PowerPoint Presentation
Zone :South ZoneCircle :Civil Circle -18Division : Southern
Division-2 Name of work : In Situ Rehabilitation at A-14 Kalka Ji
Extn.SH. : Construction of 3000 Multi Storeyed DUS at . . Community
centre Site ( Turnkey Project)Agency : Era Infra Engineering
Limited.Agreement No : 01/EE/SD-2/DDA/12-13
HISTORY OF THE PROJECT The total 8000 houses for in situ
rehabilitation of slum dwellers comprising Jawahar camp, Navjeevan
camp & Bhoomihin camp is to be constructed . The total area of
the plot comprising these three camps is 10.59 Hac.Originally this
work of in situ rehabilitation at A-14 Kalkaji Extn. including
construction of 8000 flats was proposed to be executed under PPP
Mode (Public Private Partnership Mode)Later on Honble L.G in the
meeting dated 16-09-2011 decided that DDA should do this work with
its own funds. The meetings were held and it was decided that
initially 3000 flats may be constructed in the adjacent plots (
measuring 3.068 hectares) earmarked as community centre plot and
the land use may be swapped with an equivalent area at A-14 Kalkaji
Extn. (in NavjeevanCamp/Bhumiheen Camp/Jawahar camp). The scheme
has been approved in 318th meeting of screening committee vide
dated 23-01-2014 vide agenda item no 14-2014 for built-up area
127529.80sqm for construction of 3024 DUs, accordingly the work is
being executed at site in four cluster ie cluster-1,2,3&4
comprising cluster-1 -6 towers, cluster-2 2 towers, cluster-3- 6
towers & cluster-4 6 towers.The building is of 14 storeys.
Each dwelling unit comprises of 25 sqm carpet area having one
living room, one bed room, one kitchen, bath / WC and balcony
finished with vitrified floor tiles , ceramics tiles , Udaipur
green marble counter in Kitchen etc. The building is of RCC framed
structure.There is provision of STP and treated water will be used
for flushing in cistern in toilets and for horticulture purpose .
However DJB is not ready to approve the dual water supply system (
treated water+ potable water).
WORK AWARDED VIDE F7(08)/A/SD-2/DDA/11-12/438 DT10-1- 13AGENCY
M/S ERA INFRA ENGINEERING LTDDESIGN CONSULTANT ADLAKHA ASSOCIATES
PVT .LTD CONSULTANT(QUALITY) IRCLASS SYSTEMS & SOLUTIONS TYPE
OF CONTRACT TURNKEYESTIMATED COST Rs. 205,99,63,495/-TENDER AMOUNT
Rs. 260,38,27,200/-NEGOTIATED / ACCEPTED RATE Rs. 22,232 /-per
SqmNEGOTIATED ACCEPT AMOUNT Rs. 2,31,92,42,240/-PLINTH AREA 104320
SQMTIME ALLOWED 36(THIRTY SIX) MONTHS (12 MONTHS FOR PLANNING &
24 MONTHS FOR CONSTRUCTION)
PROJECT HIGHLIGHTS
TIME SCHEDULEDate of Award:10.01.2013St. Date of
Start:25.01.2013St. Date of Completion:24.01.2016Present Status of
Work:29%Target date of completion:31.12.2016
Major Items Flooring : Vitrified tiles in rooms ,Kota Stone in
gallery . . and staircase , ceramic tiles in
ToiletsFinishingExterior : Grit WashInterior : Cement plaster with
oil bound . distemperWood work : Flush door shutterWalls : CLC
BlocksBoundary wall : Random Rubble stone masonry with SFRC .
railing
COST OF THE PROJECT1. Major Head: B.G.D.A.2. Minor Head: 10A,
Construction of Houses3. A/A & E/S : EM6(10)2012/Est/Pt/5081
dated 23.10.2012 for Rs. 2180812953/-4. Estimated Cost: Rs.
2059963493/-5. Tendered Amount: Rs. 2319242240/-6 Tentative cost
:Rs. 2679014470 /-7. Budget Code: 440030798. Budget Provision for
2015-16: Rs. 18000 Lacs
Salient features
Area of plot : 3.068 HactBuilding : 14 storeyed Structure : RCC
Framed Structure Total Dus as per agreement : 3000As per 318th
screening committee : 3024 (Vide agenda no 14:2014 dt23/1/14)Area
of one Flat : 25 SqmNO. OF CLUSTERS : 4 (
Cluster-1,Cluster-2,Cluster-3 & Cluster-4)NO. OF TOWERS : 20
TOWERS (6 towers in cluster-1, 2 towers in cluster-2, . . . 6
towers in cluster-3 & 6 towers in Cluster-4NO. OF FLOORS :
Stilt +14Water supply : Dual water supply system (drinking &
treated water)Sewerage : Sewerage treatment plant is to be
constructed by agency Payment : Stage wise paymentFinal payment :
Slab area shall be measured
CAMPS TO BE SHIFTEDNavjeevan camp Bhoomi heen camp Jawahar camp
Clearance from various departments : EIA ,DUAC,AVIATION, DFS,DPCC
obtained Approval of services : SW drain sanction by MCD (MCD/DJB)
Water supply & sewerage scheme yet to be sanction by DJB
Reason for delay of the projectCourt case : RWA Pkt.A-14 KalkaJi
Extn. move to court as . the land of the project initially was
earmarked . commercial. The land use from commercial to .
residential was changed by the Ministry of . . Urban development on
03- 06-2013. Thereafter . the court dismissed the petition on
02-07-2013 . . since petition withdrawn by the RWA Pkt. A-14 .
Kalka Ji Extn. Due to change of land use from : 25-1-13 to 3-6-13
commercial to residential Permission of Tree cutting : 25-1-13 to
21-3-15Hindrance Water supply : As per agreement dual water supply
. system is to be provided by the agency . . But DJB is not ready
to sanction the . scheme with dual water .They are ready to .
sanction single water supply system . DJB . has been requested for
sanction of dual . water system which is awaited .Sewerage scheme :
This scheme has been submitted to DJB . . The sanction is
awaited
9
KEY PLANIn-situ Rehabilitation of JJ clusters
PROPOSED HOUSINGKEY PLAN
Project Layout
Cluster-1 layoutTOWERNOS. OF
FLATSLIFTSTOWER-11402TOWER-21122TOWER-31680TOWER-4982TOWER-51262TOWER-61680TOTAL8128
12
Cluster-2 layoutTOWERNOS. OF
FLATSLIFTSTOWER-11402TOWER-21680TOTAL3082
13
Cluster-3 layoutTOWERNOS. OF
FLATSLIFTSTOWER-11402TOWER-2982TOWER-31680TOWER-4982TOWER-51402TOWER-61680TOTAL8128
14
Cluster-4 layoutTOWERNOS. OF
FLATSLIFTSTOWER-1154TOWER-21542TOWER-32382TOWER-42382TOWER-51542TOWER-6168TOTAL10928
15
Carpet Area of D.U.
CLUSTER-4ERA INFRA ENGINEERING LTDPROJECT :- DDA KALKA JI
DELHICLUSTER-4, PICTORIAL CHART M/C @ MUMTY
ROOM3-Feb-161-Feb-1615-Mar-1630-Mar-162-Apr-164-Mar-1614th
FLOOR9-Jan-1624-Jan-167-Jan-1622-Jan-1619/Feb/165-Mar-165-Mar-1620-Mar-168-Mar-1623-Mar-168-Feb-1623-Feb-1613th
FLOOR24-Dec-158-Jan-1622-Dec-156-Jan-163/Feb/1618-Feb-1618-Feb-164-Mar-1621-Feb-167-Mar-1623-Jan-167-Feb-1612th
FLOOR8-Dec-1523-Dec-156-Dec-1521-Dec-1518/Jan/162-Feb-162-Feb-1617-Feb-165-Feb-1620-Feb-167-Jan-1622-Jan-1611th
FLOOR22-Nov-157-Dec-1520-Nov-155-Dec-152/Jan/1617-Jan-1617-Jan-161-Feb-1620-Jan-164-Feb-1622-Dec-156-Jan-1610th
FLOOR17/Dec/151-Jan-161-Jan-1616-Jan-164-Jan-1619-Jan-166-Dec-1521-Dec-159th
FLOOR1/Dec/1516-Dec-1516-Dec-1531-Dec-1519-Dec-153-Jan-1620-Nov-155-Dec-158th
FLOOR15/Nov/1530-Nov-1530-Nov-1515-Dec-153-Dec-1518-Dec-157th
FLOOR13-Nov-1529-Nov-1517-Nov-152-Dec-156th FLOOR.5th FLOOR4rth
FLOOR3rd FLOOR2nd FLOOR1st FLOORSTILT
FLOOR16-Nov-14RAFTCOMPCOMPCOMPCOMPCOMPCOMPCOMPPCCCOMPCOMPCOMPCOMPCOMPCOMPEXCAVATIONCOMPCOMPCOMPCOMPCOMPCOMP
CL-4 TOWER - 1 CL-4 TOWER - 2 CL-4 TOWER - 3 CL-4 TOWER - 4 CL-4
TOWER - 5 CL-4 TOWER - 6ColourIdentificationCompletedWork in
progressBlock work completedInternal plastering completedInternal
plastering WIPTile work in ProgressTile laying Completed
(Bed,living room)
Cluster-3ERA INFRA ENGINEERING LTDCLUSTER 3, PICTORIAL CHART M/C
@ MUMTY
ROOM13-Feb-1620-Apr-1621-Apr-1622-Mar-1613-Apr-165-Mar-1614th
FLOOR19-Jan-163-Feb-1626/Mar/1610/Apr/1627-Mar-1611-Apr-1626-Feb-1612-Mar-1619-Mar-163-Apr-169-Feb-1624-Feb-1613th
FLOOR3-Jan-1618-Jan-1610/Mar/1625/Mar/1611-Mar-1626-Mar-1610-Feb-1625-Feb-163-Mar-1618-Mar-1624-Jan-168-Feb-1612th
FLOOR18-Dec-152-Jan-1623/Feb/169/Mar/1624-Feb-1610-Mar-1625-Jan-169-Feb-1616-Feb-162-Mar-168-Jan-1623-Jan-1611th
FLOOR2-Dec-1517-Dec-157/Feb/1622/Feb/168-Feb-1623-Feb-169-Jan-1624-Jan-1631-Jan-1615-Feb-1623-Dec-157-Jan-1610th
FLOOR16-Nov-151-Dec-1522/Jan/166/Feb/1623-Jan-167-Feb-1624-Dec-158-Jan-1615-Jan-1630-Jan-167-Dec-1522-Dec-159th
FLOOR6/Jan/1621/Jan/167-Jan-1622-Jan-168-Dec-1523-Dec-1530-Dec-1514-Jan-1621-Nov-156-Dec-158th
FLOOR21/Dec/155/Jan/1622-Dec-156-Jan-1617-Nov-157-Dec-1514-Dec-1529-Dec-157th
FLOOR5/Dec/1520/Dec/156-Dec-1521-Dec-1528-Nov-1513-Dec-15##6th
FLOOR19/Nov/154/Dec/1520-Nov-155-Dec-1512-Nov-1527-Nov-155th
FLOOR4rth FLOOR3rd FLOOR2nd FLOOR1st FLOORSTILT FLOORPLINTH BEAM
RAFTPCCEXCAVATION CL-3 TOWER - 1 CL-3 TOWER - 2 CL-3 TOWER - 3 CL-3
TOWER - 4 CL-3 TOWER - 5 CL-3 TOWER -
6ColourIdentificationCompletedWork in progressBlock work
completedInternal plastering completedInternal plastering WIPTile
work in ProgressTile laying Completed (Bed,living room)
CLUSTER-2ERA INFRA ENGINEERING LTDPROJECT :- DDA KALKA JI
DELJICLUSTER-2, PICTORIAL CHART M/C @ MUMTY
ROOM20/Feb/165/Mar/1614th
FLOOR26/Jan/1610/Feb/169/Feb/1624/Feb/1613th
FLOOR10/Jan/1625/Jan/1624/Jan/168/Feb/1612th
FLOOR25/Dec/159/Jan/168/Jan/1623/Jan/1611th
FLOOR9/Dec/1524/Dec/1523/Dec/157/Jan/1610th
FLOOR23/Nov/158/Dec/157/Dec/1522/Dec/159th
FLOOR21/Nov/156/Dec/158th FLOOR7th FLOOR6th FLOOR5th FLOOR4rth
FLOOR3rd FLOOR2nd FLOOR1st FLOORSTILT FLOORPLINTH BEAM
RAFTPCCEXCAVATION CL-2 TOWER - 1 CL-2 TOWER -
2ColourIdentificationCompletedWork in progressBlock work
completedInternal plastering completedInternal plastering WIPTile
work in ProgressTile laying Completed (Bed,living room)
CLUSTER-1ERA INFRA ENGINEERING LTDPROJECT :- DDA KALKA JI
DELHICLUSTER-1,PICTORIAL CHART M/C @ MUMTY
ROOM30-Jun-1623-Jun-1630-May-167-May-1610-Jun-1611-Jul-1614th
FLOOR10-Jun-1625-Jun-163-Jun-1618-Jun-1610-May-1625-May-1617-Apr-162-May-1621-May-165-Jun-1621-Jun-166-Jul-1613th
FLOOR25-May-169-Jun-1618-May-162-Jun-1624-Apr-169-May-161-Apr-1616-Apr-165-May-1620-May-165-Jun-1620-Jun-1612th
FLOOR9-May-1624-May-162-May-1617-May-168-Apr-1623-Apr-1616-Mar-1631-Mar-1619-Apr-164-May-1620-May-164-Jun-1611th
FLOOR23-Apr-168-May-1616-Apr-161-May-1623-Mar-167-Apr-1629-Feb-1615-Mar-163-Apr-1618-Apr-164-May-1619-May-1610th
FLOOR7-Apr-1622-Apr-1631-Mar-1615-Apr-167-Mar-1622-Mar-1613-Feb-1628-Feb-1618-Mar-162-Apr-1618-Apr-163-May-169th
FLOOR22-Mar-166-Apr-1615-Mar-1630-Mar-1620-Feb-166-Mar-1628-Jan-1612-Feb-162-Mar-1617-Mar-162-Apr-1617-Apr-168th
FLOOR6-Mar-1621-Mar-1628-Feb-1614-Mar-164-Feb-1619-Feb-1612-Jan-1627-Jan-1615-Feb-161-Mar-1617-Mar-161-Apr-167th
FLOOR19-Feb-165-Mar-1612-Feb-1627-Feb-1619-Jan-163-Feb-1627-Dec-1511-Jan-1630-Jan-1614-Feb-161-Mar-1616-Mar-166th
FLOOR3-Feb-1618-Feb-1627-Jan-1611-Feb-163-Jan-1618-Jan-1611-Dec-1526-Dec-1514-Jan-1629-Jan-1614-Feb-1629-Feb-165th
FLOOR18-Jan-162-Feb-1611-Jan-1626-Jan-1618-Dec-152-Jan-1623-Nov-1510-Dec-1529-Dec-1513-Jan-1629-Jan-1613-Feb-164rth
FLOOR2-Jan-1617-Jan-1626-Dec-1510-Jan-162-Dec-1517-Dec-1513-Dec-1528-Dec-1513-Jan-1628-Jan-163rd
FLOOR17-Dec-151-Jan-1610-Dec-1525-Dec-1516-Nov-151-Dec-1525-Nov-1512-Dec-1528-Dec-1512-Jan-162nd
FLOOR01-Dec-1516-Dec-1524-Nov-159-Dec-1512-Dec-1527-Dec-151st
FLOOR15-Nov-1530-Nov-1524-Nov-1511-Dec-15PLINTH
BEAMRAFTcompCOMPCOMPPCCCOMPCOMPCOMPCOMPEXCAVATIONCOMPCOMPCOMPCOMP
CL-1 TOWER - 1 CL-1 TOWER - 2 CL-1 TOWER - 3 CL-1 TOWER - 4 CL-1
TOWER - 5 CL-1 TOWER - 6ColourIdentificationCompletedWork in
progressBlock work completedInternal plastering completedInternal
plastering WIPTile work in ProgressTile laying Completed
(Bed,living room)
Current Photographs of ProjectCLUSTER-4 ,TOWER-1
Cluster 4 Tower-2
Cluster-4 Tower-3
Cluster-4 Tower-4
Cluster-4 Tower-5
Cluster-4 Tower-6
Cluster-3 Tower-1
Cluster-3 Tower-2
Cluster-3 Tower-3
Cluster-3 Tower-4
Cluster-3 Tower-5
Cluster-3 Tower-6
Cluster-2 Tower-1&2
Cluster-1 Tower-1
Cluster-1 Tower-2
Cluster-1 Tower-3
Cluster-1 Tower-4
Cluster-1 Tower-5
Cluster-1 Tower-6