PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM www.floodcontrolam.com
67

PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

Dec 18, 2015

Download

Documents

Karin Patterson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

PRESENTATIONNATIONAL FLOOD

PROOFING CONFERENCE

TAMPA, FLORIDAMARCH 25 – 29, 2002

FLOOD CONTROL AMERICA

“INVISIBLE FLOOD CONTROL WALLTM”

www.floodcontrolam.com

Page 2: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

MARCH 1997 VENLO, HOLLAND, MAAS RIVER

PHOTO ENCOMPASSES THIS PRESENTATION

FLOOD PROTECTION THAT PRESERVES URBAN RIVERSIDE LIFE

REVOLUTIONARY DEMOUNTABLE FLOOD CONTROL WALL

Page 3: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

EVOLVED FROM COLOGNE, GERMANY MID 1980’S

REPETITIVE RHINE RIVER FLOODING

PATENTED INTERNATIONALLY

“SET THE FLAME BURNING FROM WITHIN”

Page 4: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

ONE MONTH LATER….A DISASTROUS FAILURE STORY

EAST GRAND FORKS, MN – GRAND FORKS, ND

RED RIVER 4/97 FLOOD OF RECORD

EARTHEN LEVEE FAILURE AND OVER-TOPPING

Page 5: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

EAST GRAND FORKS, MN 4/97

FLOOD LEVEL LINE

(8) DRY BUILDINGS REMAINING IN CITY

GARY SAUNDERS, CITY ENGINEER, “THERE MUST BE A BETTER WAY.”

Page 6: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

EAST GRAND FORKS, MN….TODAY A WONDERFUL SUCCESS STORY

FOR FCA… A FIVE YEAR CONTINUING STRUGGLE….SELLING A NEW IDEA TO SOLVE THE NATION’S FLOODING PROBLEMS

SCULPTURE AT CABELA’S, A NEW BUSINESS……

Page 7: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

CABELA’S LOCATED 200 FT BEHIND IFCWTM

Page 8: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

STATUE REPRESENTS IFCWTM PROGRESS….BLUE MOOSE RESTAURANT

NORTH ABUTMENT OF IFCWTM EAST GRAND FORKS, MN

IFCWTM…. A DEMONSTRATION PROJECT BUILT IN 1999

EDA, FEMA, STATE OF MN, ST. PAUL COE, CITY OF EAST GRAND FORKS

Page 9: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

THIS PRESENTATION EMPHASIZES SUCCESS

LOUISVILLE, KY OHIO RIVER

NEW LOUISVILLE SLUGGER FIELD COMPLETED 4/2000

NOTE IFCWTM SILL PLATE

Page 10: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

REVISITING THE OLD

CHAOS AND DESTRUCTION

REPETITIVE WASTE AND LOSS

MONEY DOWN THE DRAIN

Page 11: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

A SWEET SUCCESS STORY…APRIL 2001

FARGO, ND – RED RIVER OF THE NORTH

OAK GROVE LUTHERAN SCHOOL

1997 FLOOD OF RECORD $3.5 MILLION DAMAGE

Page 12: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

OAK GROVE SCHOOL

PROJECT BUILD TIME FIVE MONTHS

IFCWTM (5) ACCESS CLOSURES

PLANKS READY FOR INSTALLATION

Page 13: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

ACCEPTANCE INSTALLATION FEBRUARY 2001

(5) CLOSURES

HEIGHT 4 - 6 FT WIDTH 10 - 17 FT

TIME 1.25 HOURS – CREW OF SIX

Page 14: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

THEN A FLOOD HAPPENED!

3 MONTHS LATER APRIL 2001

LACK OF CHAOS AND DESTRUCTION

NOTE THE CURRENT FLOW

Page 15: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

FARGO, ND SUCCESS STORY

RED RIVER CHANNEL BACKGROUND

PARK, STREET

Page 16: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

FLOOD HEIGHT 2 FT + OR –

FLOW RIGHT TO LEFT

BACKGROUND CHANNEL

A SCHOOL IS SAVED

Page 17: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

NEW IFCWTM TECHNOLOGY AT WORK

LOUISVILLE, KY

UTILIZATION OF HISTORIC RAILROAD STATION

ADJACENT TO OHIO RIVER

Page 18: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

RIVERSIDE DEVELOPMENT

Page 19: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

JANUARY 1937 FLOOD OF RECORD

“COE” CONCRETE WALL

21ST CENTURY CHANGING NEEDS

LOUISVILLE DISTRICT COE AUSPICES

Page 20: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

EXISTING “COE” CONCRETE WALL

REMOVED TO SUB GRADE

IFCWTM INSERTED

INVISIBLE WALL A RESULT

Page 21: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

HOW DOES IT WORK?

THREADED DAYTON ANCHOR

POSITIONED DEEP INTO CONCRETE FOUNDATION

Page 22: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

IFCWTM SILL PLATE POSITIONED ON TOP OF FOOTING

COMPONENTS SET INTO CONCRETE FOUNDATION

Page 23: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

IFCWTM WALL INSTALLATION

PLACE VERTICAL PARTING SUPPORTS

BOLT PASSES THROUGH SILL PLATE INTO THREADS OF

ANCHOR LOCATED IN CONCRETE FOUNDATION

Page 24: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

NEXT….PATENTED ALUMINUM PLANK

SEALED TONGUE AND GROOVE DESIGN

SIDE THRUST RESISTANT

BASE PLANK “FOOT” PROFILE - SEALED

Page 25: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

BASE PLANK ORIENTS WET/DRY SIDE

SEALS ON PLANK AND VERTICAL DRY SIDE

CONTINUOUS DRY SIDE SEAL ALWAYS FACES DRY SIDE

NOTE VERTICAL LOCKING HANDLE

PLANK IS ALLOWED TO FILL WITH WATER AS FLOOD WATERS RISE

Page 26: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

20 FT LENGTHS ON THIS IFCWTM PROJECT

STANDARD PLANK DESIGN, MAX LENGTH 35 FT

PLANK WEIGHT 4.5 POUNDS/LN FT

FOUR MEN TO INSTALL

Page 27: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

LOUISVILLE WALL DIMENSIONS

700 FT LENGTH

4 FT – 9 FT HEIGHT

FIRST TIME INSTALLATION 8 MEN – 12 HOURS

Page 28: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

INTERMEDIATE AND PARTING SUPPORTS

HOLD DOWN CLAMPS

TIGHTEN NUTS ON THREADED RODS

DRAWS SEALS TO A SQUEEZE SET

TIGHT…A SUCTION POP WHEN DISMANTLING

Page 29: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

THE INVISIBLE FLOOD CONTROL WALLTM

STRUCTURAL FLOOD CONTROL…. NOT AS YOU’VE KNOWN IT

IFCWTM….. MINGLES EASILY WITH URBAN SCENE!!

Page 30: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

IFCWTM SILL PLATE ALLOWS UNIMPEDED FOOT TRAFFIC AND DELIVERY VEHICLE ACCESS DIRECTLY OVER INVISIBLE WALL BASE.

Page 31: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

IFCWTM….PROTECTS, PRESERVES AND RECONNECTS

ENJOY… DON’T DESTROY THE RIVER

Page 32: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

BRECKENRIDGE, MN RED RIVER OF THE NORTH

PROTECT AND PRESERVE

HEADWATERS PARK….CULTURAL SHRINE

5 FT CONCRETE WALL AND IFCWTM

4/97 3 FT OF FLOOD WATER

Page 33: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

BRECKENRIDGE INSTALLATION

IFCWTM WALL 4 FT X 90 FT

4 TO 6 MEN 1 ½ - 2 HOURS

Page 34: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

BRECKENRIDGE, MN

WET SIDE FOUNDATION FLUSH TO GROUND

ALL STANDARDIZED COMPONENTS

Page 35: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

STORAGE 4 FT X 90 FT COMPLETE

ONE PALLET 10 FT X 5 FT X 5 FT

VERTICAL SUPPORTS, LOCKING HANDLES

HOLD DOWN CLAMPS

Page 36: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

EAST GRAND FORKS, MN

APRIL 2001 RED RIVER

FLOOD GAUGE ON BRIDGE ABUTMENT

4/97 FLOOD OF RECORD ALMOST TO TOP

Page 37: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

IFCWTM EAST GRAND FORKS, MN

2001 RED RIVER…ALMOST A FLOOD

WITHIN 1 FT OF WALL

Page 38: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

EAST GRAND FORKS, MN IFCWTM “VISIBLE”

MAXIMUM HEIGHT 10 FT ON TOP OF PARAPET WALL

1997 FLOOD EQUAL TO LEVEL OF TOP OF CONCRETE WALL

INTERMEDIATE AND PARTING SUPPORT INSTALLED

Page 39: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

EAST GRAND FORKS, MN IFCWTM

SAME VIEW “INVISIBLE” 99% OF THE TIME

CITY EMPHASIZING RIVER HERITAGE

Page 40: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

EAST GRAND FORKS, MN APRIL 2001

WET SIDE “VISIBLE” – PARTING SUPPORTS

MAXIMUM DIMENSIONS 14 FT X 880 FT

Page 41: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

WET SIDE “INVISIBLE”

LIFE AND BUSINESS AS USUAL

NO LACK OF INVESTOR CONFIDENCE

Page 42: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

EAST GRAND FORKS, MN

DRY SIDE PARTIAL INSTALLATION

DIAGONAL BRACES NOT INSTALLED

Page 43: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

EAST GRAND FORKS, MN DRY SIDE VIEW “INVISIBLE”

Page 44: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

ON A COLD SPRING DAY, ONE CAN SEE THE PROMISE OF SUMMER SIDEWALK TABLES AND COMMUNITY ENJOYMENT OF THE RED RIVER THANKS TO THE IFCWTM

Page 45: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

IFCWTM…. SAVED A CITY’S SOUL

PROVIDES BENIGN FLOOD PROTECTION

$33 MILLION NEW BUSINESS INVESTMENT – 5 YEARS

FLOURISHING CITY CENTER

ST. PAUL DISTRICT “COE” AUSPICES

Page 46: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

EAST GRAND FORKS, MNIFCWTM AWARD WINNING

Page 47: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

CLOSURE REVIEW

SIMILAR TO OAK GROVE SCHOOL….VENLO, HOLLAND

TYPICAL CLOSURE 8 FT X 20 FT – FLUSH SILL PLATE

ABUTMENT CONTAINING LOCKING HANDLES

Page 48: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

CAIRO, IL REPETITIVE FLOOD HISTORY

SOUTHERN TIP OF ILLINOIS

PENINSULA FORMED BY MISSISSIPPI AND OHIO RIVERS

Page 49: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

MEMPHIS DISTRICT “COE” AUSPICES

CAIRO, IL IFCWTM CLOSURES (6)

DIMENSIONS 16 - 18 FT X 4 - 10 FT

INSTALLATION VERTICAL SUPPORTS AND DIAGONAL BRACE

Page 50: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

CAIRO, IL WET SIDE

“STACKING” ALUMINUM PLANKS

TWO MAN JOB – USER FRIENDLY

Page 51: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

CAIRO, IL OHIO RIVER

DRY SIDE DIAGONAL BRACES….PIN CONNECTED

THRUST SHOE/TENSION ROD

“COE”…SOLE SOURCE PURCHASE

Page 52: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

CEDAR FALLS, IA ROCK ISLAND “COE” DISTRICT AUSPICES

(3) CLOSURES WIDTH 20 FT HEIGHT 8 FT

STREET, RAILROAD, BICYCLE PATH

104 FT X 7 FT WALL IFCWTM PROTECTS NATIONAL ARCHIVE BUILDING

Page 53: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

CEDAR FALLS, IA

IFCWTM MORE INGENUITY!

RAILWAY CLOSURE

SPACER TO “BRIDGE” RAIL HEIGHT

OTHERWISE STANDARD COMPONENTS

Page 54: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

SHELBY, OH

WAREHOUSE FACILITY DOORS

FLOOD PROOFING

ATTACHED TO CONCRETE FOUNDATION

Page 55: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

SHIPPING RAMP…

NO PROBLEM!

Page 56: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

LOUISVILLE BASEBALL STADIUM

PLAYING FIELD ACCESS CLOSURE

OHIO RIVER LOOMS IN BACKGROUND

Page 57: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

CLOSURE 8 FT X 26 FT

WET SIDE VIEW

ACCEPTANCE INSTALLATION

ALL COMPONENTS STANDARDIZED

Page 58: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

EAST GRAND FORKS, MN STATE HIGHWAY CLOSURE

ONE OF THREE CLOSURES DIMENSION 60 FT X 14 FT

IFCWTM “VISIBLE”….WET SIDE

TWO MORE CURRENTLY BEING INSTALLED

Page 59: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

EAST GRAND FORKS, MN STATE HIGHWAY 2

60 FT X 14 FT

DRY SIDE – “VISIBLE”

DIAGONAL BRACES

Page 60: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

INVISIBLE CLOSURE 60 FT X 14 FT

ON A TYPICAL DAY….TRAFFIC PASSING THROUGH THE MAIN GATE CLOSURE INTO EAST GRAND FORKS CITY CENTER

Page 61: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

IFCWTM PROTECTS WORLD FAMOUS VELAUS RESTAURANT

VENLO, HOLLAND MAAS RIVER

1996 FLOOD LEVEL TO WINDOW SILL

RESTAURANT – VISUAL PLEASURE OF CLASSIC RIVERSIDE VIEW

Page 62: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

VENLO, HOLLAND

SILL PLATE – STANDARD COMPONENTS

A CITY CENTER THRIVING WITH IFCWTM

Page 63: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

FARGO, ND….FARGODOME

UNIVERSITY OF NORTH DAKOTA

Page 64: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

OVERLAND FLOODING YEAR 2000

INDOOR STADIUM FLOODED….BUILDING AND

FIELD INUNDATED….SOLUTION IFCWTM

INVISIBLE WALL 110 FT X 8 FT

Page 65: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

REPETITIVE THEME..STANDARDIZED COMPONENTS

FROM VENLO, HOLLAND TO FARGO, ND

Page 66: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

IFCWTM – “INVISIBLE”

IFCWTM….IS A PROBLEM SOLVER

OVER (40) INSTALLATIONS IN U.S.

Page 67: PRESENTATION NATIONAL FLOOD PROOFING CONFERENCE TAMPA, FLORIDA MARCH 25 – 29, 2002 FLOOD CONTROL AMERICA “INVISIBLE FLOOD CONTROL WALL TM ” .

FLOOD CONTROL AMERICA

INVISIBLE FLOOD CONTROL WALLTM

www.floodcontrolam.com