SALARIO MINIMO 515,000$
FACTO PRESTACIONAL 117%
OFICIALES AYUDANTES VALOR MENSUAL VALOR DIARIO VALOR REAL
0 1 515,000$ 17,167$ 37,252$
0 2 1,030,000$ 34,333$ 74,503$
0 3 1,545,000$ 51,500$ 111,755$
0 4 2,060,000$ 68,667$ 149,007$
1 1 1,287,500$ 42,917$ 93,129$
1 2 1,802,500$ 60,083$ 130,381$
1 3 2,317,500$ 77,250$ 167,633$
1 4 2,832,500$ 94,417$ 204,884$
1 8 4,892,500$ 163,083$ 353,891$
515,000$
SALARIO MINIMO 515,000$
FACTO PRESTACIONAL 117%
OFICIALES AYUDANTES VALOR MENSUAL VALOR DIARIO VALOR REAL
0 1 515,000$ 17,167$ 37,252$
0 2 1,030,000$ 34,333$ 74,503$
0 3 1,545,000$ 51,500$ 111,755$
0 4 2,060,000$ 68,667$ 149,007$
1 0 772,500$ 40,000$ 86,800$
CUADRILLAS
CUADRILLAS
1 0 772,500$ 40,000$ 86,800$
1 2 1,802,500$ 60,083$ 130,381$
1 3 2,317,500$ 77,250$ 167,633$
1 4 2,832,500$ 94,417$ 204,884$
1 8 4,892,500$ 163,083$ 353,891$
-
123.2
-
TEM DESCRIPCIN UND. CANT. Vr/unitario Vr/Total
1 DESCAPOTE Y LIMPIEZA M2 120 $ 4,505 540,540
2 LOCALIZACION Y REPLANTEO M2 141 $ 1,898 267,094
3 EXCAVACION M3 168 $ 19,305 3,243,240
4 CONCRETO DE 24 Mpa M3 20.18 $ 577,103 11,645,945
5 CONCRETO CICLOPEO M3 3 $ 283,332 764,996
6 ACERO DE REFUERZO Kg 5800 $ 4,728 27,424,140
7 RELLENO Y COMPACTACN M3 50 $ 25,555 1,277,767
45,163,722
8 CABLE Y PENDOLONES
8.1 CABLE DE ACERO TRENSADO 3/4" ML 130 $ 25,550 3,321,5008.2
PENDOLON METALICO EN ACERO 5/8" ML 18 $ 8,500 153,0008.3 PLATINAS
5/8" 5*10cm UND. 28 $ 7,500 210,0008.4 ABRAZADERA EN LAMINA 3/8"
CON PERNOS. UND. 22 $ 4,500 99,000
3,783,500
9 MADERA DEL TABLERO
9.1 TABLONES 5*30*300cm UND. 70 $ 55,000 3850000
FECHA: MAYO DE 2011
PRESUPUESTO CONSTRUCCION PUENTE PEATONAL COLGANTE VEREDA EL
DIIVISO MUNICIPIO DE CONVENCIN (N DE S)
PROYECTO: CONSTRUCCION PUENTE COLGANTE. L= 20m
VEREDA : EL DIVISO - CONVENCIN (N DE S)
9.1 TABLONES 5*30*300cm UND. 70 $ 55,000 38500009.2 VIGAS
PRINCIPALES 12*12*300cm UND. 20 $ 45,000 9000009.3 VIGAS
LONGITUDINALES 10*10*300cm UND. 15 $ 35,000 5250009.4 VARETA EN
MADERA 6,5*7,5 *280cm UND. 35 $ 25,000 8750009.5 RIOSTRA 8*8*120cm
UND. 30 $ 45,000 1350000
$ 7,500,000
10 HERRAJES EN UNIONES
10.1 TORNILLO 3/4"*39cm UND. 25 $ 4,200 10500010.2 TORNILLO
3/4"*24cm UND. 410 $ 2,500 102500010.3 TORNILLO 3/4"31cm UND. 90 $
3,100 27900010.4 TORNILLO 7/8"24cm UND. 28 $ 3,200 8960010.5
TORNILLO 1/2"27cm UND. 60 $ 1,900 11400010.6 TORNILLO 1/2"24cm UND.
140 $ 1,700 23800010.7 TORNILLO 5/8"*13cm UND. 30 $ 1,500 4500010.8
ANGULOS 4*4*1/4"*29cm UND. 10 $ 9,500 9500010.9 ANGULOS
4*4*1/4"*61cm UND. 12 $ 12,500 150000
10.10 ANGULOS 2 1/2*2 1/2*1/8"*21cm UND. 104 $ 6,700 69680010.11
ANGULOS 2 1/2*2 1/2*1/8"*11cm UND. 64 $ 4,300 27520010.12 platinas
1/8" 53*24cm UND. 104 $ 5,400 561600
$ 3,674,200
60,121,422
18,036,427
78,157,849
______________________________________________
RAMON HELI DURAN
COSTO DIRECTO
AIU (30%)
TOTAL COSTO PRESUPUESTO
-
M.P: 54202179307 NTS
-
UNIDAD
M2
1.EQUIPO
TIPO TARIFA/DIA REND. V/R UNIT.
410
410
2.MATERIALES DE OBRA
UND PRECIO CANT V/R UNIT.
ITEM: 1
FECHA: MAYO DE 2011
PROYECTO: CONSTRUCCION PUENTE COLGANTEVEREDA: EL DIVISO -
CONVENCIN (N DE S)
ANALISIS UNITARIO
DESCRIPCION: Desmonte manual.
DESCRIPCION
HERRAMIENTA MENOR (10% M de O)
SUBTOTAL
DESCRIPCION UND PRECIO CANT V/R UNIT.
0
3.MANO DE OBRA
JORNAL PREST+JORNAL. REND. V/R UNIT.
35000 40,950 10 4,095
4,095
4,505
DESCRIPCION
M.P: 54202179307 NTS
SUBTOTAL
DESCRIPCION CUADRILLA
Cuadrilla de construccion 0*1
SUBTOTAL
TOTAL COSTO DIRECTO DEL UNITARIO
______________________________________________
RAMON HELI DURAN
-
UNIDAD
M2
1.EQUIPO
TIPO TARIFA/DIA REND. V/R UNIT.
150
150
2.MATERIALES DE OBRA
UND PRECIO CANT V/R UNIT.
kg 3,000 0.015 45
und 0 0.036 0
und 5,500 0.036 198
VEREDA: EL DIVISO - CONVENCIN (N DE S)
ANALISIS UNITARIO
ITEM: 2
PROYECTO: CONSTRUCCION PUENTE COLGANTE
FECHA: MAYO DE 2011
DESCRIPCION
Puntillas 11/2" a 5"
Vara comun 4 mts. Delgada
Hilo para nivelar
DESCRIPCION: LOCALIZACION Y REPLANTEO
DESCRIPCION
HERRAMIENTA MENOR (10% M de O)
SUBTOTAL
243
3.MANO DE OBRA
JORNAL PREST+JORNAL. REND. V/R UNIT.
90,000 105,300 70 1,504
1,504
1,898
SUBTOTAL
DESCRIPCION CUADRILLA
Cuadrilla de construccion 1*1
SUBTOTAL
TOTAL COSTO DIRECTO DEL UNITARIO
______________________________________________
RAMON HELI DURAN
M.P: 54202179307 NTS
-
UNIDAD
M3
1.EQUIPO
TIPO TARIFA/DIA REND. V/R UNIT.
1,755
1,755
2.MATERIALES DE OBRA
UND PRECIO CANT V/R UNIT.
VEREDA: EL DIVISO - CONVENCIN (N DE S)
ANALISI UNITARIO
ITEM: 3
PROYECTO: CONSTRUCCION PUENTE COLGANTE
FECHA: MAYO DE 2011
DESCRIPCION: EXCAVACIN MANUAL
DESCRIPCION
HERRAMIENTA MENOR (10% M de O)
SUBTOTAL
DESCRIPCION UND PRECIO CANT V/R UNIT.
3.MANO DE OBRA
JORNAL PREST+JORNAL. REND. V/R UNIT.
120,000 140,400 8.00 17,550
17,550
19,305
DESCRIPCION
M.P: 54202179307 NTS
SUBTOTAL
DESCRIPCION CUADRILLA
Cuadrilla de construccion 0*4
SUBTOTAL
TOTAL COSTO DIRECTO DEL UNITARIO
______________________________________________
RAMON HELI DURAN
-
UNIDAD
M3
1.EQUIPO
TIPO TARIFA/DIA REND. V/R UNIT.
Dia 60000 6 10000
Dia 55000 12 4583
7,020
21,603
2.MATERIALES DE OBRA
UND PRECIO CANT V/R UNIT.
SUBTOTAL
DESCRIPCION
PROYECTO: CONSTRUCCION PUENTE COLGANTE
ITEM: 4
DESCRIPCION: CONCRETO DE 24.0 Mpa PARA TORRES Y ZAPATAS
DESCRIPCION
Mezcladora
VEREDA: EL DIVISO - CONVENCIN (N DE S)
FECHA: MAYO DE 2011
ANALISI UNITARIO
vibrador
HERRAMIENTA MENOR (10% M de O)
Kg 600 500 300000
M3 95,000 0.85 80750
M3 80,000 0.85 68000
ml 0 6 0
Und 0 6 0
kg 7310 5 36550
Lt 0 180 0
485,300
3.MANO DE OBRA
JORNAL PREST+JORNAL. REND. V/R UNIT.
300,000 351,000 5.0 70,200
70,200
577,103
Sika Set L
Agua
Cemento
Grava
Arena
Liston de madera 0,1*0,1*3 m
Tabla 0,3*1,5"*3m
TOTAL COSTO DIRECTO DEL UNITARIO
______________________________________________
RAMON HELI DURAN
M.P: 54202179307 NTS
SUBTOTAL
DESCRIPCION CUADRILLA
Cuadrilla de construccion 1*8
SUBTOTAL
-
UNIDAD
M3
1.EQUIPO
TIPO TARIFA/DIA REND. V/R UNIT.
Dia 90000 3 30000
7,812
37,812
2.MATERIALES DE OBRA
UND PRECIO CANT V/R UNIT.
VEREDA: EL DIVISO - CONVENCIN (N DE S)
HERRAMIENTA MENOR (10% M de O)
SUBTOTAL
DESCRIPCION
DESCRIPCION: CONCRETO CICLOPEO (60% -40%)
DESCRIPCION
Mezcladora
PROYECTO: CONSTRUCCION PUENTE COLGANTE
FECHA: MAYO DE 2011
ANALISI UNITARIO
ITEM: 5
Kg 600 217 130200
M3 40,000 0.558 22320
M3 40,000 0.372 14880
M3 0 0.45 0
Und 0 6 0
167,400
3.MANO DE OBRA
JORNAL PREST+JORNAL. REND. V/R UNIT.
180,000 390,600 5.0 78,120
78,120
283,332
M.P: 54202179307 NTS
SUBTOTAL
TOTAL COSTO DIRECTO DEL UNITARIO
______________________________________________
RAMON HELI DURAN
Piedra
tabla 0,3*1,5"*3
SUBTOTAL
DESCRIPCION CUADRILLA
Cuadrilla de construccion 1*4
Cemento
Grava
Arena
-
UNIDAD
KG
1.EQUIPO
TIPO TARIFA/DIA REND. V/R UNIT.
105
105
2.MATERIALES DE OBRA
UND PRECIO CANT V/R UNIT.
Kg 3,200 1.05 3360acero de 6000psi
ITEM: 6
DESCRIPCION: acero de refuerzo de 60000Psi
DESCRIPCION
HERRAMIENTA MENOR (10% M de O)
SUBTOTAL
DESCRIPCION
PROYECTO: CONSTRUCCION PUENTE COLGANTEVEREDA: EL DIVISO -
CONVENCIN (N DE S)
FECHA: MAYO DE 2011
ANALISI UNITARIO
Kg 4,200 0.05 210
3,570
3.MANO DE OBRA
JORNAL PREST+JORNAL. REND. V/R UNIT.
180,000 210,600 200 1,053
1,053
4,728
alambre negro para amarres
RAMON HELI DURAN
M.P: 54202179307 NTS
Cuadrilla de construccion 1*4
SUBTOTAL
TOTAL COSTO DIRECTO DEL UNITARIO
SUBTOTAL
______________________________________________
DESCRIPCION CUADRILLA
-
UNIDAD
M3
1.EQUIPO
TIPO TARIFA/DIA REND. V/R UNIT.
Dia 80000 15.0 5333
702
6,035
2.MATERIALES DE OBRA
UND PRECIO CANT V/R UNIT.
ITEM: 7
DESCRIPCION: Relleno y compactacin
DESCRIPCION
Compactador Tipo Rana
VEREDA: EL DIVISO - CONVENCIN (N DE S)
FECHA: MAYO DE 2011
PROYECTO: CONSTRUCCION PUENTE COLGANTE
ANALISI UNITARIO
HERRAMIENTA MENOR (10% M de O)
SUBTOTAL
DESCRIPCION
M3 10,000 1.25 12500
12,500
3.MANO DE OBRA
JORNAL PREST+JORNAL. REND. V/R UNIT.
60,000 70,200 10 7,020
7,020
25,555
relleno para estructura
DESCRIPCION CUADRILLA
Cuadrilla de construccion 0*2
SUBTOTAL
TOTAL COSTO DIRECTO DEL UNITARIO
______________________________________________
RAMON HELI DURAN
M.P: 54202179307 NTS
SUBTOTAL
-
putillas
21/2"-31/2" 35 875004" 20 libras 90000
177500