Top Banner
Presentation to the Select Committee: Labour and Public Enterprise 2013.03. 20 Consideration of Strategic Plan of the Department of Labour (DoL) 1
45

Presentation to the Select Committee: Labour and Public Enterprise

Jan 03, 2016

Download

Documents

camden-scott

Presentation to the Select Committee: Labour and Public Enterprise. Consideration of Strategic Plan of the Department of Labour (DoL). 2013.03.20. TABLE OF CONTENTS. INTRODUCTION KEY STRATEGIC OBJECTIVE ACHIEVEMENTS AS AT END OF DECEMBER 2012 (Q3) - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Presentation to the Select Committee: Labour and Public Enterprise

Presentation to the Select Committee: Labour and Public Enterprise

2013.03.20

Consideration of Strategic Plan of the Department of Labour (DoL)

1

Page 2: Presentation to the Select Committee: Labour and Public Enterprise

TABLE OF CONTENTS

2

1. INTRODUCTION

2. KEY STRATEGIC OBJECTIVE ACHIEVEMENTS AS AT END OF DECEMBER 2012 (Q3)

3. CHALLENGES FOR NONE ACHIEVEMENT OF SOME INDICATORS

4. BRIEF SUMMARY OF THE DEPARTMENT’S EXPENDITURE FOR 2012/13

5. HOW THE EXPENDITURE HELPED THE DOL TO FULFILL ITS MANDATE

6. KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM

7. SOME OF THE KEY CHALLENGES FACING THE DOL

1. HOW THE DOL ADDRESSES CHALLENGES FACED

2. THE DOL EXPECTATIONS OF THE SELECT COMMITTEE

Page 3: Presentation to the Select Committee: Labour and Public Enterprise

1. 1. INTRODUCTION

3

• The Strategic Plan 2012-2017 and Annual Performance Plan 2012/13 were published and tabled in Parliament

• After tabling the Department realised that the 2 documents had short comings and misalignments between the 2 documents

• The Indicators and Strategic Objectives were not fulfilling the SMART principles and in some cases not corresponding

• The Technical Advisory Unit (TAU) of National Treasury was approached for assistance

Page 4: Presentation to the Select Committee: Labour and Public Enterprise

1. 1. INTRODUCTION - continues

4

• Workshops were held and the different Branches attended the workshops to ensure that all the indicators and strategic objectives are adhering to the SMART principles and that the indicators and the strategic objectives are aligned

• The Erratum for both documents were approved, published and tabled in Parliament (60 copies) on 15 February 2013

• The Strategic Plan 2013-2018 and Annual Performance Plan 2013/14 were further developed in line with the erratum

Page 5: Presentation to the Select Committee: Labour and Public Enterprise

1. 1. INTRODUCTION - continues

5

• Some of the indicators published in the erratum documents were outdated, not strategic of nature or no longer applicable

• Therefore the Department saw it fit to publish a Strategic Plan 2013-2018 and an Annual Performance Plan 2013/14 that is aligned to the changes in the Strategic Plan

• The next few slides will show the Actual Performance of 2012/13APP (as at 31 December 2012 – Quarter 3), Expenditure for 2013 and the 2013- 2018 Strategic Plan’s objectives and indicators

Page 6: Presentation to the Select Committee: Labour and Public Enterprise

KEY STRATEGIC OBJECTIVE ACHIEVEMENTS AS AT THE END OF DECEMBER 2012

Based on Quarters 1, 2 and 3 of the Financial Year 2012-13

Note that only selected Note that only selected indicators are reported on.indicators are reported on.

6

Page 7: Presentation to the Select Committee: Labour and Public Enterprise

7

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (CS)

OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIP

Strategic Objective 8: Strengthening the institutional capacity of the Department

KEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL ANNUAL TARGETSTARGETS

PROGRESSPROGRESS

1. Strategic risks monitored in line with risk appetite framework

Provide quarterly strategic risk monitoring reports to the accounting officer

The Strategic risk assessment (risk profile) of the DoL was reviewed and reports prepared, approved by the National Risk Management Committee and the Audit Committee, submitted to the Accounting Officer for approval. The Risk Appetite Framework finalised. The first report (quarterly strategic risk monitoring report) was provided to the Accounting Officer.

2. Percentage of finalisation of the fraud cases received and detected

87% of cases received or detected finalised by the year end

57% (7 cases received and 4 finalised) of cases were finalisedOffice Receive

dFinalized

Outstanding

HO 1 1 0Mpumal 2 1 1N. Cape 0 0 0Limpopo 0 0 0N. West 0 0 0E Cape 0 0 0Gauteng 3 2 1F. State 1 0 1KZN 0 0 0W Cape 0 0 0

Page 8: Presentation to the Select Committee: Labour and Public Enterprise

8

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (CS)

OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIP

Strategic Objective 8: Strengthening the institutional capacity of the Department

KEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS

3. Pre-employment screening conducted

70% pre-employment screening finalised as per the annual plan

A total of 80.92% of PSC requests were finalized.

Requests received Requests finalized Requests outstanding

Requests received

131 106 (80.92%) 25 (19.08%) 131DetailsName Received Finalized OutstandingHO 24 24 0UIF 06 05 01CC 06 06 0Mpumalanga 10 03 07N. Cape 04 04 0Limpopo 13 13 0N. West 07 06 01E Cape 11 04 07Gauteng 23 20 03F. State 09 07 02KZN 06 04 02W Cape 12 10 02TOTAL 131 106 25

Page 9: Presentation to the Select Committee: Labour and Public Enterprise

9

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (CS)

OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIPStrategic Objective 8: Strengthening the institutional capacity of the DepartmentKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS

4. Percentage of Senior Management Service (SMS) staff members vetted in the Department increased

80% of SMS staff in the department vetted

• 11 Z204 forms forwarded to SSA.

• 5 Clearance certificate received from SSA.

• 23 Requests outstanding

5. Percentage of women, youth and people with disability (PwD) employed in line with the EE Plan

40% women employed in Senior Management Service (SMS),

43% youth and

3% people with disability employed in DoL by 31 March 2013

39% of Women employed at SMS level; 35% of Youth employed and 2.7% of PwD’s employed

Page 10: Presentation to the Select Committee: Labour and Public Enterprise

10

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (CS)

OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIPStrategic Objective 8: Strengthening the institutional capacity of the DepartmentKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS

6. Fill all vacancies within a specific period of time

Vacancy rate reduced to below 7% by 31 March 2013

7% vacancy rate as at the end of Quarter 2

7. Percentage of staff trained in line with Workplace Skills Plan (WSP)

82% of Department’s staff trained in accordance with approved WSP by 31 March 2013

35% (2 280/6 550) trained

8. Percentage of misconduct cases finalised within a prescribed period of time

75% of misconduct cases finalised in line with applicable prescripts by 31 March 2013

71% (92 of 130) received misconduct cases were finalised against a target of 75%

9. Implementation of the new ICT strategy

50% of strategic plan components implemented

• ICT Strategy developed and approved

• 50% of the ICT Transition completed

10. Exit and services transfer plan developed and implemented

Completion of handover by PPP service provider and close-out of PPP

Exit and Services Transfer milestones achieved and project underway. Target is end November 2012

Page 11: Presentation to the Select Committee: Labour and Public Enterprise

11

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)

OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 2: Promote Equity in the Labour MarketKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS

1. Percentage of employers complying with their EE Plans to reflect demographics of the country in all occupational categories

80% of 240 employers reviewed comply Public Companies (100)Private Companies (200)

181 (60 public and 121 private) employers were reviewed

Table 5: Employers inspected

Prov.

Annual Target (Public companies)

Actual inspected(Public companies)

Annual Target (Private )

Actual inspected(Private companies)

EC 16 0 9 0FS 17 18 17 12GP 25 8 30 37KZN 17 1 35 13LP 16 9 6 8MP 6 4 11 13NC 3 1 7 7NW 10 12 6 6WC 6 7 20 25NATIONAL 116 60 138 121

Page 12: Presentation to the Select Committee: Labour and Public Enterprise

12

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)

OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 3: Protecting Vulnerable WorkersKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS

1. 80% of workplaces inspected and audited (targeting problematic sectors1 complying with labour legislation within 90 days of inspection or audit

80% of 87 795 workplaces inspected / audited comply

32 838 workplaces against a target of 33 917 (as at end of September 2012) were inspected/audited; and 59% (19 501) complied

Table 6: Number of workplaces inspected (targeting problematic sectors) in Wholesale and Retail Sector

Prov. Target Actual inspected No. compliedCompliance level

EC 865 1278 767 60%FS 309 475 429 90%GP 1947 1379 1039 75%KZN 1207 2141 1063 50%LP 1568 1102 642 58%MP 701 730 587 80%NC 0 153 116 76%NW 223 376 300 80%WC 672 1151 0 0%NATIONAL 7492 8785 5243 60%

Page 13: Presentation to the Select Committee: Labour and Public Enterprise

13

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)

Table 7: Number of workplaces inspected (targeting problematic sectors) in Hospitality Sector

Prov.) Target Actual No. compliedCompliance Level

EC 683 589 426 72%FS 412 293 252 86%GP 300 333 230 69%KZN 804 738 426 58%LP 271 389 207 53%MP 291 277 184 66%NC 173 305 236 77%NW 329 354 204 58%WC 462 940 277 29%NATIONAL 3 725 4 218 2 442 58%Table 8: Number of workplaces inspected (targeting problematic sectors) in Agriculture and Forestry Sector

Prov.) Target Actual No. compliedCompliance Level

EC 1094 959 696 73%FS 1182 1078 893 83%GP 80 79 70 89%KZN 1208 418 332 79%LP 252 345 243 70%MP 332 309 194 63%NC 0 324 296 91%NW 306 389 325 84%WC 441 964 247 26%NATIONAL 4 895 4 865 3 296 68%

Page 14: Presentation to the Select Committee: Labour and Public Enterprise

14

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)

Table 9: Number of workplaces inspected (targeting problematic sectors) in Iron and Steel Sector

Prov.) Target Actual No. compliedCompliance Level

EC 50 0 0 0%FS 31 25 22 88%GP 1517 159 80 50%KZN 1882 379 246 65%LP 41 46 23 50%MP 160 209 169 81%NC 78 44 21 48%NW 274 0 0 0%WC 488 41 0 0%NATIONAL 4 521 903 388 43%Table 10: Number of workplaces inspected (targeting problematic sectors) in Private Security Sector

Prov.) Target Actual No. compliedCompliance Level

EC 130 791 506 64%FS 20 183 161 88%GP 800 1323 1013 77%KZN 603 189 127 67%LP 79 180 0 0%MP 58 113 78 69%NC 32 139 122 88%NW 103 172 150 87%WC 230 916 19 2%NATIONAL 2055 4006 2182 54%

Page 15: Presentation to the Select Committee: Labour and Public Enterprise

15

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)

Table 11: Number of workplaces inspected (targeting problematic sectors) in Domestic Sector

Prov.) Target Actual No. compliedCompliance Level

EC 327 491 330 67%FS 284 460 440 96%GP 1200 1110 620 56%KZN 201 1741 1398 80%LP 489 1333 957 72%MP 506 601 548 91%NC 471 556 537 97%NW 348 550 421 77%WC 210 1000 150 15%NATIONAL 4054 6732 4592 68%Table 12: Number of workplaces inspected (targeting problematic sectors) in Chemical Sector

Prov.) Target Actual No. compliedCompliance Level

EC 5 0 0 0%FS 31 22 9 41%GP 720 119 60 50%KZN 82 1181 862 73%LP 6 2 1 50%MP 15 20 19 95%NC 434 95 0 0%NW 127 0 0 0%WC 418 0 0 0%NATIONAL 1 838 1 439 489 34%

Page 16: Presentation to the Select Committee: Labour and Public Enterprise

16

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)

Table 13: Number of workplaces inspected (targeting problematic sectors) in Construction Sector

Prov.) Target Actual No. compliedCompliance Level

EC 205 0 0 0%FS 91 75 59 79%GP 958 834 142 17%KZN 1057 63 50 80%LP 113 196 33 17%MP 255 294 259 88%NC 0 63 51 81%NW 462 98 53 54%WC 607 267 0 0%NATIONAL 3 748 1 890 869 46%

Page 17: Presentation to the Select Committee: Labour and Public Enterprise

17

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)

OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH

Strategic Objective 3: Protecting Vulnerable Workers

KEY PERFORMANCE INDICATORSKEY PERFORMANCE INDICATORS ANNUAL ANNUAL TARGETSTARGETS

PROGRESSPROGRESS

2. Percentage of labour complaints resolved within a specified number of days of receipt at Registration Services

Settle 70% of received complaints within14 days

Of the 55 484 complaints received, 65% (35 884), against the target of 70%, settlement level was realised within 14 days

Table 14: Complaints management

Prov. TargetNumber received Number settled

Settlement rate (%)

EC  70% 4081 2381 58%FS  70% 2876 2086 73%GP  70% 22649 15258 67%KZN  70% 5746 4370 76%LP  70% 4366 2233 51%MP  70% 6416 4919 77%NC  70% 1397 941 67%NW  70% 2684 1464 55%WC  70% 4332 2232 52%NATIONAL  70% 55 484 35 884 65%

Page 18: Presentation to the Select Committee: Labour and Public Enterprise

18

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (IES)

OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 5: Strengthening Social ProtectionKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL ANNUAL TARGETSTARGETS

PROGRESSPROGRESS

1. 200 workplaces inspected in WC (100) and KZN (100) to reduce exposure, to silica dust, by 2%

200 workplaces inspected

63 (all in the Western Cape)

workplaces were inspected

2. Percentage reduction in noise induced hearing loss (NIHL) in the Iron and Steel industry

Conduct base line study on the extent of noise induced hearing loss in the Iron and Steel Industry

Research in progress

3. OHS Act repealed and its regulations amended

Complete the consultation process OHS Bill finalised and promulgatedSubmit the Bill to Cabinet and Nedlac

Currently the OHS Act has been referred to state legal advisors

Page 19: Presentation to the Select Committee: Labour and Public Enterprise

19

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (PES)

OUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growthDoL Strategic Objective 1: Contribution to decent employment creation

KEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS

1. Employment Services Legislation, regulations and guidelines in place

Employment Services Act, regulations and guidelines in place (Private Employment Agencies and Career Guidance)

NEDLAC negotiations concluded. Bill tabled to Cabinet and is now in parliament

2. Increase Number of work seeker registered in different categories

450 000 reporting work-seekers registered on the system

A total of 427 349 work-seekers was registered on the system.

Table 1: Job-seekers Registered on the system

Prov.Target as at 31 Dec 2012

Actual Number Registered as at 31 Dec 2012 Variance

EC 44250 50248 5998FS 27375 30176 2801GP 61250 108645 47395KZN 71250 83086 11836LP 24000 43639 19639MP 27375 36463 9088NC 13875 12608 -275NW 24000 14548 -9452WC 44250 47936 3686NATIONAL 337625 427349 91266

Page 20: Presentation to the Select Committee: Labour and Public Enterprise

20

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (PES)

OUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growthDoL Strategic Objective 1: Contribution to decent employment creationKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS

3. Percentage of work-seekers registered on the system provided with career counselling and employability enhancement

60% of work-seekers registering on the system are profiled within 60 days of registration

94% (196 438 of 207 950 ) of work-seekers against a target of 60% of 450000 was profiled within 60 days of registration.

Table 2: Job-seekers Registered on the system assessed and profiled

Prov.Actual Registered

Target to have been Profiled by 31 Dec 2012

Actual Number Profiled % Profiled

EC 50248 22050 22508 102%FS 30176 20025 17994 90%GP 108645 51800 56584 109%KZN 83086 20025 27494 137%LP 43639 22050 19323 88%MP 36463 22050 18813 85%NC 12608 15975 5307 33%NW 14548 20025 9376 47%WC 47936 13950 19039 136%NATIONAL 427 349 207 950 196 438 94%

Page 21: Presentation to the Select Committee: Labour and Public Enterprise

21

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (PES)

OUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growthDoL Strategic Objective 1: Contribution to decent employment creationKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS

4. Increase number of work-seekers placed/referred to opportunities and other services

18 000 work-seekers placed; 72 000 work-seekers referred

A total of 10 429 (79% of the target) work-seekers was placed; and a total of 278 998 (517% of the target) was referred.

Table 3: Job-seekers placed/referred to opportunities

Prov.

Target to have been placed by 31 Dec 2012 Actual placed

Target to have been referred by 31 Dec 2012

Actual referred

EC 2145 1258 8580 25061FS 1065 512 4260 20700GP 2200 3227 10115 90547KZN 2010 1158 8040 74013LP 1470 597 5880 41543MP 1335 2021 5340 7742NC 660 561 3720 2378NW 930 595 2640 5865WC 1335 500 5340 11149NATIONAL 13 150 10 429 53 915 278 998

Page 22: Presentation to the Select Committee: Labour and Public Enterprise

22

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (PES)

OUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growthDoL Strategic Objective 1: Contribution to decent employment creationKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS

5. Increase number of employers registering vacancies on ESSA per annum

Increase from 2000 to 3000 companies register vacancies on ESSA by end of March 2013

1 924 companies registered vacancies on ESSA

Table 4: Employers registering vacancies on ESSA

Prov.

Expected target to register as at 31 Dec 2012 Actual Registered Variance

EC 67 112 23FS 60 138 46GP 143 551 276KZN 120 170 34LP 82 251 -3MP 75 196 63NC 38 117 1NW 53 130 11WC 113 259 56NATIONAL 751 1 924 507

Page 23: Presentation to the Select Committee: Labour and Public Enterprise

23

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (LP & IR)

OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 2: Promote Equity in the Labour MarketKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS

1. BCEA amended NEDLAC engagement finalized on the EEA Amendments by November 2012

NEDLAC engagements on EE Amendment Bill finalized in July 2012. Bill approved by Cabinet in September 2012 for tabling in Parliament.

2. Code of Good Practice and Technical Assistanceguidelines on HIV and AIDS reviewed and Amended andamended

HIV and AIDS Code and technical assistance guidelines amended by June 2012 

• HIV & Code gazetted on 15 June 2012• HIV TAG amendments signed off on 27

June 2012 by CEE.

14 EE awareness workshops conducted in all provinces to publicise the HIV & AIDS Code & TAGs and promote 2012 EE Online reporting.

3. Income Differentials assessed to determine race and gender disparities in Salaries

30 Income Differentials assessed to determine race and gender disparities in salaries by March 2013

14 Income differentials assessed and DG Recommendations tabled with the CEOs of companies.

Page 24: Presentation to the Select Committee: Labour and Public Enterprise

24

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (LP & IR)

OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 3: Protecting Vulnerable WorkersKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS

1. Review existing sectoral determinations

Publish an amended SD with minimum wages for one sector by June 2012.

• An amended Hospitality SD published in GG No 35460 on the 22/06/12.

• An amended Private Security SD published in GG No 35646 on the 31/08/12.

• An amended Taxi Sector SD published in GG No 35462 on the 22/6/12 and currently conducting information sessions on the research report.

• An amended Civil Engineering SD published in GG No 35658 on the 4/9/12.

Page 25: Presentation to the Select Committee: Labour and Public Enterprise

25

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (LP & IR)

OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 3: Protecting Vulnerable WorkersKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS

2. Investigate new areas for setting sectoral determinations

Investigate possibility of sectoral determinations for 2 new sectors

Report on the investigation into the Private Security Medical Aid has been finalised and submitted to the ECC for its deliberations.

3. Civil society strengthened

10 civil society organisations involved in the world of work funded

FEDUSA, NACTU, South African Labour Bulletin, DITSELA were visited.

Page 26: Presentation to the Select Committee: Labour and Public Enterprise

26

2. KEY STRATEGIC OBJECTIVES ACHIEVEMENTS (LP & IR)

OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 6: Promoting Sound Labour RelationsKEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS

ANNUAL ANNUAL TARGETSTARGETS

PROGRESSPROGRESS

1. Extend collective agreements within 60 days

Extend collective agreements within 60 days

Extensions of 9 Bargaining Council agreements to non-parties promulgated. Average turnaround time was 62 days

2. Register new labour organisations within 90 days

Decision to register new labour organizations taken within 90 days of receipt of competent applications

29 applications dealt with: • 5 approved • 24 refusedAverage turnaround time was 83 days

Page 27: Presentation to the Select Committee: Labour and Public Enterprise

3 . CHALLENGES FOR NONE ACHIEVEMENT OF SOME INDICATORS

27

KEY STRATEGIC OBJECTIVE

AREA OF CONCERN REASON FOR MAJOR VARIANCE

CORRECTIVE ACTION

Contribute to employment creation

Work-seekers placed Low skills level of registered work-seekers and insufficient opportunities

Explore alternative schemes and aggressive marketing

Existing PEAs registered No legislative enforcement mechanisms

ES Bill has enforcement provision and penalties

Learners with disabilities recruited for training to the SEF Centre of Excellence pilot project

Insufficient funding and institution not accredited

Review the programme

Jobs saved Delays in UIF funding transfer

Conclude an agreement with UIF Board

Promote equity in the Labour Market

NEDLAC engagement finalized on the EEA Amendments by November 2012

Delays in finalisation of Nedlac engagements on the EE Amendment Bill

Page 28: Presentation to the Select Committee: Labour and Public Enterprise

FINANCES

28

Page 29: Presentation to the Select Committee: Labour and Public Enterprise

4 . BRIEF SUMMARY OF THE DEPARTMENT’S EXPENDITURE FOR 2012/13

29

• As at 31 January 2013, the Department had defrayed expenditure to the value of R1, 772 billion against its adjusted budget of R2, 139 billion.

• This represents an expenditure level of 82.8 % against a time expiration of 83%.

Page 30: Presentation to the Select Committee: Labour and Public Enterprise

30

VOTE 17: LABOUR

PROGRAMME ADJUSTED ACTUALBUDGET EXPENDITURE REMAINING

2012/2013 31-Jan-13 BUDGETR'000 R'000

Administration 764 585 556 273 208 312 73% 27%Inspection & Enforcement Services 400 376 328 341 72 035 82% 18%Public Employment Services 334 331 286 973 47 358 86% 14%Labour Policy & Industrial Relations 640 274 600 004 40 270 94% 6%

TOTAL 2 139 566 1 771 591 367 975 83% 17%

EXPENDITURE AS A %

REMAINING BUDGET AS

%

-

100 000

200 000

300 000

400 000

500 000

600 000

700 000

800 000

900 000

ADJUSTED

ACTUALEXPENDITURE

EXPENDITURE PER MAIN DIVISION OF THE VOTE

Page 31: Presentation to the Select Committee: Labour and Public Enterprise

31

VOTE 17: LABOUR

ADJUSTED ACTUALECONOMIC CLASSIFICATION BUDGET EXPENDITURE REMAINING

2012/2013 31-Jan-13 BUDGETR'000 R'000

Current Payments 1 446 710 1 035 080 411 630 72% 28% Compensation of Employees 847 541 685 864 161 677 81% 19% Goods and Services 599 143 349 196 249 947 58% 42% Interest and rent on land 26 20 6 77% 23% Financial transactions in assets and liabilities - - - 0% 0% Unauthorised Expenditure - - - 0% 0%Transfers and subsidies to: 656 369 650 313 6 056 99% 1% Provinces and municipalities 88 163 (75) 185% -85% Departmental agencies and accounts 554 053 549 162 4 891 99% 1% Universities and Technikons - - - 0% 0% Foreign governments & international organisations 12 722 13 692 (970) 0% 0% Public corporations & private enterprises - - - 0% 0% Non-profit institutions 88 711 85 313 3 398 0% 0% Households 795 1 983 (1 188) 249% -149%Payments for capital assets 36 487 86 198 (49 711) 236% -136% Buildings & other fixed structures 3 416 6 470 (3 054) 189% -89% Machinery and equipment 33 071 79 728 (46 657) 241% -141% Cultivated assets - - - 0% 0% Software and other intangible assets - - - 0% 0% land and subsoil assets - - - 0% 0%

TOTAL 2 139 566 1 771 591 367 975 83% 17%

EXPENDITURE AS A %

REMAINING BUDGET AS

%

EXPENDITURE PER ECONOMIC CLASSIFICATION

Page 32: Presentation to the Select Committee: Labour and Public Enterprise

5 . HOW THE EXPENDITURE HELPED THE DOL TO FULFILL ITS MANDATE

32

• As can be noted from the performance information preceding the financial information, financial resources have been utilised in line with the Department’s mandate.

• Through a process of close scrutiny and monitoring (IYM reports), the Department has ensured that financial resources have been directed towards the achievement of service delivery objectives.

• During the Adjustment Budget process, areas of under expenditure were identified and financial resources were redirected to those areas of critical need. (eg: R11 million redirected to the SEF to address the serious cash-flow situation impacting on the delivery of goods.)

Page 33: Presentation to the Select Committee: Labour and Public Enterprise

2013/14 ANNUAL PERFORMANCE PLAN

Based on 2013-18 Strategic Plan

33

Page 34: Presentation to the Select Committee: Labour and Public Enterprise

6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM - Administration

34

Strategic Objective Objective Statement

Baseline Performance Indicator

1 Organisational Strategic plan and Annual Performance Plan approved

To manage and facilitate the development of organisational Strategic plan and Annual Performance Plan as per prescripts and guidelines

1 Strategic plan and 1 Annual Performance Plan

1.1 Strategic Plan and Annual Performance Plan approved and tabled as per prescribed timeframes

2 Organisational performance monitored and evaluated against the approved Strategic Plan and Annual Performance Plan

To manage and facilitate the development of organisational performance information reports

1 Annual report and 4 organisational performance information reports

2.1 Number of performance information reports approved within 60 days after quarter end/year end

Page 35: Presentation to the Select Committee: Labour and Public Enterprise

6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM - Administration

35

Strategic Objective Objective Statement

Baseline Performance Indicator

3 Service Delivery Improvement Plan approved as per prescribed timeframes

To manage and facilitate the development of Service Delivery Improvement Plan

1 Service Delivery Improvement Plan

3.1 Submit reviewed and approved Service Delivery Improvement Plan to Department of Public Service and Administration (DPSA) as per prescribed timeframes

4 Annual audit plan, including ad hoc investigations executed

Conduct a risk-based internal audit and timely reporting

88% (33 planned vs. 29 actuals) of final reports were issued as per timeframes indicated in the approved annual audit plan

4.1 Percentage of final reports issued as per timeframes indicated in the approved annual audit plan

Page 36: Presentation to the Select Committee: Labour and Public Enterprise

6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM – Inspections and

Enforcement Services

36

Strategic Objective

Objective Statement

Baseline Performance Indicator

1. 

Ensure promotion of Employment Equity in the labour market   

Ensure transformation of the labour market by inspecting workplaces (JSE listed and designated employers) in order to achieve compliance with Employment Equity legislation  

65 JSE workplaces inspected

218 Designated workplaces inspected

9 940 Procedural inspections conducted

1.1 Number of (a) Public Companies and (b) Private Companies reviewed for compliance with employment equity legislation per annum

New Indicator Percentage of non-compliant workplaces of those inspected dealt with in terms of the enforcement regime link to the EEA

Page 37: Presentation to the Select Committee: Labour and Public Enterprise

6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM – Inspections and

Enforcement Services

37

Strategic Objective

Objective Statement Baseline Performance Indicator

2.  

Reduction in worker vulnerability through improved compliance and enforcement  

Ensure Decent Work principles are adhered to by reducing worker vulnerability through improved compliance and enforcement   

172 300 workplaces inspected

2.1 Number of workplaces inspected per year to determine compliance levels

123 81 non-complying workplaces of those inspected were dealt with

2.2 Percentage of non-complying workplaces inspected dealt with in terms of the relevant labour legislation per year

 4 seminars 2.3 Number of

advocacy and educational seminars conducted in identified sectors to enhance compliance with labour legislation per year

Page 38: Presentation to the Select Committee: Labour and Public Enterprise

6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM – Public Employment

Services

38

Strategic Objective

Objective Statement

Baseline Performance Indicator

1. 

Employment Services legislation, related regulations and guidelines in place

Develop and implement Employment Services Legislation, regulations & guidelines

New indicator 1.1. Percentage of work completed on the Employment Services Bill and its regulations and guidelines

2. PES initiatives and interventions communicated through various media channels  

Communicate PES initiatives and interventions through various channels

4 National exhibitions on PES and 99 Provincial Advocacy campaigns were held

2.1. Number of PES Advocacy campaigns conducted

3. Work-seekers registered on the system

Register work seekers on ESSA for opportunities

553 883 work seekers registered on ESSA

3.1. Number of work-seekers registered on ESSA system per year

Page 39: Presentation to the Select Committee: Labour and Public Enterprise

6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM – Public Employment

Services

39

Strategic Objective

Objective Statement

Baseline Performance Indicator

4.   

Registered Work-seekers provided with employment counselling , placement or referral, to registered opportunities & other services    

Provide career counselling and employability enhancement to work seekers

222 956 work seekers were provided with career information and counselling

4.1 Percentage of work-seekers registered provided with employment counselling

Place and refer work seekers to opportunities  

96 505 placed and referred

 

 

4.2 Number of work-seekers placed in registered employment opportunities4.3 Number of work-seekers referred to registered opportunities4.4 Number of work-seekers referred to other services

Page 40: Presentation to the Select Committee: Labour and Public Enterprise

6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM – Labour Policy and

Industrial Relations

40

Strategic Objective Objective Statement

Baseline Performance Indicator

1. 

  

Employment Equity in the labour market ensured 

  

Establish legislative framework to promote employment equity   

Employment

Equity Act,

1998

1.1 Employment Equity Act (EEA) regulations amended in line with the amended Act.

New Indicator 1.2 Annual Employment Equity Report published and launched

58 of Income

Differentials

assessed

1.3 Number of Income Differentials assessed to determine race and gender disparities in salaries per year.

Page 41: Presentation to the Select Committee: Labour and Public Enterprise

6 . KEY ASPECTS OF THE DOL STRATEGIC PLAN FOR 2013/14 APP TO MIDTERM – Labour Policy and

Industrial Relations

41

Strategic Objective

Objective Statement

Baseline Performance Indicator

2.

 

Basic Conditions of Employment in the labour market ensured

 

Establish the legislative framework to establish basic conditions of employment 

Bill consulted and submitted to Parliament

2.1 BCEA regulations finalised in line with the amended Act by end of September.

1 Child labour programme every 5 years

2.2 One Child Labour Program of Action implemented

3

 

Sectoral determinations published for residual and emerging vulnerable workers

Review existing sectoral determinations 

6 Sectoral determinations

3.1 Number of existing Sectoral Determinations reviewed

Investigate possibility of setting a Welfare sectoral determination

3.2 Number of new emerging sectors Investigated for sectoral determination

4 Civil society organisations that protect vulnerable workers funded

Monitor Civil Society Organisations functions

10 civil society organisations funded

4.1 Number of Civil society organizations involved in the world of work funded and monitored per year 

Page 42: Presentation to the Select Committee: Labour and Public Enterprise

8 . SOME OF THE KEY CHALLENGES FACING THE DOL

42

Page 43: Presentation to the Select Committee: Labour and Public Enterprise

8 . HOW THE DOL ADDRESSES CHALLENGES FACED

43

Page 44: Presentation to the Select Committee: Labour and Public Enterprise

9 . THE DOL EXPECTATIONS OF THE SELECT COMMITTEE

44

Page 45: Presentation to the Select Committee: Labour and Public Enterprise

Thank You…

45