Page 1
MINUTES OF THE 122nd
MEETING OF THE SEAC KERALA HELD DURING 15th
, 16th
,
17th
&18th
JUNE 2021 AT THE CONFERENCE HALL, STATE ENVIRONMENT IMPACT
ASSESSMENT AUTHORITY, THIRUVANANTHAPURAM
The 122nd
meeting of the SEAC KERALA was held online during 15th,16
th,17
th &18
th June,
2021 observing all the Covid-19 protocols stipulated by the Government. The meeting started at 10.00
AM on 15th
June, 2021 with Dr.C. Bhaskaran, Chairman, SEAC KERALA chairing. The Chairman
welcomed the members to the meeting. The Committee then moved on to the deliberations on the
agenda items.
PHYSICAL FILES
Minutes of the 121st SEAC meeting held on 22nd, 23rd & 24th April 2021
Decision: Noted
Presentation
Environmental Clearance for Masonary stone mine quarry in Survey
No.59/1- 1,86/4 in Block number 79 in Koottikkal village, Kanjirapally
Taluk, Kottayam District (2438/EC1/2019/SEIAA
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Shri.G. Sankar & Dr.S. Sreekumar with the Field Inspection.
Judgment in WP (C) 3317/2021 filed by Sri.Siril Jose- regarding
the validity of EC. (File No.615/EC4/2021/SEIAA)
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr.R.Ajayakumar Varma and Dr. N. Anilkumar with the Field Inspection.
Judgment in WP (C) 3337/2021 filed by Sri.Jilson Joseph-
regarding the validity of EC. (File No.617/EC4/2021/SEIAA)
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. R. Ajayakumar Varma and Dr. N. Anilkumar with the Field Inspection.
Item No.122.01
Item No. 122.02
Item No.122.03
Item No.122.04
Page 2
Judgment in WP (C) No.3510/2021 filed by Sri.P.M.Aboobacker,
Palakkal Granites - regarding the validity of EC. (File
No.1054/EC4/2021/SEIAA)
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Shri.K. Krishna Panicker & Dr. P.S.Easa with the Field Inspection.
Hearing
Judgement in WP(C) No. 12073/2020 (H) dated 19.06.2020 filed by
M. M. Joseph, Menacheril House, Boothathankettu (P.O.),
Pindimana, Kothamangalam, Ernakulam (File No:
1032/EC3/2020/SEIAA)
Decision: The proponent and the RQP were present. The Committee heard them and decided
to await the response of the proponent on the matter of fresh appraisal of the proposal as
requested by him at the time of hearing.
Application for Environment Clearance application for mining
lease in respect of “Granite Building Stone Quarry of M/s.
Kizhakethalacakal Rocks, over an extent of 12.4408 Ha.
Survey.Nos. 184/1A (Government Land), Elappara Village,
Peermade Taluk, Idukki District, Kerala State. (Proposal No.
SIA/KL/MIN/145075/2020) File No. 1195/EC2/2018/SEIAA
Decision: The proponent and the RQP were present. The Committee decided to invite the
proponent for presentation of the alternate proposal after the study of slope stabilisation measures
by a reputed agency as agreed to by the proponent.
Application for Environmental Clearance for mining of Granite
Building Stone Quarry project in Survey No 292/1 A of Vellad
Village, Thaliparamba Taluk, Kannur District, Kerala by Mr.
Mathew, M/s Alacode Granites (File No.
1277(A)/EC2/2019/SEIAA)
Decision: The proponent and the RQP were present. The Committee heard the proponent and
decided to invite the proponent for presentation of the additional details. The Committee also
decided to provide the relevant portions of the FIR to the proponent. The Committee also
entrusted Dr. R. Ajayakumar Varma, Dr. N. Anilkumar, Sri.K. Krishna Panicker and Sri. G.
Sankar to study the additional details prior to its presentation before the Committee.
Additional Documents Received
Item No.122.05
Item No. 122.06
Item No.122.07
Item No.122.08
Page 3
Application for Environmental Clearance for Building Stone
Quarry in Survey No 34/3-2,34/10,34/9,35/1-2,31/1-2,31/1-3,31/1-
4,45/2,45/7,45/8-2,46/1-2,34/8,34/12,44/2-3,46/3,45/5,45/6,34/3,44/4
and 44/5,34/2 in Mancode Village, Kottarakara Taluk, Kollam
District (File.No.2543/EC2/2019/SEIAA (Online File No.
1462/EC2/2019/SEIAA)
Decision: Deferred for scrutiny of the additional documents submitted by the proponent as a
physical file.
Environmental clearance for the proposed Building stone quarry
project in, Survey No.1619/1,1621/1 in Kanthaladu Village,
Thamarassery Taluk, Kozhikode District, Kerala, by
Mr.Haridasan T.H, (FileNo.1264/EC1/2019/ SEIAA)
Decision: Deferred for scrutiny of the additional documents submitted by the proponent as a
physical file.
Judgment in WP (C) 5361/2021 filed by Sri. Linej T.P- regarding
the validity of EC. (File No.912/EC4/2021/SEIAA)
Decision: The Committee decided to invite the proponent for presentation.
Judgment in WP (C) 3721/2021 filed by Sri.C.P.Muhammed-
regarding the validity of EC. (File No.748/EC4/2021/SEIAA)
Decision: The Committee decided to invite the proponent for presentation.
Judgment in WP (C) 7697/2021 (J) filed by Smt. Bindhu P.A.,
Thevarmadom Granites - regarding the Revalidation of EC (File
No. 997/EC3/4906/2015)- (Revalidation –Additional documents
received)
Decision: The Committee decided to invite the proponent for presentation.
Environmental Clearance for the quarry project in Sy. No. 1/1(pt),
2/2(pt), 3/3(pt) and 32/2(pt) at Mankada Village, Mankada
Panchayath, Perinthalmanna Taluk, Malappuram District by
Sri.M.P.Shoukathali, Managing Director, M/s.Ernad Granites Pvt.
Ltd. – Judgment dated 30.03.2021 in WP(C) No.8301 of 2021 -
Revalidation of EC (File No.609/SEIAA/EC1/4638/2015) – reg :-
(Revalidation –Additional documents received)
Item No.122.09
Item No.122.10
Item No.122.11
Item No.122.12
Item No.122.13
Item No.122.14
Page 4
Decision: The Committee decided to invite the proponent for presentation.
Environmental Clearance for the quarry project in Sy.Nos. 110/1,
111/3 at Karakunnu Village, Thrikkalan Panchayath,
Malappuram – Judgment dated 22.02.2021 in WP(C) No.4396 of
2021 - Revalidation of EC (File No.848/SEIAA/EC1/2861/2015) –
reg :- (Revalidation –Additional documents received)
Decision: The Committee decided to invite the proponent for presentation.
Environmental Clearance for the Building Stone quarry project in Sy.No.
36/3 (pt), 37/1(pt), 37/2(pt), 37/3(pt) at Morayoor Village, Kondotty
Taluk, Malappuram District, Kerala by Sri.E.A.Abdul Karim, M/s
Malabar Aggregates – Judgment dated 23.02.2021 in WP(C) No.4687 of
2021 - Revalidation of EC (File No.853/SEIAA/EC1/2977/2015)
Decision: The Committee decided to invite the proponent for presentation.
Environmental Clearance for the quarry project in Sy.Nos. 51pt, 47/1pt
& 49/2pt in Kizhuparamba Village, Ernad Taluk, Malappuram District,
Kerala by Sri.K. Kunjumoyin, Managing Partner, M/s Friends Crushers
– Judgment dated 29.03.2021 in WP(C) No.8118 of 2021 - Revalidation of
EC (File No.861/SEIAA/EC1/2990/2015)
Decision: The Committee decided to invite the proponent for presentation.
Environmental Clearance issued by DEIAA, Malappuram for the
quarry project in Re.Sy.No.234 in Pathaikkara Village,
Perinthalmanna Taluk, Malappuram District, Kerala by
Shri.Saidalavi.K – Judgment dated 29.03.2021 in WP(C) No.8190 of
2021 - Revalidation of EC (File No.1052/EC6/2021/SEIAA) – reg :
Decision: The Committee decided to invite the proponent for presentation.
Environmental clearance for the proposed quarry project in Survey
No. 163 (Block No.22),2/2-2,2/4-3,2/4-2,3/1-2,2/3,2/2-3,2/4-4,2/4-5
(BlocK No.27) in Urangattiri Village, Ernad Taluk, Malappuram
District, Kerala by Mr. K.V. Moideenkoya, M/s Kallarattikkal
Granites (File No. 1230/EC2/2019/SEIAA)
Decision: The Committee decided to invite the proponent for presentation.
Item No.122.15
Item No.122.16
Item No.122.17
Item No.122.18
Item No.122.19
Page 5
Environmental Clearance for mining of Granite Building Stone
Quarry in Survey Nos 178/1, 179/pt, Block No: 56 in Morayur
Village, Kondotty Taluk, Malappuram District, Kerala for an area
of 2.1404 ha by Sri. Muhammed Faisal K. P(File No-
1300/EC/2019/SEIAA)
Decision: The Committee decided to invite the proponent for presentation.
Forwarded from SEIAA
Environmental Clearance for the proposed building stone quarry in
Re- Survey No. 498/2, 498/3, 499/3, 499/4 in Chalavara Village,
Ottapalam Taluk, Palakkad District, Kerala by Mr. Paul.K.T.,
Managing Director, M/s K.T.Crusher‟s & Aggregates Pvt. Ltd. (File
No. 1260/EC2/2019/SEIAA)
Decision: Deferred for scrutiny of the additional documents submitted by the proponent as a
physical file.
Environmental Clearance issued for the proposed Commercial
Complex (Hotel, Convention Centre & Shopping Mall) project, M/s
LULU International Shopping Mall Pvt. Ltd., Thiruvanathapuram
District - Clarification sought regarding CER/CSR commitments
(File No.1047/EC1/899/SEIAA/2016)
Decision: The Committee entrusted Er. M. Dileepkumar with the detailed study of the
proposals.
Environmental Clearance for the Granite Building Stone Quarry
project in Survey No 326/2-9 in Eramalloor Village,
Kothamangalam Taluk, Ernakulam District, Kerala for an extent
of 0.5522 Ha of land by Sri. P.M. Moitheen –Review petition
(Proposal No: SIA/KL/MIN/145890/2020) (File No:
1430/EC3/2019/SEIAA)
Decision: Deferred for scrutiny of the physical file.
Environmental Clearance for the Commercial project “Ozone
Mall” in Sy. Nos. 4/2B, 146/1 and 146/7 at Pathaikkara Village,
Perinthalmanna Municipality, Perinthalmanna Taluk,
Malappuram District, Kerala by Sri. A.K. Abdul Aziz, M/s INOA
Properties & Developers L.L.P. – Request to remove the Ordinary
earth – reg :- (File No. 864/SEIAA/ EC1/3073/2015)
Decision: The Committee decided to invite the proponent for hearing.
Item No.122.20
Item No.122.21
Item No.122.22
Item No.122.23
Item No.122.24
Page 6
Environmental Clearance for the quarry project in Sy. Nos. 2066/1,
2067/2, 2063, 2057, 2056/2, 3 and 2067/1 at Kuttichira Village ,
Kodassery Panchayath, Chalakkudy Taluk, Thrissur District by
Sri. Shibu Pynadath John, Managing Director, M/s Pynadath
Granite Pvt.Ltd. – Judgment dated 18.11.2020 in WP(C) No.24278
of 2020 - Revalidation of EC- reg :- (File
No.606/SEIAA/EC1/4633/2014)
Decision: The Committee discussed the recommendation of SEIAA as well as the orders of the
Hon’ble High Court in this regard. The Committee decided to await further orders of the Hon’ble
HC on the petition filed by the proponent on 21-04-2021 against the cancellation of the EC. Since
there are separate directions from the Hon‟ble HC in this regard, the same are to be
brought to the notice SEIAA for further action.
Request for Reconsideration
Environmental Clearance for removal of Ordinary Earth in
Sy.No.604/5-A,604/5-B,604/2-A,604/2-Bat Onakkoor Village,
Muvattupuzha Taluk, Ernakulam District by Sri.Saji.P.K. [File
No.2797/EC4/2019/SEIAA]
Decision: The Committee decided to inform the SEIAA that final decision on the
proposal could not be taken in the light of the minimum distance norms of 200mfor
mining involving blasting and 100mfor mining not involving blasting are stipulated by
the Hon‟ble NGT wherein final orders are awaited.
General
SEAC meeting – Member Secretary, SEAC neither participated
in the SEAC meeting nor signed the minutes – Reg. (File No.
1501/A2/2021/SEIAA)
Decision:The Committee decided to inform the SEIAA that as the Secretary of SEAC has
stated he had not attended the 119th, 120th& 121st meetings of SEAC and the Minutes of these
meetings were approved by the Chairman. Therefore, necessary corrections have to be
incorporated in the connected records.
Additional Agenda
Environmental Clearance issued by DEIAA, Malappuram for the
quarry project in Re.Sy.No.231 of Elankur Village, Eranad Taluk,
Malappuram District, Kerala by Shri.Hasim Malik, JSS Granites
– Judgment dated 09.02.2021 in WP(C) No.3280 of 2021 -
Revalidation of EC (File No.394/EC6/2021/SEIAA) – reg : -
Item No.122.25
Item No.122.26
Item No.122.27
Item No.122.28
Page 7
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. P.S. Easa and Dr. S. Sreekumar with the Field Inspection.
Environmental Clearance issued by DEIAA, Malappuram for the quarry
project in Re.Sy. Nos. Q02-1065/pt in Melmuri Village, Eranad Taluk,
Malappuram District, Kerala by Sri.Muhammed Ibrahim – Judgment
dated 09.02.2021 in WP(C) No.3314 of 2021 - Revalidation of EC (File
No.395/EC6/2021/SEIAA) – reg : -
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. P.S. Easa and Dr. S. Sreekumar with the Field Inspection.
Environmental Clearance for the quarry project in Sy. Nos. 182/1,
184/1, 185/2 and 186/5 at Nediyirippu Village & Panchayat,
Kondotty Taluk, Malappuram District, Kerala by Shri.K.M.
Koyamu, Managing Partner, M/s.Chirayil Granite Industries –
Judgment dated 03.02.2021 in WP(C) No.2793 of 2021 -
Revalidation of EC (File No.814/SEIAA/EC1/2485/2015) – reg : -
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. P.S. Easa and Dr. S. Sreekumar with the Field Inspection.
Environmental Clearance issued to M/s. Darkstone Land Developers
Pvt.Ltd in Sy. No. 1/1 (pt) of Ottappalam Village, Ottappalam
Taluk, Palakkad District, Kerala by Sri. Shamsudheen. M.P –
Crl.M.C. No. 1232 of 2021- Interim Report furnished-reg (File No.
705/SEIAA/KL/5657/2014)
Decision: The Committee discussed the issue. The Committee endorsed the Interim
Report prepared by Dr. R.Ajayakumar Varma and Dr.A.V.Raghu
in this regard and ratified the action of the Chairman, SEAC in
sending the Interim Report to the SEIAA due to legal emergency.
AGENDA 1
1. SIA/KL/MIN/129838/2019,1771/EC6/2020/SEIAA
Environmental Clearance for the Granite Building Stone Quarryproject in
Survey Nos. 8/2, 8/2-18 in Vettilappara Village, Eranad Taluk,Malappuram
District, Kerala for an area of 1.2914 Ha by Sri.P.P.Veeran M/SCherupara
Granites.
Item No.122.29
Item No.122.30
Item No.122.31
Page 8
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. P.S. Easa & Dr. S. Sreekumar with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Detailed Project report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. Biodiversity summary in tabular form
d. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
e. Detailed water level measurement data of nearby open wells with geo coordinates.
f. Revised tree cutting details
g. Recent cluster certificate
h. Details of project cost.
i. Recent test results on air, water and other parameters.
j. Details of ESA.
2. SIA/KL/MIN/132766/2019,1718/EC6/2020/SEIAA
Environmental Clearance for the Granite Building Stone Quarry project in Re-
survey no. 337/1 in Morayur village, Kondotty
Taluk,MalappuramDistrict,Keralaforanareaof0.6301HabyM.KunhiMuhammed
.
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Modification of OB dumping site
b. Modified Project Cost by including the quarry road
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Garland drainage to be done
e. Geo-Coordinates of observation wells
f. Contour map of the project area
g. 500m. Land use/ Land cover map with details such as building, drains, wells etc.
h. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
Page 9
physical terms to be undertaken by the proponent in consultation with the stakeholders
as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-
65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds
under CER. The CER activities incorporated in the EMP should be undertaken during
the first two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
i. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
j. Biodiversity summary in tabular form
k. Detailed water level measurement data of nearby open wells with geo coordinates.
l. Form 1M
m. Recent cluster Certificate
n. Details of ESA
3. SIA/KL/MIN/134153/2019,1797/EC6/2020/SEIAA
Application for Environmental Clearance for the Granite Building Stone
Quarry project in Sy No-276/1 in Oorakam village, Thirurangadi Taluk,
MalappuramDistrict,Keralaforanareaof0.7874HabyShri.K.P.Muhammed
Basheer
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Compensatory Afforestation Plan
b. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
c. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
d. Biodiversity summary in tabular form
e. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
f. Detailed water level measurement data of nearby open wells with geo coordinates
4. SIA/KL/MIN/141476/2020,1660/EC6/2020/SEIAA
EnvironmentalClearanceforthebuildingstonequarryprojectinSurveyNo.
Page 10
104/1ofKuruvavillage,PerinthalmannaTaluk,MalappuramDistrict,Keralaforanar
ea of0.2958HabyShri.SiddiqueAparambil
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. P.S. Easa & Dr. S. Sreekumar with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Water level data of nearby open wells with geo coordinates
f. Revised project cost
g. 500m Land use and Land cover map
5. SIA/KL/MIN/142599/2020,1773/EC6/2020/SEIAA
Environmental Clearance for the Building stone quarry project in Survey No.
161/2, 161/3, 161/4, 145/1 in Urangattiri Village, Ernad Taluk, Malappuram
District, Kerala for an extent of 0.8949Ha. by Shri. Mithun.K
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. P.S. Easa & Dr. S. Sreekumar with the Field Inspectionand also directed
the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
Page 11
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates.
f. Tree cutting and planting details
g. Greenbelt development plan
h. Recent cluster certificate
i. Area demarcation required
j. Lab test details with NABL Accreditation details
k. District Survey Report
l. Details of ESA
m. Approved mining plan and drainage plan
n. Recent hazard zonation map
6. SIA/KL/MIN/145476/2020,1705/EC6/2020/SEIAA
Environmental Clearance for the Laterite (Building stone) Quarry project in
Re-Survey No. BL 11 244/3-3, 244/3-4, 244/3-5 of Pallikkal Village, Ernad
Taluk, Malappuram District, Kerala for an area of 0.1862 Ha by Vijosh P M
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
b. Lithological section with depth details indicating the profile of the Laterite.
c. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders
as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-
65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds
under CER. The CER activities incorporated in the EMP should be undertaken during
the first two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates.
7. SIA/KL/MIN/148469/2020,1710/EC6/2020/SEIAA
Environmental Clearance for the Laterite (Building stone) Quarry project in
Re-
SurveyNo.185/1ofKattipparuthyVillage,TirurTaluk,MalappuramDistrict,Keralaforane
Page 12
xtentof0.0971HabyShri. Ali,N
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. P.S. Easa & Dr. S. Sreekumar with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Lithological section indicating the profile of the Laterite.
b. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates.
8. SIA/KL/MIN/148500/2020,1711/EC6/2020/SEIAA
Environmental Clearance for the Laterite (Building stone) Quarry project in
Re-S u r v e y N o. 27 of Athavanad V il l a g e , Tirur Taluk,
MalappuramDistrict,Keralaforanextentof0.1940HabyAhammed Nasar M
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
b. Lithological section indicating the profile of the Laterite.
c. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders
as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-
65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds
under CER. The CER activities incorporated in the EMP should be undertaken during
the first two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
d. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
e. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
Page 13
the lease boundary certified by the Village Officer.
f. Biodiversity summary in tabular form
g. Detailed water level measurement data of nearby open wells with geo coordinates.
9. SIA/KL/MIN/149363/2020,1769/EC6/2020/SEIAA
Environmental Clearance for the Building stone quarry project of Sri.
SajanManioveranextentof0.9709Ha.inSy.No.2398ofPeechiVillage,ThrissurTaluk,Thriss
urDistrict,Kerala
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. P.S. Easa & Dr. S. Sreekumar with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates
f. Site- specific Garland & Drainage plan
10. SIA/KL/MIN/151675/2020,1709/EC6/2020/SEIAA
Environmental Clearance for the Building stone quarry project in Re- Sy. Nos.
26/9, 26/13, 26/10 & 26/11 of Wadakkanchery Village, Thalappilly Taluk,
Thrissur District, Kerala for an extent of 1.937 Ha.byM/s. Peacock Rock
Products.
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Drainage Plan
b. Compensatory afforestation plan with native Sp. Existed in the quarry site.
c. Proof of the application submitted for the permission from the National Board for
Wildlife.
d. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
Page 14
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
e. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
f. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
g. Monitoring well details
h. Compensatory afforestation plan
i. Biodiversity summary in tabular form
j. Detailed water level measurement data of nearby open wells with geo coordinates
11. SIA/KL/MIN/152637/2020,1706/EC6/2020/SEIAA
Environmental Clearance for the Laterite Quarry project in Re-Survey Nos.
57/12, 57/13 & 57/1 of Valambur
Village,PerinthalmannaTaluk,MalappuramDistrict,Keralafor
anextentof0.969675HabyMohammedFaisalP
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. S. Sreekumar & Shri. G. Sankar with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Lithological section indicating the profile of the Laterite.
b. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
c. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
d. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
e. Biodiversity summary in tabular form
f. Detailed water level measurement data of nearby open wells with geo coordinates.
12. SIA/KL/MIN/152770/2020,1708/EC6/2020/SEIAA
Environmental Clearance for the Laterite (Building stone) Quarry project in Re
Sy No 228/3-1, 228/3-4, 228/3-5 of Pookkottur Village, Ernad Taluk,
Malappuram District, Kerala over an extent of 0.3886 Ha in by Shri.Abdul
Page 15
Kareem
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. S. Sreekumar & Shri. G. Sankar with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Lithological section indicating the profile of the Laterite.
b. Revised project cost.
c. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
d. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
e. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
f. Biodiversity summary in tabular form
g. Detailed water level measurement data of nearby open wells with geo coordinates.
13. SIA/KL/MIN/152789/2020,1707/EC6/2020/SEIAA
Environmental Clearance for Laterite building stone quarry project in Re Sy
No-284/1, Block No.28 of Kavanur Village, Ernad Taluk, Malappuram District,
Kerala over an extent of 0.5533 Ha by of Moideen
Decision: The proponent and RQP were present. The RQP made the presentation. The
Committee entrusted Dr. S. Sreekumar & Shri. G. Sankar with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Lithological section indicating the profile of the Laterite.
b. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
c. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
d. A Recent survey map showing distance to residential/public buildings, inhabited sites,
Page 16
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
e. Biodiversity summary in tabular form
f. Detailed water level measurement data of nearby open wells with geo coordinates.
14. SIA/KL/MIN/156633/2020,1772/EC6/2020/SEIAA
Environmental Clearance for Laterite building stone quarry project in Sy No-
477/1-2 Vazhakkad Village, Kondotty Taluk, Malappuram District, Kerala for
an area of 0.7325Ha by Mr. Ismail. K.P
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. S. Sreekumar & Shri. G. Sankar with the field inspection and also
directed the proponent to submit the following additional documents /details:
a. Clarification regarding the production plan
b. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
c. Revised biodiversity assessment with quantification separately for the core and buffer
areas. c. A Recent survey map showing distance to residential/public buildings, inhabited
sites, canals, roads, electric lines, mobile towers, religious places etc., within 200 m.
radius of the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates
f. Lithological section indicating the profile of the Laterite.
15. SIA/KL/MIN/161364/2020,1765/EC6/2020/SEIAA
Environmental Clearance for Laterite building stone quarry project in Re
Survey No. 2/3-105, 2/3-102, 2/3-108, 2/3- 106& 2/3-103 of Irimbiliyam Village, Tirur
Taluk, Malappuram District, Kerala State for an extent of 0.7752Ha by Shri.Anil
Kumar
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. S. Sreekumar & Shri. G. Sankar with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
Page 17
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates
f. Details of top soil and its storage
g. Tree cutting and Greenbelt details
h. District Survey Report
i. Lithological section indicating the profile of the Laterite.
16. SIA/KL/MIN/161510/2020,1770/EC6/2020/SEIAA
Environmental Clearance for Laterite building stone quarry project in Re
Survey No. 2/3-16 & 2/1-45 of Irimbiliyam Village, Tirur taluk, Malappuram district,
Kerala State for an extent of 0.2958
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. S. Sreekumar & Shri. G. Sankar with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates
f. Details of top soil and its storage
g. Tree cutting and Greenbelt details
h. District Survey Report
Page 18
i. Lithological section indicating the profile of the Laterite.
17. SIA/KL/MIN/161725/2020,1717/EC6/2020/SEIAA
Environmental Clearance for Laterite building stone quarry project in Re-
Survey Nos. 382/4-15, 382/5-14 of Moorkkanad Village, Perintalmanna Taluk,
Malappuram District, Kerala for an extent of 0.4858 Ha by Sri.Aneesh
Ambalakath
Decision:The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. S. Sreekumar & Dr .A. V. Raghu with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates.
f. Lithological section indicating the profile of the Laterite.
g. Depth of water table during pre-monsoon and post - monsoon periods
18. SIA/KL/MIN/163206/2020,1733/EC6/2020/SEIAA
Environmental Clearance for Laterite building stone quarry project in Re Sy.
No-240/A-320inMoorkkanadvillage,
PerinthalmannaTaluk,MalappuramDistrict,Keralaforanareaof0.9928HabyMr.S
ameeh
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr.S.Sreekumar & Dr.A.V.Raghu with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Mine Closure Plan
b. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
Page 19
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
c. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
d. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
e. Biodiversity summary in tabular form
f. Detailed water level measurement data of nearby open wells with geo coordinates
g. Lithological section indicating the profile of the Laterite.
19. SIA/KL/MIN/50013/2019,1318/EC2/2019/SEIAA
Environmental Clearance for the Granite Building stone quarry project in
Survey No:488 of Vettathur village, Perinthalmanna Taluk,Malappuram
District, Kerala for an extent of 7.7085 Ha by Shri. Haridasan (Complaint
received from Sri. Unniyambath Muhammed)
Decision:The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Shri.K. Krishna Panicker & Dr. P.S. Easa with the Field Inspection and
also directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates.
20. SIA/KL/MIN/50538/2019,1378/EC2/2019/SEIAA
Expansion of Existing Building Stone Mine (Quarry, Minor Mineral Mining)
project of M/s Kilinakod Rock Products Pvt. Ltd. at Re-Survey Nos. 24/3
pt.,25/2, 27/1, 28/2, 28/3 of Oorakam Village, Thirurangadi Taluk, Malappuram
district. (Complaint received from Ooragam Mala Samrakshana Janakeeya
Page 20
Action Samithy & Sri.Apputti)
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Compensatory afforestation plan with native Species.
b. Slope stability study details
c. Report from MoEF&CC
d. Clarification on the complaints received.
e. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
f. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
g. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
h. Biodiversity summary in tabular form
i. Afforestation plan
j. Detailed water level measurement data of nearby open wells with geo coordinates
AGENDA 2
1. SIA/KL/MIN/126475/2019,1724/EC3/2020/SEIAA
Environmental Clearance for the building stone quarry at Re-Survey No. 104/8-
1pt, 110/7pt, Block No.12 of Vengoor Village, Kunnathunad Taluk, Ernakulam
District, Kerala for an Area of0.6046Ha byMr. Tijo Lalu
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Revised Drainage plan
b. Compensatory afforestation plan
c. OB dumping site
d. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
Page 21
e. Drainage plan to be site specific with silt traps
f. Map showing OB dumping site
g. Site-specific compensatory afforestation plan
h. Details of ESA
i. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
j. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
k. Biodiversity summary in tabular form
l. Detailed water level measurement data of nearby open wells with geo coordinates.
2. SIA/KL/MIN/131666/2019,1783/EC3/2020/SEIAA
Building Stone Quarry of Mr. P. V. Santhosh for an area of 0.9998 Ha 288/1-
1,288/1-2,287/2,288/3atMazhuvannoorVillage,Kunnathunadutaluk,Ernakulam
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Shri. K. Krishna Panicker & Dr. N. Ajithkumar with the Field Inspection
and also directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates
f. Recent cluster certificate
3. SIA/KL/MIN/133526/2019,1734/EC3/2020/SEIAA
Environment Clearance in respect of the Proposed Granite Building Stone
Quarry over an extent of 1.6939 Hectares in Re-Survey Nos. 223/2pt and 227/1pt
ofAlakodeVillage,ThodupuzhaTaluk,IdukkiDistrict,KeralabyMr.BinoyJose
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Shri. G. Sankar & Dr. N. Ajithkumar with the Field Inspection.
Page 22
4. SIA/KL/MIN/136876/2020,1687/EC3/2020/SEIAA
Granite Building Stone Quarry of Shri. Shine Mathew over an extent of 1.0336
Ha. (2.5540Acres)in BlockNo.13,Re-Sy. No. 541/2, Purappuzha Village,
Thodupuzha Taluk, Idukki District, Kerala State, India.
Decision: The proponent and RQP were present. The RQP made the presentation. The
Committee entrusted Shri. G. Sankar and Dr.N.Ajithkumar with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Water level data of nearby open wells with geo coordinates
f. Tree cutting & Green belt details with species specification
g. 500m Land use and Land cover map
h. Pre- feasibility Report
i. ESA details
5. SIA/KL/MIN/137503/2020,1720/EC3/2020/SEIAA
Granite Building stone quarry of “Mr.Saji Sebastian, Sy.No:
128/3Bpt,128/4pt,129/1-4pt,129/2-1pt, in Arakkuzha Village, Muvattupuzha
Taluk, Ernakulam District, Kerala
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Compensatory afforestation plan
b. Tree cutting Quantitative information in Core & Buffer zone.
c. Modified CER
d. Site specific drainage map with silt traps
e. Recent cluster Certificate
f. Area demarcated for compensatory afforestation and plan
g. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
Page 23
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
h. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
i. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
j. Biodiversity summary in tabular form
k. Detailed water level measurement data of nearby open wells with geo coordinates.
6. SIA/KL/MIN/139395/2020,1703/EC3/2020/SEIAA
Granite Building Stone Quarry of M/s. St. Augustine‟s Granites” over an extent
of 3.6352 Ha. (8.9825 Acres) Re-Sy. Block No. 28, Re-Sy. Nos. 101/3, 102/4-2,
102/5, 102/5-1, 102/6, 102/7, 102/8, 179/1, 179/1-1, 179/3-1, 179/3-2, 179/3-3,
Ramapuram Village, Meenachil Taluk, Kottayam District, Kerala
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Recent Cluster Certificate
b. Tree cutting Quantitative information in Core & Buffer zone.
c. Bore well details
d. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
e. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
f. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
g. Biodiversity summary in tabular form
h. Detailed water level measurement data of nearby open wells with geo coordinates
i. Proof of the application submitted for the permission from the National Board for
Wildlife
j. Recent cluster certificate
7. SIA/KL/MIN/143147/2020,1755/EC3/2020/SEIAA
Granite Building Stone Quarry at Survey No. 73/1B, 73/2B of Muvattupuzha
Village, Muvattupuzha Taluk, Ernakulam, Kerala over an extent of 0.7091 Ha
of Mr. Jiji P Ulahannan
Page 24
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Latest cluster certificate
b. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
c. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
d. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
e. Biodiversity summary in tabular form
f. Detailed water level measurement data of nearby open wells with geo coordinates.
g. Tree cutting and planting details
h. Recent cluster certificate
8. SIA/KL/MIN/144310/2020,1725/EC2/2020/SEIAA
Environmental Clearance for Building Stone quarry project in Sy. No- 428/pt of
Thayannur Village, Vellarikund Taluk, Kasaragod District of Kerala for an
extent of 0.5267 Ha by Mr .Rajan V.V
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Compensatory afforestation
b. Revision of EMP cost
c. Drainage map should be redrawn separating buffer and garland canal
d. Hazard zonation map
e. Recent Cluster Certificate.
f. Detailed Project report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
g. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
h. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
i. Afforestation plan
Page 25
j. Biodiversity summary in tabular form
k. Detailed water level measurement data of nearby open wells with geo coordinates.
9. SIA/KL/MIN/146311/2020,1712/EC3/2020/SEIAA
Environmental Clearance for the building stone quarry at Survey
No.66/1,66/2A,66/2A,66/2B,128/2A,128/2B3,128/2B2,128/3A,128/3B2,of
ArakkuzhaVillage, Muvattupuzha Taluk, Ernakulam District, Kerala for an
Area of 1.7634 Ha by Saji Sebastian.
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Biodiversity summary in tabular form
b. Tree cutting details
c. Recent cluster Certificate
d. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
e. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
f. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
g. Detailed water level measurement data of nearby open wells with geo coordinates.
10. SIA/KL/MIN/151402/2020,1732/EC3/2020/SEIAA
Environment Clearance for Granite Building Stone Quarry over an extent of
1.5608 Hectares in situated at Sy.No: 219/1,219/2,219/3 in Manimala Village,
Kanjirappally Taluk, Kottayam District, Kerala State by Mr. Suraj Thomas,
Managing Partner, M/S. Seven Stars Granites
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Tree cutting details
b. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
c. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
Page 26
d. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
e. Biodiversity summary in tabular form
f. Detailed water level measurement data of nearby open wells with geo coordinates.
g. ESA Details
h. Overflow channel of garland drainage is to be connected to natural drain.
i. OB site is to be shifted to an appropriate place
11. SIA/KL/MIN/160178/2020,1798/EC6/2020/SEIAA
Environment Clearance for Granite Building Stone Quarry in Re Survey Nos.
365/1-7, 365/1-4, 365/1- 5,365/1-3,365/3,365/1-2 & 365/2 in Kavanur Village,
Ernad Taluk, Malappuram District, Keralaover an extent of 1.7830 Ha
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form e. Water level data of nearby open wells with geo
coordinates
e. Greenbelt plan
f. 500m Land use & Land cover map
12. SIA/KL/MIN/163594/2020,1756/EC3/2020/SEIAA
Granite Building Stone Quarry of Mr. Dineesh Vijayan at Re. Sy. No. 140/2,
140/2-1, 140/2-1-1 of Vallichira Village, Meenachil Taluk, Kottayam District of
Kerala for an extent of 0.7137 Ha
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Compensatory afforestation with native Sp.
b. Tree cutting details
c. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
Page 27
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
d. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
e. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
f. Biodiversity summary in tabular form
g. Detailed water level measurement data of nearby open wells with geo coordinates
13. SIA/KL/MIN/164009/2020,1372/EC2/2019/SEIAA
Environmental Clearance Building Stone Mine Quarry Project of Mr.Rajan
Thomas at Re Survey Nos. 205/3, 205/5, 199/3, 199/8, 199/7, 199/7-1, 199/9,
199/6-1, 198/1, 198/2, 197/1, 198/5, 198/5-6, 198/4, 207/1, 198/3, 206/2, 206, 206/4,
206/1, 206/3 of Kanjirappally Village & Panchayat, Kanjirappally Taluk,
Kottayam District, Kerala for an area of 4.9231 Ha
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Shri. K. Krishna panicker & Dr. N. Ajithkumar with the Field Inspection
and also directed the proponent to submit the following additional documents /details:
a. Revised buffer area plan
b. Site- specific drainage plan
c. Specific plan for reuse of water
d. Water quality assessment and maintenance
e. Sediments test report & Source of minerals
f. Solution for biological pollution of water
g. Production revision
h. Compensatory afforestation plan
i. Production plan of endemic plants.
j. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
14. SIA/KL/MIN/164222/2020,1757/EC3/2020/SEIAA
Environmental Clearance for the building stone quarry at Re Survey
No.171/8,of Airapuram Village, Kunnathunad Taluk, Ernakulam District,
Kerala for an Area of 0.9995 Ha. By N S Ganesh, Managing Partner, M/S
ESSGEE Trading and infrastructure
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Page 28
Committee directed the proponent to submit the following additional documents /details:
a. Recent cluster Certificate
b. Tree cutting details
c. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
d. Details of monitored wells
e. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
f. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
g. Biodiversity summary in tabular form
h. Detailed water level measurement data of nearby open wells with geo coordinates
15. SIA/KL/MIN/166510/2020,1811/EC3/2020/SEIAA
Building Stone Mine (Quarry, Minor Mineral Mining) project of M/s
Chattupara Granites Private Limited at Survey Nos.734/1B-32, 734/1B-34-3,
734/1B-34-4 of Kalloorkkad Village, Muvattupuzha Taluk, Ernakulam District,
Kerala in an area of 0.9700 hectares.
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Shri. K. Krishna Panicker and Dr. N. Ajithkumar for Field Inspection
and also directed the proponent to submit the following documents/details:
a. Proposal for biodiversity restoration for butterfly attraction should be site specific.
b. Workout maximum creditable flood accident potential.
c. Modified Form1M considering the changes in the nearest houses
d. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
16. SIA/KL/MIN/169050/2020,1785/EC3/2020/SEIAA
Environmental Clearance for Ordinary Earth Mining Project of Mrs.Anu J
Kadavan, over an extent of 0.5685 Ha in Re Sy No-406/2-3-2 of Vazhakulam
Village, Kunnathunad Taluk, Ernakulam District, Kerala
Page 29
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Shri. K. Krishna Panicker and Dr. N. Ajithkumar with the Field
Inspectionand also directed the proponent to submit the following documents/details:
a. Quantity should be specified in demand letter
b. Recent demand letter from the end user.
17. SIA/KL/MIN/174851/2020,1800/EC6/2020/SEIAA
Application for Environmental Clearance for the Laterite building stone quarry
project in ReSurvey No. 477/1-2 of Vazhakkad village, Kondotty taluk,
Malappuram district, Kerala for an area of 0.7649 Ha by Mr. Abu Thahir P
Decision: The proponent and RQP were present. The RQP made the presentation. The
Committee entrusted Dr. S. Sreekumar & Shri. G. Sankar with the Field Inspectionand also
directed the proponent to submit the following documents/details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Water level data of nearby open wells with geo coordinates
f. Lithological section indicating the Laterite profile.
18. SIA/KL/MIN/179449/2020,1814/EC3/2020/SEIAA
Environmental Clearance for Ordinary Earth Mining Project of Mr.Mathachan
P.J, over an extent of 0.9692 Ha in Re Sy No-440/1-2, 440/12-2, 440/2-2-2-2,
440/2-2-2 of Aikaranadu North Village, Kunnathunad Taluk, Ernakulam
District, Kerala
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Shri. K. Krishna Panicker and Dr. N. Ajithkumar with the Field
Inspection.
19. SIA/KL/MIN/34543/2019,1589/EC1/2020/SEIAA
Granite Building Stone Quarry of Mr. Jose Varghese at Sy. No. 5/1 of Alakode
Village, Thodupuzha Taluk, Idukki District, Kerala
Page 30
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Revised project cost
b. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
c. Recent cluster Certificate
d. Details of monitored wells
20. SIA/KL/MIS/142842/2020,1741/EC3/2020/SEIAA
Environmental Clearance of the proposed Residential Building Project „Jains
Marine Bay‟ at Ponjikara, Ernakulam at Re survey No. Re. Survey No. 281/7-2,
280/5-2, 280/4, 281/8-2, 281/5- 2, 281/73, 280/83, 281/13, 280/32, 280/2, 281/3,
281/4, 281/22, 281/114, 281/93,281/152,281/162,280/7, 281/1, 281/18, 281/12,
281/19, 281/6-2, 280/6 at Mulavukad Village, Kanayannur Taluk, Ernakulam
District
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. N. Ajithkumar & Er. M. Dileepkumar with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC
b. Include Mangrove associate species in the planting proposed
AGENDA 3
1. SIA/KL/MIN/132702/2019,1726/EC2/2020/SEIAA
Environment Clearance for mining lease of Granite Building Stone Quarry
ofShri.Byju T.V over an extent of 1.5913 Ha.(3.9321 Acres) at SyNo. 506/2Pt,
Kanjirangad Village, Mananthavady Taluk, Wayanad District, Kerala
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Recent cluster certificate
Page 31
b. Biodiversity Revision
c. Compensatory Afforestation
d. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
e. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
f. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
g. Biodiversity summary in tabular form
h. Detailed water level measurement data of nearby open wells with geo coordinates. f.
Details of tree cutting
i. Recent Air, Water and other parameters test results.
j. 500m Landuse and Land cover map
k. ESA details
2. SIA/KL/MIN/133893/2019,1788/E2/2020/SEIAA
Environment Clearance for mining of „Granite Building Stone Quarry of M/s.
Pulpally Stone Crushers‟ over an extent of 0.7905 Ha.(1.9533 Acres) at Re-
Sy.Nos. 399/1, 399/15 & 399/18, Padichira Village, Sulthan Bathery Taluk,
Wayanad District, Kerala by Shri. Binoj K Baby
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities
in physical terms to be undertaken by the proponent in consultation with the
stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM
No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of
funds under CER. The CER activities incorporated in the EMP should be undertaken
during the first two years of validity period of the EC so as to ensure that the
maintenance of the interventions undertaken can be done by the proponent during the
remaining validity period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form e. Water level data of nearby open wells with geo
coordinates
e. DSR
f. Tree cutting details & Green belt plan with species specification.
g. 500m Land use and Land cover map
Page 32
h. ESA details
3. SIA/KL/MIN/134824/2020,1729/EC2/2020/SEIAA
Environment Clearance for mining of Granite Building Stone Quarry of Mr.
Safarulla, K. at Re-Sy.No-320/1,321/2 of Vorkady Village, Manjeshwaram
Taluk, Kasaragod District of Kerala for an extent of 0.1920 Ha
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities
in physical terms to be undertaken by the proponent in consultation with the
stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM
No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of
funds under CER. The CER activities incorporated in the EMP should be undertaken
during the first two years of validity period of the EC so as to ensure that the
maintenance of the interventions undertaken can be done by the proponent during the
remaining validity period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates.
f. Details of tree cutting /planting required
g. Detailed afforestation plan
4. SIA/KL/MIN/140590/2020,1791/EC2/2020/SEIAA
Environment Clearance for Granite buildingstone quarrying located in Re-Sy.
Nos.382/1, &382/5,PadichiraVillage, Sulthan Bathery Taluk, Wayanad
District, Kerala Stateoveranextentof0.7300HabySri.JobyJohn
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders
as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-
65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds
under CER. The CER activities incorporated in the EMP should be undertaken during
the first two years of validity period of the EC so as to ensure that the maintenance of
the interventions undertaken can be done by the proponent during the remaining
validity period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
Page 33
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates
f. Proof of the application submitted for the permission from the National Board for
Wildlife
g. Revised drainage plan
h. Report on slope stability
i. Green belt plan with mixed crop
5. SIA/KL/MIN/142152/2020,1737/EC4/2020/SEIAA
EnvironmentalClearanceforLateritebuildingstonequarryofMr.Suresh.T,over
an extent of 0.4047 Ha, Resy no-113/21(113/2) in Mavoor Village,Kozhikode
Taluk, Kozhikode District,Kerala
Decision: The proponent and RQP were present. The RQP made the presentation. The
Committee entrusted Shri. K. Krishna Panicker and Dr. P.S Easa for Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
c. Biodiversity summary in tabular form
d. Detailed water level measurement data of nearby open wells with geo coordinates.
e. Lithological cross section with depth details
6. SIA/KL/MIN/149660/2020,1682/EC1/2020/SEIAA
Environment Clearance for Granite building stone quarry in Sy.No: 137/4-11,
137/4-11-1, 137/422, 137/4-21 in Thachanattukara-1 Village, Mannarkkad
Taluk, Palakkad District, Kerala by Sri.Mujeeb P.K
Decision: The proponent was not present online and intimated the inconvenience to
attend the meetingdue to regional lockdown, over phone. The RQP was present and he
made the presentation. The Committee directed the proponent to submit the following
additional documents /details:
a. Revised mining plan, the depth of the benches should be limited without affecting
the water table.
b. Revised CER focusing on the green infrastructure development
Page 34
c. Detailed Project Report on the Revised EMP incorporating the specific CER
activities in physical terms to be undertaken by the proponent in consultation with
the stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and
OM No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of
allocation of funds under CER. The CER activities incorporated in the EMP should
be undertaken during the first two years of validity period of the EC so as to ensure
that the maintenance of the interventions undertaken can be done by the proponent
during the remaining validity period of the EC.
c. Project cost should be revised realistically
d. Revised drainage plan
e. Biodiversity assessment for core and buffer
f. Detailed greenbelt plan
7. SIA/KL/MIN/150672/2020,1680/EC1/2020/SEIAA
Environment Clearance for Granite building stone quarry in Sy.No: 142/1 , in
Thachanattukara-1 Village, Mannarkkad Taluk, Palakkad District, Kerala by
Sri. Muhammed Mammunni
Decision: The proponent’s representative and the RQP were present. The RQP
made the presentation. The Committee directed the proponent to submit the revised
presentation with the documents sought in 120th
SEAC meeting besides the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER
activities in physical terms to be undertaken by the proponent in consultation with
the stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and
OM No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of
allocation of funds under CER. The CER activities incorporated in the EMP should
be undertaken during the first two years of validity period of the EC so as to ensure
that the maintenance of the interventions undertaken can be done by the proponent
during the remaining validity period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and
buffer areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited
sites, canals, roads, electric lines, mobile towers, religious places etc., within 200 m.
radius of the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates
f. Site specific drainage plan
g. Revised project cost
h. Tree cutting details
i. Hazard Zonation Map
j. Detailed greenbelt plan
8. SIA/KL/MIN/152787/2020,1716/EC1/2020/SEIAA
Environment Clearance for Granite Building stone quarry At Re Survey No:
24/1, 25/4, Block No: 50 in Mangalam Dam Village, Alathur Taluk, Palakkad
Page 35
District, Kerala State by Shri. M V Antoo
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to revise the proposal in toto on account of the facts that
details relating to biodiversity, including faunal biodiversity is lacking, CER detailing is
sketchy and there is no comprehensive plan for CER as part of EMP. Drainage including the
natural drains need to be reworked, and how the depth of 40 meter of mining is going to
impinge the ground water level of the proposed site, whether the proposed area is under ESA.
The Committee also decided to direct the proponent to submit the following additional
documents/details:
a. Tree cutting plan
b. Recent cluster certificate
c. Detailed Project Report on the Revised EMP incorporating the specific CER activities
in physical terms to be undertaken by the proponent in consultation with the
stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM
No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation
of funds under CER. The CER activities incorporated in the EMP should be undertaken
during the first two years of validity period of the EC so as to ensure that the
maintenance of the interventions undertaken can be done by the proponent during the
remaining validity period of the EC.
d. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
e. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
f. Biodiversity summary in tabular form
g. Detailed water level measurement data of nearby open wells with geo coordinates.
h. Greenbelt plan
9. SIA/KL/MIN/153085/2020,1777/EC1/2020/SEIAA
EnvironmentalClearancefortheProposedGranite(BuildingStone)QuarryinBlock
no.83, Re Survey No: 66 of Ambalappara -II and Block No.80, ReSy.No:287/17
of Ambalappara-I village in Ottappalam Taluk, Palakkad
District,KeralabyShri.P.K.Abdul KhaderofM/S FathimaGranites
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Dr. S Sreekumar and Dr. A.V Raghu for the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
Page 36
areas.
c. Legible Recent survey map showing distance to residential/public buildings, inhabited
sites, canals, roads, electric lines, mobile towers, religious places etc., within 200 m.
radius of the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates
f. Recent cluster certificate
g. Revised project cost
h. Compensatory afforestation plan
10. SIA/KL/MIN/154284/2020,1736/EC4/2020/SEIAA
Building Stone Mine (Quarry, Minor Mineral Mining) project of M/s Star
Granites situated at Re-Sy. No.2/1B, Re-Sy.BlockNo.5,ofKedavoorVillage,
Thamarassery Taluk, Kozhikode District, Kerala
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Recent cluster certificate
b. Air quality report
c. Buffer & Drainage to be site - specific
d. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
e. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
f. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
g. Biodiversity summary in tabular form
h. Detailed water level measurement data of nearby open wells with geo coordinates.
i. Location sketch
11. SIA/KL/MIN/156925/2020,1743/EC4/2020/SEIAA
EnvironmentalClearanceforLateriteBuildingStoneQuarryofMr.SaneeshKat Sy.
No 46/726, 727, 728, 729, 730, 731, 732, 733 of Kalliad Village, Iritty
Taluk,KannurDistrictofKeralaforanextentof0.9711Ha
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Page 37
Committee entrusted Dr. R. Ajayakumar Varma and Dr. N. Anil Kumar with the field inspection
directed the proponent to submit the documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates.
f. List of trees to be planted in green belt
g. Vertical lithological section
h. Drainage plan showing water flow to the natural drain.
12. SIA/KL/MIN/158875/2020,1751/EC1/2020/SEIAA
Environmental Clearance for the proposed granite building stone quarry in
ReSy. No35/1ofVallappuzhaVillage,PattambiTaluk, Palakkad District for an
area of 0.7099 Ha. by President, Ottappalam Taluk Karinkal Quarry Operators
Industrial Co-Operative Society Ltd.
Decision:The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. Detailed greenbelt/afforestation plan
d. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer. d. Biodiversity summary in tabular
form
e. Detailed water level measurement data of nearby open wells with geo coordinates.
Page 38
f. Recent cluster certificate.
13. SIA/KL/MIN/159168/2020,1752/EC1/2020/SEIAA
Environmental Clearance for the proposed granite buildingstone quarryin Re-
Sy. No.492/3, Block No.19 of Thiruvegappura Village, Pattambi Taluk,
Palakkad District for an area of 0.4177 Ha. by President, Ottappalam Taluk
Karinkal Quarry Operators Industrial Co- Operative Society Limited
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Revised project cost
b. Revised drainage plan
c. Afforestation plan (consider rejuvenation of Sacred Groves)
d. Recent cluster certificate
e. Detailed Project Report on the Revised EMP incorporating the specific CER
activities in physical terms to be undertaken by the proponent in consultation with
the stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and
OM No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of
allocation of funds under CER. The CER activities incorporated in the EMP should
be undertaken during the first two years of validity period of the EC so as to ensure
that the maintenance of the interventions undertaken can be done by the proponent
during the remaining validity period of the EC.
f. Revised biodiversity assessment with quantification separately for the core and
buffer areas.
g. A Recent survey map showing distance to residential/public buildings, inhabited
sites, canals, roads, electric lines, mobile towers, religious places etc., within 200 m.
radius of the lease boundary certified by the Village Officer.
h. Biodiversity summary in tabular form
i. Detailed water level measurement data of nearby open wells with geo coordinates.
14. SIA/KL/MIN/160638/2020,1721/EC2/2020/SEIAA
Environmental Clearance for Building Stone Quarry of Mr.S.Sundarasan over
an extent of 0.7678 Ha. Re Survey no.114/2-1,115/6-4-2,113/6,113/4- 2,113/13, of
PuthoorVillage,KottarakkaraTaluk,KollamDistrict
Decision: The proponent and the RQP were present. The RQP made the presentation.The
Committee directed the proponent to submit the following additional documents /details:
a. Clarification regarding the OB dumping site
b. Modified garland plan
c. Detailed Project Report on the Revised EMP incorporating the specific CER
activities in physical terms to be undertaken by the proponent in consultation with
the stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and
OM No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of
allocation of funds under CER. The CER activities incorporated in the EMP should
be undertaken during the first two years of validity period of the EC so as to ensure
that the maintenance of the interventions undertaken can be done by the proponent
Page 39
during the remaining validity period of the EC.
d. Revised biodiversity assessment with quantification separately for the core and
buffer areas.
e. A Recent survey map showing distance to residential/public buildings, inhabited
sites, canals, roads, electric lines, mobile towers, religious places etc., within 200 m.
radius of the lease boundary certified by the Village Officer.
f. Biodiversity summary in tabular form
g. Detailed afforestation plan
h. Detailed water level measurement data of nearby open wells with geo coordinates.
15. SIA/KL/MIN/161938/2020,1727/EC2/2020/SEIAA
Environment Clearance for Granite Building Stone Quarry of Mr. Sudheesh A
T at Re Survey No: 129/20,129/19,134/6,134/7 of Padichira Village, Sulthan
Bathery Taluk, Wayanad District, Kerala for an area of1.8407 hectares
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
b. Tree cutting details and restoration plan
c. Details regarding the application for wildlife clearances from nearby ESZs.
d. Detailed Project Report on the Revised EMP incorporating the specific CER
activities in physical terms to be undertaken by the proponent in consultation with
the stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and
OM No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of
allocation of funds under CER. The CER activities incorporated in the EMP should
be undertaken during the first two years of validity period of the EC so as to ensure
that the maintenance of the interventions undertaken can be done by the proponent
during the remaining validity period of the EC.
e. Revised biodiversity assessment with quantification separately for the core and
buffer areas.
f. A Recent survey map showing distance to residential/public buildings, inhabited
sites, canals, roads, electric lines, mobile towers, religious places etc., within 200 m.
radius of the lease boundary certified by the Village Officer.
g. Biodiversity summary in tabular form
h. Eco-restoration plan
i. Detailed water level measurement data of nearby open wells with geo coordinates.
j. Provide more silt traps in garland drainage plan and link to the natural drainage.
16. SIA/KL/MIN/161967/2020,1747/EC1/2020/SEIAA
Environmental Clearance for the Proposed Granite (Building Stone) Quarry in
Re-SurveyNos.98/2-1,98/1,98/1-1inNellanadVillage,NedumangadTaluk,
Thiruvananthapuram District, Kerala by Sri.Abdul Nazar A
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Page 40
Committee directed the proponent to submit the following additional documents /details:
a. Revised Project Cost
b. Detailed Project Report on the Revised EMP incorporating the specific CER
activities in physical terms to be undertaken by the proponent in consultation with
the stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and
OM No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of
allocation of funds under CER. The CER activities incorporated in the EMP should
be undertaken during the first two years of validity period of the EC so as to ensure
that the maintenance of the interventions undertaken can be done by the proponent
during the remaining validity period of the EC.
c. Revised biodiversity assessment with quantification separately for the core and
buffer areas.
d. A Recent survey map showing distance to residential/public buildings, inhabited
sites, canals, roads, electric lines, mobile towers, religious places etc., within 200 m.
radius of the lease boundary certified by the Village Officer.
e. Biodiversity summary in tabular form
f. Detailed water level measurement data of nearby open wells with geo coordinates
g. Clarification on the complaints received on 14.06.2021 from Kadal Kaani Paara
Action Council.
17. SIA/KL/MIN/163854/2020,1773/EC1/2020/SEIAA
Environmental Clearance for the Granite Building Stone Quarry of M/s. Delta
Aggregates &Sand Pvt.Ltdoveranextentof3.7691Ha.atSurvey.Nos. 889/1-15-
1&889/1-15,PerunadVillage,RanniTaluk,Pathanamthitta District, Kerala
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Shri. G. Sankar and Smt.Beena Govindan with the Field Inspection and also
directed the proponent to submit the following additional documents /details:
a. Afforestation details
b. Detailed Project Report on the Revised EMP incorporating the specific CER
activities in physical terms to be undertaken by the proponent in consultation with
the stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and
OM No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of
allocation of funds under CER. The CER activities incorporated in the EMP should
be undertaken during the first two years of validity period of the EC so as to ensure
that the maintenance of the interventions undertaken can be done by the proponent
during the remaining validity period of the EC.
c. Revised biodiversity assessment with quantification separately for the core and
buffer areas.
d. A Recent survey map showing distance to residential/public buildings, inhabited
sites, canals, roads, electric lines, mobile towers, religious places etc., within 200 m.
radius of the lease boundary certified by the Village Officer.
e. Biodiversity summary in tabular form
Page 41
f. Detailed greenbelt/afforestation plan
g. Detailed water level measurement data of nearby open wells with geo coordinates
18. SIA/KL/MIN/170197/2020,1776/EC1/2020/SEIAA
Environmental Clearance for the Proposed Granite Building Stone Quarry of
Mr. Anish S atRe.Sy.No.136/pt,137/ptof Kozhipathy Village, Chittur Taluk,
Palakkad District, Kerala
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Tree cutting details
b. Google map showing distance to the nearest wild life Sanctuary
c. Detailed Project Report on the Revised EMP incorporating the specific CER
activities in physical terms to be undertaken by the proponent in consultation with
the stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and
OM No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of
allocation of funds under CER. The CER activities incorporated in the EMP should
be undertaken during the first two years of validity period of the EC so as to ensure
that the maintenance of the interventions undertaken can be done by the proponent
during the remaining validity period of the EC.
d. Revised biodiversity assessment with quantification separately for the core and
buffer areas.
e. Site-specific drainage plan
f. A Recent survey map showing distance to residential/public buildings, inhabited
sites, canals, roads, electric lines, mobile towers, religious places etc., within 200 m.
radius of the lease boundary certified by the Village Officer.
g. Biodiversity summary in tabular form
h. Detailed afforestation plan
i. Detailed water level measurement data of nearby open wells with geo coordinates
j. ESA details
k. Valid RQP certificate
19. SIA/KL/MIN/170229/2020,1795/EC1/2020/SEIAA
Environmental Clearance for the Proposed Granite (BuildingStone)Quarryin
BlockNo:33,Re-SurveyNos: 369/1/2,368/4/1,368/3 in Ongallur II Village,
Pattambi Taluk, Palakkad District, Kerala by Sri. Abdul Gafoor
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Revised site specific Drainage map
b. Detailed Project Report on the Revised EMP incorporating the specific CER
activities in physical terms to be undertaken by the proponent in consultation with
the stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and
OM No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of
allocation of funds under CER. The CER activities incorporated in the EMP should
be undertaken during the first two years of validity period of the EC so as to ensure
Page 42
that the maintenance of the interventions undertaken can be done by the proponent
during the remaining validity period of the EC.
c. Revised biodiversity assessment with quantification separately for the core and
buffer areas.
d. A Recent survey map showing distance to residential/public buildings, inhabited
sites, canals, roads, electric lines, mobile towers, religious places etc., within 200 m.
radius of the lease boundary certified by the Village Officer.
e. Biodiversity summary in tabular form e. Water level data of nearby open wells with
geo coordinates
f. Form1M
g. OB dumping site
h. Drainage map
i. Proof of the application submitted for the permission from the National Board for
Wildlife.
20. SIA/KL/MIN/41970/2019,1715/EC1/2020/SEIAA
EnvironmentclearancefortheProposedGraniteBuildingStoneQuarryoveran
extent of 1.2120 Hectares in Re-Survey No. 222part (Govt. Land.) at
Pazhayakunnummel Village, Block No.-33, Chirayinkeezhu Taluk,
Thiruvananthapuram District of Kerala State by Mr. SAKKEER,A.
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee directed the proponent to submit the following additional documents /details:
a. Rock fall and slope stabilization
b. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
c. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
d. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
e. Biodiversity summary in tabular form
f. Detailed water level measurement data of nearby open wells with geo coordinates.
g. Recent cluster certificate
h. Google map with boundary pillars
AGENDA 4
Page 43
1. SIA/KL/MIN/134486/2020,1790/EC4/2020/SEIAA
Environmental Clearance for the building stone quarry of Sri. Shamseer VK,
projectis situated atRe Survey No. 2/18, 2/20, 2/46, 2/76, 2/77, 2/78 in Raroth
Village, Thamarassery Taluk, Kozhikode District, and Kerala for an
areaof0.9926hectares
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee decided to direct the proponent to submit the following additional documents
/details:
a. OB dumping site clarification
b. Recent cluster certificate
c. Details of water resources
d. Detailed Project Report on the Revised EMP incorporating the specific CER
activities in physical terms to be undertaken by the proponent in consultation with
the stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and
OM No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of
allocation of funds under CER. The CER activities incorporated in the EMP should
be undertaken during the first two years of validity period of the EC so as to ensure
that the maintenance of the interventions undertaken can be done by the proponent
during the remaining validity period of the EC.
e. Revised biodiversity assessment with quantification separately for the core and
buffer areas.
f. A Recent survey map showing distance to residential/public buildings, inhabited
sites, canals, roads, electric lines, mobile towers, religious places etc., within 200 m.
radius of the lease boundary certified by the Village Officer.
g. Biodiversity summary in tabular form
h. Detailed water level measurement data of nearby open wells with geo coordinates
i. Hazard Zonation Map
j. Approved mining plan
k. Greenbelt development plan
2. SIA/KL/MIN/136866/2020,1719/EC3/2020/SEIAA
Environment Clearance for mining permit of “Granite Building Stone Quarry
of M/s. Kadanadu Granites” over an extent of 0.7452 Ha. (1.8413 Acres) in
BlockNo.30,Re-Sy.Nos.327,1-1&327/1-1-1,KadanaduVillage, Meenachil Taluk,
Kottayam District, Kerala State,India.
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee decided to direct the proponent to submit the following additional documents
/details:
a. OB & Garland canal to be redrawn
b. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
Page 44
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
c. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
d. Recent cluster certificate
e. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
f. Biodiversity summary in tabular form
g. Detailed water level measurement data of nearby open wells with geo coordinates.
3. SIA/KL/MIN/138256/2020,1702/EC4/2020/SEIAA
Building Stone Quarry of Mr. K.K. Mohammed ,overanextentof0.9199 Haat
Re.Sy.No188/2 in Kodiyathur Village, KozhikodeTaluk, Kozhikode District,
Kerala.
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee entrusted Sri. K. Krishna Panicker and Dr. P.S Easa with the Field Inspection and
also directed the proponent to submit the following additional documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Water level data of nearby open wells with geo coordinates
f. Revised project cost
g. Tree cutting details and Greenbelt plan with species details
h. DSR
4. SIA/KL/MIN/148123/2020,1658/EC6/2020/SEIAA
Environmental clearance for Granite building stone quarry of Mr. Kunhalan .K,
for an extent of 0.8165 Ha Re. Sy. Nos. 211/1, 211/3-2 (Block No. 59) of Pulpatta
Village, Eranad Taluk, Malappuram District, Kerala
Decision:The proponent and the RQP were present. The RQP made the presentation.The
Page 45
Committee decided to direct the proponent to submit the following additional documents
/details:
1. Detailed Project Report on the Revised EMP incorporating the specific CER activities
in physical terms to be undertaken by the proponent in consultation with the
stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and
OM No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of
allocation of funds under CER. The CER activities incorporated in the EMP should
be undertaken during the first two years of validity period of the EC so as to ensure
that the maintenance of the interventions undertaken can be done by the proponent
during the remaining validity period of the EC.
2. DSR
5. SIA/KL/MIN/148582/2020,1690/EC4/2020/SEIAA
Environmental Clearance for Laterite Building Stone Quarry of Mr .Gopi at Re-
Sy. No- 33/1 of Naduvannur Village, Koyilandy Taluk, Kozhikode
DistrictofKeralaforanextentof0.2429HaunderB2category
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee decided to direct the proponent to submit the following additional documents
/details:
a. Details regarding post-mining activity
b. Detailed Project Report on the Revised EMP incorporating the specific CER activities
in physical terms to be undertaken by the proponent in consultation with the
stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and
OM No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of
allocation of funds under CER. The CER activities incorporated in the EMP should
be undertaken during the first two years of validity period of the EC so as to ensure
that the maintenance of the interventions undertaken can be done by the proponent
during the remaining validity period of the EC.
c. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
d. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius
of the lease boundary certified by the Village Officer.
e. Biodiversity summary in tabular form
f. Water level data of nearby open wells with geo coordinates
g. 500m Land use and Landover map
h. Lithological section indicating the Laterite profile
6. SIA/KL/MIN/156447/2020,1731/EC3/2020/SEIAA
Environmental Clearance for the building stone quarry at Survey
No.338/1A/20/D&D2 of Keerampara Village, KothamangalamTaluk, Ernakulam
District,KeralaforanAreaof0.9133Ha. By ShymonAnto
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee decided to direct the proponent to submit the following additional documents
Page 46
/details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates.
f. Recent cluster certificate
7. SIA/KL/MIN/156655/2020,1754/EC3/2020/SEIAA
Granite Building stone quarry of Mr. Deepak Cheerothy at 171/2-2, 171/4 of
Karukutty Village, Aluva Taluk & Ernakulam District for an extend of 0.9600ha
Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee decided to directthe proponent to submit the following additional documents /details:
a. Recent cluster certificate
b. OB dumping details
c. Recent survey map
d. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
e. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
f. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
g. Biodiversity summary in tabular form
h. Detailed water level measurement data of nearby open wells with geo coordinates.
i. Revise drainage plan with sufficient silt traps
Page 47
j. OB dumping location must be shown in the map
8. SIA/KL/MIN/162481/2020,1742/EC4/2020/SEIAA
Environmental Clearance for Laterite Building Stone Quarry of Sri Deepa N.K.
at Sy. No23/798, 23/912ofKalliadVillage,IrittyTaluk, Kannur District
ofKeralaforanextentof0.5567HaunderB2category
Decision: The proponent’s representative and the RQP were present. The RQP made the
presentation. The Committee directed the proponent to submit the following additional
documents /details:
a. Detailed Project Report on the Revised EMP incorporating the specific CER activities in
physical terms to be undertaken by the proponent in consultation with the stakeholders as
stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-
IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under
CER. The CER activities incorporated in the EMP should be undertaken during the first
two years of validity period of the EC so as to ensure that the maintenance of the
interventions undertaken can be done by the proponent during the remaining validity
period of the EC.
b. Revised biodiversity assessment with quantification separately for the core and buffer
areas.
c. A Recent survey map showing distance to residential/public buildings, inhabited sites,
canals, roads, electric lines, mobile towers, religious places etc., within 200 m. radius of
the lease boundary certified by the Village Officer.
d. Biodiversity summary in tabular form
e. Detailed water level measurement data of nearby open wells with geo coordinates
f. Lithological section indicating the profile of the Laterite.
9. SIA/KL/MIN/167079/2020,1787/EC4/2020/SEIAA
Environmental Clearance for Laterite building stone quarry of Mr. George
Joseph,overanextentof0.1942 Ha.ResyNo-143/1 in Perumanna Village,
Kozhikode Taluk, Kozhikode District, Kerala. Decision: The proponent and the RQP were present. The RQP made the presentation. The
Committee decided to recommend the issuance of EC subject to the following specific condition
in addition to the general conditions:
a. Submission of sworn affidavit regarding post-mining activity
10. SIA/KL/MIS/171583/2020, 1789/EC4/2020/SEIAA
Environmental Clearance for the Proposed Commercial cum Special Residential
Building in Ward No. 16, Re.SyNo.128/1,2A, 2BatPanoor
Municipality,PanoorVillage,ThalasseryTaluk,KannurDistrict,Kerala
Page 48
Decision: The consultant and the proponent were present. The consultant made the presentation
The Committee decided to direct the proponent to submit the following documents/details:
a. Details of STP, including details of Tertiary Treatment Unit (Ultra Filtration Unit), with
pre-treatment facilities of PSF and PCF (in continuation to the primary and secondary
type of treatment of sewage with MBBR type ASP), for establishing 150 KLD STP, in
order to ensure quality of treated water, fit for re-use /recycle for Flushing / Gardening/
Fire Fighting/ / HVAC make up water / Recharge of local ground water.
b. Re-examine the cost estimation given for STP, as Rs 52 lakh, considering the secondary
and tertiary treatment, as proposed above.
c. Undertaking that action will be taken for ensuring to use water efficient plumbing
features and twin line plumbing system, for ensuring recycle/reuse of treated waste
water.
d. Earmark a convenient location in the site plan, with sufficient covered storage space, for
non-degradable solid waste (dry waste), for ensuring hygienic storage and periodical
handing over of the same to Recyclers/ Local body.
e. Earmark a convenient location in the basement Floor / at site, for ensuring hygienic
storage space for biodegradable waste (wet waste) and biogas plant, for ensuring usage
of biogas, within the compound.
f. Plan for developing a Compensatory Afforestation Plan, at suitable location inside/
outside the project area, following the norms of minimum of 1 plant per 80 sqm plinth
area, specified in the KMBR.
g. Give details of pumping test conducted, in the two available wells at the proposed site,
for knowing yield, zone of influence of well and aquifer response, while pumping from
a single well as well as from both.
h. Details of storm water drainage plan in the proposed site, considering recharge potential
of proposed water abstraction points in the boundaries and proposed rain water
harvesting.
i. Details of proposed delay pond, and settling facility proposed, for imparting primary
settling of storm water.
j. Plan / Undertaking that, action will be taken for planning and implementing proper
facilities for tapping Solar Energy in the Roof Top of proposed building, (even though
there is a mention of 60 kWp capacity solar water heating system in the EMP), for
harnessing solar power for meeting partial energy requirement and for exploring
possibility for linking it with KSEB power line.
k. Revised CER following the latest MoEF&CC guidelines.
l. Undertaking that action will be taken for ensuring to plan and implement a realistic and
suitable green area development, with suitable species of trees and plants, specifically
suitable for the area .Also committing that vegetation will be adopted appropriately on
the ground as well as over built structure such as roofs, basements, podiums etc.
m. Undertaking that action will be taken for ensuring to plan a climate responsive design as
per Green Building Guidelines and also committing that exposed roof area and covered
parking will be covered with material having high solar reflective index.
n. Undertaking that action will be taken for ensuring that the building design will cater to
the differently-abled citizens.
o. Undertaking that action will be taken for ensuring that the design of the building will
be done in compliance to Energy Building Code as applicable.
Page 49
AGENDA 5
1. SIA/KL/MIN/127534/2019 ,1554/EC1/2019/SEIAA
Environment Clearance for Granite Building Stone Quarry in Sy.No. 340/1-
26/3,340/1-28/2,340/1-30/1,340/1/26-2,340/1/26-1,Enadimangalam Village, Adoor
Taluk, Pathanamthitta District byMr. Mathew Daniel
Decision: Deferred for further scrutiny
2. SIA/KL/MIN/131090/2019 ,1571/EC2/2019/SEIAA
Granite Building Stone Quarry of Mr. Sudheesh A T at Re Survey No: 151/1,
151/7ofKaniyambattaVillage,VythiriTaluk,WayanadDistrict,Kerala foran
areaof1.5875 hectares
Decision: Deferred for further scrutiny
3. SIA/KL/MIN/132322/2019 ,1635/EC1/2020/SEIAA
Granite Building Stone Quarry of Shri. Nino K Thomas‟ over an extent of
2.7213 Ha. (6.7243 Acres) at Re-Survey Block No. 31, Re-survey. Nos. 457/1,
457/2,457/3, 457/4, 457/4-1, 457/5, 457/6 & 457/7, Vadasserikkara Village, Ranni
Taluk, Pathanamthitta District, Kerala
Decision: Deferred for further scrutiny
4. SIA/KL/MIN/133062/2019 ,1576/EC2/2019/SEIAA
Proposed Granite Building Stone Quarry of M/s Valad Granites at SurveyNo.
253/62,253/356,253/349ofValadVillage,ManathavadiTaluk,Wayanad District,
and Kerala for anareaof2.9249hectares
Decision: Deferred for further scrutiny
5. SIA/KL/MIN/134803/2020,1656/EC3/2020/SEIAA
Application for Environmental Clearance for the Granite Building Stone Quarry
project in Re-Survey Nos. 304part (Govt. Land) Parathodu Village, Block No.-
49 of Udumbanchola Taluk, Idukki District, Kerala for an extent of 3.0000
Hectares bySri. Binu George
Decision: Deferred for further scrutiny
6. SIA/KL/MIN/134893/2020 ,1585/EC1/2020/SEIAA
Environmental Clearance for the proposed Granite Building Stone quarry
projectin SurveyNo. 208/1,Alanallur –3 Village, Mannarkkadu Taluk, Palakkad
District, district, M/s PLANETS ANDS&AGGREGATES
Decision: Deferred for further scrutiny
7. SIA/KL/MIN/144086/2020 ,1597/EC4/2020/SEIAA
Environmental Clearance for Laterit Building Stone Quarry of Mr.
Ramachandran, P. at Re-Sy. No- 19/245 of Koodathai Village, Thamarassery
Taluk,KozhikodeDistrictofKeralaforanextentof0.8094HaunderB2 category
Page 50
Decision: Deferred for further scrutiny
8. SIA/KL/MIN/145130/2020 ,1664/EC1/2020/SEIAA
Building Stone Mine( Quarry, Minor Mineral Mining) project ofM/s Capital
Granites at Survey Nos. 2/3&3/2at Shoranur IIVillage, Ottappalam Taluk,
Palakkad District ,Kerala for area of 2.4946 hec
Decision: Deferred for further scrutiny
9. SIA/KL/MIN/148361/2020 ,1641/EC3/2020/SEIAA
Building Stone Quarry of M/s Seas Rock Products at Survey No
426/3,426/4,426/5inNeyyasseryVillage,ThodupuzhaTaluk,IdukkiDistrict, Kerala
State foranextentof1.5163Ha
Decision: Deferred for further scrutiny
10. SIA/KL/MIN/150010/2020,1627/EC4/2020/SEIAA
Environmental Clearance for Laterite building stone quarry project of
Moyimonul Rasheed over an extent of 0.9919 Ha in Re Sy No- 44/1, 41/1 of
Thalakulathur Village, Kozhikode Taluk, Kozhikode District, Kerala.
Decision:
The Committee directed the proponent to upload a detailed drainage plan including the
width, depth and carrying capacity of the channel along with a map depicting the
drainage line up to an existing natural stream in the area. The design of the drainage
channel should be such that there will not be any stagnation of water within mining
area and project site. The map and details submitted earlier is not satisfactory as it does
not contain adequate details. Therefore, the proponent is directed to submit the details
as sought earlier. It is also decided to bring this to the notice of SEIAA.
11. SIA/KL/MIN/158734/2020 ,1768/EC6/2020/SEIAA
Application for Environmental Clearance for the Granite building stone quarry
project in Sy No-157/4 Kuruva Village,Perinthalmanna Taluk, Malappuram
District, Kerala for an area of 0.9789HabyShri. RasheedaliKottakkaran
Decision: Deferred for further scrutiny
12. SIA/KL/MIN/163150/2020 ,1749/EC1/2020/SEIAA
Environmental Clearance for the Proposed Granite (BuildingStone)Quarryin
Re-SurveyNo:129/1,Block No:30inOngallur1Village,PattambiTaluk, Palakkad
District, Kerala by Sri. Musthafa, A
Decision: Deferred for further scrutiny
13. SIA/KL/MIN/171976/2020 ,1851/EC2/2020/SEIAA
(Conversion TOR to EC) Proposed Granite Building Stone Quarry of Mr. P
Abdullaat Re SurveyNo 274/45 ofVillage-Panathady Village, Vellarikund Taluk,
Kasargode District, Kerala for an extent of0.2104 Ha
Decision: Deferred for further scrutiny
Page 51
14. SIA/KL/MIN/32061/2019 ,1622/EC2/2020/SEIAA
Environment Clearance for the Granite Building Stone Quarry of M/s
Nellimunda Granates and Sands Pvt Ltd‟ over an extent of 1.1341Ha (2.8026
Acres) at Re Sy No. 374/752 & 374/738, Valad Village, Mananthavady
Taluk,Wayanad District,KeralaState, for a production capacity of 45,231.25
tonnes per annum.
Decision: Deferred for further scrutiny
15. SIA/KL/MIN/44488/2019 ,1474/EC1/2019/SEIAA
Granite Building Stone Quarry of Sri. Nino K Thomas at Re-Survey Block No.
31,Re-survey.Nos.394/2,461/1&461/4,VadasserikkaraVillage,RanniTaluk,
Pathanamthitta District, Kerala
Decision: Deferred for further scrutiny
16. SIA/KL/MIS/148576/2020 ,1645/EC1/2020/SEIAA
Artech Grand Tower Residential Building Project at Sasthamangalam,
Thiruvananthapuram
Decision: Deferred for further scrutiny
17. SIA/KL/MIS/153603/2020 ,1673/EC2/2020/SEIAA
Environment Clearance for proposed Hospital buildings within the existing Holy
Cross Hospital complex to be developed by M/s Holy Cross Hospital, Kottiyam
Decision: Deferred for further scrutiny
18. SIA/KL/MIS/42326/2018 ,1458/EC3/2019/SEIAA
Capacity Enhancement of Secured Landfill Facility at Existing Common
Hazardous Waste Treatment, Storage and Disposal Facility (TSDF) site
proposedbyKEILatBlockNo.37,SurveyNo.205ofPuthenkurissuVillage,
KunnathunadTaluk, Ernakulam District.
Decision: Deferred for further scrutiny
AGENDA 6
1. SIA/KL/MIN/133902/2019,1678/EC6/2020/SEIAA
Proposed Laterite (Building Stone) Quarry in Re-Survey No. BL 11 239/2 of
Pallikkal Village, Kondotty Taluk, Malappuram District, Kerala for an
extent of 0.1943 Ha under B2 category. (Judgment dt.07.04.2021 in
Page 52
WP(C) No.2667 of 2021)(Copyattached)
Decision: The Committee decided to inform the SEIAA that final decision on the
proposal could not be taken in the light of the minimum distance norms of 200m. for
mining involving blasting and 100m.for mining not involving blasting are stipulated by
the Hon’ble NGT wherein final orders are awaited.
2. SIA/KL/MIN/142917/2020,1659/EC6/2020/SEIAA
Application for Environmental Clearance for the Building Stone Quarry
project in Sy. No‟s 453/1 of Arakkuparamba Village, PerinthalmannaTaluk,
Malappuram District, Kerala for an area of0.6340Ha bySri.Unnikrishnan
Decision: The Committee discussed the Field Inspection Report and decided to direct the
proponent to submit the following documents/details:
a. Recent cluster certificate
b. Details of open well –Depth of water table during post monsoon and its geoco- ordinates
O.B site must be shifted to an appropriate place.
c. Approach road has to be widened from 3m to 7m.
d. Quantitative assessment of biodiversity has to be done separately for core and buffer and
summarised in a tabular form.
e. Considering the lack of space for greening the buffer along BP3 and BP4, a compensatory
afforestation needs to be done and a plan to be prepared and submitted.
3. SIA/KL/MIN/147339/2020,1669/EC6/2020/SEIAA
The building stone quarry project of M/s Granites India is situated at Survey
Nos.98/2pt,98/24 pt(Block No.1)&SurveyNo.428/66 pt (Block No.2)of Edayur
Village of Tirur Taluk, MalappuramDist
Decision: The CER submitted is not yet part of the EMP. EMP incorporating the CER has to
be submitted. The CER also needs to be detailed with physical details of the proposal like
toilet building, solar lights, ambulance and well recharge.
4. SIA/KL/MIN/205474/2021,1444/EC2/2019/SEIAA
Granite Building Stone Quarry of Mr.K.I Joseph (Conversion ToR to EC),
Venganellur Village, ThalappillyTaluk,ThrissurDistrict,SurveyNo.53,Area-
0.9910Ha.
Decision: Deferred for further scrutiny.
5. SIA/KL/MIN/93154/2019,1235/EC2/2019/SEIAA
ApplicationforEnvironmentalClearancefortheGraniteBuildingStoneQuarry
projectinReSy.No92/ptofPulpattaVillage,ErnadTaluk,Malappuram
District,Keralaforanareaof1.7396Ha by Shri.MohammedKunhiHaji
Decision: The Committee discussed the Field Inspection Report and decided to direct the
proponent to submit the following documents/details:
a. The boundary pillars must be fixed to the ground using concrete. The Geo co- ordinates
must be marked on the pillars.
Page 53
b. Details of open well – depth of water table during post monsoon and its Geoco- ordinates
must be provided.
6. SIA/KL/MIS/209935/2021 ,1896/EC1/2021/SEIAA
EnvironmentalClearancefortheproposedbuildingconstructionprojectaspart of
development of IT/ITES campus (Phase-1) to be developed by M/s Tata
Consultancy Services Ltd. (Green Building Certificate)
Decision: The Committee scrutinized the proposal submitted by the proponent. The Committee
decided to invite the proponent for presentation.
CONSIDERATION OF TOR PROPOSAL
1. SIA/KL/MIN/41118/2019,1444/EC2/2019/SEIAA
Submission of Terms of Reference (TOR) for EIA of the mining permit in
respect of “Building StoneQuarryofMr.K.IJoseph”,overanextentof0.9910 Ha.
Survey No. 53/2 in Venganellur Village, Thalappilly Taluk, Thrissur District,
Kerala
Decision: Further decision in this proposal will be taken in the EC Proposal No.
SIA/KL/MIN/205474/2021
2. SIA/KL/NCP/57270/2020,1890/EC3/2021/SEIAA
Residential Building Project – Kent Mahal of M/s. Kent Constructions Pvt. Ltd.,
at Sy. Nos. 141/3, 141/4, 141/5 & 141/8 of Puthencruz Village, Vadavucode
Puthencruz Grama Panchayat, Kunnathunadu Taluk, Ernakulam District,
Kerala State.
Decision: The Committee discussed the proposals. The application of the proponent is
dated 23-10-2020 which is outside the window period for remediation of violation cases
prescribed by MoEF&CC and hence cannot be appraised by SEIAA. These facts have
to be brought to the notice of SEIAA for consideration.
3. SIA/KL/MIN/60375/2021,1884/EC4/2021/SEIAA
TOR (Terms of Reference)for the Proposed Granite Building Stone Quarry over
an area of 5.2794 Ha located At Un Survey (Field No. 2159, 2160, 2162 NotFinal)
in Koodaranji Village, Thamarassery Taluk, Kozhikode District, Kerala.
Category„B‟
Decision: The Committee scrutinized the proposal submitted by the proponent. The Committee
decided to invite the proponent for presentation of ToR.
General Decisions:
It is decided to expedite the field inspection in respect of the proposals for revalidation of
Page 54
EC as there is a time limit stipulated by the Hon‟ble High Court of Kerala.
It is also decided to direct the proponents of the proposals for revalidation of EC to follow
the original mine plan for calculating the life of the mine.
It is decided to convene the next meeting of SEAC during 27th -30th, July, 2021.
The meeting ended at 5pm on 18th June, 2021 with a vote of thanks.
Sd/-
Dr. C. Bhaskaran
Chairman, SEAC
List of members attending the SEAC meeting on 15.06.2021
1 Shri.M.Dileep Kumar 7 Dr.N.Anilkumar
2 Dr.R.Ajayakumar Varma 8 Shri.K.Krishna Panicker
3 Smt.Beena Govindan 9 Shri.V.N.Jithendran
4 Dr.P.S.Easa 10 Dr.A.V.Raghu
5 Shri.G.Sankar 11 Dr.N.Ajithkumar
6 Dr.S.Sreekumar
List of members attending the SEAC meeting on 16.06.2021
1 Shri.M.Dileep Kumar 7 Dr.N.Anilkumar
2 Dr.R.Ajayakumar Varma 8 Shri.K.Krishna Panicker
3 Smt.Beena Govindan 9 Shri.V.N.Jithendran
4 Dr.P.S.Easa 10 Dr.A.V.Raghu
5 Shri.G.Sankar 11 Dr.N.Ajithkumar
6 Dr.S.Sreekumar
Page 55
List of members attending the SEAC meeting on 17.06.2021
1 Shri.M.Dileep Kumar 7 Dr.N.Anilkumar
2 Dr.R.Ajayakumar Varma 8 Shri.K.Krishna Panicker
3 Smt.Beena Govindan 9 Shri.V.N.Jithendran
4 Dr.P.S.Easa 10 Dr.A.V.Raghu
5 Shri.G.Sankar 11 Dr.N.Ajithkumar
6 Dr.S.Sreekumar
List of members attending the SEAC meeting on 18.06.2021
1 Shri.M.Dileep Kumar 7 Dr.N.Anilkumar
2 Dr.R.Ajayakumar Varma 8 Shri.K.Krishna Panicker
3 Smt.Beena Govindan 9 Dr.A.V.Raghu
4 Dr.P.S.Easa 10 Dr.N.Ajithkumar
5 Shri.G.Sankar
6 Dr.S.Sreekumar