Presentation on Annual Action Plan for IWMP 2014 -15 2014 -15 MIZORAM MIZORAM
19

Presentation on Annual Action Plan for IWMP 2014 - 15

Jan 06, 2016

Download

Documents

hamlet

Presentation on Annual Action Plan for IWMP 2014 - 15. MIZORAM. Summary of IWMP. IWMP – Abstract of Fund Requirement by SLNA during 2014-15. IWMP – Monthly proposed expenditure during 2014-15. IWMP - Fund Requirement for year 2014-15- - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Presentation on

Annual Action Plan for IWMP

2014 -152014 -15

MIZORAMMIZORAM

Page 2: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Summary of IWMPSummary of IWMP

Sr. No Particulars

Year of AppraisalTotal

Batch-I (2009-10)

Batch-II(2010-11)

Batch-III(2011-12)

Batch IV(2012-13)

Batch V(2013-14)

1. No. of Projects 16 16 17 15 14 78

3. Project Area 62435 65880 72094 59144 57782 317335

4. Project Cost (Rs. Cr.) 93.6525 98.82 108.141 88.716 86.673 476.0025

5. Funds received (Rs. in Cr.) Central + State

65.55675 28.6578 21.6282 5.32296 5.20038 126.36609

6. Total Expenditure (Rs. in Cr. ) 65.55675 28.6578 21.6282 5.32296 5.20038 126.36609

7. DPRs sanctioned 16 16 17 15 14 78

8. Projects Closed/ cancellation - - - - -

9. Timelines for DPRs - - - March, 2014

July, 2014 -

Page 3: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

IWMP – Abstract of Fund Requirement by SLNA during 2014-15

Sl. No

.Item

I st Quarter

II nd Quarter

III rd Quarter

IV th Quarter

Total

Unspent Balance

as on 01.04.20

14

Actual requirem

ent(7-8)

(1) (2) (3) (4) (5) (6) (7) (8) (9)

1 Batch-I (Sanctioned in 2009-10)

11.2383 8.42873 5.61915 2.80958 28.09575

0.6005

27.49525

2 Batch-II(Sanctioned in 2010-11)

16.20648 12.1549 8.10324 4.05162 40.5162 40.5162

3 Batch-III( Sanctioned in 2011-12)

21.6282 16.2212 10.8141 5.40705 54.0705 54.0705

4 Batch-IV( Sanctioned in 2012-13)

4.968096 3.72607 2.48405 1.24202 12.42024 12.42024

5 Batch-V(Sanctioned in 2013-14)

4.853688 3.64027 2.42684 1.21342 12.13422 12.13422

6 Batch-VI( To be Sanctioned in 2014-15) 5.04 0 0 0 5.04 5.04

Total 63.934764 44.17117 29.44738 14.72369 152.277 0.6005 151.67641

Page 4: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

IWMP – Monthly proposed expenditure during 2014-15

Sl. No.

Month Proposed expenditure (Rs in lakh)

1 April 3050.002 May 2000.00

3 June 1343.4764

4 July 1015.00

5 August 1402.117

6 September 2000.00

7 October 940.00

8 November 1500.00

9 December 504.738

10 January 872.369

11 February 400.00

12 March 200-00

Total 15227.7

Page 5: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Sr. No.

Budget Component

Total funds

received

Total Expenditure (31.03.2014)

% Expenditu

re

Fund Required for year 2014-

15

Remarks (Timelines

etc.)

1 DPR 93.6525 93.6525 100 -DPR Prepared,uploaded on

website

2 EPA 374.61 374.61 100 - EPA Completed

3 Training & IEC 421.436 421.436 100 46.826

4 Admin. Cost 693.029 693.029 100 243.497

5 Watershed Work 3544.747 3544.747 100 1699.793

6 Livelihood 655.568 655.568 100 187.305

7Production Sys. & microenterprises

655.568 655.568 100 280.958

8 Monitoring 56.192 56.192 100 37.461

9 Evaluation 60.874 60.874 100 32.7784

10 Consolidation 280.958  Total 6555.677 6555.677 100 2809.576

IWMP - Fund Requirement for year 2014-15- Batch-I (Projects sanctioned in 2009-10)

(Amount in lakh)

Page 6: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Sr. No.

Budget Component

Total funds

received

Total Expenditure (31.03.2014)

%

Expenditure

Fund Required for year 2014-

15

Remarks (Timelines

etc.)

1 DPR 98.82 98.82 100 -DPR Prepared,uploaded on

website

2 EPA 395.28 395.28 100 - EPA Completed

3Training & IEC

296.460 296.460 100 148.230

4 Admin. Cost 395.280 395.280 100 335.988

5 Watershed Work 1235.250 1235.250 100 2505.087

6 Livelihood 197.640 197.640 100 494.100

7Production Sys. & microenterprises

197.640 197.640 100 494.100

8 Monitoring 19.764 19.764 100 39.528

9 Evaluation 29.646 29.646 100 34.587

10 Consolidation   Total 2865.78 2865.78 100 4051.62

IWMP - Fund Requirement for year 2014-15- Batch-II (Projects to be sanctioned in 2010-11)

(Amount in lakhs)

Page 7: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Sr. No.

Budget Component

Total funds received

Total Expenditure (31.03.2014)

% Expenditur

e

Fund Required for year 2014-15

Remarks (Timelines

etc.)

1 DPR 108.141 108.141 100 0DPR Prepared,uploaded on

website

2 EPA 432.564 432.564 100 0 EPA Completed

3Training & IEC

324.423 324.423 100 162.212

4 Admin. Cost 216.282 216.282 100 583.961

5 Watershed Work 811.058 811.058 100 3282.079

6 Livelihood 108.141 108.141 100 648.846

7Production Sys. & microenterprises

108.141 108.141 100 648.846

8 Monitoring 21.628 21.628 100 43.256

9 Evaluation 32.442 32.442 100 37.849

10 Consolidation

  Total 2162.82 2162.82 100 5407.049

IWMP - Fund Requirement for year 2014-15- Batch-III(Projects to be sanctioned in 2011-12)

(Amount in lakh)

Page 8: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Sl. No.Budget

Component

Total funds

received

Total Expenditure (31.03.2014)

% Expenditur

e

Fund Required for year 2014-15

Remarks

(Timelines etc.)

1 DPR 88.716 88.716 100 0 March,2014

2 EPA 354.864 354.864 100 0 EPA Completed

3Training & IEC

44.358 44.358 100 221.790

4 Admin. Cost 44.358 44.358 100 133.074

5 Watershed Work 0 0 0 665.370

6 Livelihood 0 0 0 88.716

7Production Sys. & microenterprises

0 0 0 88.716

8 Monitoring 0 0 0 17.743

9 Evaluation 0 0 0 26.615

10 Consolidation

  Total 532.296 532.296 100 1242.024

IWMP - Fund Requirement for year 2014-15- Batch-IV (Projects to be sanctioned in 2012-13)

(Amount in lakhs)

Page 9: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Sl. No.

Budget ComponentTotal funds

receivedTotal Expenditure

(31.03.2014)% Expenditure

100Fund Required for year

2014-15

Remarks (Timelines etc.)

1 DPR 86.673 86.673 100 0 July, 2014

2 EPA 346.692 346.692 100 0 EPA ongoing

3Training & IEC

43.337 43.337 100 216.683

4 Admin. Cost 43.337 43.337 100 130.010

5 Watershed Work 0 0 0 650.048

6 Livelihood 0 0 0 86.673

7Production Sys. & microenterprises

0 0 0 86.673

8 Monitoring 0 0 0 17.335

9 Evaluation 0 0 0 26.002

10 Consolidation 0 0 0

  Total 520.039 520.039 100 1213.424

IWMP - Fund Requirement for year 2014-15- Batch-V (Projects to be sanctioned in 2013-14)

(Amount in lac)

Page 10: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Sr. No. Budget Component Fund Required for year 2014-15Remarks

(Timelines etc.)

1 DPR 84 March,2015

2 EPA 336December, 2014

3Training & IEC

42

4 Admin. Cost 42

5 Watershed Work

6 Livelihood

7 Production Sys. & microenterprises

8 Monitoring

9 Evaluation

10 Consolidation

  Total (100%) 504

IWMP - Fund Requirement for year 2014-15- Batch-VI (Projects to be sanctioned in 2014-15)

(Amount in lakh)

Page 11: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Capacity Building

• Capacity Building Plan for State (for all levels of stakeholders prepared or not.- Preparation of Capacity building plan for PIA, DWCDC and SLNA level is under progress in liaise with SIRD, Mizoram.

• Whether CB Plan approved by SLNA and date of approval by SLNA.- CB plan is not yet completed.

• Whether CB Plan uploaded on SLNA Website or not.- Not yet uploaded.

• Whether Modules of Training have been prepared or not (for all levels of stakeholders)- Yet to be prepared.

Page 12: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Capacity Building• Whether Modules of Training in local language have been approved by

SLNA or not and date of approval.- Not yet approved.

• Whether approved Modules are uploaded on SLNA Website or not.- Not uploaded.

• Whether calendar of Training for 2014-15 have been finalised or not?, if finalised, whether it is uploaded on SLNA’s Website or not.- Not yet

• What is the total budget required for Capacity Building during 2014-15.- 837.74 lakh

Page 13: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Proposed Capacity Building Plan for 2014-15 No. of persons proposed to be trained during 2014-15

All amounts are Rs. in Lakh

Level of stakeholder No. of

Training

No. of Beneficiarie

s Subject of Training program

Name of Training Institute

Proposed Expenditure

SLNA level 12   12 MIS ,GIS,Workshop on

Sensitization,Accountancy,Exposure Visits.

 NIRD,SIRD etc 55.774 

District level (DLRC)  8  28

MIS , Preparation of DPR & PPR ,Accountancy, Exposure visits, GIS, Livelihood and Micro Enterprise, conservation of Natural resources.

 NIRD-NE,SIRD,SLNA,KVK

etc 110.146

WDT level (CLRC)  78  234

 Concept of IWMP, Action Plan , MIS, Exposure Visits, Livelihood and Micro Enterprise, Formation of Self

Help group.

SIRD,SLNA,DDWCDC,KVK,ICAR etc

 314.242

WC level (Village)  10 2710  Concept of IWMP , Exposure Visits, , Formation of Self Help

group.

 SIRD,KVK,RSETI,PIA,DWCDC etc

 314.242

Total          794.404

Page 14: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

IMPLEMENTATION STRATEGY FOR PROJECTS PROPOSED FOR 2014-15

Area allocated for 2014-15 (lakh ha) 56000

No. of Projects 11

No. of Districts 8

Timeline for completing the initial capacity buildingOctober, 2014

Timeline for completion of DPRsMarch, 2015

Completion of EPWDecember, 2014

Constitution of WCsSeptember, 2014

Training of WCsDecember, 2014

Page 15: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

IWMP –Financial Targets for 2014-2015Name of the State : Mizoram

Sr. No. Components

Funds Released up to previous year

(31-3-14)

Expenditure up to previous year

(31-3-14)

Unspent Balance

as on (31-3-

2014)

Annual target for 2014-15

Actual Requirment

of grantIst Qtr IInd Qtr IIIrd Qtr IVth QtrTOTAL

(7+8+9+10)

1 2 4 5 6 7 8 9 10 11 12

1 Administrative cost 1554.497 1554.497

60.05

587.41 440.56 293.71 146.85 1468.53 1408.48

2 Monitoring 97.584 97.584 62.13 46.60 31.06 15.53 155.32 155.32

3 Evaluation 122.962 122.962 63.13 47.35 31.57 15.78 157.83 157.83

4Entry Point Activity

(EPA)1904.01 1904.01 134.40 100.80 67.20 33.60 336.00 336.00

5Institution &

Capacity building1130.014 1130.014 335.10 251.32 167.55 83.77 837.74 837.74

6Detailed Project Report (DPR)

476.003 476.003 33.60 25.20 16.80 8.40 84.00 84.00

7 NRM Work (Total ) 5403.75 5403.75 3371.11 2528.33 1685.55 842.78 8427.77 8416.95

8

Livelihood for the asset-less persons

961.349 961.349 639.72 479.79 319.86 159.93 1599.29 1599.29

9

Production System & Micro-enterprises

1148.654 1148.654 677.18 507.88 338.59 169.29 1692.95 1692.95

10Consolidation

Phase187.31 140.48 93.65 46.83 468.26 468.26

  TOTAL 12798.82 12798.82 0.6005 6091.08 4568.31 3045.54 1522.77 15227.69 15156.82

Page 16: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Name of State: Mizoram

SL.No. Items For Projects sanctioned in

2009-10

For Projects sanctioned in

2010-11

For Projects sanctioned in

2011-12

1 Status of empanelment of Evaluating Agencies Selected Selected Selected

2

Status of Evaluation of Preparatory Phase (completed/ on-going/ not done)

Completed Completed Completed

3 If evaluation not done then timeline for completion. - - -

4

If completed then status of submission of Evaluation Report anlong with ATR to DoLR. (Submitted/ not Submitted)

Submitted Submitted Submitted

5If not submitted, then time line report submission along with ATR

- - -

Status of Evaluation of Preparatory Phase of IWMP

Page 17: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Name of State: Mizoram

SL.No. Items For Projects

sanctioned in 2009-10

For Projects sanctioned in 2010-

11

1 Status of empanelment of Evaluating Agencies Selected Not yet Selected

2Status of Evaluation of Works Phase (completed/ on-going/ not done)

Completed Not Completed

3 If evaluation not done then timeline for completion. Done March,2015

4

If completed then status of submission of Evaluation Report anlong with ATR to DoLR. (Submitted/ not Submitted)

Not Submitted Not Submitted

5If not submitted, then time line report submission along with ATR

15th Aprol,2014 March,2015

Status of Evaluation of Works Phase of IWMP

Page 18: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15

Name of State: Mizoram

SL.No. Items

1 Date of Advertisement Not yet done (Except the Panel of Evaluators selected by SLNA and duely approved by DoLR on 19.7.2012)

2 Status of selection of Agencies  Not yet started.

3If not done then timeline for completion.

 

4

If completed then status of submission of Report along with ATR to DoLR. (Submitted/ not Submitted)

  Not Submitted

5If not submitted, then time line report submission along with ATR

Status of engagement of Agencies for Concurrent Monitoring and Evaluation

Page 19: Presentation  on  Annual Action  Plan  for IWMP 2014 - 15