Top Banner
Presented By: Faisal Hamood Team Members: Faisal Hamood, Thomas Howell, Luis Herrera, Nick Allen, and Nicolai Bailly. Supervisor: Dr. Fayez Gebali . PORTABLE TRAFFIC LIGHT SYSTEM
10

Presented By: Faisal Hamood Team Members: Faisal Hamood, Thomas Howell, Luis Herrera, Nick Allen, and Nicolai Bailly. Supervisor: Dr. Fayez Gebali. PORTABLE.

Dec 18, 2015

Download

Documents

Dana Casey
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Presented By: Faisal Hamood Team Members: Faisal Hamood, Thomas Howell, Luis Herrera, Nick Allen, and Nicolai Bailly. Supervisor: Dr. Fayez Gebali. PORTABLE.

Presented By: Faisal Hamood

Team Members:Faisal Hamood, Thomas Howell, Luis Herrera, Nick Allen, and Nicolai Bailly.

Supervisor:

Dr. Fayez Gebali.

PORTABLE TRAFFIC LIGHT SYSTEM

Page 2: Presented By: Faisal Hamood Team Members: Faisal Hamood, Thomas Howell, Luis Herrera, Nick Allen, and Nicolai Bailly. Supervisor: Dr. Fayez Gebali. PORTABLE.

PROPOSAL OUTLINE

• Proposed System

• Preliminary Design

• Applications

• Worker Safety

• Business model

• Conclusion

Page 3: Presented By: Faisal Hamood Team Members: Faisal Hamood, Thomas Howell, Luis Herrera, Nick Allen, and Nicolai Bailly. Supervisor: Dr. Fayez Gebali. PORTABLE.

PROPOSED SYSTEM

For single lane streets, two flaggers are required for any construction site to re-route traffic.

Each worker gets paid between $15-25/hr.

Page 4: Presented By: Faisal Hamood Team Members: Faisal Hamood, Thomas Howell, Luis Herrera, Nick Allen, and Nicolai Bailly. Supervisor: Dr. Fayez Gebali. PORTABLE.

PROPOSED SYSTEM

Two portable traffic lights will replace the flaggers.

Each light will have two LEDs, a Battery, wireless capable microcontroller, and a pressure sensor. Time permitting, recharging solar panels may be included.

A master control will be given to the supervisor on site.

Page 5: Presented By: Faisal Hamood Team Members: Faisal Hamood, Thomas Howell, Luis Herrera, Nick Allen, and Nicolai Bailly. Supervisor: Dr. Fayez Gebali. PORTABLE.

PRELIMINARY DESIGN

Each light uses:

- Arduino Microprocessor

- Zigbee wireless module

- 12volt rechargeable battery

- 12volt LEDs (Red and Yellow)

- Resistors, BJTs, diodes, and

voltage regulators

- Differential pressure sensor

Page 6: Presented By: Faisal Hamood Team Members: Faisal Hamood, Thomas Howell, Luis Herrera, Nick Allen, and Nicolai Bailly. Supervisor: Dr. Fayez Gebali. PORTABLE.

APPLICATIONS

The system is not specific for construction site traffic

and maybe used for:

• Overnight Construction Sites

• To temporarily replace malfunctioning or under

maintenance traffic lights

• Temporary traffic control in congested areas

• Emergency response traffic reroute

• Remote area traffic control (mining sites)

Page 7: Presented By: Faisal Hamood Team Members: Faisal Hamood, Thomas Howell, Luis Herrera, Nick Allen, and Nicolai Bailly. Supervisor: Dr. Fayez Gebali. PORTABLE.

WORKER SAFETY

More than 40 cases of flagger accidents have been claimed with Work Safe BC from 2008-2010. These claims on average cost Work Safe BC $14m.

By minimizing or eliminating the need of flaggers, we will be saving lives.

Page 8: Presented By: Faisal Hamood Team Members: Faisal Hamood, Thomas Howell, Luis Herrera, Nick Allen, and Nicolai Bailly. Supervisor: Dr. Fayez Gebali. PORTABLE.

BUSINESS MODEL

Two flaggers at an average of $40/hr with an approximate 70hour per week = ~$2,800 per site, per week.

Current heavy duty portable traffic lights = ~$50,000.If a system of two light weight lights were sold at $50,000, the system will be paid for in approximately 14 weeks.

For an industrial release system materials would usually cost ~$5,000, without labor.

Page 9: Presented By: Faisal Hamood Team Members: Faisal Hamood, Thomas Howell, Luis Herrera, Nick Allen, and Nicolai Bailly. Supervisor: Dr. Fayez Gebali. PORTABLE.

CONCLUSION

The system replaces two workers with a traffic light system.

The system has many applications for temporary traffic reroute.

The system reduces accident risks and saves lives.

The system is profitable for industrial use.

The system is dynamic, smart, and easy to deploy.

The system is automated, but a master switch maybe considered for the site supervisor.

Page 10: Presented By: Faisal Hamood Team Members: Faisal Hamood, Thomas Howell, Luis Herrera, Nick Allen, and Nicolai Bailly. Supervisor: Dr. Fayez Gebali. PORTABLE.

QUESTIONS?

Thank you for your time and consideration…