Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE AQUACULTURE MISSION THROUGH SPA (2011-12)
12

Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.

Dec 17, 2015

Download

Documents

Jonas Tate
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.

Presented by: Shri Kennedy LamareProgramme Manager, FFDA

NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK

FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE AQUACULTURE MISSION THROUGH SPA (2011-12)

Page 2: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.

Area of the pond 0.1 Ha

Actual area constructed

0.15 Ha

Crest width >1.5M

Bottom width < 3 M

Slope 1:1

Depth < 1 M

Overflow canal 2-4 inch

Drain pipe 8 inch

Percentage of completion

100%

Shri Kederson Rengrin, Umdang

Page 3: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.

Area of the pond 0.1 Ha

Actual area constructed

0.1 Ha

Crest width 1-1.5 M

Bottom width < 3 M

Slope 1:1

Depth 1.5 M

Overflow pipe 2-4 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Shri Makarius Amora, Riangba

Page 4: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.

Area of the pond 0.1 Ha

Actual area constructed

0.12 Ha

Crest width < 1 M

Bottom width 3-5 M

Slope 1:1

Depth 1.5 M

Overflow pipe 2-4 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Shri Kyrmenlang Rasher, Riangwar

Page 5: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.

Area of the pond 0.1 Ha

Actual area constructed

0.1 Ha

Crest width 1-1.5 M

Bottom width < 3 M

Slope 1:1

Depth 1.5 M

Overflow pipe 4-5 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Smt. Martina Nongsiej, Nongprut

Page 6: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.

Area of the pond 0.1 Ha

Actual area constructed

0.11 Ha

Crest width 1-1.5 M

Bottom width 3-5 M

Slope 1:1

Depth 1.5 M

Overflow pipe 4-5 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Smt. Kronti Marngar, Rimardon

Page 7: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.

Area of the pond 0.1 Ha

Actual area constructed

0.2 Ha

Crest width 1-1.5 M

Bottom width 3-5 M

Slope 1:1

Depth 1.5 M

Overflow pipe 1 no.

Drain pipe 1 no.

Percentage of completion

100%

Smt. Krispina K. Snar, Nongjri

Page 8: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.

Area of the pond 0.1 Ha

Actual area constructed

0.12 Ha

Crest width 1-1.5 M

Bottom width 3-5 M

Slope 2:1

Depth 1.5 M

Overflow pipe 2-4 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Smt. Markaret Iawren, Mawthawphet

Page 9: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.

Area of the pond 0.1 Ha

Actual area constructed

0.1 Ha

Crest width 1-1.5 M

Bottom width < 3 M

Slope 2:1

Depth 1-1.5 M

Overflow pipe 4-5 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Shri Doloris Iawren, Sangriang

Page 10: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.

Area of the pond 0.1 Ha

Actual area constructed

0.13 Ha

Crest width 1-1.5 M

Bottom width 3-5 M

Slope 2:1

Depth 1-1.5 M

Overflow pipe > 5 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Smt. Kristina Wanniang, Sangriang

Page 11: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.

Area of the pond 0.1 Ha

Actual area constructed

0.2 Ha

Crest width 1.5 M

Bottom width 3-5 M

Slope 1:1

Depth > 1.5 M

Overflow pipe 2-4 inch

Drain pipe 4-6 inch

Percentage of completion

100%

Smt. Banrishisha Wanniang, Sangriang

Page 12: Presented by: Shri Kennedy Lamare Programme Manager, FFDA NONGSTOIÑ & MAWSHYNRUT C&RD BLOCK FIELD VERIFICATION ON SCHEMES IMPLEMENTED UNDER MEGHALAYA STATE.