Top Banner
Presented by: Uri Eliahu, GE [email protected] (925) 866-9000 May 23, 2011 GEOTECHNICAL CONSTRAINTS IN STORMWATER INFILTRATION PRACTICE
12

Presented by: Uri Eliahu, GE [email protected] (925) 866-9000 May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.

Jan 17, 2016

Download

Documents

Cory Allison
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Presented by: Uri Eliahu, GE ueliahu@engeo.com (925) 866-9000 May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.

Presented by:

Uri Eliahu, GE [email protected]

(925) 866-9000

May 23, 2011

GEOTECHNICAL CONSTRAINTS IN STORMWATER INFILTRATION PRACTICE

Page 2: Presented by: Uri Eliahu, GE ueliahu@engeo.com (925) 866-9000 May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.

Overview of Presentation

1. Established Geotechnical Practice

2. Typical Geotechnical Constraints Where Infiltration Practices Are Discouraged

3. Typical Mitigation Measures

4. Integrating Geotechnical Considerations Into Stormwater Design

Page 3: Presented by: Uri Eliahu, GE ueliahu@engeo.com (925) 866-9000 May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.

Established Geotechnical Practice

Geotechnical Engineers are concerned with hazards associated with geologic conditions on development projects including:

– Slope Stability– Foundation Design– Shrink Swell Potential of Soils– Groundwater

Page 4: Presented by: Uri Eliahu, GE ueliahu@engeo.com (925) 866-9000 May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.

“New” Stormwater Management Considerations

• Infiltrate rainfall runoff into ground or open space where feasible.

• Construct stormwater Integrated Management Practices (IMPs) near roadways and structures.

• Disperse on-site IMPs as much as possible.

Page 5: Presented by: Uri Eliahu, GE ueliahu@engeo.com (925) 866-9000 May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.

Typical Geotechnical Constraint – High Groundwater Table

Page 6: Presented by: Uri Eliahu, GE ueliahu@engeo.com (925) 866-9000 May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.

Geologic Variability in Contra Costa County

Page 7: Presented by: Uri Eliahu, GE ueliahu@engeo.com (925) 866-9000 May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.

Typical Geotechnical Constraint – Foundation

Page 8: Presented by: Uri Eliahu, GE ueliahu@engeo.com (925) 866-9000 May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.

Typical Geotechnical Constraint – Deep Fill

Page 9: Presented by: Uri Eliahu, GE ueliahu@engeo.com (925) 866-9000 May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.

Typical Geotechnical Constraint – Cut Areas

Page 10: Presented by: Uri Eliahu, GE ueliahu@engeo.com (925) 866-9000 May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.

Mitigation Measures

• Avoid discharging stormwater on slopes whenever possible

• In clay soils, un-lined stormwater IMPs should be located away from movement-sensitive improvements (pavements/structures etc.)

• Line IMPs in areas with potential geologic hazards as noted in previous slides

• IMPs that rely solely on infiltration will not function in clay soils due to extremely low soil permeability and will be likely to trigger problems described above

Page 11: Presented by: Uri Eliahu, GE ueliahu@engeo.com (925) 866-9000 May 23, 2011 G EOTECHNICAL C ONSTRAINTS IN S TORMWATER I NFILTRATION P RACTICE.

Integrating Geotechnical Considerations Into Your Stormwater Design

Consult a geotechnical engineer in the stormwater control plan (SWCP) early on

Identify areas where infiltration practices are impractical

Line IMPs or locate to areas where risks to structures, slopes and groundwater are lessened

Confirm subsurface conditions beneath larger IMPs during construction phase