Presented by Keith Schaber President. ROOFS THROUGHOUT OREGON CAN, DO, AND SHOULD LAST 25 - 40 YEARS (Even in low tax rate Districts). Insure Roofs Override Convention Reverse the Roles of Attorneys Enlist Taxpayers as Advocates. RADICAL IDEAS. R esponsibility AVERSION - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Presented by  Keith Schaber President
Page 2: Presented by  Keith Schaber President

Presented by Keith

SchaberPresident

Page 3: Presented by  Keith Schaber President

ROOFS THROUGHOUTOREGON

CAN, DO, AND SHOULDLAST 25 - 40 YEARS

(Even in low tax rate Districts)

Page 4: Presented by  Keith Schaber President

RADICAL IDEAS Insure Roofs

Override Convention Reverse the Roles of Attorneys Enlist Taxpayers as Advocates

Page 5: Presented by  Keith Schaber President

RESPONSIBILITYAVERSION FOR ROOFS

ISCONTAGIOUS

Page 6: Presented by  Keith Schaber President

WHY DO WE HAVE RESPONSIBILITY ISSUES RIGHT FROM THE START

Every Salesman.... sells his own stuffAND

Every Design Discipline Designs...From Their Own Perspective

ANDEvery Trade That Works on the Roof...

Acts on Their OwnUNLESS

All Parties are Held Responsible for How Their Work & Designs Impact Roof Performance

Wouldn’t This be a Good Time for a Roof Success Co-ordination Meeting with All Parties?

Page 7: Presented by  Keith Schaber President

A Roof “Assembly” is: All of the components necessary to keep water out of the building from the “roof” covering.

AndAll of the components necessary to keep water out of the roof “assembly” from the

inside.

WHAT IS A ROOF “ASSEMBLY”?

AND WHAT DOES IT DO?

A roof failure is a failure of any roof assembly component, regardless of it’s location OR who installed it.

Page 8: Presented by  Keith Schaber President

CHAPTER 15ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

Oregon Structural Specialty Code

DEFINITIONROOF ASSEMBLY; A system designed

to provide weather protection and resistance to wind loads. A roof assembly

includes the roof deck, vapor retarder, substrate or thermal barrier, insulation

and roof covering.

Page 9: Presented by  Keith Schaber President

WHO IS RESPONSIBLE FOR THE ROOF ASSEMBLY?

• Decking, plumbing, sheet metal, seismic anchors, HVAC, electrical, skylights and insulation are part of a ROOF ASSEMBLY.

• Carpenters, Electricians, Welders, HVAC Contractors, Plumbers, Sheet Metal Workers, and General Contractors work impacts the ROOF ASSEMBLIES PERFORMANCE.

• Manufacturers, Mechanical Engineers, Structural Engineers and Architects designs affect the long term performance of the roof assembly.

Roofers play a very small part compared to the whole…..

Page 10: Presented by  Keith Schaber President

DISTRICTS ARE CONSTANTLY PRESSURED BY MANY PARTIES

Have you heard of any of these…• Ours is the best- It’s new, cheap, looks good, works well every place and installs in any kind of weather• We’ve got a building to build- We want a roof we can install in any kind of weather.• We’ve got a guaranteed maximum price – we didn’t budget for all the stuff you want• We’ve got to have a roof that looks this way- don’t ruin your schools great design

YOU HAVE THE SAME RIGHTS AS ANY CONSUMER… TO GET WHAT MEETS YOUR NEEDS

Page 11: Presented by  Keith Schaber President

What Nobody Wants to Say….

WELL-INTENIONED, SCHOOL BOARDS ACTING WITHOUT

AN INDEPENDENT ADVOCATEARE FREQUENTLY “MISSINFORMED”

Page 12: Presented by  Keith Schaber President

REPORT CARDS FOR

ARCHITECTS CONTRACTORS

AND MANUFACTURERS

Page 13: Presented by  Keith Schaber President

USE STATISTICS NOT SALES OR COST

FOR ROOF SELECTION

Statistics That Verify Roof Performance

Page 14: Presented by  Keith Schaber President

ROOFING FACT

THE MOST COMMON SOURCE FOR “TECHNICAL” INFORMATION COMES FROM SALESMEN WHO CARRY NO

PROFESSIONAL LIABILITY INSURANCEAND HAVE NO CONTRACTURAL

AGREEMENTS WITH THE DISTRICT OR THE ARCHITECTS THEY WORK FOR

Page 15: Presented by  Keith Schaber President

1. Seldom meets code for wind, slope, vapor retarder, puncture resistance, and plumbing.

2. Requires additional insulation to be equal in energy efficiency to fully adhered assemblies.

3. Fosters condensation where ponding water occurs without adequate insulation or venting between vapor barrier and roof covering.

4. Poor base of financially responsible contractors with good performance records.

5. Spotty service performance.

Currently, mechanically attached recovers are the cheapest and riskiest to install and poorest in energy conservation in Oregon.

OREGON’S MOST POPULAR“REROOF”/RECOVER FOR SCHOOLS

Page 16: Presented by  Keith Schaber President

CONTINUNING EDUCATION CLASSES

FOR ARCHITECTS

CONTRACTORS AND ROOF-RESPONSIBLE DECISION-MAKERS

Page 17: Presented by  Keith Schaber President

HIRING “LOCALS”CAN BE A COSTLY

POLICY COMPARED TO CORRECT

SOLUTIONS FOR ROOF LOCATION

Page 18: Presented by  Keith Schaber President

MAKING EXCEPTIONSSELDOM, IF EVER

IS A SUCCESSFUL LONG TERM SOLUTION

Page 19: Presented by  Keith Schaber President

IN OREGON BEING COOL COSTS,

NOT SAVES,ENERGY AND MONEY

Page 20: Presented by  Keith Schaber President

THE NEED FOR FULL DISCLOSUREWHAT YOU DON’T KNOW MAY COST YOU!

1. Has anyone discussed the 3 ways of installing roofs and their impact on

energy or condensation.2. Has anyone discussed roofing over

vented spaces and the needed re-engineering required for cool roofs.

3. Has anyone disclosed how pondingwater on cool roofs can create condensation.

Page 21: Presented by  Keith Schaber President

< Re-RoofingSpecific Repairs $4,590Metal Mansard Repair $8,820Re-roofing $802,050Spread over 7 years$815,460

Maintenance Option >Specific Repairs $4,590Maintenance System $156,310Metal Mansard Repair $8,820Re-roofing $45,000Spread over 4 years $214,720

North ClackamasSetting StandardsProvides Phenomenal Options

Options Shouldn’t Be Kept a Secret

Page 22: Presented by  Keith Schaber President

WITH ADVOCATE….

North Valley High School 19 Years After Installation

Will Last Another 10-12 Years

Page 23: Presented by  Keith Schaber President

WHY DISTRICTS NEED COMMISSIONING

Neither Decking Damage or Advice Were Covered by Manufacturers Warranty

Page 24: Presented by  Keith Schaber President

WHY DISTRICTS NEED AN ADVOCATE

Roofer Was Paid by District to Roof Over Gravel With Insurance Money

Page 25: Presented by  Keith Schaber President

MANDATORYCODE

ENFORCEMENT

Changing the Code if Necessary

Page 26: Presented by  Keith Schaber President

CODES DO NOTAPPLY TO ONE KIND

OF ROOF ASSEMBLY…AND NOT TO

ANOTHER

Page 27: Presented by  Keith Schaber President

ROOF ASSEMBLIES IN OREGON NEED VAPOR RETARDERS

This new school had 2 kinds of roof assemblies..The insulation under the built-up roof assembly

had a vapor retarder.The insulation under the metal roof assembly had none..

Page 28: Presented by  Keith Schaber President

CODE COMPLIANCE1312.1.4 Moisture Control. A 1-perm vapor retarder shall be installed on the warm side (in winter) in all exterior floors, walls and ceilings of heated buildings.

MOST SCHOOLS IN OREGON ARE HEATED

(There is only one exception which is for insulation installed in ceilings in an existing structure and where ventilation has been provided as specified in Section 1203).

Page 29: Presented by  Keith Schaber President

CODE COMPLIANCEROOF DRAINAGESECTION 1504.1

ROOF DRAINAGE. Roofs shall be sloped a minimum of 1 unit vertical in 48 units horizontal (2-percent slope) for drainage unless designed for water accumulation in accordance with Section 1611.2 and approved by the building official. (requires verification to preclude progressive deflection)

SECTION 1504.3Overflow drains and scuppers. Drains must have overflows, the same size as the drain or overflow scuppers three times the size of the drain with minimum height of 4”.

Page 30: Presented by  Keith Schaber President

ROOFING FACT

GUARANTEES ARE WRITTEN BYATTORNEYS WHOSE SOLE JOB IS TO LIMIT THEIR EMPLOYER’S

LIABILITY

Your Attorney’s Know Legalese, butThey probably don’t know roofing too well…

Page 31: Presented by  Keith Schaber President

ASSURE THAT ATTORNEYS WRITE GUARANTEES THAT PROTECT SCHOOLS’

INTERESTS

Page 32: Presented by  Keith Schaber President

ASHLAND EXPERIENCE

Roof Prioritization Were Misidentified by Architect/Salesman Based On The Assumption That New Roofs Had To

Be Better Than Old Ones.

Old Roofs Were Best – New Ones Were Not The Best.

Page 33: Presented by  Keith Schaber President

ASHLAND EXPERIENCEPasses Bond Levy With Reroofing Projects

Prioritized by Salesman for Architect With No Budgets For Repairs or Maintenance

Roof recovers developed mold within a few years. The mold, of course, was not covered by their warranty.

Page 34: Presented by  Keith Schaber President

ASHLANDS “LUCK”Hailstorm Damages New Roofs

Insurance Paid for Replacement of New RoofsWhich Did Not Meet Code for Impact Resistance

Which Could Have Resulted in Claim Denial

Page 35: Presented by  Keith Schaber President

ASHLANDS NEW CONSTRUCTION EXPERIENCEArchitect and General Contractor Told District Their Request For Winter Time

Construction Methods Were Cost Prohibitive

Their Winter Time “Friendly” Roof Resulted in Condensation and Leak Problems. Neither

Were Covered by Warranty.

Page 36: Presented by  Keith Schaber President

ASHLAND’S ONGOING EXPERIENCE

•Manufacturer’s refusal to honor warranties for both roofs and roof maintenance systems.

•Architect’s refusal to comply with District’s Standards and reluctance to be responsible for the decisions they forced on District.

•General Contractor’s insistence to stay on schedule at roofs thus districts expense.

•Roofs in District with commissioning in design are out performing roofs with none.

Page 37: Presented by  Keith Schaber President

EVERYONE DOING ANYTHING RELATING TO A SCHOOLS’

ROOF…

SHOULD PLAY ON THE SAME TEAM!!

Does it leave room for opinions? YesDoes it leave room for options? Yes

Does it leave room for code violations? No

STATEWIDE STANDARDS

Page 38: Presented by  Keith Schaber President

EVERYONE DOING ANYTHING TO A SCHOOLS’ ROOF MUST PROVIDE ROOF THAT:

•Meet Code•Are Correctly Designed•Have proven to last 20 or more years•Are Correctly Installed•Have Realistic Guarantees•Will Not Void Guarantee

STATEWIDE STANDARDS

Page 39: Presented by  Keith Schaber President

PERFORMANCE CRITERIA

1. Roof assemblies code compliant for its location for new construction, recovers and reroofing.

2. Roof assemblies that are energy efficient.3. Roof assemblies with a verifiable record of long

term performance of 20 or more years. 4. Practical resistance to vandalism or other roof

traffic.5. Installed by financially responsible contractors

capable of bonding project(s) including verifiable record of exemplary performance.

STATEWIDE STANDARDS

Page 40: Presented by  Keith Schaber President

• Request code changes with consistent interpretation andenforcement of codes throughout the state.*

• Gain state support for mandatory roofing education for architects.

• Develop State of Oregon Roof Warranties for manufacturers.*

• Partner with State of Oregon Building Codes Agency, PACE (legislatively-funded insurance carrier for Oregon public agencies), City of Portland, and

OSFMA (Oregon School Facilities Managers Association) to educate and promote common sense, code compliant roofing industry standards

• Conduct education programs for Oregon Bar Association.

THERE ARE SOLUTIONS

Page 41: Presented by  Keith Schaber President

PUBLICIZESCHOOLS’

PLIGHT

In the Press and at the Legislature

Page 42: Presented by  Keith Schaber President

IF WE FAIL TO COMMUNICATE WITH EACH OTHER

THE CHANCES FOR FAILUREINCREASE

EXPOTENTIALLY