1 Using WinSLAMM For Stormwater Retrofit in Urban Environments August 22, 2011 StormCon 2011, Anaheim, CA Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI
24

Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

Feb 23, 2016

Download

Documents

Said

Using WinSLAMM For Stormwater Retrofit in Urban Environments August 22, 2011 StormCon 2011, Anaheim, CA. Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI. Dense Urban Land Uses Require Stormwater Retrofitting Open space is very limited Land values are very high - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

1

Using WinSLAMM For Stormwater Retrofit in Urban

EnvironmentsAugust 22, 2011

StormCon 2011, Anaheim, CA

Presented by:James Bachhuber PHCaroline Burger PE

AECOMMadison, WI

Page 2: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

2

Dense Urban Land Uses Require Stormwater Retrofitting Open space is very limited Land values are very high Treatment measures have higher

safety & aesthetic requirements

Page 3: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

3

Overview of Santa Monica Stormwater Study

Purpose of Study: Test WinSLAMM approach to stormwater

management Identify priority land uses for pollutant

generation Compare alternative stormwater

management for pollution control levels

Page 4: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

4

Overview of Santa Monica Stormwater Study

Basic Approach: Identify representative pilot study area Create WinSLAMM files to represent local

conditions Source areas Rainfall Drainage Soils

Page 5: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

5

Overview of Santa Monica Stormwater Study

Basic Approach (continued): Model pilot area with no management

measures (base condition) “Retrofit” alternative management

practices to predict runoff volume & pollution control achieved

Page 6: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

6

Overview of Santa Monica Stormwater Study

Stormwater Practices Analyzed: Street cleaning (vacuum assist) Porous pavement Infiltration Pits Biofilters

Page 7: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

7

Project Area – Land Use

Commercial; 52.58; 10% Residen-tial - high

dens; 86.76; 17%

Residential - med dens; 199.49; 40%

Residential - low dens; 130.64; 26%

School; 12.66; 3% Parks; 12; 2% Oceanfront dist; 7.04; 1%

Wilshire Drainage Area Land Use (acres, %) Total = 501 acres

Page 8: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

8

Project Area

Commercial Land Use

Page 9: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

9

Project Area

School Land Use

Page 10: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

10

Project Area

Medium Density Res. Land Use

Page 11: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

12

Project Area – Source Area Delineations

Source Areas

Residential – High Density

Page 12: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

13

Project Area – Source Area Delineations

Residential – Low Density

Source Areas

Page 13: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

14

Project Area – Source Area DelineationsSource Areas

Residential – Single Family

Page 14: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

15

Project Area – Source Area Delineations

Source Areas

Commercial

Page 15: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

Project Area – Source Areas

Res - high dens.

Res - low dens

Res 1-Family Commercial0%

10%20%30%40%50%60%70%80%90%

100%

45% 41%26%

36%

1%0%

0%

17%

19%20%

20%

12%

19%14%

19%

28%5%

5%

0%

4%11%20%

35%

2%

Source Area Comparison

Landscape

Alley

Street

Sidewalk / Drive

Parking

Roof

Page 16: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

17

WinSLAMM Modeling ResultsWinSLAMM Model Comparison of Development Scenarios

100%

100%

100%

95%

95%

83%

95%

95%

78%

61%

56%

55%

8%

3%3%

0%10%20%30%40%50%60%70%80%90%

100%

Runoff Volume Annual TSS Load Annual TP Load

Conventional + SwalesRoof & 1 Sidewalk + Infiltration Basin+ Narrow Streets

Page 17: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

18

WinSLAMM Model InputsSource Areas in WinSLAMM:

Conventional LIDRoofs

Disconnected

Single Sidewalk

NarrowerStreets

Page 18: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

19

Model InputsWinSLAMM Road Swale Description:

Page 19: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

20

WinSLAMM Model InputsWinSLAMM Infiltration Basin Description:

Page 20: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

21

WinSLAMM Modeling ResultsWinSLAMM Model Comparison of Development Scenarios

100%

100%

100%

95%

95%

83%

95%

95%

78%

61%

56%

55%

8%

3%3%

0%10%20%30%40%50%60%70%80%90%

100%

Runoff Volume Annual TSS Load Annual TP Load

Conventional + SwalesRoof & 1 Sidewalk + Infiltration Basin+ Narrow Streets

Page 21: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

22

WinSLAMM Modeling ResultsWinSLAMM Model Comparison of Development Scenarios

100%

100%

100%

95%

95%

83%

95%

95%

78%

61%

56%

55%

8%

3%3%

0%10%20%30%40%50%60%70%80%90%

100%

Runoff Volume Annual TSS Load Annual TP Load

Conventional + SwalesRoof & 1 Sidewalk + Infiltration Basin+ Narrow Streets

Page 22: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

23

WinSLAMM Modeling ResultsWinSLAMM Model Comparison of Development Scenarios*

Development Scenario

Runoff Volume (ac ft/yr)

TSS Load

(lbs/yr)

Total P Load

(lbs/yr)Conventional Development 29.52 11,104 44.99

Disconnect Roofs & 1 Sidewalk 24.52 10,518 42.66

Add Narrower Streets 23.09 10,585 42.63

Add Roadside Swales 16.27 6,196 27.49

Add Infiltration Basin 0.95 318 3.64* Annual loadings from 43.2 acre Cedar Hills development

Page 23: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI

24

Questions / Discussion

Page 24: Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI