Macarretane weir in Mozambic (irrigation dam – 39 gates) Gates refurbishment - Works site supervision in June 2015
14

Présentation1 Linked In english ind B

Jan 20, 2017

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Présentation1 Linked In english ind B

Macarretane weir in Mozambic (irrigation dam – 39 gates)Gates refurbishment - Works site supervision in June 2015

Page 2: Présentation1 Linked In english ind B

Modeling of one lock head of the new lock on DNC link canal (Vietnam)

Gate design for a two-way operation due to head reversal occurrence

Detailed design report and bidding document writing for all hydro-electro-mechanical equipments (gates, stoplogs, hoists, bollards,…)

Page 3: Présentation1 Linked In english ind B

Discharge pipes connection to emptying pumps in the bottom of one towing tank in Ile Longue (naval base in France)

Technical assistance to the project manager as hydro-mechanical expert

Page 4: Présentation1 Linked In english ind B

=

Filling pumps installation in Ile Longue for the submarines towing tanks Erection works of the temporary pumping station in replacement of the

main pumping station during its refurbishment works

Page 5: Présentation1 Linked In english ind B

Moto-pumps of pumping station in Millery on river RhônePumps 550 kW - 1000 m3/h

Extension project of the pumps shafts and pumps refurbishment

Page 6: Présentation1 Linked In english ind B

Global view of Canneau weir on river Artibonite (Haïti) in september 20134 sluices, total discharge: 550 m3/s + flow intake into supply canals on left bank (40 + 10 m3/s)

Expertise of hydro-electro-mechanical equipments

Page 7: Présentation1 Linked In english ind B

Extensive review of one lock (gates, embedded parts and civil structure) on Marne-Rhin canalExpertise and refurbisment works specification for VNF (Voies Navigables de France)

Page 8: Présentation1 Linked In english ind B

Bottom outlet discharge of Mesnil dam (drinkable water supply for Vire city in Normandie-France) during extensive technical review in june 2014

Page 9: Présentation1 Linked In english ind B

Replacement of one gate in Seyssel weir on river Rhône Mechanical strength verification for both gates located on each side of the

removed gate and loaded by the stoplog

Page 10: Présentation1 Linked In english ind B

Solidworks modeling of a specific stoplog for the lateral gates of Seyssel weir. Implantation example against rightbank abutment.Design, dimensioning, manufacturing monitoring.

Replacement of a first gate in september 2014

Page 11: Présentation1 Linked In english ind B

Solidworks modeling of the flap gate (10 m x 7 m) of Péage de Roussillon plant spillway (river Rhône)Mechanical strength verification of the flap gate, of its hydraulic cylinder and of all bearings in

degraded operating modes

Page 12: Présentation1 Linked In english ind B

Underview of the rotating platform of laboratory Coriolis (CNRS-LEGI). Technical expert for the project manager for the mechanical and

hydraulic packages

Page 13: Présentation1 Linked In english ind B

Solidworks modeling of one refurbished spillway of Marèges dam on river Dordogne (France).Wheels gate 13 m x 11 m. Detailed design

Page 14: Présentation1 Linked In english ind B

Maintenance operation on the speed multiplier of one power unit of Lavours new HPP (river Rhône)HPP maintenance schedule writing for the operating team