Page 1: Presentation for Industrial Training

INDUSTRIAL TRAINING (COEB314)7TH MARCH 2016 – 29TH MAY 2016

ABUDZARWAN BIN AMIR ALIEE093532

MUHAMMAD AL FIKRI MARZUKIEE093492

BACHELOR OF ELECTRICAL AND ELECTRONICS ENGINEERING (HONS.)

VISITING LECTURER: ASSOC. PROF. DR. GOH SU MEI

Page 2: Presentation for Industrial Training

Objective of Industrial Training• To experience and understand the real life situation in

industrial organization and environment.

• To build relationship and teamwork within workplace.

• Encourage students to be more independent in dealing with people and problem.

• To apply their theoretical knowledge with application in the industry.

Page 3: Presentation for Industrial Training

Company Profile

• Name of Company : Norangkasa Enterprise Sdn Bhd

• Registration Office : No 78-3, Jalan Radin Tengah,

Bandar Baru Seri Petaling, Sungai Besi,

57000 Kuala Lumpur.

• Share Holders : 100% Bumiputera

• Date of Incorporation : 29th June 1978

• Services/Products : Electrical Contractor (Gred G7)

Page 4: Presentation for Industrial Training

• Projects that had been conducted:

1. Traffic Light Installation at Putrajaya – 2003

2. Aerodrome Ground Lighting at KLIA – 2004

3. Electrical Installation, PA Systems and CCTV Installation at Penjara Kajang – 2004

4. Maintenance work for straight lightings at Putrajaya – 2009-2011

5. Design, Supply and Installation of LED Lighting and Boom Box Equipment for all elevated stations in Mass Rapid Transit (MRT) project– 2012-present

Page 5: Presentation for Industrial Training

ChairmanDato’ Ir.

Mohamad Shokri Bin Abdullah

Project Director

Mr. Mohamad Asri Bin Harun

Project Manager

Syed Alfaizal

Project Engineer

Mohd SyabilNur Hidayah

Project CoordinatorMohd ZakriMohd Faizal

Project Supervisor

Budiman DanrangMohd Hisham

HussainYusri Md Yunus

Project Engineer

Muhammad Adha

Project Coordinator

Wong Guan Sang (Chargeman BO)

Mohd Izham (Chargeman A4)

Project Supervisor

Yusaini HakimJalani Malik

V.Vijakumaran

Contract ManagerIr. Ahmad

Faizul

Office ClerkYusnaini

Adminstrative DirectorMrs. Siti

Sapura Binti Abdullah

Account Executive

Norrida Binti Daud

Organization Chart

Page 6: Presentation for Industrial Training

MRT Route Map

MRT Station MRT Train

MRT Project

Page 7: Presentation for Industrial Training

MRT Contract Hierarchy

MRT Corporation(Project Owner)

MMC Gamuda(Project Delivery Partner)

Main Contractor(Work Project Contractor)

Norangkasa Enterprise(Designated Contractor)

Sub Contractor

Page 8: Presentation for Industrial Training

Norangkasa Main Tender• DESIGN• SUPPLY• INSTALLATION• TEST & COMMISSIONING

FOR LED LIGHTING & LIGHTING BOOM BOX EQUIPMENT FOR ALL ELEVATED STATION EXCEPT UNDERGROUND

Page 9: Presentation for Industrial Training

Training Assignment1. Site Visit

• Site evaluation (the end of month)• Monitor work progress by the sub-contractor• Check delivery order at site• Analyze the amount of infill panel refer to the drawing

2. Office• Completed the drawing for submission• Preparing document for interim progress claim

Page 10: Presentation for Industrial Training

LED Lighting Types

3 types of LED light fixture are installed:a) LED Batten Light Fixture (42W and 25W)b) LED Downlight Fixture (13W)c) LED Façade Light Fixture (72W)

Page 11: Presentation for Industrial Training

• Operation of LED Lighting System

BMS – Building Management System (Main control switch)SPD – Surge Protection Device (electric power supply network)

Page 12: Presentation for Industrial Training

• Type of drawing:1. Lighting layout plan for concourse and platform2. Lighting layout plan with circuitry distribution for concourse and

platform3. Boom box structure detail for platform4. Lighting electrical services schematic diagram

• Step for drawing submission:

Advanced Check Print

Issued For Constructi

onShop

Drawing As Built

Page 13: Presentation for Industrial Training

1. Layout plan

Type Of Drawing

Page 14: Presentation for Industrial Training

2. Layout plan with circuitry distribution

Page 15: Presentation for Industrial Training

3. Led E Boombox Structural Detail at Platform

Page 16: Presentation for Industrial Training

4. Electrical services schematic diagram

Page 17: Presentation for Industrial Training

Safety, Health and Environmental Issues

• Take precautions and be sensitive about safety.• Asking before you touch anything on

site visit.• Chin straps are needed to be fastened

to the safety helmets to make sure that the helmet will not fall off.

Page 18: Presentation for Industrial Training

Conclusion• Increase self confidence level, teamwork and make good

relationship between other employees.

• Expand technical knowledge and skills.

• Disclosure of industrial training can give a real working environment in preparation before graduating.

Page 19: Presentation for Industrial Training

Thank You.