Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability
50

Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Dec 27, 2015

Download

Documents

Ashlee Pearson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Presented by: Vlad DjuricMarch 11, 2002

OSIsoft Users Conference

How PI Played a Key Role in

Achieving Maximum Equipment

Reliability

How PI Played a Key Role in

Achieving Maximum Equipment

Reliability

Page 2: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Dofasco Background & ResearchDofasco Background & Research

Dofasco Response & ResultsDofasco Response & Results

New Failure ParadigmNew Failure Paradigm

Integration with OSIsoft PIIntegration with OSIsoft PI

Case StudyCase Study

Agenda

Page 3: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Dofasco Background & ResearchDofasco Background & Research

Dofasco Response & ResultsDofasco Response & Results

New Failure ParadigmNew Failure Paradigm

Integration with OSIsoft PIIntegration with OSIsoft PI

Case StudyCase Study

Agenda

Page 4: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Dofasco Background

• Major North American metal solutions producer

• Annual revenue approximately $3 Billion

• Produce approximately 4.5 million tons of product per year

• Supply to automotive, manufacturing, construction and packaging customers

• $5 Billion equipment replacement value

Page 5: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Dofasco Main Site

Page 6: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Electric Arc Furnace

Page 7: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Central Shipping

Page 8: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Challenges of the late 80’s

• Inflation raised costs while market prices dropped

• Globalization– High quality Asian imports available at low price– Buyer’s market

• Profit formula changed:– From: Price = Cost + Profit Margin– To: Price – Cost = Profit Margin

• Shareholder value substantially eroded

• Created an urgent need to improve results

Page 9: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Responding to the Changing World of Maintenance

• Dofasco conducted global benchmarking research on:– Industry maintenance and reliability practices – Predictive maintenance technologies– Information systems– Reliability methodologies

Page 10: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

The Research Findings

• No single country, industry or plant had developed comprehensive best practices

• Pockets of excellence existed

• Reliability improvement efforts were inconsistent and short lived

• Information systems (CMMS, PdM) fell short of user expectations

• Equipment repair cultures were dominant– Rather than asset reliability cultures

Page 11: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Dofasco Background & ResearchDofasco Background & Research

Dofasco Response & ResultsDofasco Response & Results

New Failure ParadigmNew Failure Paradigm

Integration with OSIsoft PIIntegration with OSIsoft PI

Case StudyCase Study

Agenda

Page 12: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Dofasco Response

• A solution to the changing world of maintenance required a Reliability Driven Maintenance focus – Asset reliability business process– Maintenance & reliability practices– Enabling technologies– Sustained corporate commitment to reliability

Page 13: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

% Total Maintenance Hours

100 %

70%

30% Proactive Maintenance

Then

Reactive Maintenance

The Results

20%

80%

Now

Page 14: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Average EquipmentAvailability

100 %

78%

22% Unavailable

Available91%

9%

Then Now

The Results

Page 15: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Quality increased from 76% yield to 91%

% Prime Yield

70

75

80

85

90

The Results

Then Now

Page 16: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Then

7,000

Reductions achieved through voluntary attrition

Now

The Results

# of Employees

1,700Maintenanceemployees

12,500

3,460 Maintenanceemployees

Page 17: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

The Payoff

• Winner of two prestigious maintenance awards:– Best use of Innovation and Technology in Maintenance– Best Maintenance for a Large Plant

• Most Profitable North American producer in their sector

• Ranked as #1 worldwide manufacturer in their industry by Dow Jones 2 years running

• North American benchmark for World Class maintenance practices and technologies

Page 18: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Dofasco Maintenance Culture

• Historically Dofasco’s maintenance department:– Repaired broken equipment– Or preferably, prevented equipment from

breaking

• Majority of attention was to:– Improve trade repair skills– Optimize time based equipment overhauls– Better use of advanced planning & scheduling

tools

• “Equipment Repair Culture” rather than an “Asset Management Culture”

Page 19: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Asset Management Culture

• Higher market demands– Quality– Price– Delivery

• Increasingly stringent safety and environmental regulations

• Equipment becoming increasingly complex

• New research on modes of equipment failure

• New computer and diagnostic technology

• New failure paradigm

Page 20: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Dofasco Background & ResearchDofasco Background & Research

Dofasco Response & ResultsDofasco Response & Results

New Failure ParadigmNew Failure Paradigm

Integration with OSIsoft PIIntegration with OSIsoft PI

Case StudyCase Study

Agenda

Page 21: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

New Failure Paradigm

Failure starts here

Condition

P

Potential Failure

P-F Interval

F

Equipment not performing intended

function Functionally failed

New definition of failure

Equipment

broken

Olddefinition

Page 22: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

The majority of failures are random, not time-based

>80% random<20% time based

Condition Related

Random FailureAge Related

Bathtub

Infant MortalityFatigue Related

The Reality of Failure

• There are six failure patterns

2%

4%

5%

7%

14%

68%

Page 23: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Typical Current Situation

Scattered knowledge

Inconsistent actions

What Maintenance Work?

At What time?

Page 24: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

The Right Work

at

The Right Time

consistent action

Preferred Situation

Information System provides easy access to a Common Knowledge Repository

actionableknowledge

Consistent organized way to capture and use Knowledge & Information

business process and practices

Page 25: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Dofasco Background & ResearchDofasco Background & Research

Dofasco Response & ResultsDofasco Response & Results

New Failure ParadigmNew Failure Paradigm

Integration with OSIsoft PIIntegration with OSIsoft PI

Case StudyCase Study

Agenda

Page 26: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Integration with OSIsoft PI

Asset Management

Work Order Management

Planning & Scheduling

MRO Materials

Procurement

Tasks and Jobs

Personnel & Trades

CMMS

DCSOSIsoft

PI

Page 27: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Integration with OSIsoft PI

Operator roundsVisual inspectionsMechanical inspections

Lubrication analysisPlant process signalsVibration analysisInfrared thermography

Motor circuit analysisNon-destructive testing

RCM analysisAladon tool kit

Applied RCM

Condition-based management

Rules-based diagnostic engine

Indicator-based job triggers

Performance analysis and tracking

ICMS

Page 28: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Integration with OSIsoft PI

Asset Management

Work Order Management

Planning & Scheduling

MRO Materials

Procurement

Tasks and Jobs

Personnel & Trades

CMMS

OSIsoftPIDCS

Applied RCM

Condition-based management

Rules-based diagnostic engine

Indicator-based job triggers

Performance analysis and tracking

ICMS

Page 29: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Dofasco Background & ResearchDofasco Background & Research

Dofasco Response & ResultsDofasco Response & Results

New Failure ParadigmNew Failure Paradigm

Integration with OSIsoft PIIntegration with OSIsoft PI

Case StudyCase Study

Agenda

Page 30: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Case Study:

Using PI Data Collector to Improve Equipment Reliability

Page 31: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

An RCM analysis was done to identify the

maintenance program for this asset

An RCM analysis was done to identify the

maintenance program for this asset

Page 32: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

One of the Maintenance activities identified was an On-Condition task to determine tap hole face condition with survey equipment.

One of the Maintenance activities identified was an On-Condition task to determine tap hole face condition with survey equipment.

Page 33: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Before PI Implementation

• Tap hole position was collected after every trough rebuild

• Performed manually with surveying and laser equipment

• Based on the results, the Tap hole face was re-surfaced

Page 34: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

PI Implementation Requirements

• Installed Linear Voltage Differential Transducer (LVDT) into the end of the Swing Cylinder

• Calibrated the LVDT to Tap Hole Face based on a cylinder stroke of 1370mm

• Maintenance and Operations determined the effective stroke ranges of the cylinder required by the process

Page 35: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Swing Cylinder with LVDT

Page 36: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Cylinder Schematic

Magnet

Feedback

Cap End Rod End

Rod

Page 37: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.
Page 38: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.
Page 39: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.
Page 40: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

After PI Implementation

Page 41: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

We can visually see how mudgun nozzle to

tap hole face fit has deteriorated into alarm

We can visually see how mudgun nozzle to

tap hole face fit has deteriorated into alarm

Page 42: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

The ICMS system has triggered an alarm based on data received from the PI Interface bringing the problem to the attention of the maintenance

and operations personnel.

The stroke of the Swing Cylinder has gone into alarm relative to the pre-determined levels

identified when the maintenance program was set up.

The ICMS system has triggered an alarm based on data received from the PI Interface bringing the problem to the attention of the maintenance

and operations personnel.

The stroke of the Swing Cylinder has gone into alarm relative to the pre-determined levels

identified when the maintenance program was set up.

Page 43: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

The alarm is shown to be caused by the failure mode “Re-Surface East Tap Hole Face”.

The alarm is shown to be caused by the failure mode “Re-Surface East Tap Hole Face”.

The list of condition indicators values that triggered the fault are

listed.

The list of condition indicators values that triggered the fault are

listed.

The recommended sequence of corrective work to rectify the problem

is provided.

The recommended sequence of corrective work to rectify the problem

is provided.

Page 44: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

An Automated Work Request was generated by the EXP to re-surface and ream the furnace tap hole. After the supervisor/planner approved

the Automated Work Request, the company’s CMMS planned, scheduled and generated the Work Order necessary to have the work

completed.

An Automated Work Request was generated by the EXP to re-surface and ream the furnace tap hole. After the supervisor/planner approved

the Automated Work Request, the company’s CMMS planned, scheduled and generated the Work Order necessary to have the work

completed.

Page 45: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Savings:

~$1M/yr

The work initiated by Dofasco’s ICMS system, with the help of the PI Interface, resulted in a complete recovery of mudgun

nozzle to tap hole fit, saving the company $1 million per year, for every year the furnace operates past an 8 year campaign. The poor fit between the mudgun nozzle to tap hole, would not have been evident or remedied by the operators, based

on existing control room data.

The work initiated by Dofasco’s ICMS system, with the help of the PI Interface, resulted in a complete recovery of mudgun

nozzle to tap hole fit, saving the company $1 million per year, for every year the furnace operates past an 8 year campaign. The poor fit between the mudgun nozzle to tap hole, would not have been evident or remedied by the operators, based

on existing control room data.

Page 46: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Benefits of PI Integration

• Collecting important equipment indicator information automatically and more often

• Early warning of impending failure

• Scheduling the right work at the right time

• Significantly increased time between furnace re-linings

Page 47: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Benefits of PI Integration

• Savings– Furnace #4

• Extending campaign from 8 years to 15 years• Save $1 million per year after 8 years = projected

$7 million– Furnace #3

• Extending campaign from 8 years to 20 years• Save $1 million per year after 8 years = projected

$12 million– Total Projected Savings

• $19 million (just for this one example)

Page 48: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Benefits of PI Integration

0

5

10

15

20

Furnace #4 Furnace #3

Extended Furnace Campaigns (Projected)

Page 49: Presented by: Vlad Djuric March 11, 2002 OSIsoft Users Conference How PI Played a Key Role in Achieving Maximum Equipment Reliability.

Benefits of PI Integration

$0

$5,000,000

$10,000,000

$15,000,000

$20,000,000

Furnace #4 Furnace #3 Total

Projected Savings