Page 1: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

PRESENTATION ON

GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR)

A Truly Matchless Project

Page 2: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Geographical Location of Project

Page 3: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

MISSION MISSION

Page 4: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

VISION & PLANNINGVISION & PLANNING

To create world’s largest fresh water reservoir in sea to store state’s 25% average annual surface water resources by constructing 30 km long dam across the Gulf of Khambhat. This reservoir will store 10500 MCM of surface water.

Page 5: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Surface Water Availability in State

Population –year 2011(India 1230 million)

Geographical Area(India 3065000 sq.km)

Gujarat State 6.39% (196024 sq.km) Surface Water Availability(India -18,69,000 MCM)

Gujarat State 5.0% (60.3 million)

Gujarat State 2.0% (38,000 MCM)5

Page 6: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Per Capita Water Availability in India & Gujarat

Year India Gujarat

Population

(Million)

Per Capita Water

Availability(m3 / annum)

Population

(Million)

Per Capita Water

Availability(m3 / annum)

1961 43.92 4467 20.63 2468

2001 102.70 1901 50.60 990

2011 124.58 1568 60.30 830

2025 1402.13 1393 83.34 601

6

Page 7: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

7

Per Capita Availability of Water (Year 2011)

Page 8: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Region wise Water Resources in Gujarat State

Page 9: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.
Page 10: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Need of the ProjectNeed of the Project

Page 11: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

1. Gujarat is a water scarce state, with 6.39% of geographical area, 5% of population & only 2% of water resources of India.

2. 71% of water resources of Gujarat is available in 25% of geographical area of central & south Gujarat.

3. In Saurashtra region, per capita water availability is only 540 M3/annum against 1700 m3/annum minimum requirement.

4. In Saurashtra region,only 15 lakh ha agricultural land will cover under irrigation (including Sardar Sarovar Project), against 42 lakh ha agricultural land. Hence, 27 lakh ha agricultural land will remain rainfed.

Page 12: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

5. The excessive pumping of groundwater resulted in intrusion of saline water up to 10 km of entire coastal belt of Saurashtra.

6. The rain water storage capacity of Gujarat state is 20480 Mm3 in 196 major & medium reservoirs, against the total rainwater availability of 38000 MCM per annum.

7. Due to non availability of any suitable site for major irrigation scheme in the state, the “Gulf of Khambhat Development Project” is the only option available to store 10,000 MCM rainwater.

Page 13: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

13

Page 14: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

14

Page 15: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

15

Page 16: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.
Page 17: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.
Page 18: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Salient features (Tentative)1. Length of dm (in sea) 30 km

2. Top width of dam 100m wide, 12 lane road + railway

3. Reservoir :

(i) Full Reservoir Level (FRL) (+) 3.0m

(ii) Maximum Water Level (MWL) (+) 5.0m

(iii) Minimum Draw Down Level (MDDL) (-) 4.0m

(iv) Live Storage 10500 mcm

(v) Storage between MWL & FRL 4000 mcm

(vi) Reservoir spread 2000 sq.km

4. Bhadbhut Barrage and Narmada Diversion Canal

(i) Barrage including earthen dykes 10 km

(ii) Narmada Diversion Canal

Discharge 1,00,000 cusecs

Length 34 km

Page 19: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

5. Irrigation command

(i) Water envisaged for irrigation 6500 mcm

(ii) Irrigation 10.54 lakh ha in 39 talukas of 6 districts of Saurashtra region will get irrigation facilities including rejuvenation of rivers and filling of more than 60 existing dams as well as check dams, tidal regulators, spreading channels permanently.

(iii) Envisaged three garland canals : Total pumping stations 11

Level Discharge (cusec)

Length(km)

100m 8000 647

80m 6300 345

50m 2700 151

6. Life of Reservoir 400 to 500 years

7. Ground water improvement in periphery of reservoir

7.0 lakh ha

Page 20: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

8. Extra land to be recovered 1.5 lakh ha to 2 lakh ha

9. Reduction in distance

Bhavnagar – South Gujarat 136 km

10. Ports: Bhavnagar port (will be revived),

Dahej port (to remain out of reservoir),

New ports are proposed at downstream of reservoir.

11. Rivers debouching in the reservoir : Sabarmati, Mahi, Dhadhar,

Narmada (through diversion canal), Limbadi Bhogavo, Sukhbhadar,

Utavali, Keri, Vagad, Kalubhar, Rangholi, Ghelo & Maleshree

12. Construction period for dam 5 to 7 years

Page 21: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Benefits of the ProjectBenefits of the Project

Page 22: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Irrigation Benefit

Page 23: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

10.54 lakh ha. land in 39 talukas of 6 districts of Saurashtra region will get irrigation facilities including rejuvenation of rivers and filling of more than 60 existing dams as well as check dams, tidal regulators, spreading channels permanently.

Irrigation BenefitIrrigation Benefit

Page 24: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

PerceivedPerceived Agricultural BenefitsAgricultural Benefits

Page 25: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Transportation BenefitsTransportation Benefits

Page 26: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Existing RouteNew RouteDam Alignment

Detail of Road Route

Page 27: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

• Substantial saving in travel time and fuel due to reduction in distance by about 136 km between Bhavnagar and Surat/ Mumbai.

• Surat is one of the fastest growing city in the country and the diamond oriented business hub of the world.

• Most of the diamond workers (more than 10 lakhs) are migrated from Saurashtra (Mostly, from Bhavanagr, Amreli district).

Transportation BenefitTransportation Benefit

Page 28: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

• After the completion of dam and Bhadbhut Barrage, the route from Bhavnagar to Surat will be Bhavnagar—Dahej—Hansot—Olpad—Surat.

• New coastal highway will be developed to connect present petro-chemical hub Hazira (Surat) to future petro-chemical hub PCPIR (Dahej).

• 10 lane road is proposed on the top of the dam. 70,118 vehicles per day is estimated for year 2025, and 2,07,529 vehicles per day for year 2055.

• The toll-tax generation is estimated approximately Rs. 1035 crore for year 2025 and Rs. 8257 crore for year 2055.

Page 29: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

• Gulf of Khambhat is one of the Gulf in world having maximum tide of 11 m and the average tide of 8.8 m .

• During the high tide and flood in Narmada, Mahi, Sabarmati river etc., the sea water rise up to level of +7.0 m to +8.0 m from MSL.

• As per present planning, the fresh water reservoir have Full reservoir level at +3.0 m and maximum water level (during flood) is +5.0 m.

Land Reclamation BenefitsLand Reclamation Benefits

Page 30: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

• Hence, the land which is frequently submerged during high tide between permanently opened above EL +5.0 m after closure of the Gulf of Khambhat

• About 2 lakh ha land along the periphery of reservoir will be opened which can be used for the project development.

Land Reclamation BenefitsLand Reclamation Benefits

Page 31: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Levels in m Area in ha

Between 5m to 6m 54236

Between 6m to 7m 106479

Between 7m to 8m 77749

Total 238464

Land Reclamation BenefitsLand Reclamation Benefits

Page 32: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Land recovery (As per BISAG Study)Land recovery (As per BISAG Study)

Page 33: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Value Addition Of LandValue Addition Of Land

(1) Pipeline Important Projects Vicinity

• Dholera SIR

• Fedara International Airport

• PCPIR at Dahej

• Delhi- Mumbai Industrial Corridor

(2) Proposed 10 lane road for Ahmedabad-Bhavnagar route

Page 34: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

3) 2000 sq. km world’s biggest fresh water reservoir (in sea) with 6-lane periphery road of 270 km long

4) Solar and Wind power, Tourism, Bio-fuel park, Transportation, Fisheries etc. project components / benefits

Page 35: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Due to sea water ingress in rivers upto 60 to 70 km, total peripheral ground water in 7,00,000 ha of Bhavnagar, Ahmedabad, Kheda, Anand, Vadodara and Bharuch district has became saline. After post dam scenario, due to only fresh water in rivers / catchment, this saline ground water quality with improve some time.

Ground Water Quality Improvement Ground Water Quality Improvement

Page 36: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Benefit- Port Development on d/s of Dam

Project presents highly attractive locational

attributes for port development downstream of

the dam such as increased water level, lower

current velocity, reduced sedimentation

Page 37: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

37

Station/port location

Without dam With dam DifferenceBetweenTidal ranges

(m)

Tidal range (m)

Tidal range (m)

Bhavnagar 8.82 9.49 0.68Alang 6.11 8.06 1.95Pipavav 2.95 3.81 0.87Jafrabad 2.35 2.74 0.39Simar 2.10 2.23 0.12Dahej 8.46 9.41 0.94Magdalla 5.33 7.15 1.83Hazira 5.52 7.36 1.84Vansi 5.21 6.86 1.65Maroli 4.18 4.93 0.75

TIDE RANGES WITH AND WITHOUT DAM

Page 38: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

38

Station/port location

Without dam With dam Difference in currentSpeed (m)

CurrentSpeed(m/s)

CurrentSpeed(m/s)

Bhavnagar 1.21 0.72 -0.49Alang 1.38 1.00 -0.38Pipavav 1.14 1.23 0.09Jafrabad 0.90 1.49 0.59Simar 0.66 0.88 0.22Dahej 1.87 0.93 -0.94Magdalla 1.00 0.65 -0.35Hazira 1.61 1.86 0.25Vansi 1.16 1.18 0.02Maroli 0.84 1.36 0.53

CURRENT SPEED WITH AND WITHOUT DAM

Page 39: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

NIO MODEL STUDY

i. Model study results show that after the construction of the dam the tide level increases at all the port locations.

i. The currents decrease at the locations near to the dam (Bhavnagar, Ghoga).

i. Sediment transport results indicate that the sediment concentration reduces in the southern gulf (outside the dam) with a maximum reduction at Dahej and Gogha.

Bhavnagar port will be rejuvenated, therefore this region will be speedily developed

Page 40: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Wind and Solar Energy Wind and Solar Energy As per Suzlon Company’s observations for more than one year of two wind mast, the wind velocity more than 6 m/sec & density 200 watt / sq.m is available in periphery of fresh water reservoir.

Suzlon has proposed three wind farm clusters of 2.1 MW, 700 wind turbines generators (1470 MW), which will generate 250 crore unit of electricity which will be sufficient for lifting 10,000 Mm3 water from reservoir.

Page 41: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Wind and Solar Energy Wind and Solar Energy

Total 4500 ha land will be required for erection of 1470 MW wind towers against that 2 lac ha land will be recovered.

Wind farms will be installed after completion of dam on Public Private Partnership & the same land will be used for 800MW to 1000 MW solar panels. Hybrid model has been envisaged to get electricity for 8 to 9 months in a year.

Page 42: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

42

Wind & Solar ParkWind & Solar ParkWind & Solar ParkWind & Solar Park

Page 43: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

Benefits-fisheries DevelopmentBenefits-fisheries Development

• Fish production to the tune of 3,00,000 tonnes per annum amounting to Rs.22,500 Million at full development stage

• Direct employment to approximately 1,00,000 beneficiaries and indirect employment to approximately 3,00,000 beneficiaries.

Page 44: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.

OTHER BENEFITS

• Supply of 900 MCM fresh water for domestic use

• Supply of 500 MCM fresh water for industrial use

• Tourism

• Navigation

Page 45: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.
Page 46: PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) A Truly Matchless Project.