53 $44.09Truckdriver class 1(see notes)
5/1/2013 $14.82$28.12 $42.94Truckdriver class 2 (see notes)
5/1/2014 $15.56$28.63 $44.19Truckdriver class 2 (see notes)
5/1/2013 $14.82$28.62 $43.44Truckdriver class 3 (see notes)
5/1/2014 $15.56$29.13 $44.69Truckdriver class 3 (see notes)
Notes:
If you can not find a classification under Heavy/Highway please refer to the Building classifications.
The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes to clarify existing
tasks performed throughout the Commonwealth. The “Building Laborer Notes” link on the Bureau’s website provides a list
of those tasks that should be read in conformity with custom and usage of the construction industry in the geographic
region in which they are utilized.
For further information on construction types review the
on the Labor and Industry Website. Go to www.dli.state.pa.us, scroll down to the picture labeled "Labor Law Compliance"
and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link.
"Notes as Referenced in Predeterminations"
Page 14 of 14 Serial Number: 15-04231
Page 72
6/24/2015Determination Date:
HighwayProject Classification:
15-04232Serial Number:
8/18/2015Contract Award Date:
Awarding Agency:
Installation of Durable Pavement Markings (151-03-03)Project Name:
PREVAILING WAGES PROJECT RATES
Assigned Field Office:
Montgomery County
Toll Free Phone Number:
215-560-1858Field Office Phone Number:
Philadelphia
PA Turnpike Commission
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2012 $28.00$41.39 $69.39Asbestos & Insulation Workers
5/1/2013 $29.10$41.79 $70.89Asbestos & Insulation Workers
5/1/2014 $30.40$43.14 $73.54Asbestos & Insulation Workers
5/1/2015 $31.85$44.44 $76.29Asbestos & Insulation Workers
4/1/2013 $17.51$25.23 $42.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2014 $17.51$25.23 $42.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2014 $17.95$25.79 $43.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2015 $18.22$26.52 $44.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2011 $28.12$37.35 $65.47Boilermakers
1/1/2012 $29.85$37.62 $67.47Boilermakers
9/30/2012 $29.85$39.97 $69.82Boilermakers
1/1/2013 $31.13$38.69 $69.82Boilermakers
4/1/2013 $31.43$38.54 $69.97Boilermakers
1/1/2014 $32.81$39.06 $71.87Boilermakers
1/1/2015 $33.31$40.31 $73.62Boilermakers
5/1/2014 $23.59$38.02 $61.61Bricklayer
5/1/2015 $23.59$39.67 $63.26Bricklayer
Page 1 of 14 06/24/2015
Page 73
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2015 $25.79$43.87 $69.66Carpenter - Chief of Party (Surveying &
Layout)
5/1/2016 $25.79$45.43 $71.22Carpenter - Chief of Party (Surveying &
Layout)
5/1/2017 $25.79$46.98 $72.77Carpenter - Chief of Party (Surveying &
Layout)
5/1/2015 $25.79$38.15 $63.94Carpenter - Instrument Person (Surveying
& Layout)
5/1/2016 $25.79$39.50 $65.29Carpenter - Instrument Person (Surveying
& Layout)
5/1/2017 $25.79$40.85 $66.64Carpenter - Instrument Person (Surveying
& Layout)
5/1/2015 $18.76$19.08 $37.84Carpenter - Rodman (Surveying & Layout)
5/1/2016 $18.76$19.75 $38.51Carpenter - Rodman (Surveying & Layout)
5/1/2017 $18.76$20.43 $39.19Carpenter - Rodman (Surveying & Layout)
5/1/2015 $25.79$38.15 $63.94Carpenters
5/1/2016 $25.79$39.50 $65.29Carpenters
5/1/2017 $25.79$40.85 $66.64Carpenters
5/1/2014 $29.66$33.55 $63.21Cement Masons
5/1/2015 $30.51$34.15 $64.66Cement Masons
5/1/2014 $30.62$40.55 $71.17DockBuilder/Pile Drivers (Building, Heavy
& Highway)
5/1/2014 $30.62$48.66 $79.28DockBuilder/Pile Drivers Divers (Building
Heavy & Highway)
5/1/2009 $21.34$31.09 $52.43Drapery Installers
5/1/2010 $22.41$33.00 $55.41Drywall Finisher
5/1/2011 $23.45$33.11 $56.56Drywall Finisher
5/1/2012 $23.87$34.09 $57.96Drywall Finisher
5/1/2014 $25.63$35.23 $60.86Drywall Finisher
5/1/2015 $25.90$36.36 $62.26Drywall Finisher
6/3/2013 $21.29$50.19 $71.48Electric Lineman
6/2/2014 $21.81$51.64 $73.45Electric Lineman
6/5/2015 $22.17$52.93 $75.10Electric Lineman
5/30/2016 $22.61$54.56 $77.17Electric Lineman
9/2/2013 $30.15$39.86 $70.01Electricians
9/29/2014 $29.18$42.23 $71.41Electricians
1/1/2013 $25.49$49.84 $75.33Elevator Constructor
Page 2 of 14 Serial Number: 15-04232
Page 74
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
1/1/2014 $27.09$50.69 $77.78Elevator Constructor
1/1/2015 $28.69$51.62 $80.31Elevator Constructor
5/1/2014 $26.11$40.21 $66.32Floor Layer
5/1/2015 $26.41$41.21 $67.62Floor Layer
5/1/2010 $24.53$36.67 $61.20Glazier
5/1/2011 $25.25$37.35 $62.60Glazier
5/1/2012 $25.75$38.35 $64.10Glazier
5/1/2014 $27.60$39.75 $67.35Glazier
5/1/2015 $28.70$40.60 $69.30Glazier
7/1/2012 $28.14$44.70 $72.84Iron Workers (Bridge, Structural,
Ornamental, Precast)
7/1/2013 $19.25$37.00 $56.25Iron Workers (Riggers)
7/1/2014 $19.75$38.00 $57.75Iron Workers (Riggers)
7/1/2013 $19.25$39.63 $58.88Iron Workers - Reinforcing Steel Mesh -
Rebar
7/1/2014 $19.75$40.73 $60.48Iron Workers - Reinforcing Steel Mesh -
Rebar
5/1/2010 $22.30$23.85 $46.15Laborers (Class 01 - See notes)
5/1/2011 $22.30$24.75 $47.05Laborers (Class 01 - See notes)
5/1/2012 $23.00$25.15 $48.15Laborers (Class 01 - See notes)
5/1/2013 $23.40$25.85 $49.25Laborers (Class 01 - See notes)
5/1/2014 $24.55$26.00 $50.55Laborers (Class 01 - See notes)
5/1/2010 $21.73$25.97 $47.70Laborers (Class 02 - See notes)
5/1/2011 $21.73$26.87 $48.60Laborers (Class 02 - See notes)
5/1/2012 $22.85$26.45 $49.30Laborers (Class 02 - See notes)
5/1/2013 $23.45$26.95 $50.40Laborers (Class 02 - See notes)
5/1/2014 $24.40$27.25 $51.65Laborers (Class 02 - See notes)
5/1/2010 $22.28$24.37 $46.65Laborers (Class 03 - See notes)
5/1/2011 $22.28$25.17 $47.45Laborers (Class 03 - See notes)
5/1/2012 $23.23$25.45 $48.68Laborers (Class 03 - See notes)
5/1/2013 $23.83$25.92 $49.75Laborers (Class 03 - See notes)
5/1/2014 $24.78$26.27 $51.05Laborers (Class 03 - See notes)
5/1/2011 $21.65$25.27 $46.92Laborers (Class 04 - See notes)
Page 3 of 14 Serial Number: 15-04232
Page 75
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2012 $23.23$25.45 $48.68Laborers (Class 04 - See notes)
5/1/2013 $23.83$25.92 $49.75Laborers (Class 04 - See notes)
5/1/2014 $24.78$26.27 $51.05Laborers (Class 04 - See notes)
5/1/2011 $21.45$25.42 $46.87Laborers (Class 05 - See notes)
5/1/2012 $22.80$25.35 $48.15Laborers (Class 05 - See notes)
5/1/2013 $23.40$25.85 $49.25Laborers (Class 05 - See notes)
5/1/2014 $24.35$26.20 $50.55Laborers (Class 05 - See notes)
4/1/2009 $19.98$18.31 $38.29Landscape Laborer
5/1/2012 $21.03$18.71 $39.74Landscape Laborer
5/1/2013 $21.63$19.11 $40.74Landscape Laborer
5/1/2014 $22.18$19.76 $41.94Landscape Laborer
5/1/2010 $19.97$28.63 $48.60Marble Finisher
5/1/2011 $20.72$28.68 $49.40Marble Finisher
5/1/2012 $21.02$29.27 $50.29Marble Finisher
5/1/2013 $21.02$30.34 $51.36Marble Finisher
5/1/2014 $21.02$31.92 $52.94Marble Finisher
5/1/2015 $21.02$33.50 $54.52Marble Finisher
5/1/2011 $22.58$34.35 $56.93Marble Mason
5/1/2012 $22.90$35.25 $58.15Marble Mason
5/1/2013 $22.90$36.65 $59.55Marble Mason
5/1/2014 $22.90$38.30 $61.20Marble Mason
5/1/2015 $22.90$39.95 $62.85Marble Mason
5/1/2015 $30.29$38.36 $68.65Millwright
5/1/2010 $22.07$40.04 $62.11Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2011 $23.42$40.04 $63.46Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2012 $24.48$40.43 $64.91Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2013 $25.55$40.81 $66.36Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2014 $26.20$41.81 $68.01Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2015 $26.56$42.85 $69.41Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2016 $26.92$44.09 $71.01Operators Class 01 - See Notes (Building,
Heavy, Highway)
Page 4 of 14 Serial Number: 15-04232
Page 76
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2010 $22.96$43.04 $66.00Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2011 $24.31$43.04 $67.35Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2012 $25.38$43.42 $68.80Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2013 $26.45$43.80 $70.25Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2014 $27.08$44.82 $71.90Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2015 $27.44$45.86 $73.30Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2016 $27.80$47.10 $74.90Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2010 $22.00$39.79 $61.79Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2011 $23.35$39.79 $63.14Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2012 $24.41$40.18 $64.59Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2013 $25.48$40.56 $66.04Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2014 $26.12$41.57 $67.69Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2015 $26.48$42.61 $69.09Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2016 $26.85$43.84 $70.69Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2010 $22.88$42.80 $65.68Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2011 $24.23$42.80 $67.03Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2012 $25.31$43.17 $68.48Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2013 $26.36$43.57 $69.93Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2014 $27.02$44.56 $71.58Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2015 $27.37$45.61 $72.98Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2016 $27.74$46.84 $74.58Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2010 $20.79$35.71 $56.50Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2011 $22.14$35.71 $57.85Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2012 $23.20$36.10 $59.30Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2013 $24.27$36.48 $60.75Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2014 $24.92$37.48 $62.40Operators Class 03 - See Notes (Building,
Heavy, Highway)
Page 5 of 14 Serial Number: 15-04232
Page 77
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2015 $25.27$38.53 $63.80Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2016 $25.64$39.76 $65.40Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2010 $20.71$35.40 $56.11Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2011 $22.06$35.40 $57.46Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2012 $23.12$35.79 $58.91Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2013 $24.19$36.17 $60.36Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2014 $24.83$37.18 $62.01Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2015 $25.18$38.23 $63.41Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2016 $25.55$39.46 $65.01Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2010 $20.20$33.68 $53.88Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2011 $21.55$33.68 $55.23Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2012 $22.61$34.07 $56.68Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2013 $23.68$34.45 $58.13Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2014 $24.32$35.46 $59.78Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2015 $24.68$36.50 $61.18Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2016 $25.04$37.74 $62.78Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2010 $19.91$32.69 $52.60Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2011 $21.26$32.69 $53.95Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2012 $22.32$33.08 $55.40Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2013 $23.39$33.46 $56.85Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2014 $24.03$34.47 $58.50Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2015 $24.39$35.51 $59.90Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2016 $24.75$36.75 $61.50Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2010 $25.55$48.05 $73.60Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2011 $27.10$48.05 $75.15Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2012 $28.38$48.51 $76.89Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
Page 6 of 14 Serial Number: 15-04232
Page 78
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2013 $29.66$48.97 $78.63Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2014 $30.41$50.17 $80.58Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2015 $30.87$51.42 $82.29Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2016 $31.30$52.91 $84.21Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2010 $25.47$47.75 $73.22Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2011 $27.02$47.75 $74.77Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2012 $28.30$48.21 $76.51Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2013 $29.58$48.67 $78.25Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2014 $30.32$49.88 $80.20Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2015 $30.78$51.13 $81.91Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2016 $31.22$52.61 $83.83Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2010 $20.84$32.31 $53.15Painters Class 1 (see notes)
5/1/2011 $21.49$32.94 $54.43Painters Class 1 (see notes)
5/1/2012 $21.91$33.92 $55.83Painters Class 1 (see notes)
5/1/2014 $23.40$35.38 $58.78Painters Class 1 (see notes)
5/1/2015 $24.50$36.03 $60.53Painters Class 1 (see notes)
5/1/2010 $20.94$40.85 $61.79Painters Class 2 (see notes)
5/1/2011 $21.59$42.20 $63.79Painters Class 2 (see notes)
11/1/2011 $21.62$44.17 $65.79Painters Class 2 (see notes)
5/1/2012 $22.04$45.25 $67.29Painters Class 2 (see notes)
11/1/2012 $22.04$46.75 $68.79Painters Class 2 (see notes)
5/1/2014 $22.66$47.67 $70.33Painters Class 2 (see notes)
2/1/2015 $24.34$50.88 $75.22Painters Class 2 (see notes)
5/1/2010 $20.84$32.69 $53.53Painters Class 3 (see notes)
5/1/2011 $21.49$33.32 $54.81Painters Class 3 (see notes)
5/1/2012 $21.91$34.30 $56.21Painters Class 3 (see notes)
5/1/2014 $23.40$35.76 $59.16Painters Class 3 (see notes)
5/1/2015 $24.50$36.41 $60.91Painters Class 3 (see notes)
5/1/2013 $27.05$34.70 $61.75Plasterers
Page 7 of 14 Serial Number: 15-04232
Page 79
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2015 $30.60$47.38 $77.98Plumbers
5/1/2009 $20.85$35.05 $55.90Pointers, Caulkers, Cleaners
5/1/2010 $21.60$35.05 $56.65Pointers, Caulkers, Cleaners
5/1/2011 $22.45$35.10 $57.55Pointers, Caulkers, Cleaners
5/1/2012 $22.75$36.10 $58.85Pointers, Caulkers, Cleaners
5/1/2013 $22.75$37.50 $60.25Pointers, Caulkers, Cleaners
5/1/2014 $22.75$39.15 $61.90Pointers, Caulkers, Cleaners
5/1/2015 $22.75$40.80 $63.55Pointers, Caulkers, Cleaners
5/1/2013 $28.40$31.05 $59.45Roofers (Composition)
5/1/2014 $28.65$32.15 $60.80Roofers (Composition)
5/1/2015 $28.65$33.65 $62.30Roofers (Composition)
5/1/2012 $16.37$24.00 $40.37Roofers (Shingle, Slate, Tile)
5/1/2014 $17.37$24.50 $41.87Roofers (Shingle, Slate, Tile)
5/1/2015 $18.37$25.00 $43.37Roofers (Shingle, Slate, Tile)
5/1/2014 $33.98$42.95 $76.93Sheet Metal Workers (Building, Heavy,
Highway)
5/1/2015 $36.48$42.95 $79.43Sheet Metal Workers (Building, Heavy,
Highway)
5/21/2010 $16.37$24.33 $40.70Sign Makers and Hangars
5/20/2011 $17.69$23.70 $41.39Sign Makers and Hangars
4/1/2013 $20.12$33.03 $53.15Sprinklerfitters
7/1/2013 $20.12$33.69 $53.81Sprinklerfitters
4/1/2014 $20.47$34.36 $54.83Sprinklerfitters
4/1/2015 $20.62$35.05 $55.67Sprinklerfitters
5/1/2013 $28.00$48.03 $76.03Steamfitters
5/1/2014 $29.13$49.58 $78.71Steamfitters
5/1/2010 $21.77$34.36 $56.13Stone Masons
5/1/2011 $22.58$34.35 $56.93Stone Masons
5/1/2012 $22.90$35.25 $58.15Stone Masons
5/1/2013 $22.90$36.65 $59.55Stone Masons
5/1/2014 $22.90$38.30 $61.20Stone Masons
5/1/2015 $22.90$39.95 $62.85Stone Masons
Page 8 of 14 Serial Number: 15-04232
Page 80
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2010 $19.06$32.41 $51.47Terrazzo Finisher
5/1/2011 $19.96$32.41 $52.37Terrazzo Finisher
5/1/2012 $20.26$33.06 $53.32Terrazzo Finisher
5/1/2013 $20.26$34.19 $54.45Terrazzo Finisher
5/1/2014 $20.26$35.86 $56.12Terrazzo Finisher
5/1/2015 $20.26$37.53 $57.79Terrazzo Finisher
5/1/2011 $19.96$32.66 $52.62Terrazzo Grinder
5/1/2012 $20.26$33.31 $53.57Terrazzo Grinder
5/1/2013 $20.26$34.44 $54.70Terrazzo Grinder
5/1/2014 $20.26$36.12 $56.38Terrazzo Grinder
5/1/2015 $20.26$37.80 $58.06Terrazzo Grinder
5/1/2010 $21.67$35.41 $57.08Terrazzo Mechanics
5/1/2011 $21.78$36.30 $58.08Terrazzo Mechanics
5/1/2012 $22.08$37.05 $59.13Terrazzo Mechanics
5/1/2013 $22.08$38.30 $60.38Terrazzo Mechanics
5/1/2014 $22.08$40.15 $62.23Terrazzo Mechanics
5/1/2015 $22.08$42.00 $64.08Terrazzo Mechanics
5/1/2009 $19.84$29.11 $48.95Tile Finisher
5/1/2010 $20.59$29.11 $49.70Tile Finisher
5/1/2011 $21.34$29.16 $50.50Tile Finisher
5/1/2012 $21.64$29.77 $51.41Tile Finisher
5/1/2013 $21.64$30.86 $52.50Tile Finisher
5/1/2014 $21.64$32.47 $54.11Tile Finisher
5/1/2015 $21.64$34.08 $55.72Tile Finisher
5/1/2010 $21.03$36.15 $57.18Tile Layers
5/1/2011 $21.78$36.20 $57.98Tile Layers
5/1/2012 $22.08$36.95 $59.03Tile Layers
5/1/2013 $22.08$38.20 $60.28Tile Layers
5/1/2014 $22.08$40.05 $62.13Tile Layers
5/1/2015 $22.08$41.90 $63.98Tile Layers
5/1/2012 $14.16$27.54 $41.70Truckdriver class 1(see notes)
Page 9 of 14 Serial Number: 15-04232
Page 81
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2014 $15.56$28.68 $44.24Truckdriver class 1(see notes)
5/1/2012 $14.16$27.64 $41.80Truckdriver class 2 (see notes)
5/1/2014 $15.56$28.78 $44.34Truckdriver class 2 (see notes)
5/1/2012 $14.16$27.89 $42.05Truckdriver class 3 (see notes)
5/1/2014 $15.56$29.03 $44.59Truckdriver class 3 (see notes)
Page 10 of 14 Serial Number: 15-04232
Page 82
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2015 $25.89$49.23 $75.12Carpenter - Chief of Party (Surveying &
Layout)
5/1/2016 $25.89$51.07 $76.96Carpenter - Chief of Party (Surveying &
Layout)
5/1/2015 $25.89$42.81 $68.70Carpenter - Instrument Person (Surveying
& Layout)
5/1/2016 $25.89$44.41 $70.30Carpenter - Instrument Person (Surveying
& Layout)
5/1/2015 $20.31$34.25 $54.56Carpenter - Rodman (Surveying & Layout)
5/1/2016 $20.31$35.53 $55.84Carpenter - Rodman (Surveying & Layout)
5/1/2014 $25.59$41.56 $67.15Carpenters
5/1/2015 $25.89$42.81 $68.70Carpenters
5/1/2016 $25.89$44.41 $70.30Carpenters
5/1/2014 $29.16$32.25 $61.41Cement Masons
5/1/2015 $30.26$32.55 $62.81Cement Masons
5/1/2016 $29.16$35.15 $64.31Cement Masons
7/1/2010 $26.69$44.70 $71.39Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2011 $27.19$44.70 $71.89Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2012 $28.14$44.70 $72.84Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 01 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 01 - See notes)
5/1/2012 $22.95$26.00 $48.95Laborers (Class 01 - See notes)
5/1/2013 $23.55$26.60 $50.15Laborers (Class 01 - See notes)
5/1/2014 $24.50$26.90 $51.40Laborers (Class 01 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 02 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 02 - See notes)
5/1/2012 $22.95$26.20 $49.15Laborers (Class 02 - See notes)
5/1/2013 $23.55$26.80 $50.35Laborers (Class 02 - See notes)
5/1/2014 $24.50$27.10 $51.60Laborers (Class 02 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 03 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 03 - See notes)
5/1/2012 $22.95$26.20 $49.15Laborers (Class 03 - See notes)
5/1/2013 $23.55$26.80 $50.35Laborers (Class 03 - See notes)
5/1/2014 $24.50$27.10 $51.60Laborers (Class 03 - See notes)
Page 11 of 14 Serial Number: 15-04232
Page 83
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2010 $22.00$25.15 $47.15Laborers (Class 04 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 04 - See notes)
5/1/2012 $22.95$20.80 $43.75Laborers (Class 04 - See notes)
5/1/2013 $23.55$21.40 $44.95Laborers (Class 04 - See notes)
5/1/2014 $24.50$21.70 $46.20Laborers (Class 04 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 05 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 05 - See notes)
5/1/2012 $22.95$26.85 $49.80Laborers (Class 05 - See notes)
5/1/2013 $23.55$27.45 $51.00Laborers (Class 05 - See notes)
5/1/2014 $24.50$27.75 $52.25Laborers (Class 05 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 06 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 06 - See notes)
5/1/2012 $22.95$26.90 $49.85Laborers (Class 06 - See notes)
5/1/2013 $23.55$27.50 $51.05Laborers (Class 06 - See notes)
5/1/2014 $24.50$27.80 $52.30Laborers (Class 06 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 07 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 07 - See notes)
5/1/2012 $22.95$26.75 $49.70Laborers (Class 07 - See notes)
5/1/2013 $23.55$27.35 $50.90Laborers (Class 07 - See notes)
5/1/2014 $24.50$27.65 $52.15Laborers (Class 07 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 08 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 08 - See notes)
5/1/2012 $22.95$26.50 $49.45Laborers (Class 08 - See notes)
5/1/2013 $23.55$27.10 $50.65Laborers (Class 08 - See notes)
5/1/2014 $24.50$27.40 $51.90Laborers (Class 08 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 09 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 09 - See notes)
5/1/2012 $22.95$26.35 $49.30Laborers (Class 09 - See notes)
5/1/2013 $23.55$26.95 $50.50Laborers (Class 09 - See notes)
5/1/2014 $24.50$27.25 $51.75Laborers (Class 09 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 10- See notes)
Page 12 of 14 Serial Number: 15-04232
Page 84
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2011 $22.00$25.95 $47.95Laborers (Class 10- See notes)
5/1/2012 $22.95$26.50 $49.45Laborers (Class 10- See notes)
5/1/2013 $23.55$27.10 $50.65Laborers (Class 10- See notes)
5/1/2014 $24.50$27.40 $51.90Laborers (Class 10- See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 11 -See Notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 11 -See Notes)
5/1/2012 $22.95$26.40 $49.35Laborers (Class 11 -See Notes)
5/1/2013 $23.55$27.00 $50.55Laborers (Class 11 -See Notes)
5/1/2014 $24.50$27.30 $51.80Laborers (Class 11 -See Notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 12 -See Notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 12 -See Notes)
5/1/2012 $22.95$28.10 $51.05Laborers (Class 12 -See Notes)
5/1/2013 $23.55$28.70 $52.25Laborers (Class 12 -See Notes)
5/1/2014 $24.50$29.00 $53.50Laborers (Class 12 -See Notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 13 -See Notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 13 -See Notes)
5/1/2012 $22.95$30.13 $53.08Laborers (Class 13 -See Notes)
5/1/2013 $23.55$30.73 $54.28Laborers (Class 13 -See Notes)
5/1/2014 $24.50$31.03 $55.53Laborers (Class 13 -See Notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 14 -See Notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 14 -See Notes)
5/1/2012 $22.95$26.15 $49.10Laborers (Class 14 -See Notes)
5/1/2013 $23.55$26.75 $50.30Laborers (Class 14 -See Notes)
5/1/2014 $24.50$27.05 $51.55Laborers (Class 14 -See Notes)
5/1/2013 $15.38$27.10 $42.48Laborers Utility (PGW ONLY)
5/1/2013 $15.38$20.07 $35.45Laborers Utility (PGW ONLY)
(Flagperson)
4/1/2010 $19.90$18.44 $38.34Landscape Laborer
5/1/2012 $20.30$18.84 $39.14Landscape Laborer
5/1/2013 $20.90$19.24 $40.14Landscape Laborer
5/1/2014 $21.45$19.89 $41.34Landscape Laborer
Page 13 of 14 Serial Number: 15-04232
Page 85
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2013 $27.73$45.62 $73.35Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2014 $28.83$47.10 $75.93Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2013 $14.82$28.02 $42.84Truckdriver class 1(see notes)
5/1/2014 $15.56$28.53 $44.09Truckdriver class 1(see notes)
5/1/2013 $14.82$28.12 $42.94Truckdriver class 2 (see notes)
5/1/2014 $15.56$28.63 $44.19Truckdriver class 2 (see notes)
5/1/2013 $14.82$28.62 $43.44Truckdriver class 3 (see notes)
5/1/2014 $15.56$29.13 $44.69Truckdriver class 3 (see notes)
Notes:
If you can not find a classification under Heavy/Highway please refer to the Building classifications.
The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes to clarify existing
tasks performed throughout the Commonwealth. The “Building Laborer Notes” link on the Bureau’s website provides a list
of those tasks that should be read in conformity with custom and usage of the construction industry in the geographic
region in which they are utilized.
For further information on construction types review the
on the Labor and Industry Website. Go to www.dli.state.pa.us, scroll down to the picture labeled "Labor Law Compliance"
and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link.
"Notes as Referenced in Predeterminations"
Page 14 of 14 Serial Number: 15-04232
Page 86
6/24/2015Determination Date:
HighwayProject Classification:
15-04233Serial Number:
8/18/2015Contract Award Date:
Awarding Agency:
Installation of Durable Pavement Markings (151-03-03)Project Name:
PREVAILING WAGES PROJECT RATES
Assigned Field Office:
Bucks County
Toll Free Phone Number:
215-560-1858Field Office Phone Number:
Philadelphia
PA Turnpike Commission
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2012 $28.00$41.39 $69.39Asbestos & Insulation Workers
5/1/2013 $29.10$41.79 $70.89Asbestos & Insulation Workers
5/1/2014 $30.40$43.14 $73.54Asbestos & Insulation Workers
5/1/2015 $31.85$44.44 $76.29Asbestos & Insulation Workers
4/1/2013 $17.51$25.23 $42.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2014 $17.51$25.23 $42.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2014 $17.95$25.79 $43.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2015 $18.22$26.52 $44.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2011 $28.12$37.35 $65.47Boilermakers
1/1/2012 $29.85$37.62 $67.47Boilermakers
9/30/2012 $29.85$39.97 $69.82Boilermakers
1/1/2013 $31.13$38.69 $69.82Boilermakers
4/1/2013 $31.43$38.54 $69.97Boilermakers
1/1/2014 $32.81$39.06 $71.87Boilermakers
5/1/2014 $23.59$38.02 $61.61Bricklayer
5/1/2015 $23.59$39.67 $63.26Bricklayer
5/1/2015 $25.79$43.87 $69.66Carpenter - Chief of Party (Surveying &
Layout)
Page 1 of 14 06/24/2015
Page 87
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2016 $25.79$45.43 $71.22Carpenter - Chief of Party (Surveying &
Layout)
5/1/2017 $25.79$46.98 $72.77Carpenter - Chief of Party (Surveying &
Layout)
5/1/2015 $25.79$38.15 $63.94Carpenter - Instrument Person (Surveying
& Layout)
5/1/2016 $25.79$39.50 $65.29Carpenter - Instrument Person (Surveying
& Layout)
5/1/2017 $25.79$40.85 $66.64Carpenter - Instrument Person (Surveying
& Layout)
5/1/2015 $18.76$19.08 $37.84Carpenter - Rodman (Surveying & Layout)
5/1/2016 $18.76$19.75 $38.51Carpenter - Rodman (Surveying & Layout)
5/1/2017 $18.76$20.43 $39.19Carpenter - Rodman (Surveying & Layout)
5/1/2015 $25.79$38.15 $63.94Carpenters
5/1/2016 $25.79$39.50 $65.29Carpenters
5/1/2017 $25.79$40.85 $66.64Carpenters
5/1/2014 $29.66$33.55 $63.21Cement Masons
5/1/2015 $30.51$34.15 $64.66Cement Masons
5/1/2014 $30.62$40.55 $71.17DockBuilder/Pile Drivers (Building, Heavy
& Highway)
5/1/2014 $30.62$48.66 $79.28DockBuilder/Pile Drivers Divers (Building
Heavy & Highway)
5/1/2009 $21.34$31.09 $52.43Drapery Installers
5/1/2009 $21.37$32.79 $54.16Drywall Finisher
5/1/2010 $22.41$33.00 $55.41Drywall Finisher
5/1/2011 $23.45$33.11 $56.56Drywall Finisher
5/1/2012 $23.87$34.09 $57.96Drywall Finisher
5/1/2014 $25.63$35.23 $60.86Drywall Finisher
5/1/2015 $25.90$36.36 $62.26Drywall Finisher
6/3/2013 $21.29$50.19 $71.48Electric Lineman
6/2/2014 $21.81$51.64 $73.45Electric Lineman
6/5/2015 $22.17$52.93 $75.10Electric Lineman
5/30/2016 $22.61$54.56 $77.17Electric Lineman
12/1/2014 $15.28$39.81 $55.09Electricians & Telecommunications
Installation Technician
6/1/2015 $15.83$39.81 $55.64Electricians & Telecommunications
Installation Technician
1/1/2012 $23.84$49.30 $73.14Elevator Constructor
Page 2 of 14 Serial Number: 15-04233
Page 88
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
1/1/2013 $25.49$49.84 $75.33Elevator Constructor
1/1/2014 $27.09$50.69 $77.78Elevator Constructor
5/1/2014 $26.11$40.21 $66.32Floor Layer
5/1/2015 $26.41$41.21 $67.62Floor Layer
5/1/2009 $23.81$36.64 $60.45Glazier
5/1/2010 $24.53$36.67 $61.20Glazier
5/1/2011 $25.25$37.35 $62.60Glazier
5/1/2012 $25.75$38.35 $64.10Glazier
5/1/2014 $27.60$39.75 $67.35Glazier
5/1/2015 $28.70$40.60 $69.30Glazier
7/1/2014 $30.64$44.64 $75.28Iron Workers (Bridge, Structural,
Ornamental, Precast)
1/1/2015 $30.89$45.14 $76.03Iron Workers (Bridge, Structural,
Ornamental, Precast)
7/1/2013 $19.25$37.00 $56.25Iron Workers (Riggers)
7/1/2014 $19.75$38.00 $57.75Iron Workers (Riggers)
7/1/2013 $19.25$39.63 $58.88Iron Workers - Reinforcing Steel Mesh -
Rebar
7/1/2014 $19.75$40.73 $60.48Iron Workers - Reinforcing Steel Mesh -
Rebar
5/1/2010 $22.30$23.85 $46.15Laborers (Class 01 - See notes)
5/1/2011 $22.30$24.75 $47.05Laborers (Class 01 - See notes)
5/1/2012 $23.00$25.15 $48.15Laborers (Class 01 - See notes)
5/1/2013 $23.40$25.85 $49.25Laborers (Class 01 - See notes)
5/1/2014 $24.55$26.00 $50.55Laborers (Class 01 - See notes)
5/1/2010 $21.73$25.97 $47.70Laborers (Class 02 - See notes)
5/1/2011 $21.73$26.87 $48.60Laborers (Class 02 - See notes)
5/1/2012 $22.85$26.45 $49.30Laborers (Class 02 - See notes)
5/1/2013 $23.45$26.95 $50.40Laborers (Class 02 - See notes)
5/1/2014 $24.40$27.25 $51.65Laborers (Class 02 - See notes)
5/1/2010 $22.28$24.37 $46.65Laborers (Class 03 - See notes)
5/1/2011 $22.28$25.17 $47.45Laborers (Class 03 - See notes)
5/1/2012 $23.23$25.45 $48.68Laborers (Class 03 - See notes)
5/1/2013 $23.83$25.92 $49.75Laborers (Class 03 - See notes)
Page 3 of 14 Serial Number: 15-04233
Page 89
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2014 $24.78$26.27 $51.05Laborers (Class 03 - See notes)
5/1/2011 $21.65$25.27 $46.92Laborers (Class 04 - See notes)
5/1/2012 $23.23$25.45 $48.68Laborers (Class 04 - See notes)
5/1/2013 $23.83$25.92 $49.75Laborers (Class 04 - See notes)
5/1/2014 $24.78$26.27 $51.05Laborers (Class 04 - See notes)
5/1/2011 $21.45$25.42 $46.87Laborers (Class 05 - See notes)
5/1/2012 $22.80$25.35 $48.15Laborers (Class 05 - See notes)
5/1/2013 $23.40$25.85 $49.25Laborers (Class 05 - See notes)
5/1/2014 $24.35$26.20 $50.55Laborers (Class 05 - See notes)
4/1/2009 $19.98$19.31 $39.29Landscape Laborer
5/1/2012 $21.03$18.71 $39.74Landscape Laborer
5/1/2013 $21.63$19.11 $40.74Landscape Laborer
5/1/2014 $22.18$19.76 $41.94Landscape Laborer
5/1/2009 $19.22$28.63 $47.85Marble Finisher
5/1/2010 $19.97$28.63 $48.60Marble Finisher
5/1/2011 $20.72$28.68 $49.40Marble Finisher
5/1/2012 $21.02$29.27 $50.29Marble Finisher
5/1/2013 $21.02$30.34 $51.36Marble Finisher
5/1/2014 $21.02$31.92 $52.94Marble Finisher
5/1/2015 $21.02$33.50 $54.52Marble Finisher
5/1/2010 $21.77$34.36 $56.13Marble Mason
5/1/2011 $22.58$34.35 $56.93Marble Mason
5/1/2012 $22.90$35.25 $58.15Marble Mason
5/1/2013 $22.90$36.65 $59.55Marble Mason
5/1/2014 $22.90$38.30 $61.20Marble Mason
5/1/2015 $22.90$39.95 $62.85Marble Mason
5/1/2015 $30.29$38.36 $68.65Millwright
5/1/2013 $25.55$40.81 $66.36Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2014 $26.20$41.81 $68.01Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2015 $26.56$42.85 $69.41Operators Class 01 - See Notes (Building,
Heavy, Highway)
Page 4 of 14 Serial Number: 15-04233
Page 90
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2016 $26.92$44.09 $71.01Operators Class 01 - See Notes (Building,
Heavy, Highway)
5/1/2009 $21.96$43.04 $65.00Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2010 $22.96$43.04 $66.00Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2011 $24.31$43.04 $67.35Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2012 $25.38$43.42 $68.80Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2013 $26.45$43.80 $70.25Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2014 $27.08$44.82 $71.90Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2015 $27.44$45.86 $73.30Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2016 $27.80$47.10 $74.90Operators Class 01a - See Notes
(Building, Heavy, Highway)
5/1/2009 $21.00$39.79 $60.79Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2010 $22.00$39.79 $61.79Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2011 $23.35$39.79 $63.14Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2012 $24.41$40.18 $64.59Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2013 $25.48$40.56 $66.04Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2014 $26.12$41.57 $67.69Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2015 $26.48$42.61 $69.09Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2016 $26.85$43.84 $70.69Operators Class 02 - See Notes (Building,
Heavy, Highway)
5/1/2009 $21.88$42.80 $64.68Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2010 $22.88$42.80 $65.68Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2011 $24.23$42.80 $67.03Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2012 $25.31$43.17 $68.48Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2013 $26.36$43.57 $69.93Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2014 $27.02$44.56 $71.58Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2015 $27.37$45.61 $72.98Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2016 $27.74$46.84 $74.58Operators Class 02a - See Notes
(Building, Heavy, Highway)
5/1/2009 $19.79$35.71 $55.50Operators Class 03 - See Notes (Building,
Heavy, Highway)
Page 5 of 14 Serial Number: 15-04233
Page 91
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2010 $20.79$35.71 $56.50Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2011 $22.14$35.71 $57.85Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2012 $23.20$36.10 $59.30Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2013 $24.27$36.48 $60.75Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2014 $24.92$37.48 $62.40Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2015 $25.27$38.53 $63.80Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2016 $25.64$39.76 $65.40Operators Class 03 - See Notes (Building,
Heavy, Highway)
5/1/2009 $19.71$35.40 $55.11Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2010 $20.71$35.40 $56.11Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2011 $22.06$35.40 $57.46Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2012 $23.12$35.79 $58.91Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2013 $24.19$36.17 $60.36Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2014 $24.83$37.18 $62.01Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2015 $25.18$38.23 $63.41Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2016 $25.55$39.46 $65.01Operators Class 04 - See Notes (Building,
Heavy, Highway)
5/1/2009 $19.20$33.68 $52.88Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2010 $20.20$33.68 $53.88Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2011 $21.55$33.68 $55.23Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2012 $22.61$34.07 $56.68Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2013 $23.68$34.45 $58.13Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2014 $24.32$35.46 $59.78Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2015 $24.68$36.50 $61.18Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2016 $25.04$37.74 $62.78Operators Class 05 - See Notes (Building,
Heavy, Highway)
5/1/2009 $18.91$32.69 $51.60Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2010 $19.91$32.69 $52.60Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2011 $21.26$32.69 $53.95Operators Class 06 - See Notes (Building,
Heavy, Highway)
Page 6 of 14 Serial Number: 15-04233
Page 92
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2012 $22.32$33.08 $55.40Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2013 $23.39$33.46 $56.85Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2014 $24.03$34.47 $58.50Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2015 $24.39$35.51 $59.90Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2016 $24.75$36.75 $61.50Operators Class 06 - See Notes (Building,
Heavy, Highway)
5/1/2009 $24.43$48.05 $72.48Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2010 $25.55$48.05 $73.60Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2011 $27.10$48.05 $75.15Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2012 $28.38$48.51 $76.89Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2013 $29.66$48.97 $78.63Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2014 $30.41$50.17 $80.58Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2015 $30.87$51.42 $82.29Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2016 $31.30$52.91 $84.21Operators Class 07 (A) - See Notes
(Building, Heavy, Highway)
5/1/2009 $24.35$47.75 $72.10Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2010 $25.47$47.75 $73.22Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2011 $27.02$47.75 $74.77Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2012 $28.30$48.21 $76.51Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2013 $29.58$48.67 $78.25Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2014 $30.32$49.88 $80.20Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2015 $30.78$51.13 $81.91Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2016 $31.22$52.61 $83.83Operators Class 07 (B) - See Notes
(Building, Heavy, Highway)
5/1/2009 $19.24$32.31 $51.55Painters Class 1 (see notes)
10/1/2009 $20.12$32.31 $52.43Painters Class 1 (see notes)
5/1/2010 $20.84$32.31 $53.15Painters Class 1 (see notes)
5/1/2011 $21.49$32.94 $54.43Painters Class 1 (see notes)
5/1/2012 $21.91$33.92 $55.83Painters Class 1 (see notes)
5/1/2014 $23.40$35.38 $58.78Painters Class 1 (see notes)
Page 7 of 14 Serial Number: 15-04233
Page 93
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2015 $24.50$36.03 $60.53Painters Class 1 (see notes)
5/1/2009 $19.59$40.85 $60.44Painters Class 2 (see notes)
10/1/2009 $20.34$40.85 $61.19Painters Class 2 (see notes)
5/1/2010 $20.94$40.85 $61.79Painters Class 2 (see notes)
5/1/2011 $21.59$42.20 $63.79Painters Class 2 (see notes)
11/1/2011 $21.62$44.17 $65.79Painters Class 2 (see notes)
5/1/2012 $22.04$45.25 $67.29Painters Class 2 (see notes)
11/1/2012 $22.04$46.75 $68.79Painters Class 2 (see notes)
5/1/2014 $22.66$47.67 $70.33Painters Class 2 (see notes)
5/1/2015 $24.34$50.88 $75.22Painters Class 2 (see notes)
5/1/2014 $23.40$35.76 $59.16Painters Class 3 (see notes)
5/1/2015 $24.50$36.41 $60.91Painters Class 3 (see notes)
5/1/2013 $27.05$34.70 $61.75Plasterers
5/1/2015 $30.60$47.38 $77.98Plumbers
5/1/2009 $20.85$35.05 $55.90Pointers, Caulkers, Cleaners
5/1/2010 $21.60$35.05 $56.65Pointers, Caulkers, Cleaners
5/1/2011 $22.45$35.10 $57.55Pointers, Caulkers, Cleaners
5/1/2012 $22.75$36.10 $58.85Pointers, Caulkers, Cleaners
5/1/2013 $22.75$37.50 $60.25Pointers, Caulkers, Cleaners
5/1/2014 $22.75$39.15 $61.90Pointers, Caulkers, Cleaners
5/1/2015 $22.75$40.80 $63.55Pointers, Caulkers, Cleaners
5/1/2013 $28.40$31.05 $59.45Roofers (Composition)
5/1/2014 $28.65$32.15 $60.80Roofers (Composition)
5/1/2015 $28.65$33.65 $62.30Roofers (Composition)
5/1/2012 $16.37$24.00 $40.37Roofers (Shingle, Slate, Tile)
5/1/2014 $17.37$24.50 $41.87Roofers (Shingle, Slate, Tile)
5/1/2015 $18.37$25.00 $43.37Roofers (Shingle, Slate, Tile)
5/1/2014 $33.98$42.95 $76.93Sheet Metal Workers (Building, Heavy,
Highway)
5/1/2015 $36.48$42.95 $79.43Sheet Metal Workers (Building, Heavy,
Highway)
5/21/2010 $16.37$24.33 $40.70Sign Makers and Hangars
Page 8 of 14 Serial Number: 15-04233
Page 94
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/20/2011 $17.69$23.70 $41.39Sign Makers and Hangars
4/1/2013 $20.12$33.03 $53.15Sprinklerfitters
7/1/2013 $20.12$33.69 $53.81Sprinklerfitters
4/1/2014 $20.47$34.36 $54.83Sprinklerfitters
4/1/2015 $20.62$35.05 $55.67Sprinklerfitters
5/1/2013 $28.00$48.03 $76.03Steamfitters
5/1/2014 $29.13$49.58 $78.71Steamfitters
5/1/2010 $21.77$34.36 $56.13Stone Masons
5/1/2011 $22.58$34.35 $56.93Stone Masons
5/1/2012 $22.90$35.25 $58.15Stone Masons
5/1/2013 $22.90$36.65 $59.55Stone Masons
5/1/2014 $22.90$38.30 $61.20Stone Masons
5/1/2015 $22.90$39.95 $62.85Stone Masons
5/1/2009 $18.31$32.41 $50.72Terrazzo Finisher
5/1/2010 $19.06$32.41 $51.47Terrazzo Finisher
5/1/2011 $19.96$32.41 $52.37Terrazzo Finisher
5/1/2012 $20.26$33.06 $53.32Terrazzo Finisher
5/1/2013 $20.26$34.19 $54.45Terrazzo Finisher
5/1/2014 $20.26$35.86 $56.12Terrazzo Finisher
5/1/2015 $20.26$37.53 $57.79Terrazzo Finisher
5/1/2011 $19.96$32.66 $52.62Terrazzo Grinder
5/1/2012 $20.26$33.31 $53.57Terrazzo Grinder
5/1/2013 $20.26$34.44 $54.70Terrazzo Grinder
5/1/2014 $20.26$36.12 $56.38Terrazzo Grinder
5/1/2015 $20.26$37.80 $58.06Terrazzo Grinder
5/1/2008 $19.47$35.41 $54.88Terrazzo Layers
5/1/2009 $20.92$35.41 $56.33Terrazzo Mechanics
5/1/2010 $21.67$35.41 $57.08Terrazzo Mechanics
5/1/2011 $21.78$36.30 $58.08Terrazzo Mechanics
5/1/2012 $22.08$37.05 $59.13Terrazzo Mechanics
5/1/2013 $22.08$38.30 $60.38Terrazzo Mechanics
Page 9 of 14 Serial Number: 15-04233
Page 95
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2014 $22.08$40.15 $62.23Terrazzo Mechanics
5/1/2015 $22.08$42.00 $64.08Terrazzo Mechanics
5/1/2009 $19.84$29.11 $48.95Tile Finisher
5/1/2010 $20.59$29.11 $49.70Tile Finisher
5/1/2011 $21.34$29.16 $50.50Tile Finisher
5/1/2012 $21.64$29.77 $51.41Tile Finisher
5/1/2013 $21.64$30.86 $52.50Tile Finisher
5/1/2014 $21.64$32.47 $54.11Tile Finisher
5/1/2015 $21.64$34.08 $55.72Tile Finisher
5/1/2009 $20.28$36.15 $56.43Tile Layers
5/1/2010 $21.03$36.15 $57.18Tile Layers
5/1/2011 $21.78$36.20 $57.98Tile Layers
5/1/2012 $22.08$36.95 $59.03Tile Layers
5/1/2013 $22.08$38.20 $60.28Tile Layers
5/1/2014 $22.08$40.05 $62.13Tile Layers
5/1/2015 $22.08$41.90 $63.98Tile Layers
5/1/2012 $14.16$27.54 $41.70Truckdriver class 1(see notes)
5/1/2014 $15.56$28.68 $44.24Truckdriver class 1(see notes)
5/1/2012 $14.16$27.64 $41.80Truckdriver class 2 (see notes)
5/1/2014 $15.56$28.78 $44.34Truckdriver class 2 (see notes)
5/1/2012 $14.16$27.89 $42.05Truckdriver class 3 (see notes)
5/1/2014 $15.56$29.03 $44.59Truckdriver class 3 (see notes)
Page 10 of 14 Serial Number: 15-04233
Page 96
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2015 $25.89$49.23 $75.12Carpenter - Chief of Party (Surveying &
Layout)
5/1/2016 $25.89$51.07 $76.96Carpenter - Chief of Party (Surveying &
Layout)
5/1/2015 $25.89$42.81 $68.70Carpenter - Instrument Person (Surveying
& Layout)
5/1/2016 $25.89$44.41 $70.30Carpenter - Instrument Person (Surveying
& Layout)
5/1/2015 $20.31$34.25 $54.56Carpenter - Rodman (Surveying & Layout)
5/1/2016 $20.31$35.53 $55.84Carpenter - Rodman (Surveying & Layout)
5/1/2014 $25.59$41.56 $67.15Carpenters
5/1/2015 $25.89$42.81 $68.70Carpenters
5/1/2016 $25.59$44.41 $70.00Carpenters
5/1/2014 $29.16$32.25 $61.41Cement Masons
5/1/2015 $30.26$32.55 $62.81Cement Masons
5/1/2016 $29.16$35.15 $64.31Cement Masons
7/1/2010 $26.69$44.70 $71.39Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2011 $27.19$44.70 $71.89Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2012 $28.14$44.70 $72.84Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 01 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 01 - See notes)
5/1/2012 $22.95$26.00 $48.95Laborers (Class 01 - See notes)
5/1/2013 $23.55$26.60 $50.15Laborers (Class 01 - See notes)
5/1/2014 $24.50$26.90 $51.40Laborers (Class 01 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 02 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 02 - See notes)
5/1/2012 $22.95$26.20 $49.15Laborers (Class 02 - See notes)
5/1/2013 $23.55$26.80 $50.35Laborers (Class 02 - See notes)
5/1/2014 $24.50$27.10 $51.60Laborers (Class 02 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 03 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 03 - See notes)
5/1/2012 $22.95$26.20 $49.15Laborers (Class 03 - See notes)
5/1/2013 $23.55$26.80 $50.35Laborers (Class 03 - See notes)
5/1/2014 $24.50$27.10 $51.60Laborers (Class 03 - See notes)
Page 11 of 14 Serial Number: 15-04233
Page 97
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2010 $22.00$25.15 $47.15Laborers (Class 04 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 04 - See notes)
5/1/2012 $22.95$20.80 $43.75Laborers (Class 04 - See notes)
5/1/2013 $23.55$21.40 $44.95Laborers (Class 04 - See notes)
5/1/2014 $24.50$21.70 $46.20Laborers (Class 04 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 05 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 05 - See notes)
5/1/2012 $22.95$26.85 $49.80Laborers (Class 05 - See notes)
5/1/2013 $23.55$27.45 $51.00Laborers (Class 05 - See notes)
5/1/2014 $24.50$27.75 $52.25Laborers (Class 05 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 06 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 06 - See notes)
5/1/2012 $22.95$26.90 $49.85Laborers (Class 06 - See notes)
5/1/2013 $23.55$27.50 $51.05Laborers (Class 06 - See notes)
5/1/2014 $24.50$27.80 $52.30Laborers (Class 06 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 07 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 07 - See notes)
5/1/2012 $22.95$26.75 $49.70Laborers (Class 07 - See notes)
5/1/2013 $23.55$27.35 $50.90Laborers (Class 07 - See notes)
5/1/2014 $24.50$27.65 $52.15Laborers (Class 07 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 08 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 08 - See notes)
5/1/2012 $22.95$26.50 $49.45Laborers (Class 08 - See notes)
5/1/2013 $23.55$27.10 $50.65Laborers (Class 08 - See notes)
5/1/2014 $24.50$27.40 $51.90Laborers (Class 08 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 09 - See notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 09 - See notes)
5/1/2012 $22.95$26.35 $49.30Laborers (Class 09 - See notes)
5/1/2013 $23.55$26.95 $50.50Laborers (Class 09 - See notes)
5/1/2014 $24.50$27.25 $51.75Laborers (Class 09 - See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 10- See notes)
Page 12 of 14 Serial Number: 15-04233
Page 98
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2011 $22.00$25.95 $47.95Laborers (Class 10- See notes)
5/1/2012 $22.95$26.50 $49.45Laborers (Class 10- See notes)
5/1/2013 $23.55$27.10 $50.65Laborers (Class 10- See notes)
5/1/2014 $24.50$27.40 $51.90Laborers (Class 10- See notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 11 -See Notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 11 -See Notes)
5/1/2012 $22.95$26.40 $49.35Laborers (Class 11 -See Notes)
5/1/2013 $23.55$27.00 $50.55Laborers (Class 11 -See Notes)
5/1/2014 $24.50$27.30 $51.80Laborers (Class 11 -See Notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 12 -See Notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 12 -See Notes)
5/1/2012 $22.95$28.10 $51.05Laborers (Class 12 -See Notes)
5/1/2013 $23.55$28.70 $52.25Laborers (Class 12 -See Notes)
5/1/2014 $24.50$29.00 $53.50Laborers (Class 12 -See Notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 13 -See Notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 13 -See Notes)
5/1/2012 $22.95$30.13 $53.08Laborers (Class 13 -See Notes)
5/1/2013 $23.55$30.73 $54.28Laborers (Class 13 -See Notes)
5/1/2014 $24.50$31.03 $55.53Laborers (Class 13 -See Notes)
5/1/2010 $22.00$25.15 $47.15Laborers (Class 14 -See Notes)
5/1/2011 $22.00$25.95 $47.95Laborers (Class 14 -See Notes)
5/1/2012 $22.95$26.15 $49.10Laborers (Class 14 -See Notes)
5/1/2013 $23.55$26.75 $50.30Laborers (Class 14 -See Notes)
5/1/2014 $24.50$27.05 $51.55Laborers (Class 14 -See Notes)
5/1/2013 $15.38$27.10 $42.48Laborers Utility (PGW ONLY)
5/1/2013 $15.38$20.07 $35.45Laborers Utility (PGW ONLY)
(Flagperson)
4/1/2010 $19.90$18.44 $38.34Landscape Laborer
5/1/2012 $20.30$18.84 $39.14Landscape Laborer
5/1/2013 $20.90$19.24 $40.14Landscape Laborer
5/1/2014 $21.45$19.89 $41.34Landscape Laborer
Page 13 of 14 Serial Number: 15-04233
Page 99
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2013 $27.73$45.62 $73.35Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2014 $28.83$47.10 $75.93Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2013 $14.82$28.02 $42.84Truckdriver class 1(see notes)
5/1/2014 $15.56$28.53 $44.09Truckdriver class 1(see notes)
5/1/2013 $14.82$28.12 $42.94Truckdriver class 2 (see notes)
5/1/2014 $15.56$28.63 $44.19Truckdriver class 2 (see notes)
5/1/2013 $14.82$28.62 $43.44Truckdriver class 3 (see notes)
5/1/2014 $15.56$29.13 $44.69Truckdriver class 3 (see notes)
Notes:
If you can not find a classification under Heavy/Highway please refer to the Building classifications.
The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes to clarify existing
tasks performed throughout the Commonwealth. The “Building Laborer Notes” link on the Bureau’s website provides a list
of those tasks that should be read in conformity with custom and usage of the construction industry in the geographic
region in which they are utilized.
For further information on construction types review the
on the Labor and Industry Website. Go to www.dli.state.pa.us, scroll down to the picture labeled "Labor Law Compliance"
and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link.
"Notes as Referenced in Predeterminations"
Page 14 of 14 Serial Number: 15-04233
Page 100
6/24/2015Determination Date:
HighwayProject Classification:
15-04234Serial Number:
8/18/2015Contract Award Date:
Awarding Agency:
Installation of Durable Pavement Markings (151-03-03)Project Name:
PREVAILING WAGES PROJECT RATES
Assigned Field Office:
Lehigh County
877-214-3962Toll Free Phone Number:
570-963-4577Field Office Phone Number:
Scranton
PA Turnpike Commission
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
6/28/2010 $20.13$30.63 $50.76Asbestos & Insulation Workers
6/27/2011 $18.88$33.88 $52.76Asbestos & Insulation Workers
7/2/2012 $21.59$32.17 $53.76Asbestos & Insulation Workers
7/1/2013 $22.59$32.17 $54.76Asbestos & Insulation Workers
6/30/2014 $23.86$31.90 $55.76Asbestos & Insulation Workers
1/1/2010 $15.15$23.59 $38.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2011 $16.02$24.22 $40.24Boilermaker (Commercial, Institutional,
and Minor Repair Work)
5/1/2012 $16.90$24.84 $41.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
4/1/2013 $17.51$25.53 $43.04Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2014 $17.95$25.79 $43.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2015 $18.22$26.52 $44.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2011 $28.12$37.35 $65.47Boilermakers
1/1/2012 $29.85$37.62 $67.47Boilermakers
1/1/2013 $31.13$38.69 $69.82Boilermakers
4/1/2013 $31.43$38.54 $69.97Boilermakers
1/1/2014 $32.81$39.06 $71.87Boilermakers
1/1/2015 $33.31$40.31 $73.62Boilermakers
Page 1 of 14 06/24/2015
Page 101
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
7/1/2013 $17.30$30.00 $47.30Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2014 $17.82$30.28 $48.10Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2015 $17.89$31.06 $48.95Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2016 $18.01$31.84 $49.85Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2015 $24.09$35.30 $59.39Carpenter - Chief of Party (Surveying &
Layout)
5/1/2015 $24.09$32.09 $56.18Carpenter - Instrument Person (Surveying
& Layout)
5/1/2015 $19.62$25.71 $45.33Carpenter - Rodman (Surveying & Layout)
5/1/2015 $24.09$32.09 $56.18Carpenters
5/1/2009 $16.43$25.60 $42.03Cement Masons
5/2/2010 $15.32$27.01 $42.33Cement Masons
5/1/2011 $15.37$27.71 $43.08Cement Masons
5/1/2015 $21.48$27.80 $49.28Cement Masons
7/1/2008 $25.13$37.50 $62.63DockBuilder/Pile Drivers (Building, Heavy
& Highway)
7/1/2010 $27.57$37.60 $65.17DockBuilder/Pile Drivers (Building, Heavy
& Highway)
7/1/2011 $28.27$38.15 $66.42DockBuilder/Pile Drivers (Building, Heavy
& Highway)
7/1/2010 $27.57$45.12 $72.69DockBuilder/Pile Drivers Divers (Building
Heavy & Highway)
5/1/2009 $12.57$23.31 $35.88Drywall Finisher
5/1/2010 $13.42$23.86 $37.28Drywall Finisher
5/1/2011 $15.42$23.86 $39.28Drywall Finisher
5/1/2012 $15.07$25.11 $40.18Drywall Finisher
5/1/2013 $16.22$25.11 $41.33Drywall Finisher
5/1/2014 $16.12$26.51 $42.63Drywall Finisher
5/1/2015 $16.67$27.01 $43.68Drywall Finisher
6/3/2013 $18.31$40.78 $59.09Electric Lineman
6/2/2014 $19.35$42.68 $62.03Electric Lineman
6/1/2015 $19.88$44.63 $64.51Electric Lineman
5/30/2016 $20.29$46.16 $66.45Electric Lineman
12/1/2014 $15.28$39.81 $55.09Electricians & Telecommunications
Installation Technician
6/1/2015 $15.83$39.81 $55.64Electricians & Telecommunications
Installation Technician
Page 2 of 14 Serial Number: 15-04234
Page 102
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
1/1/2008 $16.47$37.85 $54.32Elevator Constructor
1/1/2010 $20.24$40.08 $60.32Elevator Constructor
1/1/2011 $25.30$41.33 $66.63Elevator Constructor
1/1/2005 $0.00$0.00 $0.00Elevator Tender (Use Elevator Apprentice
or Constructor)
5/1/2014 $24.51$30.57 $55.08Floor Layer
5/1/2015 $24.81$31.47 $56.28Floor Layer
1/1/2012 $14.38$28.01 $42.39Glazier
5/1/2012 $15.38$28.01 $43.39Glazier
6/1/2013 $15.33$30.36 $45.69Glazier
5/1/2014 $15.33$32.26 $47.59Glazier
5/1/2015 $15.33$34.36 $49.69Glazier
7/1/2012 $24.00$33.05 $57.05Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2014 $25.25$32.55 $57.80Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
5/1/2013 $15.64$23.24 $38.88Laborers (Class 01 - See notes)
5/1/2014 $16.29$23.49 $39.78Laborers (Class 01 - See notes)
5/1/2015 $16.74$23.99 $40.73Laborers (Class 01 - See notes)
5/1/2016 $18.19$23.49 $41.68Laborers (Class 01 - See notes)
5/1/2013 $15.64$24.27 $39.91Laborers (Class 02 - See notes)
5/1/2014 $16.29$24.52 $40.81Laborers (Class 02 - See notes)
5/1/2015 $16.74$25.02 $41.76Laborers (Class 02 - See notes)
5/1/2016 $18.19$24.52 $42.71Laborers (Class 02 - See notes)
5/1/2013 $15.64$23.94 $39.58Laborers (Class 03 - See notes)
5/4/2014 $16.47$24.24 $40.71Laborers (Class 03 - See notes)
5/3/2015 $16.92$24.74 $41.66Laborers (Class 03 - See notes)
5/1/2016 $18.42$24.24 $42.66Laborers (Class 03 - See notes)
5/1/2013 $15.64$23.94 $39.58Laborers (Class 04 - See notes)
5/4/2014 $16.47$24.24 $40.71Laborers (Class 04 - See notes)
5/3/2015 $16.92$24.74 $41.66Laborers (Class 04 - See notes)
5/1/2016 $18.42$24.24 $42.66Laborers (Class 04 - See notes)
5/1/2013 $15.64$25.94 $41.58Laborers (Class 05 - See notes)
Page 3 of 14 Serial Number: 15-04234
Page 103
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/4/2014 $16.47$26.24 $42.71Laborers (Class 05 - See notes)
5/3/2015 $16.92$26.74 $43.66Laborers (Class 05 - See notes)
5/1/2016 $18.42$26.24 $44.66Laborers (Class 05 - See notes)
5/1/2013 $15.64$24.59 $40.23Laborers (Class 06 - See notes)
5/1/2014 $16.29$24.84 $41.13Laborers (Class 06 - See notes)
5/1/2015 $16.74$25.34 $42.08Laborers (Class 06 - See notes)
5/1/2016 $18.19$24.84 $43.03Laborers (Class 06 - See notes)
5/1/2015 $28.29$36.34 $64.63Millwright
5/1/2009 $16.89$29.42 $46.31Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2010 $17.85$30.76 $48.61Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2011 $18.85$32.06 $50.91Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2012 $20.25$32.06 $52.31Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2013 $21.65$32.06 $53.71Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2014 $22.41$32.70 $55.11Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2009 $17.55$31.67 $49.22Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2010 $18.51$33.01 $51.52Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2011 $19.51$34.31 $53.82Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2012 $20.91$34.31 $55.22Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2013 $22.31$34.31 $56.62Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2014 $23.07$34.95 $58.02Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2009 $16.81$29.13 $45.94Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2010 $17.77$30.47 $48.24Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2011 $18.77$31.77 $50.54Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2012 $20.17$31.77 $51.94Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2013 $21.57$31.77 $53.34Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2014 $22.33$32.41 $54.74Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2009 $17.48$31.38 $48.86Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2010 $18.44$32.72 $51.16Operators (Building/Heavy, Class 02a -
See Notes)
Page 4 of 14 Serial Number: 15-04234
Page 104
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2011 $19.44$34.02 $53.46Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2012 $20.84$34.02 $54.86Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2013 $22.24$34.02 $56.26Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2014 $23.00$34.66 $57.66Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2009 $15.94$26.22 $42.16Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2010 $16.91$27.55 $44.46Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2011 $17.91$28.85 $46.76Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2012 $19.31$28.85 $48.16Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2013 $20.71$28.85 $49.56Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2014 $21.47$29.49 $50.96Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2009 $15.61$25.08 $40.69Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2010 $16.57$26.42 $42.99Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2011 $17.57$27.72 $45.29Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2012 $18.97$27.72 $46.69Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2013 $20.37$27.72 $48.09Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2014 $21.14$28.35 $49.49Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2009 $15.47$24.64 $40.11Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2010 $16.44$25.97 $42.41Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2011 $17.44$27.27 $44.71Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2012 $18.84$27.27 $46.11Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2013 $20.24$27.27 $47.51Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2014 $21.01$27.90 $48.91Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2009 $15.21$23.76 $38.97Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2010 $16.18$25.09 $41.27Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2011 $17.18$26.39 $43.57Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2012 $18.58$26.39 $44.97Operators (Building/Heavy, Class 06 -
See Notes)
Page 5 of 14 Serial Number: 15-04234
Page 105
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2013 $19.98$26.39 $46.37Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2014 $20.75$27.02 $47.77Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2009 $19.38$35.30 $54.68Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2010 $20.43$36.91 $57.34Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2011 $21.53$38.47 $60.00Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2012 $23.16$38.47 $61.63Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2013 $24.79$38.47 $63.26Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2014 $25.69$39.24 $64.93Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2009 $19.27$34.96 $54.23Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2010 $20.33$36.56 $56.89Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2011 $21.43$38.12 $59.55Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2012 $23.06$38.12 $61.18Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2013 $24.69$38.12 $62.81Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2014 $25.59$38.89 $64.48Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2014 $16.12$25.95 $42.07Painters Class 1 (see notes)
5/1/2015 $16.67$26.45 $43.12Painters Class 1 (see notes)
5/1/2016 $17.77$26.45 $44.22Painters Class 1 (see notes)
5/1/2017 $18.97$26.45 $45.42Painters Class 1 (see notes)
5/1/2014 $16.12$27.95 $44.07Painters Class 2 (see notes)
5/1/2015 $16.67$28.65 $45.32Painters Class 2 (see notes)
5/1/2016 $18.12$28.65 $46.77Painters Class 2 (see notes)
5/1/2017 $19.67$28.65 $48.32Painters Class 2 (see notes)
5/1/2014 $16.12$32.25 $48.37Painters Class 3 (see notes)
5/1/2015 $16.67$33.25 $49.92Painters Class 3 (see notes)
5/1/2016 $18.67$33.25 $51.92Painters Class 3 (see notes)
5/1/2017 $21.17$33.25 $54.42Painters Class 3 (see notes)
5/1/2013 $19.61$27.93 $47.54Plasterers
5/1/2014 $20.06$28.38 $48.44Plasterers
Page 6 of 14 Serial Number: 15-04234
Page 106
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2015 $28.63$40.35 $68.98Plumbers
5/1/2013 $28.40$31.05 $59.45Roofers (Composition)
5/1/2014 $28.65$32.15 $60.80Roofers (Composition)
5/1/2015 $28.65$33.65 $62.30Roofers (Composition)
5/1/2012 $16.37$24.00 $40.37Roofers (Shingle, Slate, Tile)
5/1/2014 $17.37$24.50 $41.87Roofers (Shingle, Slate, Tile)
5/1/2015 $18.37$25.00 $43.37Roofers (Shingle, Slate, Tile)
6/1/2013 $30.45$31.58 $62.03Sheet Metal Workers
1/6/2014 $30.95$31.58 $62.53Sheet Metal Workers
6/1/2014 $30.98$32.55 $63.53Sheet Metal Workers
12/1/2014 $31.39$32.64 $64.03Sheet Metal Workers
6/1/2015 $32.39$32.64 $65.03Sheet Metal Workers
12/1/2015 $32.89$32.64 $65.53Sheet Metal Workers
7/1/2009 $15.99$24.17 $40.16Sign Makers and Hangars
5/21/2010 $16.37$24.33 $40.70Sign Makers and Hangars
1/1/2010 $17.60$33.85 $51.45Sprinklerfitters
1/1/2011 $18.45$33.35 $51.80Sprinklerfitters
4/1/2011 $18.45$34.18 $52.63Sprinklerfitters
1/1/2012 $18.60$34.18 $52.78Sprinklerfitters
4/1/2012 $18.65$35.21 $53.86Sprinklerfitters
1/1/2013 $18.80$35.21 $54.01Sprinklerfitters
4/1/2013 $20.12$33.03 $53.15Sprinklerfitters
7/1/2013 $20.12$33.69 $53.81Sprinklerfitters
4/1/2014 $20.47$34.36 $54.83Sprinklerfitters
4/1/2015 $20.62$35.05 $55.67Sprinklerfitters
5/1/2013 $27.83$41.41 $69.24Steamfitters
5/1/2014 $28.96$42.71 $71.67Steamfitters
5/1/2013 $14.58$29.13 $43.71Terrazzo Finisher
5/1/2014 $14.99$29.47 $44.46Terrazzo Finisher
5/1/2013 $17.54$28.39 $45.93Terrazzo Setter
5/1/2014 $18.01$28.67 $46.68Terrazzo Setter
Page 7 of 14 Serial Number: 15-04234
Page 107
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2013 $13.45$24.24 $37.69Tile & Marble Finisher
5/1/2014 $13.89$24.50 $38.39Tile & Marble Finisher
5/1/2015 $14.08$25.11 $39.19Tile & Marble Finisher
5/1/2016 $14.38$25.71 $40.09Tile & Marble Finisher
5/1/2011 $15.22$26.31 $41.53Tile & Marble Layer
5/1/2012 $15.80$26.91 $42.71Tile & Marble Layer
7/1/2013 $17.08$26.23 $43.31Tile & Marble Layer
5/1/2014 $17.60$26.41 $44.01Tile & Marble Layer
5/1/2015 $17.67$27.14 $44.81Tile & Marble Layer
5/1/2016 $17.79$27.92 $45.71Tile & Marble Layer
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 8 of 14 Serial Number: 15-04234
Page 108
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2014 $23.69$36.27 $59.96Carpenter - Chief of Party (Surveying &
Layout)
5/1/2015 $23.69$37.36 $61.05Carpenter - Chief of Party (Surveying &
Layout)
5/1/2014 $23.69$31.54 $55.23Carpenter - Instrument Person (Surveying
& Layout)
5/1/2015 $23.69$32.49 $56.18Carpenter - Instrument Person (Surveying
& Layout)
5/1/2014 $23.69$22.71 $46.40Carpenter - Rodman (Surveying & Layout)
5/1/2015 $23.69$23.39 $47.08Carpenter - Rodman (Surveying & Layout)
5/1/2015 $24.09$32.14 $56.23Carpenters
5/1/2009 $11.03$16.22 $27.25Laborers (Class 01 - See notes)
5/1/2010 $11.88$16.77 $28.65Laborers (Class 01 - See notes)
5/1/2011 $12.78$17.32 $30.10Laborers (Class 01 - See notes)
5/1/2012 $13.39$17.71 $31.10Laborers (Class 01 - See notes)
5/1/2013 $14.04$18.16 $32.20Laborers (Class 01 - See notes)
5/1/2014 $14.69$18.66 $33.35Laborers (Class 01 - See notes)
5/1/2015 $15.34$19.21 $34.55Laborers (Class 01 - See notes)
5/1/2009 $11.03$22.84 $33.87Laborers (Class 02 - See notes)
5/1/2010 $11.88$23.39 $35.27Laborers (Class 02 - See notes)
5/1/2011 $12.78$23.94 $36.72Laborers (Class 02 - See notes)
5/1/2012 $13.39$24.33 $37.72Laborers (Class 02 - See notes)
5/1/2013 $14.04$24.78 $38.82Laborers (Class 02 - See notes)
5/1/2014 $14.69$25.28 $39.97Laborers (Class 02 - See notes)
5/1/2015 $15.34$25.83 $41.17Laborers (Class 02 - See notes)
5/1/2009 $11.03$19.83 $30.86Laborers (Class 03 - See notes)
5/1/2010 $11.88$20.38 $32.26Laborers (Class 03 - See notes)
5/1/2011 $12.78$20.93 $33.71Laborers (Class 03 - See notes)
5/1/2012 $13.39$21.32 $34.71Laborers (Class 03 - See notes)
5/1/2013 $14.04$21.77 $35.81Laborers (Class 03 - See notes)
5/1/2014 $14.69$22.27 $36.96Laborers (Class 03 - See notes)
5/1/2015 $15.34$22.82 $38.16Laborers (Class 03 - See notes)
5/1/2009 $11.03$20.18 $31.21Laborers (Class 04 - See notes)
5/1/2010 $11.88$20.73 $32.61Laborers (Class 04 - See notes)
Page 9 of 14 Serial Number: 15-04234
Page 109
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2011 $12.78$21.28 $34.06Laborers (Class 04 - See notes)
5/1/2012 $13.39$21.67 $35.06Laborers (Class 04 - See notes)
5/1/2013 $14.04$22.12 $36.16Laborers (Class 04 - See notes)
5/1/2014 $14.69$22.62 $37.31Laborers (Class 04 - See notes)
5/1/2015 $15.34$23.17 $38.51Laborers (Class 04 - See notes)
5/1/2009 $11.03$20.85 $31.88Laborers (Class 05 - See notes)
5/1/2010 $11.88$21.40 $33.28Laborers (Class 05 - See notes)
5/1/2011 $12.78$21.95 $34.73Laborers (Class 05 - See notes)
5/1/2012 $13.39$22.34 $35.73Laborers (Class 05 - See notes)
5/1/2013 $14.04$22.79 $36.83Laborers (Class 05 - See notes)
5/1/2014 $14.69$23.29 $37.98Laborers (Class 05 - See notes)
5/1/2015 $15.34$23.84 $39.18Laborers (Class 05 - See notes)
5/1/2009 $11.03$20.27 $31.30Laborers (Class 06 - See notes)
5/1/2010 $11.88$20.82 $32.70Laborers (Class 06 - See notes)
5/1/2011 $12.78$21.37 $34.15Laborers (Class 06 - See notes)
5/1/2012 $13.39$21.76 $35.15Laborers (Class 06 - See notes)
5/1/2013 $14.04$22.21 $36.25Laborers (Class 06 - See notes)
5/1/2014 $14.69$22.71 $37.40Laborers (Class 06 - See notes)
5/1/2015 $15.34$23.26 $38.60Laborers (Class 06 - See notes)
5/1/2009 $11.03$20.56 $31.59Laborers (Class 07 - See notes)
5/1/2010 $11.88$21.11 $32.99Laborers (Class 07 - See notes)
5/1/2011 $12.78$21.66 $34.44Laborers (Class 07 - See notes)
5/1/2012 $13.39$22.05 $35.44Laborers (Class 07 - See notes)
5/1/2013 $14.04$22.50 $36.54Laborers (Class 07 - See notes)
5/1/2014 $14.69$23.00 $37.69Laborers (Class 07 - See notes)
5/1/2015 $15.34$23.55 $38.89Laborers (Class 07 - See notes)
5/1/2009 $11.03$21.04 $32.07Laborers (Class 08 - See notes)
5/1/2010 $11.88$21.59 $33.47Laborers (Class 08 - See notes)
5/1/2011 $12.78$22.14 $34.92Laborers (Class 08 - See notes)
5/1/2012 $13.39$22.53 $35.92Laborers (Class 08 - See notes)
5/1/2013 $14.04$22.98 $37.02Laborers (Class 08 - See notes)
Page 10 of 14 Serial Number: 15-04234
Page 110
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2014 $14.69$23.48 $38.17Laborers (Class 08 - See notes)
5/1/2015 $15.34$24.03 $39.37Laborers (Class 08 - See notes)
5/1/2009 $16.30$27.45 $43.75Operators (Highway, Class 01 - See
Notes)
5/1/2010 $17.26$28.79 $46.05Operators (Highway, Class 01 - See
Notes)
5/1/2011 $18.26$30.09 $48.35Operators (Highway, Class 01 - See
Notes)
5/1/2012 $19.51$30.09 $49.60Operators (Highway, Class 01 - See
Notes)
5/1/2013 $20.76$30.09 $50.85Operators (Highway, Class 01 - See
Notes)
5/1/2014 $21.72$30.38 $52.10Operators (Highway, Class 01 - See
Notes)
5/1/2009 $16.98$29.70 $46.68Operators (Highway, Class 01a - See
Notes)
5/1/2010 $17.94$31.04 $48.98Operators (Highway, Class 01a - See
Notes)
5/1/2011 $18.94$32.34 $51.28Operators (Highway, Class 01a - See
Notes)
5/1/2012 $20.19$32.34 $52.53Operators (Highway, Class 01a - See
Notes)
5/1/2013 $21.44$32.34 $53.78Operators (Highway, Class 01a - See
Notes)
5/1/2014 $22.40$32.63 $55.03Operators (Highway, Class 01a - See
Notes)
5/1/2009 $15.96$26.27 $42.23Operators (Highway, Class 02 - See
Notes)
5/1/2010 $16.92$27.61 $44.53Operators (Highway, Class 02 - See
Notes)
5/1/2011 $17.92$28.91 $46.83Operators (Highway, Class 02 - See
Notes)
5/1/2012 $19.17$28.91 $48.08Operators (Highway, Class 02 - See
Notes)
5/1/2013 $20.42$28.91 $49.33Operators (Highway, Class 02 - See
Notes)
5/1/2014 $21.37$29.21 $50.58Operators (Highway, Class 02 - See
Notes)
5/1/2009 $15.75$25.58 $41.33Operators (Highway, Class 03 - See
Notes)
5/1/2010 $16.72$26.91 $43.63Operators (Highway, Class 03 - See
Notes)
5/1/2011 $17.72$28.21 $45.93Operators (Highway, Class 03 - See
Notes)
5/1/2012 $18.97$28.21 $47.18Operators (Highway, Class 03 - See
Notes)
5/1/2013 $20.22$28.21 $48.43Operators (Highway, Class 03 - See
Notes)
5/1/2014 $21.18$28.50 $49.68Operators (Highway, Class 03 - See
Notes)
5/1/2009 $15.62$25.13 $40.75Operators (Highway, Class 04 - See
Notes)
Page 11 of 14 Serial Number: 15-04234
Page 111
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2010 $16.59$26.46 $43.05Operators (Highway, Class 04 - See
Notes)
5/1/2011 $17.59$27.76 $45.35Operators (Highway, Class 04 - See
Notes)
5/1/2012 $18.85$27.75 $46.60Operators (Highway, Class 04 - See
Notes)
5/1/2013 $20.10$27.75 $47.85Operators (Highway, Class 04 - See
Notes)
5/1/2014 $21.05$28.05 $49.10Operators (Highway, Class 04 - See
Notes)
5/1/2009 $15.47$24.62 $40.09Operators (Highway, Class 05 - See
Notes)
5/1/2010 $16.44$25.95 $42.39Operators (Highway, Class 05 - See
Notes)
5/1/2011 $17.44$27.25 $44.69Operators (Highway, Class 05 - See
Notes)
5/1/2012 $18.69$27.25 $45.94Operators (Highway, Class 05 - See
Notes)
5/1/2013 $19.94$27.25 $47.19Operators (Highway, Class 05 - See
Notes)
5/1/2014 $20.90$27.54 $48.44Operators (Highway, Class 05 - See
Notes)
5/1/2009 $16.36$27.69 $44.05Operators (Highway, Class 06 - See
Notes)
5/1/2010 $17.32$29.03 $46.35Operators (Highway, Class 06 - See
Notes)
5/1/2011 $18.32$30.33 $48.65Operators (Highway, Class 06 - See
Notes)
5/1/2012 $19.57$30.33 $49.90Operators (Highway, Class 06 - See
Notes)
5/1/2013 $20.82$30.33 $51.15Operators (Highway, Class 06 - See
Notes)
5/1/2014 $21.78$30.62 $52.40Operators (Highway, Class 06 - See
Notes)
5/1/2009 $17.02$29.94 $46.96Operators (Highway, Class 06/A - See
Notes)
5/1/2010 $17.98$31.28 $49.26Operators (Highway, Class 06/A - See
Notes)
5/1/2011 $18.98$32.58 $51.56Operators (Highway, Class 06/A - See
Notes)
5/1/2012 $20.23$32.59 $52.82Operators (Highway, Class 06/A - See
Notes)
5/1/2013 $21.48$32.58 $54.06Operators (Highway, Class 06/A - See
Notes)
5/1/2014 $22.44$32.87 $55.31Operators (Highway, Class 06/A - See
Notes)
5/1/2009 $18.67$32.94 $51.61Operators (Highway, Class 07/A - See
Notes)
5/1/2010 $19.72$34.55 $54.27Operators (Highway, Class 07/A - See
Notes)
5/1/2011 $20.83$36.10 $56.93Operators (Highway, Class 07/A - See
Notes)
Page 12 of 14 Serial Number: 15-04234
Page 112
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2012 $22.28$36.10 $58.38Operators (Highway, Class 07/A - See
Notes)
5/1/2013 $23.73$36.10 $59.83Operators (Highway, Class 07/A - See
Notes)
5/1/2014 $24.88$36.45 $61.33Operators (Highway, Class 07/A - See
Notes)
5/1/2009 $18.25$31.53 $49.78Operators (Highway, Class 07/B - See
Notes)
5/1/2010 $19.31$33.13 $52.44Operators (Highway, Class 07/B - See
Notes)
5/1/2011 $20.41$34.69 $55.10Operators (Highway, Class 07/B - See
Notes)
5/1/2012 $21.86$34.69 $56.55Operators (Highway, Class 07/B - See
Notes)
5/1/2013 $23.31$34.69 $58.00Operators (Highway, Class 07/B - See
Notes)
5/1/2014 $24.46$35.04 $59.50Operators (Highway, Class 07/B - See
Notes)
5/1/2007 $22.48$27.01 $49.49Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2010 $26.09$30.27 $56.36Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2012 $26.86$34.87 $61.73Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2013 $27.73$36.02 $63.75Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2014 $28.83$37.19 $66.02Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 13 of 14 Serial Number: 15-04234
Page 113
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
Notes:
If you can not find a classification under Heavy/Highway please refer to the Building classifications.
The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes to clarify existing
tasks performed throughout the Commonwealth. The “Building Laborer Notes” link on the Bureau’s website provides a list
of those tasks that should be read in conformity with custom and usage of the construction industry in the geographic
region in which they are utilized.
For further information on construction types review the
on the Labor and Industry Website. Go to www.dli.state.pa.us, scroll down to the picture labeled "Labor Law Compliance"
and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link.
"Notes as Referenced in Predeterminations"
Page 14 of 14 Serial Number: 15-04234
Page 114
6/24/2015Determination Date:
HighwayProject Classification:
15-04235Serial Number:
8/18/2015Contract Award Date:
Awarding Agency:
Installation of Durable Pavement Markings (151-03-03)Project Name:
PREVAILING WAGES PROJECT RATES
Assigned Field Office:
Carbon County
877-214-3962Toll Free Phone Number:
570-963-4577Field Office Phone Number:
Scranton
PA Turnpike Commission
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
7/1/2013 $17.52$32.48 $50.00Asbestos & Insulation Workers
7/1/2014 $18.52$32.48 $51.00Asbestos & Insulation Workers
1/1/2010 $15.15$23.59 $38.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2011 $16.02$24.22 $40.24Boilermaker (Commercial, Institutional,
and Minor Repair Work)
5/1/2012 $16.90$24.84 $41.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
4/1/2013 $17.51$25.53 $43.04Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2014 $17.95$25.79 $43.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2015 $18.22$26.52 $44.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2011 $28.12$37.35 $65.47Boilermakers
1/1/2012 $29.85$37.62 $67.47Boilermakers
1/1/2013 $31.13$38.69 $69.82Boilermakers
4/1/2013 $31.43$38.54 $69.97Boilermakers
1/1/2014 $32.81$39.06 $71.87Boilermakers
1/1/2015 $33.31$40.31 $73.62Boilermakers
7/1/2013 $17.30$30.00 $47.30Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2014 $17.82$30.28 $48.10Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
Page 1 of 14 06/24/2015
Page 115
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2015 $17.89$31.06 $48.95Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2016 $18.01$31.84 $49.85Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2015 $24.09$35.30 $59.39Carpenter - Chief of Party (Surveying &
Layout)
5/1/2015 $24.09$32.09 $56.18Carpenter - Instrument Person (Surveying
& Layout)
5/1/2015 $19.62$25.71 $45.33Carpenter - Rodman (Surveying & Layout)
5/1/2015 $24.09$32.09 $56.18Carpenters
5/1/2009 $16.43$25.60 $42.03Cement Masons
5/2/2010 $15.32$27.01 $42.33Cement Masons
5/1/2011 $15.37$27.71 $43.08Cement Masons
4/30/2012 $15.42$28.41 $43.83Cement Masons
1/1/2010 $12.25$29.95 $42.20Dockbuilder, Pile Drivers
1/1/2011 $13.10$30.35 $43.45Dockbuilder, Pile Drivers
1/1/2012 $13.70$30.85 $44.55Dockbuilder, Pile Drivers
1/1/2013 $14.20$31.45 $45.65Dockbuilder, Pile Drivers
7/1/2010 $27.57$37.60 $65.17DockBuilder/Pile Drivers (Building, Heavy
& Highway)
7/1/2011 $28.27$38.15 $66.42DockBuilder/Pile Drivers (Building, Heavy
& Highway)
5/1/2014 $16.12$26.51 $42.63Drywall Finisher
5/1/2015 $16.67$27.01 $43.68Drywall Finisher
3/1/2006 $14.64$35.15 $49.79Electric Lineman
9/2/2013 $17.00$50.09 $67.09Electric Lineman
9/1/2014 $17.09$52.19 $69.28Electric Lineman
12/1/2014 $15.28$39.81 $55.09Electricians & Telecommunications
Installation Technician
6/1/2015 $15.83$39.81 $55.64Electricians & Telecommunications
Installation Technician
1/1/2008 $16.47$37.85 $54.32Elevator Constructor
1/1/2010 $20.24$40.08 $60.32Elevator Constructor
1/1/2011 $25.30$41.33 $66.63Elevator Constructor
1/1/2005 $0.00$0.00 $0.00Elevator Tender (Use Elevator Apprentice
or Constructor)
5/1/2014 $24.51$30.57 $55.08Floor Layer
5/1/2015 $24.81$31.47 $56.28Floor Layer
Page 2 of 14 Serial Number: 15-04235
Page 116
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
1/1/2012 $14.38$28.01 $42.39Glazier
5/1/2012 $15.38$28.01 $43.39Glazier
6/1/2013 $15.33$30.36 $45.69Glazier
5/1/2014 $15.33$32.26 $47.59Glazier
5/1/2015 $15.33$34.36 $49.69Glazier
7/1/2012 $24.00$33.05 $57.05Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2013 $25.78$31.07 $56.85Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/10/2014 $27.28$31.07 $58.35Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2015 $27.78$31.57 $59.35Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
5/1/2013 $15.64$23.24 $38.88Laborers (Class 01 - See notes)
5/1/2014 $16.29$23.49 $39.78Laborers (Class 01 - See notes)
5/1/2015 $16.74$23.99 $40.73Laborers (Class 01 - See notes)
5/1/2016 $18.19$23.49 $41.68Laborers (Class 01 - See notes)
5/1/2013 $15.64$24.27 $39.91Laborers (Class 02 - See notes)
5/1/2014 $16.29$24.52 $40.81Laborers (Class 02 - See notes)
5/1/2015 $16.74$25.02 $41.76Laborers (Class 02 - See notes)
5/1/2016 $18.19$24.52 $42.71Laborers (Class 02 - See notes)
5/1/2013 $15.64$23.94 $39.58Laborers (Class 03 - See notes)
5/4/2014 $16.47$24.24 $40.71Laborers (Class 03 - See notes)
5/3/2015 $16.92$24.74 $41.66Laborers (Class 03 - See notes)
5/1/2016 $18.42$24.24 $42.66Laborers (Class 03 - See notes)
5/1/2013 $15.64$23.94 $39.58Laborers (Class 04 - See notes)
5/4/2014 $16.47$24.24 $40.71Laborers (Class 04 - See notes)
5/3/2015 $16.92$24.74 $41.66Laborers (Class 04 - See notes)
5/1/2016 $18.42$24.24 $42.66Laborers (Class 04 - See notes)
5/1/2013 $15.64$25.94 $41.58Laborers (Class 05 - See notes)
5/4/2014 $16.47$26.24 $42.71Laborers (Class 05 - See notes)
5/3/2015 $16.92$26.74 $43.66Laborers (Class 05 - See notes)
5/1/2016 $18.42$26.24 $44.66Laborers (Class 05 - See notes)
5/1/2013 $15.64$24.59 $40.23Laborers (Class 06 - See notes)
Page 3 of 14 Serial Number: 15-04235
Page 117
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2014 $16.29$24.84 $41.13Laborers (Class 06 - See notes)
5/1/2015 $16.74$25.34 $42.08Laborers (Class 06 - See notes)
5/1/2016 $18.19$24.84 $43.03Laborers (Class 06 - See notes)
5/1/2015 $28.29$36.34 $64.63Millwright
5/1/2009 $16.89$29.42 $46.31Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2010 $17.85$30.76 $48.61Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2011 $18.85$32.06 $50.91Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2012 $20.25$32.06 $52.31Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2013 $21.65$32.06 $53.71Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2014 $22.41$32.70 $55.11Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2009 $17.55$31.67 $49.22Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2010 $18.51$33.01 $51.52Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2011 $19.51$34.31 $53.82Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2012 $20.91$34.31 $55.22Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2013 $22.31$34.31 $56.62Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2014 $23.07$34.95 $58.02Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2009 $16.81$29.13 $45.94Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2010 $17.77$30.47 $48.24Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2011 $18.77$31.77 $50.54Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2012 $20.17$31.77 $51.94Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2013 $21.57$31.77 $53.34Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2014 $22.33$32.41 $54.74Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2009 $17.48$31.38 $48.86Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2010 $18.44$32.72 $51.16Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2011 $19.44$34.02 $53.46Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2012 $20.84$34.02 $54.86Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2013 $22.24$34.02 $56.26Operators (Building/Heavy, Class 02a -
See Notes)
Page 4 of 14 Serial Number: 15-04235
Page 118
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2014 $23.00$34.66 $57.66Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2009 $15.94$26.22 $42.16Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2010 $16.91$27.55 $44.46Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2011 $17.91$28.85 $46.76Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2012 $19.31$28.85 $48.16Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2013 $20.71$28.85 $49.56Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2014 $21.47$29.49 $50.96Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2009 $15.61$25.08 $40.69Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2010 $16.57$26.42 $42.99Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2011 $17.57$27.72 $45.29Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2012 $18.97$27.72 $46.69Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2013 $20.37$27.72 $48.09Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2014 $21.14$28.35 $49.49Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2009 $15.47$24.64 $40.11Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2010 $16.44$25.97 $42.41Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2011 $17.44$27.27 $44.71Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2012 $18.84$27.27 $46.11Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2013 $20.24$27.27 $47.51Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2014 $21.01$27.90 $48.91Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2009 $15.21$23.76 $38.97Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2010 $16.18$25.09 $41.27Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2011 $17.18$26.39 $43.57Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2012 $18.58$26.39 $44.97Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2013 $19.98$26.39 $46.37Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2014 $20.75$27.02 $47.77Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2009 $19.38$35.30 $54.68Operators (Building/Heavy, Class 07/A -
See Notes)
Page 5 of 14 Serial Number: 15-04235
Page 119
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2010 $20.43$36.91 $57.34Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2011 $21.53$38.47 $60.00Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2012 $23.16$38.47 $61.63Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2013 $24.79$38.47 $63.26Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2014 $25.69$39.24 $64.93Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2009 $19.27$34.96 $54.23Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2010 $20.33$36.56 $56.89Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2011 $21.43$38.12 $59.55Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2012 $23.06$38.12 $61.18Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2013 $24.69$38.12 $62.81Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2014 $25.59$38.89 $64.48Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2014 $16.12$25.95 $42.07Painters Class 1 (see notes)
5/1/2015 $16.67$26.45 $43.12Painters Class 1 (see notes)
5/1/2016 $17.77$26.45 $44.22Painters Class 1 (see notes)
5/1/2017 $18.97$26.45 $45.42Painters Class 1 (see notes)
5/1/2014 $16.12$27.95 $44.07Painters Class 2 (see notes)
5/1/2015 $16.67$28.65 $45.32Painters Class 2 (see notes)
5/1/2016 $18.12$28.65 $46.77Painters Class 2 (see notes)
5/1/2017 $19.67$28.65 $48.32Painters Class 2 (see notes)
5/1/2014 $16.12$32.25 $48.37Painters Class 3 (see notes)
5/1/2015 $16.67$33.25 $49.92Painters Class 3 (see notes)
5/1/2016 $18.67$33.25 $51.92Painters Class 3 (see notes)
5/1/2017 $21.17$33.25 $54.42Painters Class 3 (see notes)
1/1/2009 $12.00$43.28 $55.28Pile Driver Divers (Building, Heavy,
Highway)
1/1/2010 $12.25$44.39 $56.64Pile Driver Divers (Building, Heavy,
Highway)
1/1/2010 $12.25$44.39 $56.64Pile Driver Divers (Building, Heavy,
Highway)
7/1/2010 $27.57$37.60 $65.17Pile Driver Divers (Building, Heavy,
Highway)
1/1/2011 $13.00$45.53 $58.53Pile Driver Divers (Building, Heavy,
Highway)
Page 6 of 14 Serial Number: 15-04235
Page 120
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
1/1/2012 $13.60$46.28 $59.88Pile Driver Divers (Building, Heavy,
Highway)
1/1/2013 $14.10$47.18 $61.28Pile Driver Divers (Building, Heavy,
Highway)
5/1/2013 $19.61$27.93 $47.54Plasterers
5/1/2014 $20.06$28.38 $48.44Plasterers
6/1/2013 $19.01$39.89 $58.90Plumbers and Steamfitters
7/7/2014 $19.51$39.89 $59.40Plumbers and Steamfitters
6/1/2015 $20.01$39.89 $59.90Plumbers and Steamfitters
6/1/2016 $20.51$39.89 $60.40Plumbers and Steamfitters
5/1/2013 $28.40$31.05 $59.45Roofers (Composition)
5/1/2014 $28.65$32.15 $60.80Roofers (Composition)
5/1/2015 $28.65$33.65 $62.30Roofers (Composition)
5/1/2012 $16.37$24.00 $40.37Roofers (Shingle, Slate, Tile)
5/1/2014 $17.37$24.50 $41.87Roofers (Shingle, Slate, Tile)
5/1/2015 $18.37$25.00 $43.37Roofers (Shingle, Slate, Tile)
5/1/2014 $20.44$30.17 $50.61Sheet Metal Workers
5/1/2015 $21.09$30.27 $51.36Sheet Metal Workers
1/1/2010 $17.60$33.85 $51.45Sprinklerfitters
1/1/2011 $18.45$33.35 $51.80Sprinklerfitters
4/1/2011 $18.45$34.18 $52.63Sprinklerfitters
1/1/2012 $18.60$34.18 $52.78Sprinklerfitters
4/1/2012 $18.65$35.21 $53.86Sprinklerfitters
1/1/2013 $18.80$35.21 $54.01Sprinklerfitters
4/1/2013 $20.12$33.03 $53.15Sprinklerfitters
7/1/2013 $20.12$33.69 $53.81Sprinklerfitters
4/1/2014 $20.47$34.36 $54.83Sprinklerfitters
4/1/2015 $20.62$35.05 $55.67Sprinklerfitters
5/1/2013 $14.58$29.13 $43.71Terrazzo Finisher
5/1/2014 $14.99$29.47 $44.46Terrazzo Finisher
5/1/2013 $17.54$28.39 $45.93Terrazzo Setter
5/1/2014 $18.01$28.67 $46.68Terrazzo Setter
Page 7 of 14 Serial Number: 15-04235
Page 121
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2013 $13.45$24.24 $37.69Tile & Marble Finisher
5/1/2014 $13.89$24.50 $38.39Tile & Marble Finisher
5/1/2015 $14.08$25.11 $39.19Tile & Marble Finisher
5/1/2016 $14.38$25.71 $40.09Tile & Marble Finisher
5/1/2011 $15.22$26.31 $41.53Tile & Marble Layer
5/1/2012 $15.80$26.91 $42.71Tile & Marble Layer
7/1/2013 $17.08$26.23 $43.31Tile & Marble Layer
5/1/2014 $17.60$26.41 $44.01Tile & Marble Layer
5/1/2015 $17.67$27.14 $44.81Tile & Marble Layer
5/1/2016 $17.79$27.92 $45.71Tile & Marble Layer
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 8 of 14 Serial Number: 15-04235
Page 122
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2014 $23.69$36.27 $59.96Carpenter - Chief of Party (Surveying &
Layout)
5/1/2015 $23.69$37.36 $61.05Carpenter - Chief of Party (Surveying &
Layout)
5/1/2014 $23.69$31.54 $55.23Carpenter - Instrument Person (Surveying
& Layout)
5/1/2015 $23.69$32.49 $56.18Carpenter - Instrument Person (Surveying
& Layout)
5/1/2014 $23.69$22.71 $46.40Carpenter - Rodman (Surveying & Layout)
5/1/2015 $23.69$23.39 $47.08Carpenter - Rodman (Surveying & Layout)
5/1/2014 $22.74$31.54 $54.28Carpenters
5/1/2015 $22.74$32.49 $55.23Carpenters
7/1/2013 $25.78$28.42 $54.20Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2014 $27.28$28.92 $56.20Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2015 $27.78$29.42 $57.20Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
5/1/2013 $14.04$18.16 $32.20Laborers (Class 01 - See notes)
5/1/2014 $14.69$18.66 $33.35Laborers (Class 01 - See notes)
5/1/2015 $15.34$19.21 $34.55Laborers (Class 01 - See notes)
5/1/2009 $11.03$22.84 $33.87Laborers (Class 02 - See notes)
5/1/2010 $11.88$23.39 $35.27Laborers (Class 02 - See notes)
5/1/2011 $12.78$23.94 $36.72Laborers (Class 02 - See notes)
5/1/2012 $13.39$24.33 $37.72Laborers (Class 02 - See notes)
5/1/2013 $14.04$24.78 $38.82Laborers (Class 02 - See notes)
5/1/2014 $14.69$25.28 $39.97Laborers (Class 02 - See notes)
5/1/2015 $15.34$25.83 $41.17Laborers (Class 02 - See notes)
5/1/2009 $11.03$19.83 $30.86Laborers (Class 03 - See notes)
5/1/2010 $11.88$20.38 $32.26Laborers (Class 03 - See notes)
5/1/2011 $12.78$20.93 $33.71Laborers (Class 03 - See notes)
5/1/2012 $13.39$21.32 $34.71Laborers (Class 03 - See notes)
5/1/2013 $14.04$21.77 $35.81Laborers (Class 03 - See notes)
5/1/2014 $14.69$22.27 $36.96Laborers (Class 03 - See notes)
5/1/2015 $15.34$22.82 $38.16Laborers (Class 03 - See notes)
5/1/2009 $11.03$20.18 $31.21Laborers (Class 04 - See notes)
5/1/2010 $11.88$20.73 $32.61Laborers (Class 04 - See notes)
Page 9 of 14 Serial Number: 15-04235
Page 123
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2011 $12.78$21.28 $34.06Laborers (Class 04 - See notes)
5/1/2012 $13.39$21.67 $35.06Laborers (Class 04 - See notes)
5/1/2013 $14.04$22.12 $36.16Laborers (Class 04 - See notes)
5/1/2014 $14.69$22.62 $37.31Laborers (Class 04 - See notes)
5/1/2015 $15.34$23.17 $38.51Laborers (Class 04 - See notes)
5/1/2009 $11.03$20.85 $31.88Laborers (Class 05 - See notes)
5/1/2010 $11.88$21.40 $33.28Laborers (Class 05 - See notes)
5/1/2011 $12.78$21.95 $34.73Laborers (Class 05 - See notes)
5/1/2012 $13.39$22.34 $35.73Laborers (Class 05 - See notes)
5/1/2013 $14.04$22.79 $36.83Laborers (Class 05 - See notes)
5/1/2014 $14.69$23.29 $37.98Laborers (Class 05 - See notes)
5/1/2015 $15.34$23.84 $39.18Laborers (Class 05 - See notes)
5/1/2009 $11.03$20.27 $31.30Laborers (Class 06 - See notes)
5/1/2010 $11.88$20.82 $32.70Laborers (Class 06 - See notes)
5/1/2011 $12.78$21.37 $34.15Laborers (Class 06 - See notes)
5/1/2012 $13.39$21.76 $35.15Laborers (Class 06 - See notes)
5/1/2013 $14.04$22.21 $36.25Laborers (Class 06 - See notes)
5/1/2014 $14.69$22.71 $37.40Laborers (Class 06 - See notes)
5/1/2015 $15.34$23.26 $38.60Laborers (Class 06 - See notes)
5/1/2009 $11.03$20.56 $31.59Laborers (Class 07 - See notes)
5/1/2010 $11.88$21.11 $32.99Laborers (Class 07 - See notes)
5/1/2011 $12.78$21.66 $34.44Laborers (Class 07 - See notes)
5/1/2012 $13.39$22.05 $35.44Laborers (Class 07 - See notes)
5/1/2013 $14.04$22.50 $36.54Laborers (Class 07 - See notes)
5/1/2014 $14.69$23.00 $37.69Laborers (Class 07 - See notes)
5/1/2015 $15.34$23.55 $38.89Laborers (Class 07 - See notes)
5/1/2009 $11.03$21.04 $32.07Laborers (Class 08 - See notes)
5/1/2010 $11.88$21.59 $33.47Laborers (Class 08 - See notes)
5/1/2011 $12.78$22.14 $34.92Laborers (Class 08 - See notes)
5/1/2012 $13.39$22.53 $35.92Laborers (Class 08 - See notes)
5/1/2013 $14.04$22.98 $37.02Laborers (Class 08 - See notes)
Page 10 of 14 Serial Number: 15-04235
Page 124
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2014 $14.69$23.48 $38.17Laborers (Class 08 - See notes)
5/1/2015 $15.34$24.03 $39.37Laborers (Class 08 - See notes)
5/1/2009 $16.30$27.45 $43.75Operators (Highway, Class 01 - See
Notes)
5/1/2010 $17.26$28.79 $46.05Operators (Highway, Class 01 - See
Notes)
5/1/2011 $18.26$30.09 $48.35Operators (Highway, Class 01 - See
Notes)
5/1/2012 $19.51$30.09 $49.60Operators (Highway, Class 01 - See
Notes)
5/1/2013 $20.76$30.09 $50.85Operators (Highway, Class 01 - See
Notes)
5/1/2014 $21.72$30.38 $52.10Operators (Highway, Class 01 - See
Notes)
5/1/2009 $16.98$29.70 $46.68Operators (Highway, Class 01a - See
Notes)
5/1/2010 $17.94$31.04 $48.98Operators (Highway, Class 01a - See
Notes)
5/1/2011 $18.94$32.34 $51.28Operators (Highway, Class 01a - See
Notes)
5/1/2012 $20.19$32.34 $52.53Operators (Highway, Class 01a - See
Notes)
5/1/2013 $21.44$32.34 $53.78Operators (Highway, Class 01a - See
Notes)
5/1/2014 $22.40$32.63 $55.03Operators (Highway, Class 01a - See
Notes)
5/1/2009 $15.96$26.27 $42.23Operators (Highway, Class 02 - See
Notes)
5/1/2010 $16.92$27.61 $44.53Operators (Highway, Class 02 - See
Notes)
5/1/2011 $17.92$28.91 $46.83Operators (Highway, Class 02 - See
Notes)
5/1/2012 $19.17$28.91 $48.08Operators (Highway, Class 02 - See
Notes)
5/1/2013 $20.42$28.91 $49.33Operators (Highway, Class 02 - See
Notes)
5/1/2014 $21.37$29.21 $50.58Operators (Highway, Class 02 - See
Notes)
5/1/2009 $15.75$25.58 $41.33Operators (Highway, Class 03 - See
Notes)
5/1/2010 $16.72$26.91 $43.63Operators (Highway, Class 03 - See
Notes)
5/1/2011 $17.72$28.21 $45.93Operators (Highway, Class 03 - See
Notes)
5/1/2012 $18.97$28.21 $47.18Operators (Highway, Class 03 - See
Notes)
5/1/2013 $20.22$28.21 $48.43Operators (Highway, Class 03 - See
Notes)
5/1/2014 $21.18$28.50 $49.68Operators (Highway, Class 03 - See
Notes)
5/1/2009 $15.62$25.13 $40.75Operators (Highway, Class 04 - See
Notes)
Page 11 of 14 Serial Number: 15-04235
Page 125
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2010 $16.59$26.46 $43.05Operators (Highway, Class 04 - See
Notes)
5/1/2011 $17.59$27.76 $45.35Operators (Highway, Class 04 - See
Notes)
5/1/2012 $18.85$27.75 $46.60Operators (Highway, Class 04 - See
Notes)
5/1/2013 $20.10$27.75 $47.85Operators (Highway, Class 04 - See
Notes)
5/1/2014 $21.05$28.05 $49.10Operators (Highway, Class 04 - See
Notes)
5/1/2009 $15.47$24.62 $40.09Operators (Highway, Class 05 - See
Notes)
5/1/2010 $16.44$25.95 $42.39Operators (Highway, Class 05 - See
Notes)
5/1/2011 $17.44$27.25 $44.69Operators (Highway, Class 05 - See
Notes)
5/1/2012 $18.69$27.25 $45.94Operators (Highway, Class 05 - See
Notes)
5/1/2013 $19.94$27.25 $47.19Operators (Highway, Class 05 - See
Notes)
5/1/2014 $20.90$27.54 $48.44Operators (Highway, Class 05 - See
Notes)
5/1/2009 $16.36$27.69 $44.05Operators (Highway, Class 06 - See
Notes)
5/1/2010 $17.32$29.03 $46.35Operators (Highway, Class 06 - See
Notes)
5/1/2011 $18.32$30.33 $48.65Operators (Highway, Class 06 - See
Notes)
5/1/2012 $19.57$30.33 $49.90Operators (Highway, Class 06 - See
Notes)
5/1/2013 $20.82$30.33 $51.15Operators (Highway, Class 06 - See
Notes)
5/1/2014 $21.78$30.62 $52.40Operators (Highway, Class 06 - See
Notes)
5/1/2009 $17.02$29.94 $46.96Operators (Highway, Class 06/A - See
Notes)
5/1/2010 $17.98$31.28 $49.26Operators (Highway, Class 06/A - See
Notes)
5/1/2011 $18.98$32.58 $51.56Operators (Highway, Class 06/A - See
Notes)
5/1/2012 $20.23$32.59 $52.82Operators (Highway, Class 06/A - See
Notes)
5/1/2013 $21.48$32.58 $54.06Operators (Highway, Class 06/A - See
Notes)
5/1/2014 $22.44$32.87 $55.31Operators (Highway, Class 06/A - See
Notes)
5/1/2009 $18.67$32.94 $51.61Operators (Highway, Class 07/A - See
Notes)
5/1/2010 $19.72$34.55 $54.27Operators (Highway, Class 07/A - See
Notes)
5/1/2011 $20.83$36.10 $56.93Operators (Highway, Class 07/A - See
Notes)
Page 12 of 14 Serial Number: 15-04235
Page 126
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2012 $22.28$36.10 $58.38Operators (Highway, Class 07/A - See
Notes)
5/1/2013 $23.73$36.10 $59.83Operators (Highway, Class 07/A - See
Notes)
5/1/2014 $24.88$36.45 $61.33Operators (Highway, Class 07/A - See
Notes)
5/1/2009 $18.25$31.53 $49.78Operators (Highway, Class 07/B - See
Notes)
5/1/2010 $19.31$33.13 $52.44Operators (Highway, Class 07/B - See
Notes)
5/1/2011 $20.41$34.69 $55.10Operators (Highway, Class 07/B - See
Notes)
5/1/2012 $21.86$34.69 $56.55Operators (Highway, Class 07/B - See
Notes)
5/1/2013 $23.31$34.69 $58.00Operators (Highway, Class 07/B - See
Notes)
5/1/2014 $24.46$35.04 $59.50Operators (Highway, Class 07/B - See
Notes)
5/1/2009 $9.86$25.30 $35.16Piledrivers
5/1/2010 $10.83$25.98 $36.81Piledrivers
5/1/2011 $11.73$27.03 $38.76Piledrivers
5/1/2010 $26.09$30.27 $56.36Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2012 $26.86$34.87 $61.73Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2013 $27.73$36.02 $63.75Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2014 $28.83$37.19 $66.02Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 13 of 14 Serial Number: 15-04235
Page 127
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
Notes:
If you can not find a classification under Heavy/Highway please refer to the Building classifications.
The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes to clarify existing
tasks performed throughout the Commonwealth. The “Building Laborer Notes” link on the Bureau’s website provides a list
of those tasks that should be read in conformity with custom and usage of the construction industry in the geographic
region in which they are utilized.
For further information on construction types review the
on the Labor and Industry Website. Go to www.dli.state.pa.us, scroll down to the picture labeled "Labor Law Compliance"
and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link.
"Notes as Referenced in Predeterminations"
Page 14 of 14 Serial Number: 15-04235
Page 128
6/24/2015Determination Date:
HighwayProject Classification:
15-04236Serial Number:
8/18/2015Contract Award Date:
Awarding Agency:
Installation of Durable Pavement Markings (151-03-03)Project Name:
PREVAILING WAGES PROJECT RATES
Assigned Field Office:
Luzerne County
877-214-3962Toll Free Phone Number:
570-963-4577Field Office Phone Number:
Scranton
PA Turnpike Commission
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
7/1/2013 $17.52$32.48 $50.00Asbestos & Insulation Workers
7/1/2014 $18.52$32.48 $51.00Asbestos & Insulation Workers
1/1/2010 $15.15$23.59 $38.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2011 $16.02$24.22 $40.24Boilermaker (Commercial, Institutional,
and Minor Repair Work)
5/1/2012 $16.90$24.84 $41.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
4/1/2013 $17.51$25.53 $43.04Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2014 $17.95$25.79 $43.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2015 $18.22$26.52 $44.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2011 $28.12$37.35 $65.47Boilermakers
1/1/2012 $29.85$37.62 $67.47Boilermakers
1/1/2013 $31.13$38.69 $69.82Boilermakers
4/1/2013 $31.43$38.54 $69.97Boilermakers
1/1/2014 $32.81$39.06 $71.87Boilermakers
1/1/2015 $33.31$40.31 $73.62Boilermakers
5/1/2013 $15.02$32.00 $47.02Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2014 $15.37$32.45 $47.82Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
Page 1 of 14 06/24/2015
Page 129
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2015 $15.47$33.20 $48.67Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2016 $15.63$33.94 $49.57Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2013 $14.35$26.70 $41.05Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
5/12/2014 $15.10$27.26 $42.36Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
5/1/2015 $15.65$27.86 $43.51Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
5/1/2016 $16.08$28.53 $44.61Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2014 $10.15$31.23 $41.38Cement Finishers
12/1/2014 $10.30$31.43 $41.73Cement Finishers
6/1/2015 $10.85$31.93 $42.78Cement Finishers
1/1/2010 $12.25$29.95 $42.20Dockbuilder, Pile Drivers
1/1/2011 $13.10$30.35 $43.45Dockbuilder, Pile Drivers
1/1/2012 $13.70$30.85 $44.55Dockbuilder, Pile Drivers
1/1/2013 $14.20$31.45 $45.65Dockbuilder, Pile Drivers
5/1/2009 $12.57$23.31 $35.88Drywall Finisher
5/1/2010 $13.27$23.86 $37.13Drywall Finisher
5/1/2011 $14.52$24.61 $39.13Drywall Finisher
5/1/2012 $15.07$25.11 $40.18Drywall Finisher
5/1/2013 $16.22$25.11 $41.33Drywall Finisher
5/1/2014 $16.12$26.51 $42.63Drywall Finisher
5/1/2015 $16.67$27.01 $43.68Drywall Finisher
3/1/2006 $14.64$35.15 $49.79Electric Lineman
9/2/2013 $17.00$50.09 $67.09Electric Lineman
9/1/2014 $17.09$52.19 $69.28Electric Lineman
6/1/2010 $13.29$32.27 $45.56Electricians
6/1/2011 $14.24$33.32 $47.56Electricians
6/1/2012 $15.19$33.37 $48.56Electricians
6/1/2013 $16.04$33.77 $49.81Electricians
Page 2 of 14 Serial Number: 15-04236
Page 130
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
6/1/2014 $16.95$34.36 $51.31Electricians
1/1/2008 $16.47$37.85 $54.32Elevator Constructor
1/1/2010 $20.24$40.08 $60.32Elevator Constructor
1/1/2011 $25.30$41.33 $66.63Elevator Constructor
5/1/2009 $11.72$24.53 $36.25Glazier
5/1/2010 $14.55$22.73 $37.28Glazier
1/1/2012 $14.25$23.53 $37.78Glazier
5/1/2012 $15.50$23.53 $39.03Glazier
5/1/2013 $17.00$23.53 $40.53Glazier
7/1/2011 $24.28$30.82 $55.10Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2012 $24.78$31.07 $55.85Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2013 $25.78$31.07 $56.85Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2014 $27.28$31.07 $58.35Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2015 $27.78$31.57 $59.35Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
5/1/2009 $11.18$19.52 $30.70Laborers (Class 01 - See notes)
5/1/2010 $12.13$19.97 $32.10Laborers (Class 01 - See notes)
5/1/2011 $12.58$19.97 $32.55Laborers (Class 01 - See notes)
5/1/2012 $13.28$19.75 $33.03Laborers (Class 01 - See notes)
5/1/2013 $13.73$20.32 $34.05Laborers (Class 01 - See notes)
5/1/2014 $14.53$20.47 $35.00Laborers (Class 01 - See notes)
5/1/2015 $15.33$20.62 $35.95Laborers (Class 01 - See notes)
5/1/2016 $16.13$20.72 $36.85Laborers (Class 01 - See notes)
5/1/2009 $11.18$21.52 $32.70Laborers (Class 02 - See notes)
5/1/2010 $12.13$21.97 $34.10Laborers (Class 02 - See notes)
5/1/2011 $12.58$21.97 $34.55Laborers (Class 02 - See notes)
5/1/2012 $13.28$21.75 $35.03Laborers (Class 02 - See notes)
5/1/2013 $13.73$22.32 $36.05Laborers (Class 02 - See notes)
5/1/2014 $14.53$22.47 $37.00Laborers (Class 02 - See notes)
5/1/2015 $15.33$22.62 $37.95Laborers (Class 02 - See notes)
5/1/2016 $16.13$22.72 $38.85Laborers (Class 02 - See notes)
Page 3 of 14 Serial Number: 15-04236
Page 131
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2014 $14.71$22.67 $37.38Laborers (Class 03 - See notes)
5/1/2015 $15.51$22.82 $38.33Laborers (Class 03 - See notes)
5/1/2016 $16.31$23.02 $39.33Laborers (Class 03 - See notes)
5/1/2014 $14.71$24.17 $38.88Laborers (Class 04 - See notes)
5/1/2015 $15.51$24.32 $39.83Laborers (Class 04 - See notes)
5/1/2016 $16.31$24.52 $40.83Laborers (Class 04 - See notes)
5/1/2014 $14.71$24.67 $39.38Laborers (Class 05 - See notes)
5/1/2015 $15.51$24.82 $40.33Laborers (Class 05 - See notes)
5/1/2016 $16.31$25.02 $41.33Laborers (Class 05 - See notes)
5/1/2011 $12.58$21.97 $34.55Laborers (Class 06 - See notes)
5/1/2012 $13.28$22.52 $35.80Laborers (Class 06 - See notes)
5/1/2013 $13.73$22.72 $36.45Laborers (Class 06 - See notes)
5/1/2014 $14.53$22.47 $37.00Laborers (Class 06 - See notes)
5/1/2015 $15.33$22.62 $37.95Laborers (Class 06 - See notes)
5/1/2016 $16.13$22.72 $38.85Laborers (Class 06 - See notes)
5/1/2010 $13.99$28.91 $42.90Millwright
5/1/2011 $14.63$30.27 $44.90Millwright
5/1/2012 $15.26$31.14 $46.40Millwright
5/1/2013 $15.74$32.16 $47.90Millwright
5/1/2014 $16.23$33.17 $49.40Millwright
5/1/2015 $16.98$33.27 $50.25Millwright
5/1/2016 $17.51$33.59 $51.10Millwright
5/1/2017 $18.16$33.79 $51.95Millwright
5/1/2009 $16.87$29.34 $46.21Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2010 $17.83$30.68 $48.51Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2011 $18.83$31.98 $50.81Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2012 $20.23$31.98 $52.21Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2013 $21.63$31.98 $53.61Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2014 $22.39$32.62 $55.01Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2009 $17.53$31.59 $49.12Operators (Building/Heavy, Class 01a -
See Notes)
Page 4 of 14 Serial Number: 15-04236
Page 132
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2010 $18.49$32.93 $51.42Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2011 $19.49$34.23 $53.72Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2012 $20.89$34.23 $55.12Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2013 $22.29$34.23 $56.52Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2014 $23.05$34.87 $57.92Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2009 $16.78$29.06 $45.84Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2010 $17.75$30.39 $48.14Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2011 $18.75$31.69 $50.44Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2012 $20.15$31.69 $51.84Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2013 $21.55$31.69 $53.24Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2014 $22.31$32.33 $54.64Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2009 $17.44$31.31 $48.75Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2010 $18.41$32.64 $51.05Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2011 $19.41$33.94 $53.35Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2012 $20.81$33.94 $54.75Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2013 $22.21$33.94 $56.15Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2014 $22.97$34.58 $57.55Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2009 $16.07$26.65 $42.72Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2010 $17.04$27.98 $45.02Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2011 $18.04$29.28 $47.32Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2012 $19.44$29.28 $48.72Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2013 $20.84$29.28 $50.12Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2014 $21.60$29.92 $51.52Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2009 $15.85$25.87 $41.72Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2010 $16.81$27.21 $44.02Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2011 $17.81$28.51 $46.32Operators (Building/Heavy, Class 04 -
See Notes)
Page 5 of 14 Serial Number: 15-04236
Page 133
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2012 $19.21$28.51 $47.72Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2013 $20.61$28.51 $49.12Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2014 $21.37$29.15 $50.52Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2009 $15.70$25.38 $41.08Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2010 $16.66$26.72 $43.38Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2011 $17.66$28.02 $45.68Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2012 $19.06$28.02 $47.08Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2013 $20.46$28.02 $48.48Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2014 $21.22$28.66 $49.88Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2009 $15.44$24.50 $39.94Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2010 $16.40$25.84 $42.24Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2011 $17.40$27.14 $44.54Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2012 $18.80$27.14 $45.94Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2013 $20.20$27.14 $47.34Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2014 $20.96$27.78 $48.74Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2009 $19.34$35.21 $54.55Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2010 $20.40$36.81 $57.21Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2011 $21.49$38.38 $59.87Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2012 $23.12$38.38 $61.50Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2013 $24.76$38.38 $63.14Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2014 $25.66$39.15 $64.81Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2009 $19.24$34.87 $54.11Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2010 $20.31$36.47 $56.78Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2011 $21.40$38.03 $59.43Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2012 $23.04$38.03 $61.07Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2013 $24.67$38.03 $62.70Operators (Building/Heavy, Class 07/B -
See Notes)
Page 6 of 14 Serial Number: 15-04236
Page 134
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2014 $25.57$38.80 $64.37Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2014 $16.12$25.95 $42.07Painters Class 1 (see notes)
5/1/2015 $16.67$26.45 $43.12Painters Class 1 (see notes)
5/1/2016 $17.77$26.45 $44.22Painters Class 1 (see notes)
5/1/2017 $18.97$26.45 $45.42Painters Class 1 (see notes)
5/1/2014 $16.12$27.95 $44.07Painters Class 2 (see notes)
5/1/2015 $16.67$28.65 $45.32Painters Class 2 (see notes)
5/1/2016 $18.12$28.65 $46.77Painters Class 2 (see notes)
5/1/2017 $19.67$28.65 $48.32Painters Class 2 (see notes)
5/1/2014 $16.12$32.25 $48.37Painters Class 3 (see notes)
5/1/2015 $16.67$33.25 $49.92Painters Class 3 (see notes)
5/1/2016 $18.67$33.25 $51.92Painters Class 3 (see notes)
5/1/2017 $21.17$33.25 $54.42Painters Class 3 (see notes)
1/1/2010 $12.25$44.39 $56.64Pile Driver Divers (Building, Heavy,
Highway)
1/1/2011 $13.00$45.53 $58.53Pile Driver Divers (Building, Heavy,
Highway)
1/1/2012 $13.60$46.28 $59.88Pile Driver Divers (Building, Heavy,
Highway)
1/1/2013 $14.10$47.18 $61.28Pile Driver Divers (Building, Heavy,
Highway)
6/1/2014 $9.72$31.74 $41.46Plasterers
12/1/2014 $9.87$31.94 $41.81Plasterers
6/1/2015 $10.42$32.44 $42.86Plasterers
6/1/2013 $19.01$39.89 $58.90Plumbers and Steamfitters
7/7/2014 $19.51$39.89 $59.40Plumbers and Steamfitters
6/1/2015 $20.01$39.89 $59.90Plumbers and Steamfitters
6/1/2016 $20.51$39.89 $60.40Plumbers and Steamfitters
6/1/2013 $16.13$25.25 $41.38Roofers
6/1/2014 $16.13$26.00 $42.13Roofers
5/1/2015 $28.65$33.65 $62.30Roofers (Composition)
5/1/2015 $18.37$25.00 $43.37Roofers (Shingle, Slate, Tile)
5/1/2014 $20.44$30.17 $50.61Sheet Metal Workers
5/1/2015 $21.09$30.27 $51.36Sheet Metal Workers
Page 7 of 14 Serial Number: 15-04236
Page 135
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
1/1/2010 $17.85$33.85 $51.70Sprinklerfitters
1/1/2011 $18.45$33.35 $51.80Sprinklerfitters
4/1/2011 $18.45$34.18 $52.63Sprinklerfitters
1/1/2012 $18.60$34.18 $52.78Sprinklerfitters
4/1/2012 $18.65$35.21 $53.86Sprinklerfitters
1/1/2013 $18.80$35.21 $54.01Sprinklerfitters
4/1/2013 $20.12$33.03 $53.15Sprinklerfitters
7/1/2013 $20.12$33.69 $53.81Sprinklerfitters
4/1/2014 $20.47$34.36 $54.83Sprinklerfitters
4/1/2015 $20.62$35.05 $55.67Sprinklerfitters
5/1/2013 $14.58$29.13 $43.71Terrazzo Finisher
5/1/2014 $14.99$29.47 $44.46Terrazzo Finisher
5/1/2013 $17.54$28.39 $45.93Terrazzo Setter
5/1/2014 $18.01$28.67 $46.68Terrazzo Setter
5/1/2013 $13.37$25.95 $39.32Tile & Marble Finisher
5/1/2014 $13.72$26.30 $40.02Tile & Marble Finisher
5/1/2015 $13.82$27.00 $40.82Tile & Marble Finisher
5/1/2016 $13.98$27.74 $41.72Tile & Marble Finisher
5/1/2013 $13.86$28.87 $42.73Tile & Marble Layer
5/1/2014 $14.22$29.21 $43.43Tile & Marble Layer
5/1/2015 $14.32$29.91 $44.23Tile & Marble Layer
5/1/2016 $14.48$30.65 $45.13Tile & Marble Layer
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 8 of 14 Serial Number: 15-04236
Page 136
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2013 $12.84$27.92 $40.76Carpenters
5/1/2014 $13.24$28.72 $41.96Carpenters
5/1/2015 $13.83$29.13 $42.96Carpenters
5/1/2016 $14.54$29.67 $44.21Carpenters
5/1/2017 $15.34$30.12 $45.46Carpenters
7/1/2011 $24.28$28.67 $52.95Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2012 $24.78$28.92 $53.70Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2013 $25.78$28.42 $54.20Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2014 $27.28$28.92 $56.20Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2015 $27.78$29.42 $57.20Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
5/1/2009 $11.03$16.22 $27.25Laborers (Class 01 - See notes)
5/1/2010 $11.88$16.77 $28.65Laborers (Class 01 - See notes)
5/1/2011 $12.78$17.32 $30.10Laborers (Class 01 - See notes)
5/1/2012 $13.39$17.71 $31.10Laborers (Class 01 - See notes)
5/1/2013 $14.04$18.16 $32.20Laborers (Class 01 - See notes)
5/1/2014 $14.69$18.66 $33.35Laborers (Class 01 - See notes)
5/1/2015 $15.34$19.21 $34.55Laborers (Class 01 - See notes)
5/1/2009 $11.03$22.84 $33.87Laborers (Class 02 - See notes)
5/1/2010 $11.88$23.39 $35.27Laborers (Class 02 - See notes)
5/1/2011 $12.78$23.94 $36.72Laborers (Class 02 - See notes)
5/1/2012 $13.39$24.33 $37.72Laborers (Class 02 - See notes)
5/1/2013 $14.04$24.78 $38.82Laborers (Class 02 - See notes)
5/1/2014 $14.69$25.28 $39.97Laborers (Class 02 - See notes)
5/1/2015 $15.34$25.83 $41.17Laborers (Class 02 - See notes)
5/1/2008 $10.23$19.28 $29.51Laborers (Class 03 - See notes)
5/1/2009 $11.03$19.83 $30.86Laborers (Class 03 - See notes)
5/1/2010 $11.88$20.38 $32.26Laborers (Class 03 - See notes)
5/1/2011 $12.78$20.93 $33.71Laborers (Class 03 - See notes)
5/1/2012 $13.39$21.32 $34.71Laborers (Class 03 - See notes)
5/1/2013 $14.04$21.77 $35.81Laborers (Class 03 - See notes)
Page 9 of 14 Serial Number: 15-04236
Page 137
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2014 $14.69$22.27 $36.96Laborers (Class 03 - See notes)
5/1/2015 $15.34$22.82 $38.16Laborers (Class 03 - See notes)
5/1/2009 $11.03$20.18 $31.21Laborers (Class 04 - See notes)
5/1/2010 $11.88$20.73 $32.61Laborers (Class 04 - See notes)
5/1/2011 $12.78$21.28 $34.06Laborers (Class 04 - See notes)
5/1/2012 $13.39$21.67 $35.06Laborers (Class 04 - See notes)
5/1/2013 $14.04$22.12 $36.16Laborers (Class 04 - See notes)
5/1/2014 $14.69$22.62 $37.31Laborers (Class 04 - See notes)
5/1/2015 $15.34$23.17 $38.51Laborers (Class 04 - See notes)
5/1/2009 $11.03$20.85 $31.88Laborers (Class 05 - See notes)
5/1/2010 $11.88$21.40 $33.28Laborers (Class 05 - See notes)
5/1/2011 $12.78$21.95 $34.73Laborers (Class 05 - See notes)
5/1/2012 $13.39$22.34 $35.73Laborers (Class 05 - See notes)
5/1/2013 $14.04$22.79 $36.83Laborers (Class 05 - See notes)
5/1/2014 $14.69$23.29 $37.98Laborers (Class 05 - See notes)
5/1/2015 $15.34$23.84 $39.18Laborers (Class 05 - See notes)
5/1/2009 $11.03$20.27 $31.30Laborers (Class 06 - See notes)
5/1/2010 $11.88$20.82 $32.70Laborers (Class 06 - See notes)
5/1/2011 $12.78$21.37 $34.15Laborers (Class 06 - See notes)
5/1/2012 $13.39$21.76 $35.15Laborers (Class 06 - See notes)
5/1/2013 $14.04$22.21 $36.25Laborers (Class 06 - See notes)
5/1/2014 $14.69$22.71 $37.40Laborers (Class 06 - See notes)
5/1/2015 $15.34$23.26 $38.60Laborers (Class 06 - See notes)
5/1/2009 $11.03$20.56 $31.59Laborers (Class 07 - See notes)
5/1/2010 $11.88$21.11 $32.99Laborers (Class 07 - See notes)
5/1/2011 $12.78$21.66 $34.44Laborers (Class 07 - See notes)
5/1/2012 $13.39$22.05 $35.44Laborers (Class 07 - See notes)
5/1/2013 $14.04$22.50 $36.54Laborers (Class 07 - See notes)
5/1/2014 $14.69$23.00 $37.69Laborers (Class 07 - See notes)
5/1/2015 $15.34$23.55 $38.89Laborers (Class 07 - See notes)
5/1/2009 $11.03$21.04 $32.07Laborers (Class 08 - See notes)
Page 10 of 14 Serial Number: 15-04236
Page 138
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2010 $11.88$21.59 $33.47Laborers (Class 08 - See notes)
5/1/2011 $12.78$22.14 $34.92Laborers (Class 08 - See notes)
5/1/2012 $13.39$22.53 $35.92Laborers (Class 08 - See notes)
5/1/2013 $14.04$22.98 $37.02Laborers (Class 08 - See notes)
5/1/2014 $14.69$23.48 $38.17Laborers (Class 08 - See notes)
5/1/2015 $15.34$24.03 $39.37Laborers (Class 08 - See notes)
5/1/2009 $16.30$27.45 $43.75Operators (Highway, Class 01 - See
Notes)
5/1/2010 $17.26$28.79 $46.05Operators (Highway, Class 01 - See
Notes)
5/1/2011 $18.26$30.09 $48.35Operators (Highway, Class 01 - See
Notes)
5/1/2012 $19.51$30.09 $49.60Operators (Highway, Class 01 - See
Notes)
5/1/2013 $20.76$30.09 $50.85Operators (Highway, Class 01 - See
Notes)
5/1/2014 $21.72$30.38 $52.10Operators (Highway, Class 01 - See
Notes)
5/1/2009 $16.98$29.70 $46.68Operators (Highway, Class 01a - See
Notes)
5/1/2010 $17.94$31.04 $48.98Operators (Highway, Class 01a - See
Notes)
5/1/2011 $18.94$32.34 $51.28Operators (Highway, Class 01a - See
Notes)
5/1/2012 $20.19$32.34 $52.53Operators (Highway, Class 01a - See
Notes)
5/1/2013 $21.44$32.34 $53.78Operators (Highway, Class 01a - See
Notes)
5/1/2014 $22.40$32.63 $55.03Operators (Highway, Class 01a - See
Notes)
5/1/2009 $15.96$26.27 $42.23Operators (Highway, Class 02 - See
Notes)
5/1/2010 $16.92$27.61 $44.53Operators (Highway, Class 02 - See
Notes)
5/1/2011 $17.92$28.91 $46.83Operators (Highway, Class 02 - See
Notes)
5/1/2012 $19.17$28.91 $48.08Operators (Highway, Class 02 - See
Notes)
5/1/2013 $20.42$28.91 $49.33Operators (Highway, Class 02 - See
Notes)
5/1/2014 $21.37$29.21 $50.58Operators (Highway, Class 02 - See
Notes)
5/1/2009 $15.75$25.58 $41.33Operators (Highway, Class 03 - See
Notes)
5/1/2010 $16.72$26.91 $43.63Operators (Highway, Class 03 - See
Notes)
5/1/2011 $17.72$28.21 $45.93Operators (Highway, Class 03 - See
Notes)
Page 11 of 14 Serial Number: 15-04236
Page 139
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2012 $18.97$28.21 $47.18Operators (Highway, Class 03 - See
Notes)
5/1/2013 $20.22$28.21 $48.43Operators (Highway, Class 03 - See
Notes)
5/1/2014 $21.18$28.50 $49.68Operators (Highway, Class 03 - See
Notes)
5/1/2009 $15.62$25.13 $40.75Operators (Highway, Class 04 - See
Notes)
5/1/2010 $16.59$26.46 $43.05Operators (Highway, Class 04 - See
Notes)
5/1/2011 $17.59$27.76 $45.35Operators (Highway, Class 04 - See
Notes)
5/1/2012 $18.85$27.75 $46.60Operators (Highway, Class 04 - See
Notes)
5/1/2013 $20.10$27.75 $47.85Operators (Highway, Class 04 - See
Notes)
5/1/2014 $21.05$28.05 $49.10Operators (Highway, Class 04 - See
Notes)
5/1/2009 $15.47$24.62 $40.09Operators (Highway, Class 05 - See
Notes)
5/1/2010 $16.44$25.95 $42.39Operators (Highway, Class 05 - See
Notes)
5/1/2011 $17.44$27.25 $44.69Operators (Highway, Class 05 - See
Notes)
5/1/2012 $18.69$27.25 $45.94Operators (Highway, Class 05 - See
Notes)
5/1/2013 $19.94$27.25 $47.19Operators (Highway, Class 05 - See
Notes)
5/1/2014 $20.90$27.54 $48.44Operators (Highway, Class 05 - See
Notes)
5/1/2009 $16.36$27.69 $44.05Operators (Highway, Class 06 - See
Notes)
5/1/2010 $17.32$29.03 $46.35Operators (Highway, Class 06 - See
Notes)
5/1/2011 $18.32$30.33 $48.65Operators (Highway, Class 06 - See
Notes)
5/1/2012 $19.57$30.33 $49.90Operators (Highway, Class 06 - See
Notes)
5/1/2013 $20.82$30.33 $51.15Operators (Highway, Class 06 - See
Notes)
5/1/2014 $21.78$30.62 $52.40Operators (Highway, Class 06 - See
Notes)
5/1/2009 $17.02$29.94 $46.96Operators (Highway, Class 06/A - See
Notes)
5/1/2010 $17.98$31.28 $49.26Operators (Highway, Class 06/A - See
Notes)
5/1/2011 $18.98$32.58 $51.56Operators (Highway, Class 06/A - See
Notes)
5/1/2012 $20.23$32.59 $52.82Operators (Highway, Class 06/A - See
Notes)
5/1/2013 $21.48$32.58 $54.06Operators (Highway, Class 06/A - See
Notes)
Page 12 of 14 Serial Number: 15-04236
Page 140
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2014 $22.44$32.87 $55.31Operators (Highway, Class 06/A - See
Notes)
5/1/2009 $18.67$32.94 $51.61Operators (Highway, Class 07/A - See
Notes)
5/1/2010 $19.72$34.55 $54.27Operators (Highway, Class 07/A - See
Notes)
5/1/2011 $20.83$36.10 $56.93Operators (Highway, Class 07/A - See
Notes)
5/1/2012 $22.28$36.10 $58.38Operators (Highway, Class 07/A - See
Notes)
5/1/2013 $23.73$36.10 $59.83Operators (Highway, Class 07/A - See
Notes)
5/1/2014 $24.88$36.45 $61.33Operators (Highway, Class 07/A - See
Notes)
5/1/2009 $18.25$31.53 $49.78Operators (Highway, Class 07/B - See
Notes)
5/1/2010 $19.31$33.13 $52.44Operators (Highway, Class 07/B - See
Notes)
5/1/2011 $20.41$34.69 $55.10Operators (Highway, Class 07/B - See
Notes)
5/1/2012 $21.86$34.69 $56.55Operators (Highway, Class 07/B - See
Notes)
5/1/2013 $23.31$34.69 $58.00Operators (Highway, Class 07/B - See
Notes)
5/1/2014 $24.46$35.04 $59.50Operators (Highway, Class 07/B - See
Notes)
5/1/2009 $9.86$25.30 $35.16Piledrivers
5/1/2010 $10.83$25.98 $36.81Piledrivers
5/1/2011 $11.43$27.03 $38.46Piledrivers
5/1/2010 $26.09$30.27 $56.36Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2012 $26.86$34.87 $61.73Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2013 $27.73$36.02 $63.75Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2014 $28.83$37.19 $66.02Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
Page 13 of 14 Serial Number: 15-04236
Page 141
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Notes:
If you can not find a classification under Heavy/Highway please refer to the Building classifications.
The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes to clarify existing
tasks performed throughout the Commonwealth. The “Building Laborer Notes” link on the Bureau’s website provides a list
of those tasks that should be read in conformity with custom and usage of the construction industry in the geographic
region in which they are utilized.
For further information on construction types review the
on the Labor and Industry Website. Go to www.dli.state.pa.us, scroll down to the picture labeled "Labor Law Compliance"
and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link.
"Notes as Referenced in Predeterminations"
Page 14 of 14 Serial Number: 15-04236
Page 142
6/24/2015Determination Date:
HighwayProject Classification:
15-04238Serial Number:
8/18/2015Contract Award Date:
Awarding Agency:
Installation of Durable Pavement Markings (151-03-03)Project Name:
PREVAILING WAGES PROJECT RATES
Assigned Field Office:
Lackawanna County
877-214-3962Toll Free Phone Number:
570-963-4577Field Office Phone Number:
Scranton
PA Turnpike Commission
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
7/1/2013 $17.52$32.48 $50.00Asbestos & Insulation Workers
7/1/2014 $18.52$32.48 $51.00Asbestos & Insulation Workers
1/1/2010 $15.15$23.59 $38.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2011 $16.02$24.22 $40.24Boilermaker (Commercial, Institutional,
and Minor Repair Work)
5/1/2012 $16.90$24.84 $41.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
4/1/2013 $17.51$25.53 $43.04Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2014 $17.95$25.79 $43.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
3/1/2015 $18.22$26.52 $44.74Boilermaker (Commercial, Institutional,
and Minor Repair Work)
1/1/2011 $28.12$37.35 $65.47Boilermakers
1/1/2012 $29.85$37.62 $67.47Boilermakers
1/1/2013 $31.13$38.69 $69.82Boilermakers
4/1/2013 $31.43$38.54 $69.97Boilermakers
1/1/2014 $32.81$39.06 $71.87Boilermakers
1/1/2015 $33.31$40.31 $73.62Boilermakers
5/1/2013 $15.02$32.00 $47.02Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2014 $15.37$32.45 $47.82Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
Page 1 of 14 06/24/2015
Page 143
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2015 $15.47$33.20 $48.67Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2016 $15.63$33.94 $49.57Bricklayers, Stone Masons, Pointers,
Caulkers, Cleaners
5/1/2013 $13.85$27.26 $41.11Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
5/12/2014 $14.73$27.63 $42.36Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
5/1/2015 $15.48$28.03 $43.51Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
5/1/2016 $16.08$28.53 $44.61Carpenters, Drywall Hangers, Framers,
Instrument Men, Lathers, Soft Floor
Layers
6/1/2014 $10.15$31.23 $41.38Cement Finishers
12/1/2014 $10.30$31.43 $41.73Cement Finishers
6/1/2015 $10.85$31.93 $42.78Cement Finishers
1/1/2010 $12.25$29.95 $42.20Dockbuilder, Pile Drivers
1/1/2011 $13.10$30.35 $43.45Dockbuilder, Pile Drivers
1/1/2012 $13.70$30.85 $44.55Dockbuilder, Pile Drivers
1/1/2013 $14.20$31.45 $45.65Dockbuilder, Pile Drivers
5/1/2010 $13.27$23.86 $37.13Drywall Finisher
5/1/2011 $14.52$24.61 $39.13Drywall Finisher
5/1/2012 $15.07$25.11 $40.18Drywall Finisher
5/1/2013 $16.22$25.11 $41.33Drywall Finisher
5/1/2014 $16.12$26.51 $42.63Drywall Finisher
5/1/2015 $16.67$27.01 $43.68Drywall Finisher
3/1/2006 $14.64$35.15 $49.79Electric Lineman
9/2/2013 $17.00$50.09 $67.09Electric Lineman
9/1/2014 $17.09$52.19 $69.28Electric Lineman
6/1/2013 $18.83$34.25 $53.08Electricians
6/1/2014 $19.88$34.25 $54.13Electricians
6/1/2015 $19.91$34.92 $54.83Electricians
6/1/2016 $20.67$35.41 $56.08Electricians
1/1/2010 $20.24$40.08 $60.32Elevator Constructor
Page 2 of 14 Serial Number: 15-04238
Page 144
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
1/1/2011 $25.30$41.33 $66.63Elevator Constructor
1/1/2008 $0.00$0.00 $0.00Elevator Tender (Use Elevator Apprentice
or Constructor)
5/1/2010 $14.55$22.73 $37.28Glazier
1/1/2012 $14.25$23.53 $37.78Glazier
5/1/2012 $15.50$23.53 $39.03Glazier
5/1/2013 $17.00$23.53 $40.53Glazier
7/1/2011 $24.28$30.82 $55.10Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2012 $24.78$31.07 $55.85Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2013 $25.78$31.07 $56.85Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2014 $27.28$31.07 $58.35Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2015 $27.78$31.57 $59.35Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
5/1/2010 $12.13$19.95 $32.08Laborers (Class 01 - See notes)
5/1/2011 $12.58$19.95 $32.53Laborers (Class 01 - See notes)
5/1/2012 $13.28$20.10 $33.38Laborers (Class 01 - See notes)
5/1/2013 $13.73$20.30 $34.03Laborers (Class 01 - See notes)
5/1/2014 $14.53$20.45 $34.98Laborers (Class 01 - See notes)
5/1/2015 $15.33$20.60 $35.93Laborers (Class 01 - See notes)
5/1/2016 $16.13$20.70 $36.83Laborers (Class 01 - See notes)
5/1/2010 $12.13$21.95 $34.08Laborers (Class 02 - See notes)
5/1/2011 $12.58$21.95 $34.53Laborers (Class 02 - See notes)
5/1/2012 $13.28$22.10 $35.38Laborers (Class 02 - See notes)
5/1/2013 $13.73$22.30 $36.03Laborers (Class 02 - See notes)
5/1/2014 $14.53$22.45 $36.98Laborers (Class 02 - See notes)
5/1/2015 $15.33$22.60 $37.93Laborers (Class 02 - See notes)
5/1/2016 $16.13$22.70 $38.83Laborers (Class 02 - See notes)
5/1/2014 $14.71$23.02 $37.73Laborers (Class 03 - See notes)
5/1/2015 $15.51$23.17 $38.68Laborers (Class 03 - See notes)
5/1/2016 $16.31$23.37 $39.68Laborers (Class 03 - See notes)
5/1/2014 $14.71$24.52 $39.23Laborers (Class 04 - See notes)
5/1/2015 $15.51$24.67 $40.18Laborers (Class 04 - See notes)
Page 3 of 14 Serial Number: 15-04238
Page 145
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2016 $16.31$24.87 $41.18Laborers (Class 04 - See notes)
5/1/2014 $14.71$25.02 $39.73Laborers (Class 05 - See notes)
5/1/2015 $15.51$25.17 $40.68Laborers (Class 05 - See notes)
5/1/2016 $16.31$25.37 $41.68Laborers (Class 05 - See notes)
5/1/2011 $12.58$22.72 $35.30Laborers (Class 06 - See notes)
5/1/2012 $13.28$22.87 $36.15Laborers (Class 06 - See notes)
5/1/2013 $13.73$23.07 $36.80Laborers (Class 06 - See notes)
5/1/2014 $14.53$23.22 $37.75Laborers (Class 06 - See notes)
5/1/2015 $15.33$23.37 $38.70Laborers (Class 06 - See notes)
5/1/2016 $16.13$23.47 $39.60Laborers (Class 06 - See notes)
5/1/2010 $13.99$28.91 $42.90Millwright
5/1/2011 $14.63$30.27 $44.90Millwright
5/1/2012 $15.26$31.14 $46.40Millwright
5/1/2013 $15.74$32.16 $47.90Millwright
5/1/2014 $16.23$33.17 $49.40Millwright
5/1/2015 $16.98$33.27 $50.25Millwright
5/1/2016 $17.51$33.59 $51.10Millwright
5/1/2017 $18.16$33.79 $51.95Millwright
5/1/2010 $17.83$30.68 $48.51Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2011 $18.83$31.98 $50.81Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2012 $20.23$31.98 $52.21Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2013 $21.63$31.98 $53.61Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2014 $22.39$32.62 $55.01Operators (Building/Heavy, Class 01 -
See Notes)
5/1/2010 $18.49$32.93 $51.42Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2011 $19.49$34.23 $53.72Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2012 $20.89$34.23 $55.12Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2013 $22.29$34.23 $56.52Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2014 $23.05$34.87 $57.92Operators (Building/Heavy, Class 01a -
See Notes)
5/1/2010 $17.75$30.39 $48.14Operators (Building/Heavy, Class 02 -
See Notes)
Page 4 of 14 Serial Number: 15-04238
Page 146
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2011 $18.75$31.69 $50.44Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2012 $20.15$31.69 $51.84Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2013 $21.55$31.69 $53.24Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2014 $22.31$32.33 $54.64Operators (Building/Heavy, Class 02 -
See Notes)
5/1/2010 $18.41$32.64 $51.05Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2011 $19.41$33.94 $53.35Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2012 $20.81$33.94 $54.75Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2013 $22.21$33.94 $56.15Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2014 $22.97$34.58 $57.55Operators (Building/Heavy, Class 02a -
See Notes)
5/1/2010 $17.04$27.98 $45.02Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2011 $18.04$29.28 $47.32Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2012 $19.44$29.28 $48.72Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2013 $20.84$29.28 $50.12Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2014 $21.60$29.92 $51.52Operators (Building/Heavy, Class 03 -
See Notes)
5/1/2010 $16.81$27.21 $44.02Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2011 $17.81$28.51 $46.32Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2012 $19.21$28.51 $47.72Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2013 $20.61$28.51 $49.12Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2014 $21.37$29.15 $50.52Operators (Building/Heavy, Class 04 -
See Notes)
5/1/2010 $16.66$26.72 $43.38Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2011 $17.66$28.02 $45.68Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2012 $19.06$28.02 $47.08Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2013 $20.46$28.02 $48.48Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2014 $21.22$28.66 $49.88Operators (Building/Heavy, Class 05 -
See Notes)
5/1/2010 $16.40$25.84 $42.24Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2011 $17.40$27.14 $44.54Operators (Building/Heavy, Class 06 -
See Notes)
Page 5 of 14 Serial Number: 15-04238
Page 147
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2012 $18.80$27.14 $45.94Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2013 $20.20$27.14 $47.34Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2014 $20.96$27.78 $48.74Operators (Building/Heavy, Class 06 -
See Notes)
5/1/2010 $20.40$36.81 $57.21Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2011 $21.49$38.38 $59.87Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2012 $23.12$38.38 $61.50Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2013 $24.76$38.38 $63.14Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2014 $25.66$39.15 $64.81Operators (Building/Heavy, Class 07/A -
See Notes)
5/1/2010 $20.31$36.47 $56.78Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2011 $21.40$38.03 $59.43Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2012 $23.04$38.03 $61.07Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2013 $24.67$38.03 $62.70Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2014 $25.57$38.80 $64.37Operators (Building/Heavy, Class 07/B -
See Notes)
5/1/2014 $16.12$25.95 $42.07Painters Class 1 (see notes)
5/1/2015 $16.67$26.45 $43.12Painters Class 1 (see notes)
5/1/2016 $17.77$26.45 $44.22Painters Class 1 (see notes)
5/1/2017 $18.97$26.45 $45.42Painters Class 1 (see notes)
5/1/2014 $16.12$27.95 $44.07Painters Class 2 (see notes)
5/1/2015 $16.67$28.65 $45.32Painters Class 2 (see notes)
5/1/2016 $18.12$28.65 $46.77Painters Class 2 (see notes)
5/1/2017 $19.67$28.65 $48.32Painters Class 2 (see notes)
5/1/2014 $16.12$32.25 $48.37Painters Class 3 (see notes)
5/1/2015 $16.67$33.25 $49.92Painters Class 3 (see notes)
5/1/2016 $18.67$33.25 $51.92Painters Class 3 (see notes)
5/1/2017 $21.17$33.25 $54.42Painters Class 3 (see notes)
1/1/2010 $12.25$44.39 $56.64Pile Driver Divers (Building, Heavy,
Highway)
1/1/2011 $13.00$45.53 $58.53Pile Driver Divers (Building, Heavy,
Highway)
1/1/2012 $13.60$46.28 $59.88Pile Driver Divers (Building, Heavy,
Highway)
Page 6 of 14 Serial Number: 15-04238
Page 148
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
1/1/2013 $14.10$47.18 $61.28Pile Driver Divers (Building, Heavy,
Highway)
6/1/2014 $9.72$31.74 $41.46Plasterers
12/1/2014 $9.87$31.94 $41.81Plasterers
6/1/2015 $10.42$32.44 $42.86Plasterers
6/1/2013 $19.01$39.89 $58.90Plumbers and Steamfitters
7/7/2014 $19.51$39.89 $59.40Plumbers and Steamfitters
6/1/2015 $20.01$39.89 $59.90Plumbers and Steamfitters
6/1/2016 $20.51$39.89 $60.40Plumbers and Steamfitters
6/1/2013 $16.13$25.25 $41.38Roofers
6/1/2014 $16.63$26.00 $42.63Roofers
5/1/2014 $20.44$30.17 $50.61Sheet Metal Workers
5/1/2015 $21.09$30.27 $51.36Sheet Metal Workers
1/1/2010 $17.60$33.85 $51.45Sprinklerfitters
1/1/2011 $18.45$33.35 $51.80Sprinklerfitters
4/1/2011 $18.45$34.18 $52.63Sprinklerfitters
1/1/2012 $18.60$34.18 $52.78Sprinklerfitters
4/1/2012 $18.65$35.21 $53.86Sprinklerfitters
1/1/2013 $18.80$35.21 $54.01Sprinklerfitters
4/1/2013 $20.12$33.03 $53.15Sprinklerfitters
7/1/2013 $20.12$33.69 $53.81Sprinklerfitters
4/1/2014 $20.47$34.36 $54.83Sprinklerfitters
4/1/2015 $20.62$35.05 $55.67Sprinklerfitters
5/1/2013 $14.58$29.13 $43.71Terrazzo Finisher
5/1/2014 $14.99$29.47 $44.46Terrazzo Finisher
5/1/2013 $17.54$28.39 $45.93Terrazzo Setter
5/1/2014 $18.01$28.67 $46.68Terrazzo Setter
5/1/2013 $13.37$25.95 $39.32Tile & Marble Finisher
5/1/2014 $13.72$26.30 $40.02Tile & Marble Finisher
5/1/2015 $13.82$27.00 $40.82Tile & Marble Finisher
5/1/2016 $13.98$27.74 $41.72Tile & Marble Finisher
Page 7 of 14 Serial Number: 15-04238
Page 149
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalBuilding
5/1/2013 $13.86$28.87 $42.73Tile & Marble Layer
5/1/2014 $14.22$29.21 $43.43Tile & Marble Layer
5/1/2015 $14.32$29.91 $44.23Tile & Marble Layer
5/1/2016 $14.48$30.65 $45.13Tile & Marble Layer
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 8 of 14 Serial Number: 15-04238
Page 150
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2013 $12.84$27.92 $40.76Carpenters
5/1/2014 $13.24$28.72 $41.96Carpenters
5/1/2015 $13.83$29.13 $42.96Carpenters
5/1/2016 $14.54$29.67 $44.21Carpenters
5/1/2017 $15.34$30.12 $45.46Carpenters
7/1/2012 $24.78$28.92 $53.70Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2013 $25.78$28.42 $54.20Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2014 $27.28$28.92 $56.20Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2015 $27.78$29.42 $57.20Iron Workers (Bridge, Structural Steel,
Ornamental, Precast, Reinforcing)
7/1/2010 $23.28$28.17 $51.45Iron Workers (Highway Reinforcing)
5/1/2013 $14.04$18.16 $32.20Laborers (Class 01 - See notes)
5/1/2014 $14.69$18.66 $33.35Laborers (Class 01 - See notes)
5/1/2015 $15.34$19.21 $34.55Laborers (Class 01 - See notes)
5/1/2009 $11.03$22.84 $33.87Laborers (Class 02 - See notes)
5/1/2010 $11.88$23.39 $35.27Laborers (Class 02 - See notes)
5/1/2011 $12.78$23.94 $36.72Laborers (Class 02 - See notes)
5/1/2012 $13.39$24.33 $37.72Laborers (Class 02 - See notes)
5/1/2013 $14.04$24.78 $38.82Laborers (Class 02 - See notes)
5/1/2014 $14.69$25.28 $39.97Laborers (Class 02 - See notes)
5/1/2015 $15.34$25.83 $41.17Laborers (Class 02 - See notes)
5/1/2009 $11.03$19.83 $30.86Laborers (Class 03 - See notes)
5/1/2010 $11.88$20.38 $32.26Laborers (Class 03 - See notes)
5/1/2011 $12.78$20.93 $33.71Laborers (Class 03 - See notes)
5/1/2012 $13.39$21.32 $34.71Laborers (Class 03 - See notes)
5/1/2013 $14.04$21.77 $35.81Laborers (Class 03 - See notes)
5/1/2014 $14.69$22.27 $36.96Laborers (Class 03 - See notes)
5/1/2015 $15.34$22.82 $38.16Laborers (Class 03 - See notes)
5/1/2009 $11.03$20.18 $31.21Laborers (Class 04 - See notes)
5/1/2010 $11.88$20.73 $32.61Laborers (Class 04 - See notes)
5/1/2011 $12.78$21.28 $34.06Laborers (Class 04 - See notes)
Page 9 of 14 Serial Number: 15-04238
Page 151
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2012 $13.39$21.67 $35.06Laborers (Class 04 - See notes)
5/1/2013 $14.04$22.12 $36.16Laborers (Class 04 - See notes)
5/1/2014 $14.69$22.62 $37.31Laborers (Class 04 - See notes)
5/1/2015 $15.34$23.17 $38.51Laborers (Class 04 - See notes)
5/1/2009 $11.03$20.85 $31.88Laborers (Class 05 - See notes)
5/1/2010 $11.88$21.40 $33.28Laborers (Class 05 - See notes)
5/1/2011 $12.78$21.95 $34.73Laborers (Class 05 - See notes)
5/1/2012 $13.39$22.34 $35.73Laborers (Class 05 - See notes)
5/1/2013 $14.04$22.79 $36.83Laborers (Class 05 - See notes)
5/1/2014 $14.69$23.29 $37.98Laborers (Class 05 - See notes)
5/1/2015 $15.34$23.84 $39.18Laborers (Class 05 - See notes)
5/1/2009 $11.03$20.27 $31.30Laborers (Class 06 - See notes)
5/1/2010 $11.88$20.82 $32.70Laborers (Class 06 - See notes)
5/1/2011 $12.78$21.37 $34.15Laborers (Class 06 - See notes)
5/1/2012 $13.39$21.76 $35.15Laborers (Class 06 - See notes)
5/1/2013 $14.04$22.21 $36.25Laborers (Class 06 - See notes)
5/1/2014 $14.69$22.71 $37.40Laborers (Class 06 - See notes)
5/1/2015 $15.34$23.26 $38.60Laborers (Class 06 - See notes)
5/1/2009 $11.03$20.56 $31.59Laborers (Class 07 - See notes)
5/1/2010 $11.88$21.11 $32.99Laborers (Class 07 - See notes)
5/1/2011 $12.78$21.66 $34.44Laborers (Class 07 - See notes)
5/1/2012 $13.39$22.05 $35.44Laborers (Class 07 - See notes)
5/1/2013 $14.04$22.50 $36.54Laborers (Class 07 - See notes)
5/1/2014 $14.69$23.00 $37.69Laborers (Class 07 - See notes)
5/1/2015 $15.34$23.55 $38.89Laborers (Class 07 - See notes)
5/1/2009 $11.03$21.04 $32.07Laborers (Class 08 - See notes)
5/1/2010 $11.88$21.59 $33.47Laborers (Class 08 - See notes)
5/1/2011 $12.78$22.14 $34.92Laborers (Class 08 - See notes)
5/1/2012 $13.39$22.53 $35.92Laborers (Class 08 - See notes)
5/1/2013 $14.04$22.98 $37.02Laborers (Class 08 - See notes)
5/1/2014 $14.69$23.48 $38.17Laborers (Class 08 - See notes)
Page 10 of 14 Serial Number: 15-04238
Page 152
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2015 $15.34$24.03 $39.37Laborers (Class 08 - See notes)
5/1/2009 $16.30$27.45 $43.75Operators (Highway, Class 01 - See
Notes)
5/1/2010 $17.26$28.79 $46.05Operators (Highway, Class 01 - See
Notes)
5/1/2011 $18.26$30.09 $48.35Operators (Highway, Class 01 - See
Notes)
5/1/2012 $19.51$30.09 $49.60Operators (Highway, Class 01 - See
Notes)
5/1/2013 $20.76$30.09 $50.85Operators (Highway, Class 01 - See
Notes)
5/1/2014 $21.72$30.38 $52.10Operators (Highway, Class 01 - See
Notes)
5/1/2009 $16.98$29.70 $46.68Operators (Highway, Class 01a - See
Notes)
5/1/2010 $17.94$31.04 $48.98Operators (Highway, Class 01a - See
Notes)
5/1/2011 $18.94$32.34 $51.28Operators (Highway, Class 01a - See
Notes)
5/1/2012 $20.19$32.34 $52.53Operators (Highway, Class 01a - See
Notes)
5/1/2013 $21.44$32.34 $53.78Operators (Highway, Class 01a - See
Notes)
5/1/2014 $22.40$32.63 $55.03Operators (Highway, Class 01a - See
Notes)
5/1/2009 $15.96$26.27 $42.23Operators (Highway, Class 02 - See
Notes)
5/1/2010 $16.92$27.61 $44.53Operators (Highway, Class 02 - See
Notes)
5/1/2011 $17.92$28.91 $46.83Operators (Highway, Class 02 - See
Notes)
5/1/2012 $19.17$28.91 $48.08Operators (Highway, Class 02 - See
Notes)
5/1/2013 $20.42$28.91 $49.33Operators (Highway, Class 02 - See
Notes)
5/1/2014 $21.37$29.21 $50.58Operators (Highway, Class 02 - See
Notes)
5/1/2009 $15.75$25.58 $41.33Operators (Highway, Class 03 - See
Notes)
5/1/2010 $16.72$26.91 $43.63Operators (Highway, Class 03 - See
Notes)
5/1/2011 $17.72$28.21 $45.93Operators (Highway, Class 03 - See
Notes)
5/1/2012 $18.97$28.21 $47.18Operators (Highway, Class 03 - See
Notes)
5/1/2013 $20.22$28.21 $48.43Operators (Highway, Class 03 - See
Notes)
5/1/2014 $21.18$28.50 $49.68Operators (Highway, Class 03 - See
Notes)
5/1/2009 $15.62$25.13 $40.75Operators (Highway, Class 04 - See
Notes)
5/1/2010 $16.59$26.46 $43.05Operators (Highway, Class 04 - See
Notes)
Page 11 of 14 Serial Number: 15-04238
Page 153
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2011 $17.59$27.76 $45.35Operators (Highway, Class 04 - See
Notes)
5/1/2012 $18.85$27.75 $46.60Operators (Highway, Class 04 - See
Notes)
5/1/2013 $20.10$27.75 $47.85Operators (Highway, Class 04 - See
Notes)
5/1/2014 $21.05$28.05 $49.10Operators (Highway, Class 04 - See
Notes)
5/1/2009 $15.47$24.62 $40.09Operators (Highway, Class 05 - See
Notes)
5/1/2010 $16.44$25.95 $42.39Operators (Highway, Class 05 - See
Notes)
5/1/2011 $17.44$27.25 $44.69Operators (Highway, Class 05 - See
Notes)
5/1/2012 $18.69$27.25 $45.94Operators (Highway, Class 05 - See
Notes)
5/1/2013 $19.94$27.25 $47.19Operators (Highway, Class 05 - See
Notes)
5/1/2014 $20.90$27.54 $48.44Operators (Highway, Class 05 - See
Notes)
5/1/2009 $16.36$27.69 $44.05Operators (Highway, Class 06 - See
Notes)
5/1/2010 $17.32$29.03 $46.35Operators (Highway, Class 06 - See
Notes)
5/1/2011 $18.32$30.33 $48.65Operators (Highway, Class 06 - See
Notes)
5/1/2012 $19.57$30.33 $49.90Operators (Highway, Class 06 - See
Notes)
5/1/2013 $20.82$30.33 $51.15Operators (Highway, Class 06 - See
Notes)
5/1/2014 $21.78$30.62 $52.40Operators (Highway, Class 06 - See
Notes)
5/1/2009 $17.02$29.94 $46.96Operators (Highway, Class 06/A - See
Notes)
5/1/2010 $17.98$31.28 $49.26Operators (Highway, Class 06/A - See
Notes)
5/1/2011 $18.98$32.58 $51.56Operators (Highway, Class 06/A - See
Notes)
5/1/2012 $20.23$32.59 $52.82Operators (Highway, Class 06/A - See
Notes)
5/1/2013 $21.48$32.58 $54.06Operators (Highway, Class 06/A - See
Notes)
5/1/2014 $22.44$32.87 $55.31Operators (Highway, Class 06/A - See
Notes)
5/1/2009 $18.67$32.94 $51.61Operators (Highway, Class 07/A - See
Notes)
5/1/2010 $19.72$34.55 $54.27Operators (Highway, Class 07/A - See
Notes)
5/1/2011 $20.83$36.10 $56.93Operators (Highway, Class 07/A - See
Notes)
5/1/2012 $22.28$36.10 $58.38Operators (Highway, Class 07/A - See
Notes)
Page 12 of 14 Serial Number: 15-04238
Page 154
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
5/1/2013 $23.73$36.10 $59.83Operators (Highway, Class 07/A - See
Notes)
5/1/2014 $24.88$36.45 $61.33Operators (Highway, Class 07/A - See
Notes)
5/1/2009 $18.25$31.53 $49.78Operators (Highway, Class 07/B - See
Notes)
5/1/2010 $19.31$33.13 $52.44Operators (Highway, Class 07/B - See
Notes)
5/1/2011 $20.41$34.69 $55.10Operators (Highway, Class 07/B - See
Notes)
5/1/2012 $21.86$34.69 $56.55Operators (Highway, Class 07/B - See
Notes)
5/1/2013 $23.31$34.69 $58.00Operators (Highway, Class 07/B - See
Notes)
5/1/2014 $24.46$35.04 $59.50Operators (Highway, Class 07/B - See
Notes)
5/1/2009 $9.86$25.30 $35.16Piledrivers
5/1/2010 $10.83$25.98 $36.81Piledrivers
5/1/2011 $11.43$27.03 $38.46Piledrivers
5/1/2010 $26.09$30.27 $56.36Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2012 $26.86$34.87 $61.73Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2013 $27.73$36.02 $63.75Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2014 $28.83$37.19 $66.02Steamfitters (Heavy and Highway - Gas
Distribution)
5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)
5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)
5/1/2012 $0.00$30.98 $30.98Truckdriver class 1(see notes)
5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)
5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)
5/1/2012 $0.00$31.05 $31.05Truckdriver class 2 (see notes)
5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)
5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)
5/1/2012 $0.00$31.54 $31.54Truckdriver class 3 (see notes)
Page 13 of 14 Serial Number: 15-04238
Page 155
PREVAILING WAGES PROJECT RATES
Effective
Date
Expiration
Date
Hourly
Rate
Fringe
BenefitsTotalHeavy/Highway
Notes:
If you can not find a classification under Heavy/Highway please refer to the Building classifications.
The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes to clarify existing
tasks performed throughout the Commonwealth. The “Building Laborer Notes” link on the Bureau’s website provides a list
of those tasks that should be read in conformity with custom and usage of the construction industry in the geographic
region in which they are utilized.
For further information on construction types review the
on the Labor and Industry Website. Go to www.dli.state.pa.us, scroll down to the picture labeled "Labor Law Compliance"
and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link.
"Notes as Referenced in Predeterminations"