sentation Group : 2012 v1 Summary Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1
14

Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Dec 14, 2015

Download

Documents

Frida Castell
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

Resistive Bulk prototyping at Cirea

15 June 2012 @ CERN

Michel Billant

1

Page 2: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

Process

• Status of bulk production

Coverlay Lamination

Development

Curing

Aspect

Gap PCB & Mesh

Last delivery @ CEA in May 2012Tested under 740V ok

Page 3: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

Q2-2012

In process for CERN :

• BXY with resistive layer– Training done by Rui end of March 2012

– Production of 5 units 100 x 100 delivery in June– Production of 5 units 600 x 400 delivery in

September– Production of 5 units 600 x 1500 delivery

beginning of 2013

Page 4: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

RMM

Resitive process :

• Etching the grooves on the external Pcb layer• Carbon printing• Surface leveling• Etching the copper• Measurement

Page 5: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

Grooves Etching

• Wall profile, artwork width adjustment

Page 6: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

Printing

• Grooves Printed

Page 7: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

Carbon leveling

• To ensure to have the right and homogeneos thickness

Page 8: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

Etching

• Remove the copper between Carbon lines

Piste Résist.

L : 196µm

Page 9: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

Inspection

Page 10: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

Resistance Mesurement

Page 11: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

Results

Page 12: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

Restitive layer

• Could be produce with an industrial way

• No main issue detected at this level

• Increased panel sizes will be produced in September 2012.

Page 13: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

Conclusions

• Cirea has now the full knowledge for Bulk Micromegas.

• Restistive layer is starting with good results in small areas.

• The process has to be improved by using industrial processes, to be done this year.

Page 14: Presentation Group : 2012 v1 Resistive Bulk prototyping at Cirea 15 June 2012 @ CERN Michel Billant 1.

Presentation Group : 2012 v1Summary

14

Thanks for Your attention

Contacts :Cirea : Yann Duigou [email protected] : Jean-Pol Thiebaut [email protected]